CN109240850A - Server DC Reboot test method under a kind of linux system - Google Patents

Server DC Reboot test method under a kind of linux system Download PDF

Info

Publication number
CN109240850A
CN109240850A CN201810954930.9A CN201810954930A CN109240850A CN 109240850 A CN109240850 A CN 109240850A CN 201810954930 A CN201810954930 A CN 201810954930A CN 109240850 A CN109240850 A CN 109240850A
Authority
CN
China
Prior art keywords
log
reboot
test
server
method under
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810954930.9A
Other languages
Chinese (zh)
Inventor
徐东阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Yunhai Information Technology Co Ltd
Original Assignee
Zhengzhou Yunhai Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Yunhai Information Technology Co Ltd filed Critical Zhengzhou Yunhai Information Technology Co Ltd
Priority to CN201810954930.9A priority Critical patent/CN109240850A/en
Publication of CN109240850A publication Critical patent/CN109240850A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/07Responding to the occurrence of a fault, e.g. fault tolerance
    • G06F11/14Error detection or correction of the data by redundancy in operation
    • G06F11/1402Saving, restoring, recovering or retrying
    • G06F11/1415Saving, restoring, recovering or retrying at system level
    • G06F11/1438Restarting or rejuvenating

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Debugging And Monitoring (AREA)

Abstract

Server DC Reboot test method under a kind of linux system proposed by the present invention, pass through perform script, can reboot operation repeatedly be carried out according to test specification and customer requirement automatically, whether monitoring system has the various fail information that report an error such as system hardware, starting self-test in restarting process each time in entire DC Reboot test process, and preserve, it is checked as in attachment insertion report convenient for subsequent analysis.The present invention realizes the DC Reboot test for exempting from AC/DC power source equipment;Various external equipments and space are saved, for example does not need socket and more outlet;It is on duty to be not required to very important person, whole scripts realize automation switching on and shutting down reboot operation and automatically save, remove test macro log.

Description

Server DC Reboot test method under a kind of linux system
Technical field
The present invention relates to field of computer technology, server DC under more particularly to a kind of linux system Reboot test method.
Background technique
With the arrival of big data era, as the server of computing platform core, reliability, stability just receive Various tests.Due to the huge number of server, different properties, how to select reliable, stable server also becomes puzzlement use One problem at family.
Currently, startup stage is easiest to transmission problem in the operational process of server.After server power-up, The all devices of flyback retrace connection in systems, while can all devices be carried out with resource allocation and attempt to carry out all devices Initialization action and self-checking behavior.The problems in very big product design can be exposed in this stage, open in server It moves after completing and entering stable operation stage, the problems in many designs are not easy to reappear instead.Therefore, as long as frequent progress weight Test is opened, allows system to be constantly scanned to all devices, resource allocation, initialization and self-checking behavior, so that it may compare appearance It changes places the quality problems exposed in product design.
So server can be stable under repeated switching starting up, into system and successfully start up all systems Unite software and hardware resources, finally can normal shutdown be the critically important index for measuring its stability and reliability.With Toward we always need to arrange in pairs or groups DC/AC source carry out switching on and shutting down test.Carrying these tools may require that more space and electricity Supply socket, and when test prototype quantity is on the high side or DC/AC source quantity is in short supply, we just can only passively wait, therefore Research and development testing progress can be seriously affected.
Summary of the invention
In view of the above problems, the purpose of the present invention is to provide the test sides server DC Reboot under a kind of linux system Method can carry out reboot operation repeatedly according to test specification and customer requirement, supervise in entire DC Reboot test process Whether control system has the various fail information that report an error such as system hardware, starting self-test in restarting process each time, and preserves, It is checked as in attachment insertion report convenient for subsequent analysis.
The present invention to achieve the above object, is achieved through the following technical solutions: server DC under a kind of linux system Reboot test method, includes the following steps:
Step 1: logging in linux operating system with administrator root user;
Step 2: saving the test log in each restarting process;
Step 3: clearing up the test log in each restarting process;
Step 4: being restarted automatically primary system;
Step 5: opening task schedule, repeat dc reboot operation.
Further, the step 2 includes:
Step 21: generating file dc reboot at path/root/, and generate in dc reboot for saving test The empty file of log;
Step 22: automatically grabbing test log, and will be in the test log write-in empty file.
Further, the test log includes: dmesg log, messages log and bmc log.
Further, the empty file includes: dmesg.txt, messages.txt and bmc.txt.
Further, the step 22 includes: to automatically grab dmesg log, and dmesg log is written in dmesg.txt; Messages log is automatically grabbed, and messages log is written in messages.txt;Bmc log is automatically grabbed, and will Bmc log is written in bmc.txt.
Further, the step 5 includes: to create task schedule by task dispatcher crontab.
Further, the step 5 further include: setting repeats the interval time of dc reboot operation.
Further, the interval time be greater than server from power on booting, into system until normal shutdown it is total when It is long.
The prior art is compared, the beneficial effects of the invention are that: server DC under a kind of linux system proposed by the present invention Reboot test method, by perform script, can automatically according to test specification and customer requirement carry out repeatedly restart behaviour Make, whether monitoring system has system hardware, starting self-test in restarting process each time in entire DC Reboot test process It etc. the various fail information that report an error, and preserves, is checked as in attachment insertion report convenient for subsequent analysis.
The present invention realizes the DC Reboot test for exempting from AC/DC power source equipment;Save various external set Standby and space, for example do not need socket and more outlet;It is on duty to be not required to very important person, whole scripts realize automatic Switching It machine reboot operation and automatically saves, remove test macro log.
It can be seen that compared with prior art, the present invention implementing with substantive distinguishing features outstanding and significant progress Beneficial effect be also obvious.
Detailed description of the invention
Attached drawing 1 is flow chart of the method for the present invention.
Specific embodiment
It explains with reference to the accompanying drawing to a specific embodiment of the invention.
Server DC Reboot test method under a kind of linux system, which is characterized in that include the following steps.
Step 1: logging in linux operating system with administrator root user.
Step 2: saving the test log in each restarting process.
In step 2, specifically comprise the following steps:
Step 21: generating file dc reboot at path/root/, and generate in dc reboot for saving test The empty file of log;
Step 22: automatically grabbing test log, and will be in the test log write-in empty file.
Step 3: clearing up the test log in each restarting process.
In above-mentioned steps, the test log includes: dmesg log, messages log and bmc log.It is described Empty file includes: dmesg.txt, messages.txt and bmc.txt.Therefore, the step 22 specifically: automatically grab Dmesg log, and dmesg log is written in dmesg.txt;Automatically grab messages log, and by messages log It is written in messages.txt;Bmc log is automatically grabbed, and bmc log is written in bmc.txt.
Step 4: being restarted automatically primary system.
Step 5: opening task schedule, repeat dc reboot operation.
Task schedule is opened, specifically includes and task schedule is created by task dispatcher crontab.Repeated Before dc reboot operation, need to set the interval time for repeating dc reboot operation.Moreover, the interval time is big In server from power on booting, into system until normal shutdown total duration.
Server DC Reboot test method can by perform script under a kind of linux system proposed by the present invention Automatically reboot operation repeatedly is carried out according to test specification and customer requirement, is monitored in entire DC Reboot test process Whether system has the various fail information that report an error such as system hardware, starting self-test in restarting process each time, and preserves, and makees To be checked in attachment insertion report convenient for subsequent analysis.
On the basis of the above, specific Program Realizing Method is as follows.
The preservation and cleaning of test log in 1 each restarting process:
DC Reboot test needs to carry out reboot operation repeatedly, especially reliability according to test specification and customer requirement Test needs to be tested in high-low temperature incubator equipment.Need monitoring system every in entire DC Reboot test process Whether there are the various fail information that report an error such as system hardware, starting self-test in restarting process, please preserve, be inserted as attachment Enter and is checked in report convenient for subsequent analysis.Script logging and clear.sh then realizes this effect.
Script logging and clear.sh particular content is as follows:
#!/bin/bash
cat /var/log/dmesg >> /root/dc reboot/dmesg.txt
cat /var/log/messages >> /root/dc reboot/messages.txt
ipmitool sel elist>>/root/dc reboot/bmc.txt
>/var/log/dmesg
>/var/log/messages
ipmitool sel clear
/sbin/reboot
Above-mentioned script logging and clear.sh's is described as follows:
1.1 generate file dc reboot first at path/root/, then open this document folder, generate empty file Dmesg.txt, messages.txt, bmc.txt are convenient for our test log of preservation.
System log dmesg and messages can be automatically grabbed out and replicated by 1.2 following front two row instructions is appended to text It is last in part dmesg.txt, messages.txt.The bmc log of system can be automatically grabbed out and replicated and chased after by the third line It is added to last in file bmc.txt
cat /var/log/dmesg >> /root/dc reboot/dmesg.txt
cat /var/log/messages> > /root/dc reboot/messages.txt
ipmitool sel elist>>/root/de reboot/bmc.txt
1.3 following three rows instructions realize dmesg, messages and the bmc log under clearing systems.
>/var/log/dmesg
>/var/log/messages
ipmitool sel clear
The effect of this instruction of 1.4/sbin/reboot is to be restarted automatically primary system after completing aforesaid operations.
2 open task schedule, and realization repeats dc reboot operation:
But script logging and clear.sh can only realize primary preservation, removes log and restart primary system;Nothing Method realization repeatedly restarts repeatedly and saves each log.It can be realized at this time by task dispatcher crontab.
Therefore, crontab-e carriage return is inputted under system, is created task schedule, is inputted following code:
*/8 * * * * sh /root/logging and clear.sh
Preservation is exited.Wherein/8 represent the script logging and clear.sh of execution in every 8 minutes.Number 8 has to be larger than Server from power on booting, into system until overall length normal shutdown this period, can modify according to the actual situation.
From above-described embodiment it is found that the present invention realizes the DC Reboot test for exempting from AC/DC power source equipment; Various external equipments and space are saved, for example does not need socket and more outlet;It is on duty to be not required to very important person, whole feet This realization automates switching on and shutting down reboot operation and automatically saves, removes test macro log.
With reference to the drawings and specific embodiments, the invention will be further described.It should be understood that these embodiments are merely to illustrate The present invention rather than limit the scope of the invention.In addition, it should also be understood that, after reading the content taught by the present invention, this field Technical staff can make various changes or modifications the present invention, and such equivalent forms equally fall within range defined herein.

Claims (8)

1. server DC Reboot test method under a kind of linux system, which comprises the steps of:
Step 1: logging in linux operating system with administrator root user;
Step 2: saving the test log in each restarting process;
Step 3: clearing up the test log in each restarting process;
Step 4: being restarted automatically primary system;
Step 5: opening task schedule, repeat dc reboot operation.
2. server DC Reboot test method under linux system according to claim 1, which is characterized in that the step Rapid 2 include:
Step 21: generating file dc reboot at path/root/, and generate in dc reboot for saving test The empty file of log;
Step 22: automatically grabbing test log, and will be in the test log write-in empty file.
3. server DC Reboot test method under linux system according to claim 1, which is characterized in that the survey Trying log includes: dmesg log, messages log and bmc log.
4. server DC Reboot test method under linux system according to claim 2, which is characterized in that the sky File includes: dmesg.txt, messages.txt and bmc.txt.
5. server DC Reboot test method under linux system according to claim 4, which is characterized in that the step Rapid 22 include: to automatically grab dmesg log, and dmesg log is written in dmesg.txt;Messages log is automatically grabbed, And messages log is written in messages.txt;Bmc log is automatically grabbed, and bmc log is written in bmc.txt.
6. server DC Reboot test method under linux system according to claim 1, which is characterized in that the step Rapid 5 include: to create task schedule by task dispatcher crontab.
7. server DC Reboot test method under linux system according to claim 1, which is characterized in that the step Rapid 5 further include: setting repeats the interval time of dc reboot operation.
8. server DC Reboot test method under linux system according to claim 1, it is characterised in that: between described Every the time be greater than server from power on booting, into system until normal shutdown total duration.
CN201810954930.9A 2018-08-21 2018-08-21 Server DC Reboot test method under a kind of linux system Pending CN109240850A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810954930.9A CN109240850A (en) 2018-08-21 2018-08-21 Server DC Reboot test method under a kind of linux system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810954930.9A CN109240850A (en) 2018-08-21 2018-08-21 Server DC Reboot test method under a kind of linux system

Publications (1)

Publication Number Publication Date
CN109240850A true CN109240850A (en) 2019-01-18

Family

ID=65070886

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810954930.9A Pending CN109240850A (en) 2018-08-21 2018-08-21 Server DC Reboot test method under a kind of linux system

Country Status (1)

Country Link
CN (1) CN109240850A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110581786A (en) * 2019-09-10 2019-12-17 浪潮商用机器有限公司 Method, device, system and medium for testing communication stability of NCSI (network communication service) network

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080201610A1 (en) * 2007-02-20 2008-08-21 Inventec Corporation Integrated test method on multi-operating system platform
CN103019920A (en) * 2012-12-14 2013-04-03 浪潮电子信息产业股份有限公司 Complete machine non-power-off startup and shutdown method based on Linux system
CN103731663A (en) * 2013-11-29 2014-04-16 乐视致新电子科技(天津)有限公司 Method and device for testing smart television
CN103970660A (en) * 2014-05-19 2014-08-06 浪潮电子信息产业股份有限公司 Total system stability automatic test method based on crontab
CN104536860A (en) * 2015-01-16 2015-04-22 浪潮电子信息产业股份有限公司 Hard disk sequence marshalling method based on real-time JBOD monitoring mode
CN104572422A (en) * 2015-02-03 2015-04-29 浪潮电子信息产业股份有限公司 Memory monitoring achievement method based on startup and shutdown of Linux system
CN105608002A (en) * 2015-12-17 2016-05-25 浪潮电子信息产业股份有限公司 Method for simultaneously capturing all node information of Rack whole cabinet
CN105718340A (en) * 2016-01-13 2016-06-29 浪潮电子信息产业股份有限公司 Crontab based CPU stability testing method
CN106095680A (en) * 2016-06-12 2016-11-09 浪潮电子信息产业股份有限公司 A kind of out of order automated testing method of checking disk being applied to Linux
CN107133147A (en) * 2017-05-09 2017-09-05 郑州云海信息技术有限公司 A kind of method that self-inspection is logged under the platform redhat systems based on OPenPower
CN107168838A (en) * 2017-05-16 2017-09-15 郑州云海信息技术有限公司 A kind of RAID card Auto-Test System
CN107220178A (en) * 2017-05-26 2017-09-29 郑州云海信息技术有限公司 A kind of method that server diagnostic test results quasi real time show
CN107612775A (en) * 2017-09-19 2018-01-19 郑州云海信息技术有限公司 A kind of node two level connects the DC method of testings and system of server
CN107766189A (en) * 2017-10-13 2018-03-06 郑州云海信息技术有限公司 Server restarts the method for testing of stability automatically under a kind of Windows systems

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080201610A1 (en) * 2007-02-20 2008-08-21 Inventec Corporation Integrated test method on multi-operating system platform
CN103019920A (en) * 2012-12-14 2013-04-03 浪潮电子信息产业股份有限公司 Complete machine non-power-off startup and shutdown method based on Linux system
CN103731663A (en) * 2013-11-29 2014-04-16 乐视致新电子科技(天津)有限公司 Method and device for testing smart television
CN103970660A (en) * 2014-05-19 2014-08-06 浪潮电子信息产业股份有限公司 Total system stability automatic test method based on crontab
CN104536860A (en) * 2015-01-16 2015-04-22 浪潮电子信息产业股份有限公司 Hard disk sequence marshalling method based on real-time JBOD monitoring mode
CN104572422A (en) * 2015-02-03 2015-04-29 浪潮电子信息产业股份有限公司 Memory monitoring achievement method based on startup and shutdown of Linux system
CN105608002A (en) * 2015-12-17 2016-05-25 浪潮电子信息产业股份有限公司 Method for simultaneously capturing all node information of Rack whole cabinet
CN105718340A (en) * 2016-01-13 2016-06-29 浪潮电子信息产业股份有限公司 Crontab based CPU stability testing method
CN106095680A (en) * 2016-06-12 2016-11-09 浪潮电子信息产业股份有限公司 A kind of out of order automated testing method of checking disk being applied to Linux
CN107133147A (en) * 2017-05-09 2017-09-05 郑州云海信息技术有限公司 A kind of method that self-inspection is logged under the platform redhat systems based on OPenPower
CN107168838A (en) * 2017-05-16 2017-09-15 郑州云海信息技术有限公司 A kind of RAID card Auto-Test System
CN107220178A (en) * 2017-05-26 2017-09-29 郑州云海信息技术有限公司 A kind of method that server diagnostic test results quasi real time show
CN107612775A (en) * 2017-09-19 2018-01-19 郑州云海信息技术有限公司 A kind of node two level connects the DC method of testings and system of server
CN107766189A (en) * 2017-10-13 2018-03-06 郑州云海信息技术有限公司 Server restarts the method for testing of stability automatically under a kind of Windows systems

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110581786A (en) * 2019-09-10 2019-12-17 浪潮商用机器有限公司 Method, device, system and medium for testing communication stability of NCSI (network communication service) network

Similar Documents

Publication Publication Date Title
CN102314388B (en) Method for testing server supporting intelligent platform management interface
Maji et al. Mitigating interference in cloud services by middleware reconfiguration
US20130311827A1 (en) METHOD and APPARATUS for automatic testing of automation software
CN107612775A (en) A kind of node two level connects the DC method of testings and system of server
CN103106128A (en) Cold startup switch machine test method and cold starting switch machine test system
CN104391780A (en) Method for automatically testing stability of redundancy function of power supply of server
CN111382055B (en) Automatic unit testing method and device based on unified description language
CN103257922A (en) Method for quickly testing reliability of BIOS (basic input output system) and OS (operating system) interface codes
Gupta et al. Mining energy traces to aid in software development: An empirical case study
Mooney Issues in the specification and measurement of software portability
CN108519951A (en) Three node BIOS continuous integratings platforms of one kind and method
CN108121842B (en) Method and device for verifying low-power-consumption working mode of multiprocessor system chip
CN106445787B (en) Method and device for monitoring server core dump file and electronic equipment
CN109240850A (en) Server DC Reboot test method under a kind of linux system
CN110750445A (en) Method, system and equipment for testing high-availability function of YARN component
CN105183598A (en) Reliability test method of server complete machine in cloud computing ecosystem
CN111290942A (en) Pressure testing method, device and computer readable medium
US20110087922A1 (en) Test method and tool for master-slave systems on multicore processors
CN102053888A (en) Self-checking method and system for arithmetic device
CN105912431A (en) Reboot testing method of server, server, control device and system
Garousi Traffic-aware stress testing of distributed real-time systems based on UML models in the presence of time uncertainty
CN103559134A (en) Configuration method and device for benchmark test component
CN107870840A (en) The multiple test instruction automatic execution methods of server based on IPMI
CN112003727A (en) Multi-node server power supply testing method, system, terminal and storage medium
CN111930502A (en) Server management method, device, equipment and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190118