CN109231787A - A kind of device for dehydrating sladge waste - Google Patents

A kind of device for dehydrating sladge waste Download PDF

Info

Publication number
CN109231787A
CN109231787A CN201811408989.4A CN201811408989A CN109231787A CN 109231787 A CN109231787 A CN 109231787A CN 201811408989 A CN201811408989 A CN 201811408989A CN 109231787 A CN109231787 A CN 109231787A
Authority
CN
China
Prior art keywords
sludge
fixed
chamber
pusher
charging chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201811408989.4A
Other languages
Chinese (zh)
Inventor
乐兰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811408989.4A priority Critical patent/CN109231787A/en
Publication of CN109231787A publication Critical patent/CN109231787A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F11/00Treatment of sludge; Devices therefor
    • C02F11/12Treatment of sludge; Devices therefor by de-watering, drying or thickening
    • C02F11/14Treatment of sludge; Devices therefor by de-watering, drying or thickening with addition of chemical agents
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2201/00Apparatus for treatment of water, waste water or sewage
    • C02F2201/002Construction details of the apparatus

Abstract

The invention discloses a kind of device for dehydrating sladge waste, including Treatment of Sludge case and the charging chamber being set in Treatment of Sludge case, sludge bogey is equipped in the charging chamber, the sludge bogey includes multiple sludge boxes, switchover apparatus is equipped in the charging chamber, the power device and the sludge bogey cooperate;Present apparatus mechanism is simple, it is easy to repair, use simplicity, it can be achieved sludge carrying out barrelling, simultaneously to adding sludge dehydrating agent in sludge, when adding sludge dehydrating agent, due to the difference of sludge moisture content, when water content is higher, it is longer to reach the specified wt time under same traffic, sludge dehydrating agent additive amount is more, to realize the sludge dehydrating agent for adding corresponding amount according to sludge moisture content, avoids the waste of sludge dehydrating agent, reach utilization rate maximization, present apparatus whole-course automation, substantially increases treatment effeciency, saves human cost.

Description

A kind of device for dehydrating sladge waste
Technical field
The present invention relates to sludge dewatering technical field, specifically a kind of device for dehydrating sladge waste.
Background technique
The present invention relates to a kind of device for dehydrating sladge waste, the key of Treatment of Sludge is sludge dewatering, and this kind of sludge is generally aqueous Up to 80 or so percent, since sludge is formed by cotton-shaped colloid set, particle is very thin and very soft, when application external force When, gelatinous subparticle will block to form filter bridge, increase the ratio resistance value of filtering, and since soft particle has centainly Compressibility, when external force increases, particle can be very small " film " in filter media surface one layer of hole of formation, so that water be made to be difficult Pass through, dehydration also just seems abnormal difficult;Mechanical dehydration is used merely, and common mechanical pressing method is difficult to release in the water in sludge Out, test proves that this phenomenon is particularly acute between sludge aqueous 65 60 percent to percent, if sludge can take off Water to moisture content weight ratio is 60 percent hereinafter, breaching sludge this " viscose glue phase region ", and sludge just has preferable point Property is dissipated, is just further processed or disposes the condition created for sludge, is based on this, dehydrating agent is largely suitable for sludge dewatering In, but sludge dehydrating agent price is added costly in tradition, as being added according to different moisture content sludge, can reach It is maximized to utilizing, for this reason, it is necessary to which the prior art is further improved.
Summary of the invention
Deficiency in view of the above technology, the invention proposes a kind of device for dehydrating sladge waste, can overcome drawbacks described above.
The present invention is a kind of device for dehydrating sladge waste, including Treatment of Sludge case and the charging being set in Treatment of Sludge case Chamber, is equipped with sludge bogey in the charging chamber, and the sludge bogey includes multiple sludge boxes, in the charging chamber Equipped with switchover apparatus, the power device and the sludge bogey cooperate, when one of sludge bogey fills When full sludge, cooperating the power device and the sludge bogey by the decline of locating rod fills the sludge carrying It sets to switch over and continues to sludge, sewage sludge feed device is equipped in the charging chamber, the sewage sludge feed device is moved with described The cooperation of power switching device, when the sludge bogey switches over, the sewage sludge feed device stops charging, the charging Sludge dehydrating agent adding set is equipped in chamber, the sludge dehydrating agent adding set and the switchover apparatus cooperate, and work as institute When stating sludge bogey and switching over, expeller stops pusher in the sludge dehydrating agent adding set, to stop adding; It further include being equipped with to change a barrel chamber in the Treatment of Sludge case, described change in barrel chamber is equipped with material tank replacement device, can will be processed The sludge box is replaced with the sludge box not charged.
Preferably, the sewage sludge feed device include be fixedly installed on the charging chamber roof and upper end extend to it is extraneous Feed pipe is equipped with the reset case for being fixedly installed on the feed pipe left wall in the charging chamber, is equipped with and closes in the resets case Bar reseting cavity, sliding is equipped with that right end extends in the feed pipe, left end extends to the charging in the closed rod reseting cavity Closed plate in chamber, be equipped in the closed rod reseting cavity be fixedly connected on the closed plate and on the closed rod reseting cavity The reset sliding block that lower wall is slidably matched, the reset sliding block are solid by closed rod reset spring and the closed rod reseting cavity right wall Fixed connection.
Preferably, the sludge dehydrating agent adding set includes being fixedly installed on the charging chamber rear wall to extend on wall body The pusher pipe of end face, pre-and post perforative pusher chamber is equipped in the pusher pipe, and the pusher chamber roof has been threadedly engaged upper end and has prolonged The water-removal additive bucket in the charging chamber is extended to, the charging chamber rear wall extends the rotation of wall body left side and is equipped with pusher shaft, institute It states pusher shaft left end and is fixed with pusher turbine, the pusher on the right side of the pusher turbine is fixed on the pusher shaft and is turned Disk, sliding is equipped with expeller in the pusher chamber, and the expeller right side and the pusher turntable front end face are hinged with pusher Hinge bar.
Preferably, the sludge bogey includes the transaxle for being rotatably dispose in lower wall in the charging chamber, and described turn It changes and is fixed with fixed block on axis, symmetrical bucket fixed plate is fixed on the fixed block, is set in the bucket fixed plate Have perforative for placing the through-hole of sludge box up and down, the sludge box periphery is fixed with limited block, outside the sludge box The conversion that disc is fixed on the upside of the limited block mentions plate, and the mud chamber of upward opening, institute are equipped in the sludge box It states sliding in mud chamber and is equipped with loading plate, the loading plate lower end surface is fixed with locating rod, and the loading plate lower end surface passes through Weight induction spring is fixedly connected with the mud chamber bottom wall, and the mud chamber bottom wall is equipped with upper and lower perforative hole.
Preferably, the switchover apparatus includes the conversion bevel gear for being fixedly installed on the transaxle, the charging Bottom of chamber wall upwardly extends rotation in wall body and is equipped with matching spline set, and the matching spline set right end is fixed with bores with the conversion The conversion of gear engagement cooperates bevel gear, and the reseting cavity being located on the downside of the charging chamber is equipped in the Treatment of Sludge case, described The rotation of reseting cavity bottom wall is equipped with the resetting shaft that upper end is fixedly connected with the transaxle lower end, and the reseting cavity bottom wall rotation is equipped with It resets fitted shaft, the reset fitted shaft and the resetting shaft and is cooperated by resetting pulley mechanism, in the reset fitted shaft End, which is fixed with, resets bevel gear, and reseting cavity rear wall rotation is equipped with wire wheel axis, be fixed on the wire wheel axis rear end with The torsional spring (not shown) that the reseting cavity rear wall is fixedly connected is fixed with positioned at the torsional spring (not shown) on the wire wheel axis And the reset engaged with the reset bevel gear cooperates bevel gear, is fixed with to cooperate positioned at the reset on the wire wheel axis and bore Reset line wheel on front side of gear is arranged with bracing wire in the reset line wheel;It further include being set to the charging chamber and the reset The sliding slot of wall body between chamber, sliding is equipped with that upper end extends to the charging chamber, lower end extends to the reseting cavity in the sliding slot In sliding bar, the bracing wire left end is fixedly connected on the sliding bar, is equipped in the charging chamber and is rotatably dispose in the cunning The spline fitted axis of lever right side, the spline fitted axis right end and the matching spline cover spline fitted, the sliding bar Upper end is fixed with rack bar, and the rack bar upper surface is fixed with axis fixed link, and rotation, which is equipped with, in the axis fixed link cuts Conjunction gear shaft is changed, switching cooperating teeth wheel shaft left end is fixed with switching mate gear, and the switching cooperating teeth wheel shaft is right End is cooperated by the second pulley mechanism and the spline fitted axis, is fixed in the axis fixed link and is matched positioned at the switching The drive splines axis on the upside of gear shaft is closed, the charging chamber left wall is fixed with main motor, and the main motor right end is connected by power There is the power spline housing on right side with the drive splines axis spline fitted;It further include being rotatably dispose in determining for the charging chamber rear wall Position gear shaft is fixed with the positioning gear engaged with the rack bar, the charging chamber rear wall turn on the positioning gear shaft Dynamic to be equipped with the camshaft being located on the upside of the positioning gear shaft, the camshaft and the positioning gear shaft pass through third belt pulley Mechanism cooperates, and the cam that right end offsets with the closed plate left end is fixed on the camshaft;It further include being rotatably dispose in The charging chamber rear wall extends the worm screw in wall body, the worm screw left end and the drive splines axis right end spline fitted, described Worm screw right end is engaged with the pusher turbine.
Preferably, the material tank replacement device include be fixedly installed on it is described change a barrel conversion motor for chamber roof, described turn It changes motor power axis lower end and is fixed with hydraulic cylinder fixed block, hydraulic cylinder, the liquid are fixed in the hydraulic cylinder fixed block Cylinder pressure hydraulic cylinder lower end is fixed with pail bar, and lower end is symmetrically arranged with take-up, the take-up at left and right sides of the pail bar Device includes the take-up motor (not shown) being fixed in the pail bar front end face, take-up motor (not shown) front end It is fixed with shadoof on line shaft and resets line wheel, the shadoof, which resets, is arranged with reset bracing wire, pail bar front end in line wheel Face is fixed with spring retaining plate, and pail bar lower end bilateral symmetry is hinged with box lifting rod, the box lifting rod and the spring It is fixedly connected between fixed plate by shadoof reset spring, the box lifting rod opposing end surface is fixedly connected with the reset bracing wire;
Further include being set to the bunghole that takes for changing barrel chamber right wall and left and right perforation, it is described change barrel bottom of chamber wall and be equipped with put tub.
In conclusion present apparatus mechanism is simple, and it is easy to repair, using simplicity, it can be achieved that sludge is carried out barrelling, and meanwhile it is right Sludge dehydrating agent is added in sludge, when adding sludge dehydrating agent, due to the difference of sludge moisture content, when water content is higher, Reach that the specified wt time is longer, and sludge dehydrating agent additive amount is more under same traffic, is added to realize according to sludge moisture content The sludge dehydrating agent for adding corresponding amount avoids the waste of sludge dehydrating agent, reaches utilization rate and maximizes, present apparatus whole-course automation, Treatment effeciency is substantially increased, human cost is saved.
Detailed description of the invention
It, below will be to embodiment or existing in order to illustrate more clearly of inventive embodiments or technical solution in the prior art Attached drawing needed in technical description is briefly described, it should be apparent that, the accompanying drawings in the following description is only to invent Some embodiments for those of ordinary skill in the art without creative efforts, can also basis These attached drawings obtain other attached drawings.
Fig. 1 is a kind of overall structure diagram of device for dehydrating sladge waste of the invention;
Fig. 2 is structural schematic diagram at A-A in Fig. 1;
Fig. 3 is structural schematic diagram at B in Fig. 1;
Fig. 4 is structural schematic diagram at C in Fig. 1.
Specific embodiment
All features disclosed in this specification or disclosed all methods or in the process the step of, in addition to mutually exclusive Feature and/or step other than, can combine in any way.
Any feature disclosed in this specification (including any accessory claim, abstract and attached drawing), except non-specifically chatting State, can it is equivalent by other or have similar purpose alternative features replaced.That is, unless specifically stated, each feature is An example in a series of equivalent or similar characteristics.
As shown in Figs 1-4, a kind of device for dehydrating sladge waste of apparatus of the present invention, including Treatment of Sludge case 10 and it is set to dirt Charging chamber 69 in mud treatment box 10, sludge bogey is equipped in the charging chamber 69, and the sludge bogey includes Multiple sludge boxes 49, switchover apparatus is equipped in the charging chamber 69, and the power device is matched with the sludge bogey It closes, when one of sludge bogey fills sludge, the power device and the dirt is made by the decline of locating rod 52 The cooperation of mud bogey switches over the sludge bogey to continue to sludge, be equipped in the charging chamber 69 sludge into Expect device, the sewage sludge feed device and the switchover apparatus cooperate, when the sludge bogey switches over, institute It states sewage sludge feed device and stops charging, be equipped with sludge dehydrating agent adding set in the charging chamber 69, the sludge dehydrating agent adds Feeder apparatus and the switchover apparatus cooperate, when the sludge bogey switches over, the sludge dehydrating agent addition Expeller 70 stops pusher in device, to stop adding;It further include being equipped with to change barrel chamber 57 in the Treatment of Sludge case 10, it is described Change in barrel chamber 57 and be equipped with material tank replacement device, can by the processed sludge box 49 and the sludge box 49 not charged into Row replacement.
Beneficial, the sewage sludge feed device includes being fixedly installed on 69 roof of charging chamber and upper end extends to the external world Feed pipe 21, the reset case 81 for being fixedly installed on 21 left wall of feed pipe, the reset case are equipped in the charging chamber 69 Closed rod reseting cavity 82 is equipped in 81, in the closed rod reseting cavity 82 sliding be equipped with right end extend in the feed pipe 21, Left end extends to the closed plate 15 in the charging chamber 69, is equipped in the closed rod reseting cavity 82 and is fixedly connected on the closing Plate 15 and the reset sliding block 80 being slidably matched with lower wall on the closed rod reseting cavity 82, the reset sliding block 80 pass through closed rod Reset spring 79 is fixedly connected with 82 right wall of closed rod reseting cavity.
Beneficial, the sludge dehydrating agent adding set includes being fixedly installed on 69 rear wall of charging chamber to extend wall body The pusher pipe 83 of upper surface, pre-and post perforative pusher chamber 26 is equipped in the pusher pipe 83, and the 26 roof screw thread of pusher chamber is matched Conjunction has upper end to extend to the water-removal additive bucket 22 in the charging chamber 69, and 69 rear wall of charging chamber extends wall body left side and turns Dynamic to be equipped with pusher shaft 27,27 left end of pusher shaft is fixed with pusher turbine 28, is fixed with and is located on the pusher shaft 27 The pusher turntable 72 on 28 right side of the pusher turbine, sliding is equipped with expeller 70 in the pusher chamber 26, and the expeller 70 is right End face and 72 front end face of pusher turntable are hinged with pusher hinge bar 71.
Beneficial, the sludge bogey includes the transaxle 31 for being rotatably dispose in lower wall in the charging chamber 69, institute It states and is fixed with fixed block 30 on transaxle 31, symmetrical bucket fixed plate 54 is fixed on the fixed block 30, it is described It is equipped with the perforative through-hole for being used to place sludge box 49,49 periphery of sludge box up and down in bucket fixed plate 54 and is fixed with limit Position block 51, the conversion that 49 periphery of sludge box is fixed with positioned at 51 upside of limited block propose plate 55, the sludge box The mud chamber 48 of upward opening is equipped in 49, sliding is equipped with loading plate 47,47 lower end surface of loading plate in the mud chamber 48 It is fixed with locating rod 52,47 lower end surface of loading plate connects by the way that weight induction spring 53 and 48 bottom wall of mud chamber are fixed It connects, 48 bottom wall of mud chamber is equipped with upper and lower perforative hole.
Beneficial, the switchover apparatus includes the conversion bevel gear 32 for being fixedly installed on the transaxle 31, described 69 bottom wall of charging chamber upwardly extends in wall body rotation and is equipped with matching spline set 34, the matching spline cover 34 right ends be fixed with The conversion that the conversion bevel gear 32 engages cooperates bevel gear 33, is equipped in the Treatment of Sludge case 10 and is located at the charging chamber 69 The reseting cavity 67 of downside, 67 bottom wall of the reseting cavity rotation are equipped with the resetting shaft that upper end is fixedly connected with 31 lower end of transaxle 58,67 bottom wall of the reseting cavity rotation, which is equipped with, resets fitted shaft 63, and the reset fitted shaft 63 passes through multiple with the resetting shaft 58 Position pulley mechanism 59 cooperates, and 63 upper end of reset fitted shaft, which is fixed with, resets bevel gear 61,67 rear wall of reseting cavity Rotation is equipped with wire wheel axis 60, is fixed with the torsional spring that rear end is fixedly connected with 67 rear wall of reseting cavity on the wire wheel axis 60 (not shown) is fixed on the wire wheel axis 60 positioned at the torsional spring (not shown) and engages with the reset bevel gear 61 Cooperation bevel gear 66 is resetted, is fixed on the wire wheel axis 60 positioned at the reset line wheel for resetting 66 front side of cooperation bevel gear 64, bracing wire is arranged in the reset line wheel 64;It further include being set to wall body between the charging chamber 69 and the reseting cavity 67 Sliding slot 68, sliding is equipped with that upper end extends to the charging chamber 69, lower end extends in the reseting cavity 67 in the sliding slot 68 Sliding bar 40, the bracing wire left end is fixedly connected on the sliding bar 40, is equipped in the charging chamber 69 and is rotatably dispose in institute The spline fitted axis 39 of 40 right side of sliding bar is stated, 39 right end of spline fitted axis covers 34 splines with the matching spline and matches It closes, 40 upper end of sliding bar is fixed with rack bar 38, and 38 upper surface of rack bar is fixed with axis fixed link 17, described Rotation is equipped with switching cooperating teeth wheel shaft 24 in axis fixed link 17, and 24 left end of switching cooperating teeth wheel shaft is fixed with switching cooperation Gear 23,24 right end of switching cooperating teeth wheel shaft are cooperated by the second pulley mechanism 25 with the spline fitted axis 39, institute State the drive splines axis 16 being fixed in axis fixed link 17 positioned at 24 upside of switching cooperating teeth wheel shaft, the charging chamber 69 Left wall is fixed with main motor 11, and 11 right end of main motor has been connected by power right side and 16 spline fitted of drive splines axis Power spline housing 12;It further include the positioning gear shaft 36 for being rotatably dispose in 69 rear wall of charging chamber, the positioning gear shaft The positioning gear 35 engaged with the rack bar 38 is fixed on 36,69 rear wall of the charging chamber rotation is equipped with positioned at described fixed The camshaft 19 of 36 upside of position gear shaft, the camshaft 19 are matched with the positioning gear shaft 36 by third pulley mechanism 37 It closes, the cam 18 that right end offsets with 15 left end of closed plate is fixed on the camshaft 19;It further include being rotatably dispose in 69 rear wall of charging chamber extends the worm screw 29 in wall body, and 29 left end of worm screw is matched with the 16 right end spline of drive splines axis It closes, 29 right end of worm screw is engaged with the pusher turbine 28.
Beneficial, the material tank replacement device includes being fixedly installed on the conversion motor 43 for changing 57 roof of barrel chamber, institute It states 43 line shaft lower end of conversion motor and is fixed with hydraulic cylinder fixed block 44, be fixed in the hydraulic cylinder fixed block 44 hydraulic Cylinder 42, the 42 hydraulic cylinder lower end of hydraulic cylinder are fixed with pail bar 45, and 45 left and right sides lower end of pail bar is symmetrically arranged with Take-up, the take-up includes being fixed in the take-up motor (not shown) of 45 front end face of pail bar, described It is fixed with shadoof on the line shaft of take-up motor (not shown) front end and resets line wheel 74, the shadoof resets to be arranged in line wheel 74 Bracing wire is resetted, 45 front end face of pail bar is fixed with spring retaining plate 77, and 45 lower end of the pail bar bilateral symmetry is hinged There is box lifting rod 73, is fixedly connected between the box lifting rod 73 and the spring retaining plate 77 by shadoof reset spring 78, it is described 73 opposing end surface of box lifting rod is fixedly connected with the reset bracing wire;It further include being set to described to change 57 right wall of barrel chamber and left and right perforation Take bunghole 56, it is described change 57 bottom wall of barrel chamber and be equipped with put tub 46.
In the following, applicant will with reference to attached drawing 1-4 and be described above specifically to introduce the application a kind of sludge it is de- Wetting system: under original state, the drive splines axis 16 cooperates with the worm screw 29, and the change gear 13 is matched with the switching It closes gear 23 not engage, winding bracing wire is relaxation state in the reset line wheel 64;When charging, the main motor 11 starts, institute It states sludge in feed pipe 21 to fall into the mud chamber 48, the power spline housing 12 passes through the drive splines axis 16, described Worm screw 29 drives the pusher turbine 28 to rotate, and the pusher turbine 28 drives the pusher shaft 27 to rotate, the pusher shaft 27 The rotation of pusher turntable 72 is driven to drive the expeller 70 to recycle promotion forward by the pusher hinge bar 71, by sludge Dehydrating agent is pushed into the mud chamber 48, and when reaching specified wt, rack bar 38 described in the lower general who has surrendered of the locating rod 52 is to the left Sliding drives the rotation of positioning gear 35 to drive the camshaft 19 to rotate by the third pulley mechanism 37, described Camshaft 19 drives the rotation of cam 18 to push the closed plate 15 to the right and closes the feed pipe 21, the transmission flower Key axis 16 and the worm screw 29 are detached from, and stop addition sludge dehydrating agent, the switching mate gear 23 and the change gear 13 Engagement, the power spline housing 12 drive the change gear 13 to rotate, and the change gear 13 passes through the switching cooperating teeth Take turns 23, the switching cooperating teeth wheel shaft 24, second pulley mechanism 25, the spline fitted axis 39, the matching spline Set 34, conversion cooperation bevel gear 33 drive the conversion bevel gear 32 to rotate, and the conversion bevel gear 32 drives described turn It changes axis 31 and rotates 180 degree;When replacing bucket, the hydraulic cylinder 42 starts, and the lower general who has surrendered's box lifting rod 73 of the pail bar 45 declines 55 downside of plate is mentioned to the conversion, the hydraulic cylinder 42 starts, and the rising of pail bar 45 carries away the sludge box 49 completely, The starting of conversion motor 43 drives the hydraulic cylinder fixed block 44 to rotate, and completes the replacement of bucket, described hydraulic after the completion of replacement The starting of cylinder 42 declines the pail bar 45, and the box lifting rod 73 is packed up in the take-up motor starting (not shown), the liquid The starting of cylinder pressure 42 resets;When reset, during the transaxle 31 rotates 180 degree, winding in the reset line wheel 64 Bracing wire is tension, and the transaxle 31 drives the resetting shaft 58 to rotate, and the resetting shaft 58 passes through the reset belt Wheel mechanism 59, the reset fitted shaft 63, the reset bevel gear 61 drive the reset cooperation rotation of bevel gear 66 to make The rotation of reset line wheel 64 pulls the sliding bar 40, and the switching mate gear 23 is detached from the change gear 13, institute Stating torsional spring reset (not shown) resets the sliding bar 40 under the cooperation of the top pressure spring 90.
In conclusion present apparatus mechanism is simple, and it is easy to repair, using simplicity, it can be achieved that sludge is carried out barrelling, and meanwhile it is right Sludge dehydrating agent is added in sludge, when adding sludge dehydrating agent, due to the difference of sludge moisture content, when water content is higher, Reach that the specified wt time is longer, and sludge dehydrating agent additive amount is more under same traffic, is added to realize according to sludge moisture content The sludge dehydrating agent for adding corresponding amount avoids the waste of sludge dehydrating agent, reaches utilization rate and maximizes, present apparatus whole-course automation, Treatment effeciency is substantially increased, human cost is saved.
The above, the specific embodiment only invented, but invent protection scope be not limited thereto, it is any without The change or replacement that creative work is expected are crossed, should all be covered within the protection scope of invention.Therefore, the protection scope of invention It should be determined by the scope of protection defined in the claims.

Claims (6)

1. a kind of device for dehydrating sladge waste exists including Treatment of Sludge case and the charging chamber being set in Treatment of Sludge case, feature In: sludge bogey is equipped in the charging chamber, the sludge bogey includes multiple sludge boxes, in the charging chamber Equipped with switchover apparatus, the power device and the sludge bogey cooperate, when one of sludge bogey fills When full sludge, cooperating the power device and the sludge bogey by the decline of locating rod fills the sludge carrying It sets to switch over and continues to sludge, sewage sludge feed device is equipped in the charging chamber, the sewage sludge feed device is moved with described The cooperation of power switching device, when the sludge bogey switches over, the sewage sludge feed device stops charging, the charging Sludge dehydrating agent adding set is equipped in chamber, the sludge dehydrating agent adding set and the switchover apparatus cooperate, and work as institute When stating sludge bogey and switching over, expeller stops pusher in the sludge dehydrating agent adding set, to stop adding; It further include being equipped with to change a barrel chamber in the Treatment of Sludge case, described change in barrel chamber is equipped with material tank replacement device, can will be processed The sludge box is replaced with the sludge box not charged.
2. a kind of device for dehydrating sladge waste according to claim 1, it is characterised in that: the sewage sludge feed device includes fixing Be set to the charging chamber roof and upper end extend to extraneous feed pipe, be equipped in the charging chamber be fixedly installed on it is described into The reset case of expects pipe left wall is equipped with closed rod reseting cavity in the reset case, and sliding is equipped with right end in the closed rod reseting cavity Extend in the feed pipe, left end extends to closed plate in the charging chamber, be equipped with and fix in the closed rod reseting cavity The reset sliding block for being connected to the closed plate and being slidably matched with lower wall on the closed rod reseting cavity, the reset sliding block pass through Closed rod reset spring is fixedly connected with the closed rod reseting cavity right wall.
3. a kind of device for dehydrating sladge waste according to claim 1, it is characterised in that: the sludge dehydrating agent adding set packet It includes and is fixedly installed on the pusher pipe that the charging chamber rear wall extends wall body upper surface, be equipped in the pusher pipe pre-and post perforative Pusher chamber, the pusher chamber roof are threadedly engaged the water-removal additive bucket that upper end extends in the charging chamber, the charging Chamber rear wall extends the rotation of wall body left side and is equipped with pusher shaft, and the pusher shaft left end is fixed with pusher turbine, the pusher shaft On be fixed with pusher turntable on the right side of the pusher turbine, sliding is equipped with expeller, the pusher in the pusher chamber Block right side and the pusher turntable front end face are hinged with pusher hinge bar.
4. a kind of device for dehydrating sladge waste according to claim 1, it is characterised in that: the sludge bogey includes rotation It is set to the transaxle of lower wall in the charging chamber, fixed block is fixed on the transaxle, fixation is set on the fixed block There is symmetrical bucket fixed plate, is equipped in the bucket fixed plate perforative for placing the through-hole of sludge box, the dirt up and down Mud box periphery is fixed with limited block, and the conversion that the sludge box periphery is fixed on the upside of the limited block mentions Plate is equipped with the mud chamber of upward opening in the sludge box, and sliding is equipped with loading plate, the loading plate lower end in the mud chamber Face is fixed with locating rod, and the loading plate lower end surface is fixedly connected by weight induction spring with the mud chamber bottom wall, institute It states mud chamber bottom wall and is equipped with upper and lower perforative hole.
5. a kind of device for dehydrating sladge waste according to claim 1, it is characterised in that: the switchover apparatus includes fixing It is set to the conversion bevel gear of the transaxle, the charging chamber bottom wall upwardly extends rotation in wall body and is equipped with matching spline set, The matching spline set right end is fixed with the conversion engaged with the conversion bevel gear and cooperates bevel gear, the Treatment of Sludge case In be equipped with the reseting cavity being located on the downside of the charging chamber, it is solid that reseting cavity bottom wall rotation is equipped with upper end and the transaxle lower end Surely the resetting shaft connected, the reseting cavity bottom wall rotation, which is equipped with, resets fitted shaft, and the reset fitted shaft and the resetting shaft are logical The cooperation of reset pulley mechanism is crossed, the reset fitted shaft upper end, which is fixed with, resets bevel gear, the reseting cavity rear wall rotation Equipped with wire wheel axis, the torsional spring (not shown) that rear end is fixedly connected with the reseting cavity rear wall, institute are fixed on the wire wheel axis State be fixed on wire wheel axis positioned at the torsional spring (not shown) and with it is described reset bevel gear engage reset cooperation bevel gear, It is fixed on the wire wheel axis and is arranged in the reset line wheel resetted on front side of cooperation bevel gear, the reset line wheel Bracing wire;It further include the sliding slot for being set to wall body between the charging chamber and the reseting cavity, sliding is equipped with upper end in the sliding slot Extend to the charging chamber, lower end extends to sliding bar in the reseting cavity, the bracing wire left end is fixedly connected on the cunning Lever, the spline fitted axis for being rotatably dispose in the sliding bar right side is equipped in the charging chamber, and the spline fitted axis is right End covers spline fitted with the matching spline, and the sliding bar upper end is fixed with rack bar, and the rack bar upper surface is fixed Equipped with axis fixed link, rotation is equipped with switching cooperating teeth wheel shaft in the axis fixed link, and switching cooperating teeth wheel shaft left end is fixed Equipped with switching mate gear, the switching cooperating teeth wheel shaft right end is matched by the second pulley mechanism and the spline fitted axis It closes, the drive splines axis being fixed in the axis fixed link on the upside of the switching cooperating teeth wheel shaft, the charging chamber is left Wall is fixed with main motor, and the main motor right end is connected by power power flower of the right side with the drive splines axis spline fitted Key set;Further include the positioning gear shaft for being rotatably dispose in the charging chamber rear wall, is fixed on the positioning gear shaft and institute The positioning gear of rack bar engagement is stated, the charging chamber rear wall rotation is equipped with the camshaft being located on the upside of the positioning gear shaft, The camshaft is cooperated with the positioning gear shaft by third pulley mechanism, and right end and institute are fixed on the camshaft State the cam that closed plate left end offsets;It further include the worm screw being rotatably dispose in the charging chamber rear wall extension wall body, the snail Bar left end and the drive splines axis right end spline fitted, the worm screw right end are engaged with the pusher turbine.
6. a kind of device for dehydrating sladge waste according to claim 1, it is characterised in that: the material tank replacement device includes fixing A barrel conversion motor for chamber roof is changed described in being set to, conversion motor line shaft lower end is fixed with hydraulic cylinder fixed block, institute It states and is fixed with hydraulic cylinder in hydraulic cylinder fixed block, cylinder hydraulic cylinder lower end is fixed with pail bar, the pail bar Left and right sides lower end is symmetrically arranged with take-up, and the take-up includes being fixed in the take-up of the pail bar front end face Motor (not shown) is fixed with shadoof on the line shaft of take-up motor (not shown) front end and resets line wheel, and the shadoof is multiple Reset bracing wire is arranged on bit line wheel, the pail bar front end face is fixed with spring retaining plate, pail bar lower end or so It symmetrically is hinged with box lifting rod, is fixedly connected between the box lifting rod and the spring retaining plate by shadoof reset spring, it is described Box lifting rod opposing end surface is fixedly connected with the reset bracing wire;It further include being set to described to change taking for barrel chamber right wall and left and right perforation Bunghole, it is described change barrel bottom of chamber wall be equipped with put tub.
CN201811408989.4A 2018-11-23 2018-11-23 A kind of device for dehydrating sladge waste Withdrawn CN109231787A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811408989.4A CN109231787A (en) 2018-11-23 2018-11-23 A kind of device for dehydrating sladge waste

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811408989.4A CN109231787A (en) 2018-11-23 2018-11-23 A kind of device for dehydrating sladge waste

Publications (1)

Publication Number Publication Date
CN109231787A true CN109231787A (en) 2019-01-18

Family

ID=65076467

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811408989.4A Withdrawn CN109231787A (en) 2018-11-23 2018-11-23 A kind of device for dehydrating sladge waste

Country Status (1)

Country Link
CN (1) CN109231787A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109945012A (en) * 2019-04-03 2019-06-28 杭州谷典服饰有限公司 A kind of aqueduct detection device
CN110078347A (en) * 2019-06-06 2019-08-02 丽水莲都晶格智能科技有限公司 A kind of Centrifugal sludge dehydration machine bigger than organizing for sludge
CN110283673A (en) * 2019-05-13 2019-09-27 杭州圣檀服饰有限公司 A kind of automatic die molding method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109945012A (en) * 2019-04-03 2019-06-28 杭州谷典服饰有限公司 A kind of aqueduct detection device
CN110283673A (en) * 2019-05-13 2019-09-27 杭州圣檀服饰有限公司 A kind of automatic die molding method
CN110078347A (en) * 2019-06-06 2019-08-02 丽水莲都晶格智能科技有限公司 A kind of Centrifugal sludge dehydration machine bigger than organizing for sludge

Similar Documents

Publication Publication Date Title
CN109231787A (en) A kind of device for dehydrating sladge waste
CN207949929U (en) A kind of facing automatic rinser
CN108423965A (en) A kind of sludge treating system and method for sludge treatment
CN109231788A (en) A method of sludge dewatering is carried out using device for dehydrating sladge waste
CN206448248U (en) A kind of hydraulic engineering lift water conservancy gate
CN110905987A (en) Swing mechanism of drying device for clothing production
CN110078347A (en) A kind of Centrifugal sludge dehydration machine bigger than organizing for sludge
CN213378184U (en) Raw materials belt cleaning device is used in tea-seed oil production
CN212024941U (en) New forms of energy sewage treatment plant
CN102720042A (en) Mechanism for automatically opening upper cover of washing machine
CN217676754U (en) Honey filling machine
CN108343122B (en) Hand-free contact type water supply device combined with garbage containing device
CN112273681B (en) Be used for abluent dewatering device of vegetables
CN102410711A (en) Light-emitting diode dehydrator
CN215142810U (en) Be used for abluent environment-friendly machinery
CN104588271A (en) Automatic glue dispensing machine for electronic chips
CN209234851U (en) A kind of tealeaves production cooling device
CN209396347U (en) A kind of storage device making concrete material
CN209594661U (en) A kind of rolling machine
CN208540701U (en) A kind of de- thorn cleaning device of seedless roxburgh rose
CN201217746Y (en) Novel washing machine
CN207659298U (en) A kind of sludge dehydration device with shock-absorbing denoising function
CN108726730A (en) A kind of processing method of papermaking factory production waste water
CN110624896A (en) Rotatory belt cleaning device of ultrasonic wave suitable for irregular article
CN204146170U (en) A kind of portable fish-egg debonding device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20190118

WW01 Invention patent application withdrawn after publication