CN109231295A - Autocontrol method for electrochemical heavy metals sewage disposal system - Google Patents

Autocontrol method for electrochemical heavy metals sewage disposal system Download PDF

Info

Publication number
CN109231295A
CN109231295A CN201811123740.9A CN201811123740A CN109231295A CN 109231295 A CN109231295 A CN 109231295A CN 201811123740 A CN201811123740 A CN 201811123740A CN 109231295 A CN109231295 A CN 109231295A
Authority
CN
China
Prior art keywords
sewage
time
solenoid valve
processing pond
passed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201811123740.9A
Other languages
Chinese (zh)
Inventor
蔡小春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811123740.9A priority Critical patent/CN109231295A/en
Publication of CN109231295A publication Critical patent/CN109231295A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/008Control or steering systems not provided for elsewhere in subclass C02F
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2209/00Controlling or monitoring parameters in water treatment
    • C02F2209/005Processes using a programmable logic controller [PLC]

Abstract

The present invention discloses a kind of autocontrol method for electrochemical heavy metals sewage disposal system, comprising: obtains the first processing pond and corresponds to the time t1 that content of beary metal is reduced to amount up to standard;It obtains second processing pond and corresponds to the time t2 that content of beary metal is reduced to amount up to standard;It obtains third processing pond and corresponds to the time t3 that content of beary metal is reduced to amount up to standard;Settling time fitting function T (t, m), time match function T (t, m) mapping relations of the sewage treatment time of m content and the time that agent fully reacting is attached containing heavy metal in heavy metal containing sewage of a unit are provided, measure the content m of the medium sewage to be processed of a cycle, t1, t2, t3 are updated to time match function T (t, m) with m respectively, calculate sewage treatment time T1, T2, T3 of corresponding m content;Then the opening time of first solenoid valve is set by controller programming are as follows: the T0+T1+ reasonable turnaround time;The opening time T0+T1+T2+ reasonable turnaround time of second solenoid valve is set;The opening time T0+T1+T2+T3+ reasonable turnaround time of third solenoid valve is set.

Description

Autocontrol method for electrochemical heavy metals sewage disposal system
Technical field
The present invention relates to electrochemical heavy metals sewage treatment fields, especially a kind of to be used for electrochemical heavy metals sewage treatment The autocontrol method of system.
Background technique
Electrochemistry is the charged interface phenomenon for studying the formation of two class conductors and the science of the variation occurred thereon.Electricity and change Learning reaction interaction can be completed by battery, and high voltage electrostatic discharge can also be used to realize;Electrochemistry often specially refers to " electricity The science in pond ".Many heavy metal pollutions, such as common mercury, lead and chromium ion pollution, traditional electrochemistry are generated in electrochemistry Heavy metal-polluted water process expends time manually inconvenient real-time management, so needing the application of automated control technology to be The management of system not only will affect the efficiency of sewage treatment, very however, the assurance of time cycle is key in automation control To the quality that will affect sewage treatment.
Summary of the invention
In order to overcome deficiency existing for existing technology, the present invention provides a kind of for electrochemical heavy metals sewage treatment system The autocontrol method of system, the technical solution adopted by the present invention to solve the technical problems be the following steps are included:
Step a, the sewage containing electrochemical heavy metals of a unit is passed through into the first processing pond, and will be attached in the first addition bucket Add agent to be added to the first processing pond, obtains the time t1 that corresponding content of beary metal is reduced to amount up to standard;
Step b, the sewage containing electrochemical heavy metals that the first solenoid valve is passed through an above-mentioned unit into second processing pond is opened, and And the additives in the second addition bucket are added to second processing pond, obtain the time that corresponding content of beary metal is reduced to amount up to standard t2;
Step c, the sewage containing electrochemical heavy metals that second solenoid valve is passed through an above-mentioned unit into third processing pond is opened, and And the additives in third addition bucket are added to third processing pond, obtain the time that corresponding content of beary metal is reduced to amount up to standard t3;Step d, settling time fitting function T (t, m), wherein t is being attached containing heavy metal in heavy metal containing sewage for a unit The time of agent fully reacting, m are the unit content of sewage, and time match function T (t, m) provides the sewage treatment time of m content With the mapping relations of the time for being attached agent fully reacting containing heavy metal in heavy metal containing sewage of a unit;
Step e, the content m for measuring the medium sewage to be processed of a cycle, t1, t2, t3 be updated to m to the time respectively to be intended It closes function T (t, m), calculates sewage treatment time T1, T2, T3 of corresponding m content;
Step f, the opening time point T0 of a default sewage treatment, is then arranged opening for the first solenoid valve by controller programming Open the time are as follows: the T0+T1+ reasonable turnaround time;The opening time of second solenoid valve is set by controller programming are as follows: T0+T1+T2 + reasonable turnaround time;The opening time of third solenoid valve is set by controller programming are as follows: when T0+T1+T2+T3+ rationally has enough to meet the need Between, then start the automatic control of controller;
Step g, the sewage of m content is passed through mouth by sewage and is passed through the first processing pond, later adds the additives in the first addition bucket It is added to the first processing pond, completes the removal reaction of heavy metal, sewage is passed through second processing pond after the unlatching of the first solenoid valve, later Additives in second addition bucket are added to second processing pond, the removal reaction of heavy metal is completed, is opened to second solenoid valve Sewage is passed through third processing pond afterwards, and the additives in third addition bucket are added to third processing pond later, complete heavy metal Removal reaction, sewage is passed through indwelling pond after the unlatching of third solenoid valve.
Further, step g, the sewage of m content is later added the additives in the first addition bucket by being passed through the first processing pond It is added to the first processing pond, completes the removal reaction of heavy metal, sewage is passed through second processing pond after the unlatching of the first solenoid valve, later Additives in second addition bucket are added to second processing pond, the removal reaction of heavy metal is completed, is opened to second solenoid valve Sewage is passed through third processing pond afterwards, and the additives in third addition bucket are added to third processing pond later, complete heavy metal Removal reaction, sewage is passed through indwelling pond after the unlatching of third solenoid valve.
Further, step f is therein, and the sewage that the reasonable turnaround time refers to flows needs between former and later two processing ponds Time.
Further, step d is therein, and time match function can be established in advance, and time match function can be according to unit It measures the processing time data containing heavy metal containing sewage with volume and is fitted using deep learning algorithm.
Further, step g is therein, and sewage first passes through first before being passed through second processing pond after the unlatching of the first solenoid valve Tail processing unit is handled.
Further, step g is therein, and sewage first passes through second before being passed through third processing pond after second solenoid valve unlatching Tail processing unit is handled.
Further, step g is therein, and sewage first passes through at third tail before being passed through indwelling pond after the unlatching of third solenoid valve Reason device is handled.
Further, step a/b/c/g, additives therein are for reacting heavy metal and by heavy metals removal;It is therein First tail processing unit and the second tail processing unit, third tail processing unit be used to recycling heavy metal reaction after substance or into The processing of row gas harmless.
The invention has the advantages that may be implemented to calculate volume by the processing time of a unit heavy metal containing sewage content The processing time of heavy metal containing sewage, and then the automation period with planning sewage treatment in advance can be calculated;In the calculating of time Or estimate, the present invention takes efficient time match function, and accuracy can also be improved by not only improving speed;In addition, logical Cross automation control takes the separated mode of classifying to carry out in the heavy metal processing of sewage, improve sewage treatment efficiency and Accuracy.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples.
Fig. 1 is the schematic diagram of one embodiment of electrochemical heavy metals sewage disposal system.
Specific embodiment
In specific implementation, as shown in Figure 1, electrochemical heavy metals sewage disposal system includes the first processing pond 3, second processing Pond 7 and third processing pond 11, the first processing pond 3 is connected on second processing pond 7 and pipeline by pipeline installs the first tail processing dress 4 and first solenoid valve 5 are set, second processing pond 7 is connected in third processing pond 11 and pipeline by pipeline installs the second tail processing dress 8 and second solenoid valve 9 are set, third processing pond 11 is connected on indwelling pond 14 and pipeline by pipeline and installs third tail processing unit 12 With third solenoid valve 13;The connection setting of first processing pond, 3 top and the first addition bucket 2, the connection setting of 7 top of second processing pond is simultaneously Second addition bucket 6, the connection setting of 11 top of third processing pond and third addition bucket 10, the first solenoid valve 5,9 and of second solenoid valve Third solenoid valve 13 is electrical connected with controller 15, and the first processing pond 3 connection sewage is passed through mouth 1.Controller 15 is specifically can Programmed logic controller.
The method of the present invention includes the step of:
Step a, the sewage containing electrochemical heavy metals of a unit is passed through into the first processing pond 3, and will be in the first addition bucket 2 Additives are added to the first processing pond 3, obtain the time t1 that corresponding content of beary metal is reduced to amount up to standard;
Step b, the sewage containing electrochemical heavy metals that the first solenoid valve 5 is passed through an above-mentioned unit into second processing pond 7 is opened, And the additives in the second addition bucket 6 are added to second processing pond 7, corresponding content of beary metal is obtained and is reduced to amount up to standard Time t2;
Step c, it opens second solenoid valve 9 and is passed through the dirty containing electrochemical heavy metals of an above-mentioned unit into third processing pond 11 Water, and the additives in third addition bucket 10 are added to third processing pond 11, it obtains corresponding content of beary metal reduction and reaches The time t3 of scalar;
Step d, settling time fitting function T (t, m), wherein t is being attached containing heavy metal in heavy metal containing sewage for a unit The time of agent fully reacting, m are the unit content of sewage, and time match function T (t, m) provides the sewage treatment time of m content With the mapping relations of the time for being attached agent fully reacting containing heavy metal in heavy metal containing sewage of a unit;
Step e, the content m for measuring the medium sewage to be processed of a cycle, is updated to time match with m respectively for t1, t2, t3 Function T (t, m) calculates sewage treatment time T1, T2, T3 of corresponding m content;
Step f, then the opening time point T0 of a default sewage treatment passes through programming the first solenoid valve 5 of setting of controller 15 Opening time are as follows: the T0+T1+ reasonable turnaround time;The opening time of setting second solenoid valve 9 is programmed by controller 15 are as follows: The T0+T1+T2+ reasonable turnaround time;The opening time of setting third solenoid valve 13 is programmed by controller 15 are as follows: T0+T1+T2+ When T3+ rationally has enough to meet the need, then start controller 15 automatic control;
Step g, the sewage of m content is passed through mouth 1 by sewage and is passed through the first processing pond 3, later by the additives in the first addition bucket 2 It is added to the first processing pond 3, completes the removal reaction of heavy metal, sewage is passed through second processing pond after the unlatching of the first solenoid valve 5 7, the additives in the second addition bucket 6 are added to second processing pond 7 later, the removal reaction of heavy metal are completed, to the second electricity Sewage is passed through third processing pond 11 after magnet valve 9 is opened, and the additives in third addition bucket 10 are added to third processing pond later 11, the removal reaction of heavy metal is completed, sewage is passed through indwelling pond 14 after the unlatching of third solenoid valve 13.
Step f is therein, and the sewage that the reasonable turnaround time refers to flows the time of needs between former and later two processing ponds.
Step d is therein, and time match function can be established in advance, and time match function can be according to unit quantity and volume The processing time data containing heavy metal containing sewage and be fitted using deep learning algorithm.
Step g is therein, and sewage first passes through at the first tail before being passed through second processing pond 7 after the unlatching of the first solenoid valve 5 Reason device 4 is handled.
Step g is therein, and sewage first passes through at the second tail before being passed through third processing pond 11 after the unlatching of second solenoid valve 9 Reason device 8 is handled.
Step g is therein, and sewage first passes through the processing of third tail after the unlatching of third solenoid valve 13 before being passed through indwelling pond 14 Device 12 is handled.
Step a/b/c/g, additives therein are for reacting heavy metal and by heavy metals removal;At first tail therein Reason device 4 and the second tail processing unit 8, third tail processing unit 12 are used to the substance after recycling heavy metal reaction or carry out gas The harmless processing of body.
Time match function according to the processing time data containing heavy metal containing sewage of unit quantity and volume and can utilize Deep learning algorithm is fitted
For example, it is as follows to provide data model:
Handle heavy metal type One unit quantity heavy metal-polluted water process time, unit s More unit quantity heavy metal-polluted water process times, unit s
Lead x1 X1
Lead x2 X2
Lead x3 X3
Lead x4 X4
Lead x5 X5
Lead x6 X6
Lead x7 X7
Lead x8 X8
Lead x9 X9
Lead x10 X10
Mercury y1 Y1
Mercury y2 Y2
Mercury y3 Y3
Mercury y4 Y4
Mercury y5 Y5
Mercury y6 Y6
Mercury y7 Y7
Mercury y8 Y8
Mercury y9 Y9
Mercury y10 Y10
Wherein, x1- x10 is various concentration heavy metal lead, and the time of agent fully reacting, x1- are attached in a unit sewage X10 is various concentration heavy metal lead, the time of agent fully reacting is attached in volume (more units) sewage, various concentration m contains The mapping of the sewage treatment time of amount and the time that agent fully reacting is attached containing heavy metal in heavy metal containing sewage of a unit Relationship is apparently not a kind of simple linear relationship, and the side by Function Fitting can be corresponded to for every heavy metal species and its concentration Formula solves time match function T (t, m), it provides sewage treatment time of m content with unit containing in heavy metal containing sewage Heavy metal is attached the mapping relations of the time of agent fully reacting.Then, enough data are collected, using in deep learning algorithm Self-adaptive processing algorithm is iterated training and continues to optimize time match function.
In specific implementation, the weight handled in the first processing pond 3, second processing pond 7 and third processing pond 11 Metal or heavy metal related substances are respectively as follows: mercury, lead and chromium ion;The 2, second addition of corresponding first addition bucket bucket 6 and third The additives for being reacted with heavy metal or heavy metal related substances placed in addition bucket 10.First addition bucket, 2 preparation is additional Agent are as follows: be added separately to lauryl sodium sulfate and chloroform in carbon tetrachloride, and moderate-speed mixer, add oxalyl later The additives of liquid are made in acetic acid, high-speed stirred, which can carry out reacting formation oil mutually and be isolated with mercury.Second Addition bucket 6 prepares additives are as follows: with acetic acid, malic acid, two propyl alcohol of citric acid, fumaric acid and diethyl mixture prepare it is organic Solvent, using above-mentioned organic solvent and aluminium polychloride/polyacrylamide flocculant as additives, which gives up with leaded Simultaneously Air Exposure can be with separating beavy metal lead for anoxybiotic processing after water reaction.Third addition bucket 10 prepares additives are as follows: immobilization is small Ball algae and acidity-basicity regulator can pass through Immobilized cells culture efficient absorption chromium after adjusting sewage by acidity-basicity regulator Ion.
Any technical solution disclosed in aforementioned present invention unless otherwise stated, if it discloses numberical range, Disclosed numberical range is preferred numberical range, and any it should be appreciated by those skilled in the art preferred numberical ranges The only obvious or representative numerical value of technical effect in many enforceable numerical value.It, can not since numerical value is more Exhaustion, so the present invention just technical solution of the open component values to illustrate the present invention, also, the above-mentioned numerical value enumerated The limitation to the invention protection scope should not be constituted.

Claims (8)

1. a kind of autocontrol method for electrochemical heavy metals sewage disposal system, it is characterized in that comprising steps of
Step a, the sewage containing electrochemical heavy metals of a unit is passed through into the first processing pond, and will be attached in the first addition bucket Add agent to be added to the first processing pond, obtains the time t1 that corresponding content of beary metal is reduced to amount up to standard;
Step b, the sewage containing electrochemical heavy metals that the first solenoid valve is passed through an above-mentioned unit into second processing pond is opened, and And the additives in the second addition bucket are added to second processing pond, obtain the time that corresponding content of beary metal is reduced to amount up to standard t2;
Step c, the sewage containing electrochemical heavy metals that second solenoid valve is passed through an above-mentioned unit into third processing pond is opened, and And the additives in third addition bucket are added to third processing pond, obtain the time that corresponding content of beary metal is reduced to amount up to standard t3;
Step d, settling time fitting function T (t, m), t therein are the attached containing heavy metal in heavy metal containing sewage of a unit Add the time of agent fully reacting, m is the unit content of sewage, when time match function T (t, m) provides the sewage treatment of m content Between mapping relations with the time for being attached agent fully reacting containing heavy metal in heavy metal containing sewage of a unit;
Step e, the content m for measuring the medium sewage to be processed of a cycle, is updated to time match with m respectively for t1, t2, t3 Function T (t, m) calculates sewage treatment time T1, T2, T3 of corresponding m content;
Step f, the opening time point T0 of a default sewage treatment, is then arranged opening for the first solenoid valve by controller programming Open the time are as follows: the T0+T1+ reasonable turnaround time;The opening time of second solenoid valve is set by controller programming are as follows: T0+T1+T2 + reasonable turnaround time;The opening time of third solenoid valve is set by controller programming are as follows: when T0+T1+T2+T3+ rationally has enough to meet the need Between, then start the automatic control of controller;
Step g, the sewage of m content is passed through mouth by sewage and is passed through the first processing pond, later adds the additives in the first addition bucket It is added to the first processing pond, completes the removal reaction of heavy metal, sewage is passed through second processing pond after the unlatching of the first solenoid valve, later Additives in second addition bucket are added to second processing pond, the removal reaction of heavy metal is completed, is opened to second solenoid valve Sewage is passed through third processing pond afterwards, and the additives in third addition bucket are added to third processing pond later, complete heavy metal Removal reaction, sewage is passed through indwelling pond after the unlatching of third solenoid valve.
2. a kind of autocontrol method for electrochemical heavy metals sewage disposal system according to claim 1, special Sign is: step g, the additives in the first addition bucket are added at first by the sewage of m content later by being passed through the first processing pond Pond is managed, the removal reaction of heavy metal is completed, sewage is passed through second processing pond after the unlatching of the first solenoid valve, later by the second addition Additives in bucket are added to second processing pond, complete the removal reaction of heavy metal, sewage is passed through after second solenoid valve unlatching Additives in third addition bucket are added to third processing pond later by third processing pond, complete the removal reaction of heavy metal, to Sewage is passed through indwelling pond after third solenoid valve is opened.
3. a kind of autocontrol method for electrochemical heavy metals sewage disposal system according to claim 1, special Sign is: step f is therein, and the sewage that the reasonable turnaround time refers to flows the time of needs between former and later two processing ponds.
4. a kind of autocontrol method for electrochemical heavy metals sewage disposal system according to claim 1, special Sign is: step d is therein, and time match function can be established in advance, and time match function can be according to unit quantity and volume It processing time data containing heavy metal containing sewage and is fitted using deep learning algorithm.
5. a kind of autocontrol method for electrochemical heavy metals sewage disposal system according to claim 1, special Sign is: step g is therein, and sewage first passes through the first tail processing unit before being passed through second processing pond after the unlatching of the first solenoid valve It is handled.
6. a kind of autocontrol method for electrochemical heavy metals sewage disposal system according to claim 1, special Sign is: step g is therein, and sewage first passes through the second tail processing unit before being passed through third processing pond after second solenoid valve unlatching It is handled.
7. a kind of autocontrol method for electrochemical heavy metals sewage disposal system according to claim 1, special Sign is: step g is therein, and sewage first passes through third tail processing unit before being passed through indwelling pond and carries out after the unlatching of third solenoid valve Processing.
8. a kind of autocontrol method for electrochemical heavy metals sewage disposal system according to claim 1, special Sign is: step a/b/c/g, and additives therein are for reacting heavy metal and by heavy metals removal;First tail processing therein Device and the second tail processing unit, third tail processing unit are used to the substance after recycling heavy metal reaction or carry out gas harmless Processing.
CN201811123740.9A 2018-09-26 2018-09-26 Autocontrol method for electrochemical heavy metals sewage disposal system Withdrawn CN109231295A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811123740.9A CN109231295A (en) 2018-09-26 2018-09-26 Autocontrol method for electrochemical heavy metals sewage disposal system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811123740.9A CN109231295A (en) 2018-09-26 2018-09-26 Autocontrol method for electrochemical heavy metals sewage disposal system

Publications (1)

Publication Number Publication Date
CN109231295A true CN109231295A (en) 2019-01-18

Family

ID=65057098

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811123740.9A Withdrawn CN109231295A (en) 2018-09-26 2018-09-26 Autocontrol method for electrochemical heavy metals sewage disposal system

Country Status (1)

Country Link
CN (1) CN109231295A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114706438A (en) * 2022-05-19 2022-07-05 河南省科学院地理研究所 Sewage treatment control system and method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101786721A (en) * 2010-02-05 2010-07-28 重庆大学 Random process predicting method for outlet water organic substance concentration of municipal sewage treatment plant
CN105923724A (en) * 2016-05-16 2016-09-07 河南理工大学 Coal mine underground hydraulic flushing slime water purification treatment method
CN107305194A (en) * 2016-04-21 2017-10-31 北京华科天宇环保科技有限公司 A kind of heavy metal detector and its electrolytic cell
CN107523840A (en) * 2017-09-07 2017-12-29 中国科学院青海盐湖研究所 The method that chrome oxide green is prepared using ferrochrome
CN107735367A (en) * 2015-04-28 2018-02-23 Aquatec垂直流迷宫有限公司 Use the method and apparatus of the Wastewater Treated by Activated Sludge Process waste water with intensified denitrification and dephosphorization

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101786721A (en) * 2010-02-05 2010-07-28 重庆大学 Random process predicting method for outlet water organic substance concentration of municipal sewage treatment plant
CN107735367A (en) * 2015-04-28 2018-02-23 Aquatec垂直流迷宫有限公司 Use the method and apparatus of the Wastewater Treated by Activated Sludge Process waste water with intensified denitrification and dephosphorization
CN107305194A (en) * 2016-04-21 2017-10-31 北京华科天宇环保科技有限公司 A kind of heavy metal detector and its electrolytic cell
CN105923724A (en) * 2016-05-16 2016-09-07 河南理工大学 Coal mine underground hydraulic flushing slime water purification treatment method
CN107523840A (en) * 2017-09-07 2017-12-29 中国科学院青海盐湖研究所 The method that chrome oxide green is prepared using ferrochrome

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张允诚等: "《电镀手册》", 31 December 2011 *
黄忠秀: "《船舶与港口水域防污染》", 31 July 1999, 北京:人民交通出版社 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114706438A (en) * 2022-05-19 2022-07-05 河南省科学院地理研究所 Sewage treatment control system and method

Similar Documents

Publication Publication Date Title
Mannina et al. Greenhouse gases from wastewater treatment—A review of modelling tools
CN202356398U (en) Electric repairing device for removing heavy metals and organic pollutants in soil
CN103601353B (en) Method for removing heavy metals in municipal sludge
CN109231295A (en) Autocontrol method for electrochemical heavy metals sewage disposal system
CN107093484B (en) A kind of uranium-containing waste water efficient process system and processing method
CN109231595A (en) A kind of electric microfield strengthens iron carbon dephosphorization apparatus and its application
CN111362419A (en) Biochemical treatment system for mine acidic wastewater
CN203269686U (en) Heavy metal waste liquid modularization program control treatment apparatus
CN209010296U (en) A kind of electric microfield reinforcing iron carbon dephosphorization apparatus
CN107729711A (en) A kind of heavy metal wastewater thereby electrochemical treatments reaction rate On-line Estimation method and device
CN209368079U (en) Integrated sewage treating apparatus
CN104445855A (en) System and method for treating breeding fecal sewage
CN113075280B (en) Biochemical oxygen demand BOD and toxicity integrated detection method
CN207244012U (en) Chemical nickel devil liquor recovery pure nickel equipment
CN104496086B (en) A kind of electrolysis coupling class Fenton water treatment facilities
CN206783447U (en) A kind of waste water from power plant device based on impregnation
CN208136007U (en) A kind of a variety of sewage experimental teaching units of electrochemical treatments
CN206940591U (en) The Waste Water Treatment of denitrogenation dephosphorizing
CN209161670U (en) Battery is sliced waste water treatment system
CN110436608A (en) Aeration monitoring method and device for bed mud residual water treatment equipment
CN220564457U (en) Laboratory inorganic waste water treatment device
CN206142912U (en) Use integrated device that biological enzyme was disposed of sewage
CN206089300U (en) Ion device such as environmental protection sewage treatment
CN209193696U (en) A kind of cosmetics sewage pretreatment device
CN218969025U (en) Integrated iron-carbon and UV sewage treatment device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20190118