CN109242525A - A kind of preferably move keeps away quiet Selection of Urban Pedestrian Overpass site selecting method - Google Patents

A kind of preferably move keeps away quiet Selection of Urban Pedestrian Overpass site selecting method Download PDF

Info

Publication number
CN109242525A
CN109242525A CN201810785380.2A CN201810785380A CN109242525A CN 109242525 A CN109242525 A CN 109242525A CN 201810785380 A CN201810785380 A CN 201810785380A CN 109242525 A CN109242525 A CN 109242525A
Authority
CN
China
Prior art keywords
overpass
intersection
speed
vehicle
selecting method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810785380.2A
Other languages
Chinese (zh)
Other versions
CN109242525B (en
Inventor
彭卫兵
黄子恒
张豪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University of Technology ZJUT
Original Assignee
Zhejiang University of Technology ZJUT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University of Technology ZJUT filed Critical Zhejiang University of Technology ZJUT
Priority to CN201810785380.2A priority Critical patent/CN109242525B/en
Publication of CN109242525A publication Critical patent/CN109242525A/en
Application granted granted Critical
Publication of CN109242525B publication Critical patent/CN109242525B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0201Market modelling; Market analysis; Collecting market data
    • G06Q30/0204Market segmentation
    • G06Q30/0205Location or geographical consideration
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services

Landscapes

  • Business, Economics & Management (AREA)
  • Strategic Management (AREA)
  • Engineering & Computer Science (AREA)
  • Development Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Accounting & Taxation (AREA)
  • Finance (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Game Theory and Decision Science (AREA)
  • Educational Administration (AREA)
  • Data Mining & Analysis (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Primary Health Care (AREA)
  • Traffic Control Systems (AREA)

Abstract

A kind of preferably move keeps away quiet Selection of Urban Pedestrian Overpass site selecting method, comprising: and (1) judge whether to belong to intersection, if being not belonging to, execute step (2), otherwise, jump procedure (5);(2) collect and handle the traffic information at non-crossing crossing;(3) it calculates vehicle safety when hit probability is less than estimate by design and guarantees speed;(4) according to speed distribution map, the region for guaranteeing speed greater than vehicle safety is selected, step (7) are jumped to;(5) collect and handle the traffic information of intersection;(6) the maximum area ratio of overpass and intersection when hit probability is less than estimate by design;(7) comprehensively consider the factors such as Bridges, environment, determine overpass installation location.Using overline bridge site selecting method of the invention, the casualties that may cause when overpass recurring structure collapses can be reduced to a certain extent, be particularly suitable for that vehicle is more, the city of heavy traffic.

Description

A kind of preferably move keeps away quiet Selection of Urban Pedestrian Overpass site selecting method
Technical field
The invention belongs to traffic programme technical fields, keep away quiet Selection of Urban Pedestrian Overpass addressing side more particularly, to a kind of preferably move Method.
Background technique
In recent years, with the development of economic construction, China's urban transportation is increasingly flourishing, for the passage energy for improving city road network Power ensures pedestrian's street crossing safe ready, and the construction of city pedestrian crossing facilities is increasing, wherein main is exactly overpass Construction.The construction of Selection of Urban Pedestrian Overpass is mentioned to improving running velocity, realizing human and vehicle shunting, improvement congested traffic condition High city dweller's walking quality etc. has good traffic and social benefit, becomes essential composition in each Traffic Systems Part, thus the attention increasingly by urban construction department.
Overpass not only facilitates the daily trip of people, also adds the beautiful landscape of a lot of for city.However Many overpasses are located at the top of the stop line before signal lamp, due at signal lamp often many vehicles at stop line etc. Wait pass through or be prepared to stop wait go, average speed is smaller, once structure problem occurs in overpass, the vehicle of lower section has no way of hiding It keeps away, often will cause more serious accident, there is very big security risk.Not long ago, positioned at FIU people's row day of Midland, MI Bridge is just collapsed, just as bridge is located at the top of stop line before signal lamp, there are many vehicles to meet just when accident occurs Red light is waiting passage, causes biggish casualties and economic loss then.
Overpass reasonable plant-site selection is to guarantee its economy, safety, the important measures of stability and durability.But so far Until, less for the research of overpass addressing both at home and abroad, Selection of Urban Pedestrian Overpass is often used as independent facility.Meanwhile In design, designing unit or designer generally only focus on a certain problem, and the considerations of lack system, this often makes city The cost performance of overpass is difficult to achieve the desired results, and influences the performance of overpass.
In order to reduce security risk, need to design a kind of Selection of Urban Pedestrian Overpass site selecting method, to reduce overpass Recurring structure jeopardizes the probability of passing vehicle under bridge when damaging.
Summary of the invention
The present invention provides a kind of preferably move to keep away quiet Selection of Urban Pedestrian Overpass site selecting method, reduces overpass recurring structure Jeopardize the probability of passing vehicle under bridge when damage.
A kind of preferably move keeps away quiet Selection of Urban Pedestrian Overpass site selecting method, comprising the following steps:
(1) judge whether overpass region yet to be built belongs to intersection, if being not belonging to, execute step (2), if belonging to, Then go to step (5);
(2) it collects and handles to road conditions basic information in favored area, the average speed-traffic density for obtaining the section is bent Line fitted figure and speed distribution map;
(3) it calculates when the damage of overpass recurring structure, the probability of vehicle under bridge is hit, to obtain hit probability Vehicle safety when less than estimate by design guarantees speed;
(4) the speed distribution map for inquiring the section jumps to step after selecting the region for guaranteeing speed greater than vehicle safety (7);
(5) basic information for collecting and handling intersection, the average speed-traffic density for obtaining the intersection are bent Line fitted figure and speed distribution map;
(6) vehicle under bridge is hit when be calculated in favored area when the damage of overpass recurring structure in intersection Probability, thus the maximum area ratio of overpass and intersection when obtaining hit probability less than estimate by design;
(7) comprehensively consider Bridges, environmental factor and social factor, it is final to determine overpass in favored area Installation location.
The present invention solves above the motor vehicle waiting area before overpass in city at this stage is usually located at signal lamp, because This would generally be parked in wait at motor vehicle waiting area there are many vehicle and pass through, once overpass recurring structure collapses, it will and it is right It causes directly to damage wait drive a vehicle under bridge, often will cause great casualties, there is the case where very big security risk.
In step (2), the road conditions basic information includes: lane width, Vehicle Speed, vehicle fleet size etc..
The detailed process of step (3) are as follows:
(3-1) sets lane width as C, and overpass width is set as w, according to calculation of sector " average speed-traffic density Curve matching figure " show that the traffic density of the section is y, and overpass collapses, and to pound the probability of vehicle under bridge be P, then specific public Formula is as follows:
P=y × C × w < Pd (1)
(3-2) searches the correspondence average speed of density y in calculation of sector " average speed-traffic density curve matching figure " V, the as section " safety assurance speed ", " dynamic " in " preferably move keep away quiet " is to be greater than that " safety is protected at this point, mention in this method The average speed of card speed ", similarly, " quiet " is the average speed less than " safety assurance speed ".
In this method, the estimate by design PdIt is true according to road importance degree, economy and applicability index comprehensive It is fixed, it is proposed that 5% < Pd< 20%
The detailed process of step (6) are as follows:
If lane width is C, L at intersection is takenH×LVSquare area be zoning, overpass width sets For w, show that the traffic density of the calculation of sector is y, people according to calculation of sector " average speed-traffic density curve matching figure " Row overline bridge collapses, and to strike the probability of vehicle under bridge be P, and the area ratio of overpass and intersection is ρ, then specific formula is such as Under:
According to measured data, the average speed v of zoning is obtained, search calculation of sector " average speed-traffic density The corresponding traffic density y of average speed v in curve matching figure ", (4) formula of substitution obtain w, obtain (5) formula further according to the w acquired.
The maximum area ratio of the region overpass and intersection regionIt is wanted when building overpass Ensure that the area ratio in overpass and intersection region is less than ρ.
Preferably, for intersection, the Bridges selected are intersection " X " shape in step (7);For non-crossing Crossing, the Bridges selected are line-styled.
When final choice installation location, the landing position for comprehensively considering Bridges, overline bridge ladder access is also needed, economic benefit, And the factors such as difficulty of construction.
The present invention select average speed larger and avoid causing because of factors such as traffic lights the region of vehicle parks as The selection principle of overpass.For non-crossing crossing, by determining safety assurance speed, subsequent being averaged according to the section Overpass is arranged in speed distribution map, the region for selecting average speed to be greater than safety assurance speed.For intersection, design is handed over " X " shape man day row bridge is pitched, by calculating the maximum area ratio of overpass and intersection, to be ensured when building overpass The area ratio in overpass and intersection region is less than maximum area ratio.Overpass can be reduced to a certain extent to tie The casualties that may cause when structure collapses.
Detailed description of the invention
Fig. 1, which is that the present invention is a kind of, preferably moves the flow chart for keeping away quiet Selection of Urban Pedestrian Overpass site selecting method;
Fig. 2 is the floor map that the present invention carries out overline bridge addressing on the arterial traffic at non-crossing crossing;
Fig. 3 is the floor map that the present invention carries out overline bridge addressing on the arterial traffic of intersection.
Specific embodiment
The present invention is further elaborated with reference to the accompanying drawings and detailed description.
As shown in Figure 1, a kind of preferably move keeps away quiet Selection of Urban Pedestrian Overpass site selecting method, comprising:
S01, judge whether overpass region yet to be built belongs to intersection, if being not belonging to, execute step S02, if belonging to, Then go to step S05;
S02, collection simultaneously handle average speed-traffic density song that the section is obtained to road conditions basic information in favored area Line fitted figure and speed distribution map;
S03, to overpass addressing quantitative analysis: according to the average speed of step S02-traffic density curve matching figure, Determine that the probability that vehicle under bridge is hit when the damage of overpass recurring structure is less than PdWhen the minimum average speed of section vehicle Degree, i.e. vehicle safety guarantee speed, specifically include:
(1) lane width is set as C m, and overpass width is set as w m, and according to calculation of sector, " average speed-vehicle is close Write music line fitted figure " show that the traffic density of the section is y/m2, overpass collapse pound vehicle under bridge probability be P, Then specific formula is as follows:
P=y × C × w < Pd (1)
(2) the correspondence average speed v of density y in calculation of sector " average speed-traffic density curve matching figure " is searched, The as section " safety assurance speed ", " dynamic " in " preferably move keep away quiet " is to be greater than " safety assurance at this point, mention in this method The average speed of speed ", similarly, " quiet " is the average speed less than " safety assurance speed ".
Vehicle is by the estimate by design P hit under bridgedIt is comprehensive according to indexs such as road importance degree, economy and applicabilities It closes and determines.Estimate by design P in the present embodimentdTake 5%.
S04, the speed distribution map for inquiring the section jump to step after selecting the region for guaranteeing speed greater than vehicle safety Rapid S07;
S05, collection and the basic information for handling intersection, the average speed-traffic density for obtaining the intersection are bent Line fitted figure and speed distribution map;
S06, in intersection when be calculated in favored area when the damage of overpass recurring structure, hit vehicle under bridge Probability, so that the maximum area ratio of overpass and intersection when obtaining hit probability less than estimate by design, specific to wrap It includes:
(1) lane width is set as C m, takes L at intersectionH m×LVThe square area of m is zoning, people's row day Bridge width is set as w m, and the vehicle of the calculation of sector is obtained according to calculation of sector " average speed-traffic density curve matching figure " Density is y/m2, overpass collapses, and to strike the probability of vehicle under bridge be P, and the area ratio of overpass and intersection is ρ, then specific formula is as follows:
According to measured data, the average speed v of zoning is obtained, search calculation of sector " average speed-traffic density The corresponding traffic density y of average speed v in curve matching figure ", (4) formula of substitution obtain w, obtain (5) formula further according to the w acquired.
(2) determine the maximum area ratio of overpass area Yu intersection region area: the region overpass with intersect The maximum area ratio in crossing regionTo ensure the face of overpass Yu intersection region when building overpass Product is than being less than ρ.
S07, comprehensively consider Bridges, environmental factor and social factor, it is final to determine overpass in favored area Installation location.
As shown in Fig. 2, for non-crossing crossing, by below overpass yet to be built road actual measurement " speed-vehicle is close Write music line fitted figure " and " average speed distribution map ", determine when overpass recurring structure destroys, under bridge vehicle by The probability of shock is less than estimate by design PdWhen the minimum average speed of section vehicle, be denoted as " safety assurance speed ", then according to should The average speed distribution map in section finds average speed less than safety assurance velocity band 3, and remaining area is that average speed is big In the region of safety assurance speed, overpass is set.In the present embodiment, main bridge 1 is selected as line-styled, finally comprehensively considers People's row day is arranged in the region that average speed is greater than safety assurance speed in landing position, environment and the economic factor of fly stair 2 Bridge.
As shown in figure 3, for intersection, using the vehicle at intersection mostly all in the spy of driving status Point, designing main bridge 4 is the man day row bridge for intersecting " X " shape, is erected at intersection, and day bridge is arranged in four ends of main bridge 4 Ladder 5;According to " speed-traffic density curve matching figure " in intersection region, determine that overpass recurring structure destroys When, vehicle is less than estimate by design P by the probability hit under bridgedWhen overpass and intersection maximum area ratio.It is building To ensure that the area ratio in overpass and intersection region is less than maximum area ratio when making overpass.

Claims (6)

1. a kind of preferably move keeps away quiet Selection of Urban Pedestrian Overpass site selecting method, which comprises the following steps:
(1) judge whether overpass region yet to be built belongs to intersection, if being not belonging to, execute step (2) and jumped if belonging to Go to step (5);
(2) it collects and handles to road conditions basic information in favored area, the average speed-traffic density curve for obtaining the section is quasi- Close figure and speed distribution map;
(3) it calculates when the damage of overpass recurring structure, hits the probability of vehicle under bridge, be less than to obtain hit probability Vehicle safety when estimate by design guarantees speed;
(4) the speed distribution map for inquiring the section jumps to step (7) after selecting the region for guaranteeing speed greater than vehicle safety;
(5) basic information for collecting and handling intersection, the average speed-traffic density curve for obtaining the intersection are quasi- Close figure and speed distribution map;
(6) in intersection when be calculated in favored area when the damage of overpass recurring structure, vehicle is general under shock bridge Rate, to obtain the maximum area ratio of overpass and intersection of the hit probability less than estimate by design when;
(7) comprehensively consider Bridges, environmental factor and social factor, it is final to determine overpass to the construction in favored area Position.
2. according to claim 1 preferably move keeps away quiet Selection of Urban Pedestrian Overpass site selecting method, which is characterized in that in step (2), The road conditions basic information includes: lane width, Vehicle Speed, vehicle fleet size.
3. according to claim 1 preferably move keeps away quiet Selection of Urban Pedestrian Overpass site selecting method, which is characterized in that in step (3), The vehicle safety guarantees the calculating process of speed are as follows:
(3-1) calculates the traffic density y under the conditions of estimate by design, formula are as follows:
Wherein, C is lane width, and w is overpass width, PdFor estimate by design;
(3-2) searches traffic density y in calculation of sector average speed-traffic density curve matching figure and corresponds to average speed v, i.e., For the safety assurance speed of the section.
4. according to claim 1 preferably move keeps away quiet Selection of Urban Pedestrian Overpass site selecting method, which is characterized in that in step (6), The maximum area of overpass and intersection compares calculation formula are as follows:
Wherein, PdFor estimate by design, y is traffic density, LHAnd LVFor the side length of the square region at intersection.
5. according to claim 3 or 4 preferably move keeps away quiet Selection of Urban Pedestrian Overpass site selecting method, which is characterized in that described Estimate by design PdIt is determined according to road importance degree, economy and applicability index comprehensive, 5% < Pd< 20%.
6. according to claim 1 preferably move keeps away quiet Selection of Urban Pedestrian Overpass site selecting method, which is characterized in that in step (7), For intersection, the Bridges selected are intersection " X " shape;For non-crossing crossing, the Bridges selected are " one " word Type.
CN201810785380.2A 2018-07-17 2018-07-17 Urban pedestrian overpass site selection method suitable for movement and quiet avoidance Active CN109242525B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810785380.2A CN109242525B (en) 2018-07-17 2018-07-17 Urban pedestrian overpass site selection method suitable for movement and quiet avoidance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810785380.2A CN109242525B (en) 2018-07-17 2018-07-17 Urban pedestrian overpass site selection method suitable for movement and quiet avoidance

Publications (2)

Publication Number Publication Date
CN109242525A true CN109242525A (en) 2019-01-18
CN109242525B CN109242525B (en) 2021-08-24

Family

ID=65072019

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810785380.2A Active CN109242525B (en) 2018-07-17 2018-07-17 Urban pedestrian overpass site selection method suitable for movement and quiet avoidance

Country Status (1)

Country Link
CN (1) CN109242525B (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108009677A (en) * 2017-11-29 2018-05-08 黑龙江鑫联华信息股份有限公司 A kind of site selecting method

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108009677A (en) * 2017-11-29 2018-05-08 黑龙江鑫联华信息股份有限公司 A kind of site selecting method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
汪晓松: ""山地城市桥址复杂风场特性研究"", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *
陈尚和等: ""人行过街天桥( 地道) 选址模型的研究"", 《中国公路学报》 *

Also Published As

Publication number Publication date
CN109242525B (en) 2021-08-24

Similar Documents

Publication Publication Date Title
CN112950946B (en) Method for judging traffic jam reason in construction period of municipal road
CN106530710B (en) A kind of freeway traffic index forecasting method and system towards manager
Thiessen et al. Operating speed models for tangent segments on urban roads
CN108876075B (en) Walking performance evaluation method for urban rail transit site area
CN104182633B (en) Hierarchical traffic operation evaluation method
CN109242525A (en) A kind of preferably move keeps away quiet Selection of Urban Pedestrian Overpass site selecting method
Ignaccolo et al. How to redesign urbanized arterial roads? The case of Italian small cities
CN201010845Y (en) Simple vertical crossing T-shaped intersection
CN109215345B (en) Stop line position determination method for eliminating intersection predicament area
CN104775344A (en) Method for reducing traffic jam
CN108824110A (en) A kind of T-junction road of simplified traffic organization
Al-Anbari et al. Transport sustainability index of main arterials at Hilla case study (safety and environmental aspects)
Weston A methodology to evaluate neighborhood urban form
Lazda et al. Impact of permitted driving speed on the design of urban street network in Latvia
Mhana Evaluation of transportation network in AL-Fallujah city
Rege et al. Improving Safety of Rural Intersection with Approaching Reverse Curve
CN114419873A (en) Health index system evaluation method for urban traffic
Easa Geometric design
Shumin et al. Research on the utilizing features of pedestrian crossing facilities
Mou et al. Study on Emergency Traffic Organization of Urban Road Traffic System under Abnormal State
Paul et al. Case Study-SUSTAINABLE TRANSPORTATION ENGINEERING: creating a sustainable urban area: An Efficient Transportation Network
Khudaiberdiev The System of Measures toProtect Against Noise Emitted by Vehicles in theCity of Samarkand
Zhang et al. Research on Route Selection Model of Road Network Emergency Evacuation under Ice and Snow
El-Shourbagy Transport and Traffic Networks Planning in the New Urban Communities
Lukosius et al. 10. Decision support techniques in urban planning: using a geographical information system for site selection of a new culture and sport hall in Kaunas, Lithuania

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant