CN109228758A - A kind of envelope stuffing machine device and its application method - Google Patents
A kind of envelope stuffing machine device and its application method Download PDFInfo
- Publication number
- CN109228758A CN109228758A CN201810967015.3A CN201810967015A CN109228758A CN 109228758 A CN109228758 A CN 109228758A CN 201810967015 A CN201810967015 A CN 201810967015A CN 109228758 A CN109228758 A CN 109228758A
- Authority
- CN
- China
- Prior art keywords
- gear
- piece installing
- spur gear
- shaft
- fixedly connected
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B43—WRITING OR DRAWING IMPLEMENTS; BUREAU ACCESSORIES
- B43M—BUREAU ACCESSORIES NOT OTHERWISE PROVIDED FOR
- B43M5/00—Devices for closing envelopes
- B43M5/04—Devices for closing envelopes automatic
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65B—MACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
- B65B25/00—Packaging other articles presenting special problems
- B65B25/14—Packaging paper or like sheets, envelopes, or newspapers, in flat, folded, or rolled form
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65B—MACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
- B65B63/00—Auxiliary devices, not otherwise provided for, for operating on articles or materials to be packaged
- B65B63/04—Auxiliary devices, not otherwise provided for, for operating on articles or materials to be packaged for folding or winding articles, e.g. gloves or stockings
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Making Paper Articles (AREA)
Abstract
The invention discloses a kind of envelope stuffing machine device and its application methods, including first device main body, it is set to the intracorporal piece installing device of the first device master and is set to the intracorporal open/close device of first device master, the piece installing device includes being set to the piece installing chamber of the first device main body inner opening to the left, the first fixed block is fixedly installed on end face on the downside of the piece installing chamber, first upper end of fixing block is fixedly installed the first piece installing plate, the positioning chamber of opening upwards is provided on the upside of the first piece installing plate in end face, the present apparatus carries out envelope stuffing in the form of packaging, automatically envelope can be packaged, device is set only just to can be carried out piece installing in the closed condition in the form of interlocking simultaneously, unexpected injury caused by preventing because of operation error, it is more safe and reliable.
Description
Technical field
The present invention relates to technical field of smart office, specifically a kind of envelope stuffing machine device and its application method.
Background technique
In daily life, envelope still plays very big effect, but is artificial mail etc. to be placed in envelope all
It is placed, sometimes will appear and can't be put in situation, while also very important person's gluing encapsulation for being and its cumbersome, efficiency is also very
It is low, thus design it is a kind of can the envelope stuffing machine device of automatic packaging it is really necessary to, the present apparatus using carrying out letter in the form of packing
Packaging part can automatically be packaged envelope, while make device only in the closed condition could be into the form of interlocking
Luggage part, unexpected injury caused by preventing because of operation error, more securely and reliably.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of envelope stuffing machine device and its application methods, can solve
The problems in certainly above-mentioned present technology.
The present invention is achieved through the following technical solutions: a kind of envelope stuffing machine device of the invention and its user
Method, including first device main body, be set to the intracorporal piece installing device of the first device master and be set to the first device
Main intracorporal open/close device, the piece installing device includes being set to the piece installing chamber of the first device main body inner opening to the left,
It is fixedly installed the first fixed block on end face on the downside of the piece installing chamber, first upper end of fixing block is fixedly installed the first piece installing
Plate is provided with the positioning chamber of opening upwards on the upside of the first piece installing plate, runs through before and after the first piece installing plate left end in end face
And it is rotatably connected with first rotating shaft, the second piece installing plate, the first piece installing plate are fixedly connected on the left of the first rotating shaft
Run through and be rotatably provided with the second shaft before and after right end, is fixedly connected with third piece installing plate, institute on the right side of second shaft
First sliding cavity that is provided with being connected in piece installing chamber upper inside walls is stated, what is be connected in the first sliding cavity upper inside walls sets
It is equipped with the second sliding cavity, the first sliding block is slidably provided in first sliding cavity, first upper end of slide block is fixed to be connected
It is connected to the second sliding block that sliding connection slides cavity wall in described second, is provided with opening upwards in second sliding block
First thread cavity is rotatably provided with the first screw rod in first thread cavity, phase in inner wall on the right side of second sliding cavity
Connection is provided with third sliding cavity, and what is be connected in inner wall on the right side of the third sliding cavity is provided with the 4th sliding cavity, described
Second sliding block right end face upper end is fixedly connected with right end and extends the first connecting rod that is passed through in the 4th sliding cavity, and described first
Connecting rod right end is fixedly connected with sliding connection on the second connecting rod of the 4th sliding cavity wall, second sliding cavity
The first drive cavity is provided in the inner wall of side, first screw rod upper end, which extends, to be passed through in first drive cavity and be fixedly connected with
First bevel gear, what is be connected on rear side of first drive cavity in inner wall is provided with the 5th sliding cavity, in the 5th sliding cavity
It slidably is provided with third sliding block, first motor, the first motor are fixedly installed in the third sliding block front end face
Front end is fixedly connected with the second bevel gear for being engageable to the first bevel gear front end by shaft, on rear side of the piece installing chamber in
It is provided with the second drive cavity in wall, is fixedly installed the second motor, second motor in inner wall on rear side of second drive cavity
Front end is fixedly connected with a quarter gear by shaft, a quarter gear lower end it is engageable be provided with the first straight-tooth
Wheel, first spur gear front end are fixedly connected with the second spur gear by shaft, and second spur gear upper right side is meshed
Be provided with third spur gear, second shaft rear end is fixedly connected in the third spur gear front end face, described four
Engageable on the left of/mono- gear to be provided with the 4th spur gear, the first rotating shaft rear end is fixedly connected on the 4th straight-tooth
Take turns in front end face, what the 4th spur gear left end was meshed be provided with the 5th spur gear, on rear side of the 5th spur gear in
Spiral chamber is provided in wall, the 5th spur gear rear end is fixedly connected with extension and is passed through the intracavitary third shaft of the spiral,
Third shaft rear end is fixedly connected with reel, is arranged with the first bracing wire on the reel, on the upside of the spiral chamber in
What is be connected in wall is provided with the first threading hole for being connected to inner wall on rear side of the 5th sliding cavity, and first bracing wire is fixed to be connected
Be connected in the third sliding block back end surface, a quarter gear upper end it is engageable be provided with the 6th spur gear, it is described
6th spur gear is connected to the open/close device.
The open/close device includes that connection is set in the piece installing chamber versant inner wall as a preferred technical solution,
First lifting chamber, first lifting is intracavitary to be slidably provided with baffle, and the is fixedly installed in the baffle right end face
One rack gear, what is be connected in inner wall on the right side of the first lifting chamber is provided with first gear chamber, and the first gear is intracavitary to be turned
It is dynamic to be provided with the 7th spur gear for being engaged in first rack gear, behind the 7th spur gear rear end and the first gear chamber
It is fixedly connected with the first torque spring between the inner wall of side, is provided with third drive cavity, institute in inner wall on rear side of the first gear chamber
It states the 7th spur gear rear end and is fixedly connected with the 4th shaft for extending and being passed through in described, the 4th shaft rear end is fixedly connected with
First belt pulley, the 6th spur gear rear end are fixedly connected with the second belt pulley by extending the shaft being passed through in described, institute
It states and is sequentially connected between the second belt pulley and first belt pulley by belt.
It is fixedly installed envelope briquetting on the front and rear sides end face of first sliding block lower end as a preferred technical solution,
The second connecting rod lower end is fixedly connected with gluing block.
It is provided on the left of first fixed block as a preferred technical solution, and is fixedly connected on piece installing chamber lower side
The first buffer stopper on face, the first fixed block right side are provided with second be fixedly connected on the downside of the piece installing chamber on end face
Buffer stopper carries out buffer protection when resetting to the second piece installing plate by first buffer stopper, passes through described
Two buffer stoppers carry out buffer protection when resetting to the third piece installing plate.
It is fixed between the third sliding block right end and the 5th sliding cavity right side inner wall as a preferred technical solution, to connect
It is connected to the first spring, first spring plays reset role the third sliding block, first spur gear rear end and described the
The second torque spring is fixedly connected on rear side of two drive cavities between inner wall, second torque spring, which plays the first spur gear, to be resetted
Effect.
The specific steps of this method are:
Firstly, the second electric motor starting, and then drive a quarter gear to rotate counterclockwise 90 degree, and then engage band by gear
Dynamic 6th spur gear rotation, and then the second pulley rotation is driven by shaft, and then the first belt is moved by belt driving band
Wheel rotation, and then the rotation of the 4th shaft is driven by the 4th shaft, and then drive the first rack gear to rise by rack and pinion engagement,
And then baffle is driven to rise, and then piece installing chamber is opened, M.G. pure sulphite paper is placed in the first piece installing plate, the second piece installing plate and the at this time
On three piece installing plates, then object is placed on M.G. pure sulphite paper and is located within the scope of positioning chamber;
Secondly, the second electric motor starting at this time, and then a quarter gear is driven to rotate 90 degree, at this time a quarter gear and the
Six spur gears are disengaged from, and the 4th shaft inverts under the elastic force effect of the first torque spring at this time, and then drives baffle decline
Piece installing chamber is closed, in the process, a quarter gear is meshed with the 4th spur gear, and then drives the 4th spur gear up time
Needle rotates 180 degree, and then drives the second piece installing plate to turn clockwise 180 degree by first rotating shaft, and then will letter
Envelope paper is folded, and first rotating shaft is engaged by gear at this time drives the rotation of the 5th spur gear, and then is driven by third shaft
Reel rotation, and then the first bracing wire is tensed, and then third sliding block is pulled to move backward, second bevel gear bores tooth with first at this time
Wheel is meshed, and first motor starts at this time, and then drives second bevel gear rotation by shaft, and then engage and drive by gear
First bevel gear rotation, and then the rotation of the first screw rod is driven, and then drive the decline of the second sliding block by being threadedly engaged connection, in turn
It drives the first sliding block to decline, seals briquetting at this time and carry out envelope pressure to connecting before and after envelope, seal envelope front and rear sides, in this process
In, the second sliding block drives second connecting rod to decline by first connecting rod, and then drives gluing block decline, and then coat on the right side of envelope
Glue, hereafter first motor inverts, and drives envelope briquetting and gluing block to restPose, the second electric motor starting, and then band at this time
Dynamic a quarter gear rotates 90 degree, and a quarter gear is disengaged from the 4th spur gear at this time, at this time in the first spring
Elastic force effect under restPose, at this time a quarter gear drive the first spur gear rotate clockwise 180 degree,
And then the second spur gear is driven to rotate clockwise 180 degree by shaft, and then engage by gear and drive third spur gear
180 degree are rotated counterclockwise, and then drives third piece installing plate to turn counterclockwise 180 degree by the second shaft, in turn
By being sealed on one side with glue;
Finally, the second motor rotates at this time, and then drives a quarter gear to rotate 180 degree, and then drive the 6th straight-tooth
Wheel rotation, and then baffle is driven to rise, packaged envelope can be taken out at this time, at this time the second electric motor starting, drive four/
One gear inverts 90 degree, and then restPoses.
The beneficial effects of the present invention are: the configuration of the present invention is simple, easy to operate, and when carrying out piece installing by the present apparatus, second
Electric motor starting, and then drive a quarter gear to rotate counterclockwise 90 degree, and then engage by gear and drive the 6th spur gear
Rotation, and then the second pulley rotation is driven by shaft, and then the first pulley rotation, Jin Ertong are moved by belt driving band
It crosses the 4th shaft and drives the rotation of the 4th shaft, and then drive the first rack gear to rise by rack and pinion engagement, and then drive baffle
Rise, and then piece installing chamber opened, M.G. pure sulphite paper is placed on the first piece installing plate, the second piece installing plate and third piece installing plate at this time,
Then object is placed on M.G. pure sulphite paper and is located within the scope of positioning chamber, at this time the second electric motor starting, and then drive a quarter
Gear rotates 90 degree, and a quarter gear is disengaged from the 6th spur gear at this time, and the 4th shaft is in the first torsion bullet at this time
The lower reversion of the elastic force effect of spring, and then general who has surrendered's piece installing chamber under baffle is driven to close, in the process, a quarter gear and the 4th
Spur gear is meshed, and then drives the 4th spur gear to rotate clockwise 180 degree, and then drive second by first rotating shaft
Piece installing plate turns clockwise 180 degree, and then M.G. pure sulphite paper is folded, and first rotating shaft is engaged by gear and driven at this time
The rotation of 5th spur gear, and then reel rotation is driven by third shaft, and then tense the first bracing wire, and then pull third sliding
Block moves backward, and second bevel gear is meshed with first bevel gear at this time, and first motor starts at this time, and then is driven by shaft
Second bevel gear rotation, and then engaged by gear and drive first bevel gear rotation, and then drive the rotation of the first screw rod, Jin Ertong
Crossing to be threadedly engaged to connect drives the second sliding block to decline, and then drives the decline of the first sliding block, and envelope briquetting is a to connecting before and after envelope at this time
Envelope pressure is carried out, envelope front and rear sides are sealed, in the process, the second sliding block drives second connecting rod to decline by first connecting rod,
And then gluing block decline is driven, and then apply glue on the right side of envelope, hereafter first motor inverts, and drives envelope briquetting and gluing block
It restPoses, at this time the second electric motor starting, and then a quarter gear is driven to rotate 90 degree, at this time a quarter gear
It is disengaged from, restPoses under the elastic force effect of the first spring at this time, at this time a quarter gear with the 4th spur gear
It drives the first spur gear to rotate clockwise 180 degree, and then drives the second spur gear to rotate clockwise 108 by shaft
Ten degree, and then engaged by gear and third spur gear is driven to rotate counterclockwise 180 degree, and then driven by the second shaft
Third piece installing plate turns counterclockwise 180 degree, and then by being sealed on one side with glue, the second motor is rotated at this time, into
And drive a quarter gear to rotate 180 degree, and then drive the rotation of the 6th spur gear, and then baffle is driven to rise, at this time
Packaged envelope can be taken out, at this time the second electric motor starting, a quarter gear is driven to invert 90 degree, and then restore initial
State, the present apparatus are carried out envelope stuffing in the form of packaging, can be packaged automatically to envelope, while using the form interlocked
Device is set only just to can be carried out piece installing in the closed condition, unexpected injury caused by preventing because of operation error, more securely and reliably.
Detailed description of the invention
The present invention is described in detail by following specific embodiments and drawings for ease of explanation,.
Fig. 1 is the schematic diagram of internal structure of a kind of envelope stuffing machine device of the invention and its application method;
Fig. 2 is the schematic diagram in direction " A-A " in Fig. 1;
Fig. 3 is the schematic diagram in direction " B-B " in Fig. 2;
Fig. 4 is the schematic diagram in direction " C-C " in Fig. 3.
Specific embodiment
As Figure 1-Figure 4, a kind of envelope stuffing machine device of the invention and its application method, including first device main body
11, the piece installing device being set in the first device main body 11 and the shutter door being set in the first device main body 11
Device, the piece installing device include being set to the piece installing chamber 12 of 11 inner opening of first device main body to the left, the piece installing chamber
The first fixed block 13 is fixedly installed on 12 downsides end face, 13 upper end of the first fixed block is fixedly installed the first piece installing plate
14, the positioning chamber 15 of opening upwards is provided in the 14 upside end face of the first piece installing plate, before 14 left end of the first piece installing plate
After run through and be rotatably connected with first rotating shaft 16, the second piece installing plate 17, institute are fixedly connected on the left of the first rotating shaft 16
It states 14 right end of the first piece installing plate front and back and runs through and be rotatably provided with the second shaft 18, fixed company on the right side of second shaft 18
It is connected to third piece installing plate 19, what is be connected in 12 upper inside walls of piece installing chamber is provided with the first sliding cavity 20, and described first is sliding
What is be connected in dynamic 20 upper inside walls of chamber is provided with the second sliding cavity 21, and the is slidably provided in first sliding cavity 20
One sliding block 22,22 upper end of the first sliding block are fixedly connected with sliding connection in the second of 21 inner wall of the second sliding cavity
Sliding block 23 is provided with the first thread cavity 24 of opening upwards in second sliding block 23, can be rotated in first thread cavity 24
Be provided with the first screw rod 25, what is be connected in the 21 right side inner wall of the second sliding cavity is provided with third sliding cavity 26, described
What is be connected in 26 right side inner wall of third sliding cavity is provided with the 4th sliding cavity 27, and the 23 right end face upper end of the second sliding block is solid
Surely it is connected with right end and extends the first connecting rod 28 being passed through in the 4th sliding cavity 27,28 right end of first connecting rod is fixedly connected
There is sliding connection to set in the second connecting rod 29 of 27 inner wall of the 4th sliding cavity, 21 upper inside walls of the second sliding cavity
It is equipped with the first drive cavity 30,25 upper end of the first screw rod, which extends, to be passed through in first drive cavity 30 and be fixedly connected with first
Bevel gear 31, what is be connected in the 30 rear side inner wall of the first drive cavity is provided with the 5th sliding cavity 32, the 5th sliding cavity
It is slidably provided with third sliding block 33 in 32, is fixedly installed first motor 34, institute in 33 front end face of third sliding block
It states 34 front end of first motor and is fixedly connected with the second bevel gear 35 for being engageable to 31 front end of first bevel gear by shaft,
It is provided with the second drive cavity 38 in the 12 rear side inner wall of piece installing chamber, is fixedly installed in the 38 rear side inner wall of the second drive cavity
Second motor 39,39 front end of the second motor are fixedly connected with a quarter gear 40, a quarter tooth by shaft
Take turns 40 lower ends it is engageable be provided with the first spur gear 41,41 front end of the first spur gear is fixedly connected with second by shaft
Spur gear 42, what 42 upper right side of the second spur gear was meshed is provided with third spur gear 43,18 rear end of the second shaft
Be fixedly connected in 43 front end face of third spur gear, 40 left side of a quarter gear it is engageable be provided with the 4th
Spur gear 45,16 rear end of first rotating shaft are fixedly connected in 45 front end face of the 4th spur gear, the 4th straight-tooth
That takes turns that 45 left ends are meshed is provided with the 5th spur gear 46, is provided with spiral chamber 47 in the 46 rear side inner wall of the 5th spur gear,
5th spur gear, 46 rear end is fixedly connected with the third shaft 48 for extending and being passed through in the spiral chamber 47, the third shaft
48 rear ends are fixedly connected with reel 49, and the first bracing wire 37,47 upper inside walls of spiral chamber are arranged on the reel 49
What is be inside connected is provided with the first threading hole 36 for being connected to the 32 rear side inner wall of the 5th sliding cavity, and first bracing wire 37 is solid
Surely be connected in 33 back end surface of third sliding block, 40 upper end of a quarter gear it is engageable be provided with the 6th straight-tooth
Wheel 50, the 6th spur gear 50 is connected to the open/close device.
Valuably, the open/close device includes the first lifting chamber that connection is set in the 12 versant inner wall of piece installing chamber
55, it is described first lifting chamber 55 in be slidably provided with baffle 56, be fixedly installed first in 56 right end face of baffle
Rack gear 57, it is described first lifting 55 right side inner wall of chamber in be connected be provided with first gear chamber 58, the first gear chamber 58
It is interior to be rotatably provided with the 7th spur gear 59 for being engaged in first rack gear 57,59 rear end of the 7th spur gear with it is described
The first torque spring, setting in the 58 rear side inner wall of first gear chamber are fixedly connected between 58 rear side inner wall of first gear chamber
There is third drive cavity 51,59 rear end of the 7th spur gear is fixedly connected with the 4th shaft 60 for extending and being passed through in described 51, institute
It states 60 rear end of the 4th shaft and is fixedly connected with the first belt pulley 61,50 rear end of the 6th spur gear is passed through described 51 by extending
Interior shaft is fixedly connected with the second belt pulley 52, passes through belt between second belt pulley 52 and first belt pulley 61
Transmission connection.
Valuably, it is fixedly installed on the front and rear sides end face of 22 lower end of the first sliding block and seals briquetting 71, described second
29 lower end of connecting rod is fixedly connected with gluing block 72.
Valuably, be fixedly connected on the 12 downside end face of piece installing chamber is provided on the left of first fixed block 13
It is slow to be provided with second be fixedly connected on the 12 downside end face of piece installing chamber on the right side of first fixed block 13 for one buffer stopper 73
Block 74 is rushed, buffer protection is carried out when resetting to the second piece installing plate 17 by first buffer stopper 73, passes through institute
It states the second buffer stopper 74 and buffer protection is carried out when resetting to the third piece installing plate 19.
Valuably, first is fixedly connected between 33 right end of third sliding block and 32 right side inner wall of the 5th sliding cavity
Spring 75, first spring 75 play reset role the third sliding block 33,41 rear end of the first spur gear and described the
The second torque spring 76 is fixedly connected between two drive cavities, 38 rear side inner wall, second torque spring 76 is to the first spur gear
41 play reset role.
When original state, baffle 56 moves down to greatest extent closes piece installing chamber 12, at this time the second piece installing plate 17 and third dress
Part plate 19 is in horizontality, and the first sliding block 22 rises to greatest extent and then is retracted in the first sliding cavity 20, at this time second at this time
Sliding block 23 moves up to greatest extent, and the first screw rod 25 is retracted to greatest extent in the first thread cavity 24 at this time, and first connecting rod 28 is most at this time
Big loudness rises, and second connecting rod 29 rises to greatest extent and then is retracted in the 4th sliding cavity 27 at this time, at this time a quarter gear
40 gear parts and 50 lower end of the 6th spur gear are in meshing state i.e., at this time a quarter gear 40 and the 4th spur gear 45
And first do not engage between spur gear 41, third sliding block 33 moves to left to greatest extent under the elastic force effect of the first spring 75 at this time,
The first bracing wire 37 is in relaxation state at this time, is disengaged between second bevel gear 35 and first bevel gear 31 at this time.
The specific steps of this method are:
Firstly, the second motor 39 starts, and then a quarter gear 40 is driven to rotate counterclockwise 90 degree, and then nibble by gear
Crossed belt moves the rotation of the 6th spur gear 50, and then drives the rotation of the second belt pulley 52 by shaft, and then dynamic by belt driving band
The rotation of first belt pulley 61, and then the rotation of the 4th shaft 60 is driven by the 4th shaft 60, and then pass through rack and pinion engagement band
Dynamic first rack gear 57 rises, and then drives baffle 56 to rise, and then piece installing chamber 12 is opened, and M.G. pure sulphite paper is placed in first at this time
On piece installing plate 14, the second piece installing plate 17 and third piece installing plate 19, then object is placed on M.G. pure sulphite paper and is located at positioning chamber 15
In range;
Secondly, the second motor 39 starts at this time, and then drive a quarter gear 40 rotates 90 degree, at this time a quarter gear
40 are disengaged from the 6th spur gear 50, and the 4th shaft 60 inverts under the elastic force effect of the first torque spring at this time, and then band
The lower general who has surrendered's piece installing chamber 12 of dynamic baffle 56 is closed, and in the process, a quarter gear 40 is meshed with the 4th spur gear 45, in turn
It drives the 4th spur gear 45 to rotate clockwise 180 degree, and then the second piece installing plate 17 is driven clockwise by first rotating shaft 16
180 degree are overturn, and then M.G. pure sulphite paper is folded, first rotating shaft 16 is engaged by gear and drives the 5th spur gear at this time
46 rotations, and then drive reel 49 to rotate by third shaft 48, and then tense the first bracing wire 37, and then pull third sliding block
33 move backward, and second bevel gear 35 is meshed with first bevel gear 31 at this time, and first motor 34 starts at this time, and then by turning
Axis drives second bevel gear 35 to rotate, and then is engaged by gear and first bevel gear 31 is driven to rotate, and then drives the first screw rod
25 rotations, so by being threadedly engaged connection drive the second sliding block 23 decline, and then the decline of the first sliding block 22 is driven, envelope is pressed at this time
Block 71 carries out envelope pressure to connecting before and after envelope, seals envelope front and rear sides, in the process, the second sliding block 23 connects by first
Bar 28 drives second connecting rod 29 to decline, and then drives gluing block 72 to decline, and then apply glue on the right side of envelope, hereafter the first electricity
Machine 34 inverts, and envelope briquetting 71 and gluing block 72 is driven to restPose, and the second motor 39 starts at this time, and then drive four/
One gear 40 rotates 90 degree, and a quarter gear 40 is disengaged from the 4th spur gear 45 at this time, at this time in the first spring 75
Elastic force effect under restPose, at this time a quarter gear 40 drive the first spur gear 41 rotate clockwise 180
Degree, and then drive the second spur gear 42 to rotate clockwise 180 degree by shaft, and then engage by gear and drive third
Spur gear 43 rotates counterclockwise 180 degree, and then drives third piece installing plate 19 to turn counterclockwise 100 by the second shaft 18
80 degree, and then by being sealed on one side with glue;
Finally, the second motor 39 rotates at this time, and then drives a quarter gear 40 to rotate 180 degree, and then drive the 6th
Spur gear 50 rotates, and then baffle 56 is driven to rise, and at this time can take out packaged envelope, and the second motor 39 starts at this time,
It drives a quarter gear 40 to invert 90 degree, and then restPoses.
When original state, baffle 56 moves down to greatest extent closes piece installing chamber 12, at this time the second piece installing plate 17 and third dress
Part plate 19 is in horizontality, and the first sliding block 22 rises to greatest extent and then is retracted in the first sliding cavity 20, at this time second at this time
Sliding block 23 moves up to greatest extent, and the first screw rod 25 is retracted to greatest extent in the first thread cavity 24 at this time, and first connecting rod 28 is most at this time
Big loudness rises, and second connecting rod 29 rises to greatest extent and then is retracted in the 4th sliding cavity 27 at this time, at this time a quarter gear
40 gear parts and 50 lower end of the 6th spur gear are in meshing state i.e., at this time a quarter gear 40 and the 4th spur gear 45
And first do not engage between spur gear 41, third sliding block 33 moves to left to greatest extent under the elastic force effect of the first spring 75 at this time,
The first bracing wire 37 is in relaxation state at this time, is disengaged between second bevel gear 35 and first bevel gear 31 at this time.
When carrying out piece installing by the present apparatus, the starting of the second motor 39, and then a quarter gear 40 is driven to rotate counterclockwise
90 degree, and then engaged by gear and drive the rotation of the 6th spur gear 50, and then the rotation of the second belt pulley 52 is driven by shaft,
And then the rotation of the first belt pulley 61 is moved by belt driving band, and then the rotation of the 4th shaft 60 is driven by the 4th shaft 60, into
And drive the first rack gear 57 to rise by rack and pinion engagement, and then baffle 56 is driven to rise, and then piece installing chamber 12 is opened, this
When M.G. pure sulphite paper is placed on the first piece installing plate 14, the second piece installing plate 17 and third piece installing plate 19, object is then placed in letter
It seals on paper and is located in 15 range of positioning chamber, the second motor 39 starts at this time, and then drives the rotation of a quarter gear 40 90
Degree, a quarter gear 40 is disengaged from the 6th spur gear 50 at this time, at this time bullet of the 4th shaft 60 in the first torque spring
The lower reversion of power effect, and then the lower general who has surrendered's piece installing chamber 12 of baffle 56 is driven to close, in the process, a quarter gear 40 and the 4th
Spur gear 45 is meshed, and then drives the 4th spur gear 45 to rotate clockwise 180 degree, and then pass through 16 band of first rotating shaft
Dynamic second piece installing plate 17 turns clockwise 180 degree, and then M.G. pure sulphite paper is folded, and first rotating shaft 16 passes through tooth at this time
Wheel engagement drives the rotation of the 5th spur gear 46, and then drives reel 49 to rotate by third shaft 48, and then tenses first and draw
Line 37, and then third sliding block 33 is pulled to move backward, second bevel gear 35 is meshed with first bevel gear 31 at this time, and at this time first
Motor 34 starts, and then drives second bevel gear 35 to rotate by shaft, and then is engaged by gear and drive first bevel gear 31
Rotation, and then the rotation of the first screw rod 25 is driven, and then drive the decline of the second sliding block 23 by being threadedly engaged connection, and then drive the
The decline of one sliding block 22 seals briquetting 71 at this time and carries out envelope pressure to connecting before and after envelope, seals envelope front and rear sides, in this process
In, the second sliding block 23 drives second connecting rod 29 to decline by first connecting rod 28, and then drives gluing block 72 to decline, and then in envelope
Right side applies glue, and hereafter first motor 34 inverts, and envelope briquetting 71 and gluing block 72 is driven to restPose, at this time the second electricity
Machine 39 starts, and then a quarter gear 40 is driven to rotate 90 degree, and a quarter gear 40 and the 4th spur gear 45 are de- at this time
From engagement, restPose under the elastic force effect of the first spring 75 at this time, the drive of a quarter gear 40 at this time first is straight
Gear 41 rotates clockwise 180 degree, and then drives the second spur gear 42 to rotate clockwise 180 degree by shaft,
And then third spur gear 43 is driven to rotate counterclockwise 180 degree by gear engagement, and then pass through the second shaft 18 drive the
Three piece installing plates 19 turn counterclockwise 180 degree, and then by being sealed on one side with glue, the second motor 39 is rotated at this time,
And then a quarter gear 40 is driven to rotate 180 degree, and then drive the rotation of the 6th spur gear 50, and then drive baffle 56
Rise, packaged envelope can be taken out at this time, the second motor 39 starts at this time, drives the reversion of a quarter gear 40 90
Degree, and then restPose.
The beneficial effects of the present invention are: the configuration of the present invention is simple, easy to operate, and when carrying out piece installing by the present apparatus, second
Electric motor starting, and then drive a quarter gear to rotate counterclockwise 90 degree, and then engage by gear and drive the 6th spur gear
Rotation, and then the second pulley rotation is driven by shaft, and then the first pulley rotation, Jin Ertong are moved by belt driving band
It crosses the 4th shaft and drives the rotation of the 4th shaft, and then drive the first rack gear to rise by rack and pinion engagement, and then drive baffle
Rise, and then piece installing chamber opened, M.G. pure sulphite paper is placed on the first piece installing plate, the second piece installing plate and third piece installing plate at this time,
Then object is placed on M.G. pure sulphite paper and is located within the scope of positioning chamber, at this time the second electric motor starting, and then drive a quarter
Gear rotates 90 degree, and a quarter gear is disengaged from the 6th spur gear at this time, and the 4th shaft is in the first torsion bullet at this time
The lower reversion of the elastic force effect of spring, and then general who has surrendered's piece installing chamber under baffle is driven to close, in the process, a quarter gear and the 4th
Spur gear is meshed, and then drives the 4th spur gear to rotate clockwise 180 degree, and then drive second by first rotating shaft
Piece installing plate turns clockwise 180 degree, and then M.G. pure sulphite paper is folded, and first rotating shaft is engaged by gear and driven at this time
The rotation of 5th spur gear, and then reel rotation is driven by third shaft, and then tense the first bracing wire, and then pull third sliding
Block moves backward, and second bevel gear is meshed with first bevel gear at this time, and first motor starts at this time, and then is driven by shaft
Second bevel gear rotation, and then engaged by gear and drive first bevel gear rotation, and then drive the rotation of the first screw rod, Jin Ertong
Crossing to be threadedly engaged to connect drives the second sliding block to decline, and then drives the decline of the first sliding block, and envelope briquetting is a to connecting before and after envelope at this time
Envelope pressure is carried out, envelope front and rear sides are sealed, in the process, the second sliding block drives second connecting rod to decline by first connecting rod,
And then gluing block decline is driven, and then apply glue on the right side of envelope, hereafter first motor inverts, and drives envelope briquetting and gluing block
It restPoses, at this time the second electric motor starting, and then a quarter gear is driven to rotate 90 degree, at this time a quarter gear
It is disengaged from, restPoses under the elastic force effect of the first spring at this time, at this time a quarter gear with the 4th spur gear
It drives the first spur gear to rotate clockwise 180 degree, and then drives the second spur gear to rotate clockwise 108 by shaft
Ten degree, and then engaged by gear and third spur gear is driven to rotate counterclockwise 180 degree, and then driven by the second shaft
Third piece installing plate turns counterclockwise 180 degree, and then by being sealed on one side with glue, the second motor is rotated at this time, into
And drive a quarter gear to rotate 180 degree, and then drive the rotation of the 6th spur gear, and then baffle is driven to rise, at this time
Packaged envelope can be taken out, at this time the second electric motor starting, a quarter gear is driven to invert 90 degree, and then restore initial
State, the present apparatus are carried out envelope stuffing in the form of packaging, can be packaged automatically to envelope, while using the form interlocked
Device is set only just to can be carried out piece installing in the closed condition, unexpected injury caused by preventing because of operation error, more securely and reliably.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any
The change or replacement expected without creative work, should be covered by the protection scope of the present invention.Therefore, of the invention
Protection scope should be determined by the scope of protection defined in the claims.
Claims (5)
1. a kind of envelope stuffing machine device and its application method, including first device main body, it is set to the first device main body
Interior piece installing device and it is set to the intracorporal open/close device of first device master, the piece installing device includes being set to institute
The piece installing chamber of first device main body inner opening to the left is stated, is fixedly installed the first fixed block, institute on end face on the downside of the piece installing chamber
It states the first upper end of fixing block and is fixedly installed the first piece installing plate, be provided with opening upwards in end face on the upside of the first piece installing plate
First rotating shaft is run through and are rotatably connected in positioning chamber, the first piece installing plate left end front and back, and the first rotating shaft left side is solid
Surely it is connected with the second piece installing plate, runs through and be rotatably provided with the second shaft before and after the first piece installing plate right end, described the
It is fixedly connected with third piece installing plate on the right side of two shafts, what is be connected in the piece installing chamber upper inside walls is provided with the first sliding cavity,
What is be connected in the first sliding cavity upper inside walls is provided with the second sliding cavity, is slidably arranged in first sliding cavity
There is the first sliding block, first upper end of slide block is fixedly connected with sliding connection and slides in the second of the second sliding cavity wall
Block is provided with the first thread cavity of opening upwards in second sliding block, is rotatably provided in first thread cavity
One screw rod, what is be connected on the right side of second sliding cavity in inner wall is provided with third sliding cavity, on the right side of the third sliding cavity in
What is be connected in wall is provided with the 4th sliding cavity, and the second sliding block right end face upper end is fixedly connected with right end extension and is passed through institute
The first connecting rod in the 4th sliding cavity is stated, the first connecting rod right end is fixedly connected with sliding connection in the 4th sliding
The second connecting rod of cavity wall is provided with the first drive cavity in the second sliding cavity upper inside walls, and first screw rod upper end is prolonged
It stretches and is passed through in first drive cavity and is fixedly connected with first bevel gear, be connected in inner wall on rear side of first drive cavity
It is provided with the 5th sliding cavity, third sliding block, the third sliding block front end face are slidably provided in the 5th sliding cavity
It is inside fixedly installed first motor, the first motor front end is fixedly connected with by shaft is engageable to the first bevel gear
The second bevel gear of front end is provided with the second drive cavity, inner wall on rear side of second drive cavity in inner wall on rear side of the piece installing chamber
Inside it is fixedly installed the second motor, second motor front end is fixedly connected with a quarter gear by shaft, and described four points
One of gear lower end it is engageable be provided with the first spur gear, first spur gear front end is fixedly connected with second by shaft
Spur gear, what second spur gear upper right side was meshed is provided with third spur gear, and second shaft rear end is fixedly connected
It is engageable on the left of a quarter gear to be provided with the 4th spur gear in the third spur gear front end face, it is described
First rotating shaft rear end is fixedly connected in the 4th spur gear front end face, the setting that the 4th spur gear left end is meshed
There is the 5th spur gear, is provided with spiral chamber in inner wall on rear side of the 5th spur gear, the 5th spur gear rear end is fixedly connected
There is extension to be passed through the intracavitary third shaft of the spiral, third shaft rear end is fixedly connected with reel, the reel
On be arranged with the first bracing wire, in being provided with of being connected in the spiral chamber upper inside walls is connected on rear side of the 5th sliding cavity
First threading hole of wall, first bracing wire are fixedly connected in the third sliding block back end surface, a quarter gear
Upper end it is engageable be provided with the 6th spur gear, the 6th spur gear is connected to the open/close device.
2. a kind of envelope stuffing machine device according to claim 1 and its application method, it is characterised in that: the shutter door
Device includes the first lifting chamber that connection is set in the piece installing chamber versant inner wall, and first lifting is intracavitary slidably to be set
It is equipped with baffle, the first rack gear is fixedly installed in the baffle right end face, is connected in inner wall on the right side of the first lifting chamber
Be provided with first gear chamber, the first gear is intracavitary to be rotatably provided with the 7th straight-tooth for being engaged in first rack gear
It is fixedly connected with the first torque spring between inner wall on rear side of wheel, the 7th spur gear rear end and the first gear chamber, it is described
Be provided with third drive cavity on rear side of first gear chamber in inner wall, the 7th spur gear rear end be fixedly connected with extension be passed through it is described
The 4th interior shaft, the 4th shaft rear end are fixedly connected with the first belt pulley, and the 6th spur gear rear end passes through extension
The shaft being passed through in described is fixedly connected with the second belt pulley, passes through skin between second belt pulley and first belt pulley
V belt translation connection.
3. a kind of envelope stuffing machine device according to claim 1 and its application method, it is characterised in that: described first is sliding
Envelope briquetting is fixedly installed on the front and rear sides end face of block lower end, the second connecting rod lower end is fixedly connected with gluing block.
4. a kind of envelope stuffing machine device according to claim 1 and its application method, it is characterised in that: described first is solid
Determine to be provided with the first buffer stopper being fixedly connected on the downside of the piece installing chamber on end face on the left of block, be set on the right side of first fixed block
It is equipped with the second buffer stopper being fixedly connected on the downside of the piece installing chamber on end face, by first buffer stopper to second dress
Part plate carries out buffer protection when being resetted, by second buffer stopper to the third piece installing plate when resetting into
Row buffering protection.
5. a kind of envelope stuffing machine device according to claim 1 and its application method, it is characterised in that: the third is sliding
The first spring is fixedly connected on the right side of block right end and the 5th sliding cavity between inner wall, first spring is sliding to the third
Block plays reset role, and is fixedly connected with the second torsion between inner wall on rear side of first spur gear rear end and second drive cavity
Spring, second torque spring play reset role the first spur gear;The specific steps of this method are:
Firstly, the second electric motor starting, and then drive a quarter gear to rotate counterclockwise 90 degree, and then engage band by gear
Dynamic 6th spur gear rotation, and then the second pulley rotation is driven by shaft, and then the first belt is moved by belt driving band
Wheel rotation, and then the rotation of the 4th shaft is driven by the 4th shaft, and then drive the first rack gear to rise by rack and pinion engagement,
And then baffle is driven to rise, and then piece installing chamber is opened, M.G. pure sulphite paper is placed in the first piece installing plate, the second piece installing plate and the at this time
On three piece installing plates, then object is placed on M.G. pure sulphite paper and is located within the scope of positioning chamber;
Secondly, the second electric motor starting at this time, and then a quarter gear is driven to rotate 90 degree, at this time a quarter gear and the
Six spur gears are disengaged from, and the 4th shaft inverts under the elastic force effect of the first torque spring at this time, and then drives baffle decline
Piece installing chamber is closed, in the process, a quarter gear is meshed with the 4th spur gear, and then drives the 4th spur gear up time
Needle rotates 180 degree, and then drives the second piece installing plate to turn clockwise 180 degree by first rotating shaft, and then will letter
Envelope paper is folded, and first rotating shaft is engaged by gear at this time drives the rotation of the 5th spur gear, and then is driven by third shaft
Reel rotation, and then the first bracing wire is tensed, and then third sliding block is pulled to move backward, second bevel gear bores tooth with first at this time
Wheel is meshed, and first motor starts at this time, and then drives second bevel gear rotation by shaft, and then engage and drive by gear
First bevel gear rotation, and then the rotation of the first screw rod is driven, and then drive the decline of the second sliding block by being threadedly engaged connection, in turn
It drives the first sliding block to decline, seals briquetting at this time and carry out envelope pressure to connecting before and after envelope, seal envelope front and rear sides, in this process
In, the second sliding block drives second connecting rod to decline by first connecting rod, and then drives gluing block decline, and then coat on the right side of envelope
Glue, hereafter first motor inverts, and drives envelope briquetting and gluing block to restPose, the second electric motor starting, and then band at this time
Dynamic a quarter gear rotates 90 degree, and a quarter gear is disengaged from the 4th spur gear at this time, at this time in the first spring
Elastic force effect under restPose, at this time a quarter gear drive the first spur gear rotate clockwise 180 degree,
And then the second spur gear is driven to rotate clockwise 180 degree by shaft, and then engage by gear and drive third spur gear
180 degree are rotated counterclockwise, and then drives third piece installing plate to turn counterclockwise 180 degree by the second shaft, in turn
By being sealed on one side with glue;
Finally, the second motor rotates at this time, and then drives a quarter gear to rotate 180 degree, and then drive the 6th straight-tooth
Wheel rotation, and then baffle is driven to rise, packaged envelope can be taken out at this time, at this time the second electric motor starting, drive four/
One gear inverts 90 degree, and then restPoses.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810967015.3A CN109228758A (en) | 2018-08-23 | 2018-08-23 | A kind of envelope stuffing machine device and its application method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810967015.3A CN109228758A (en) | 2018-08-23 | 2018-08-23 | A kind of envelope stuffing machine device and its application method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109228758A true CN109228758A (en) | 2019-01-18 |
Family
ID=65069405
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810967015.3A Withdrawn CN109228758A (en) | 2018-08-23 | 2018-08-23 | A kind of envelope stuffing machine device and its application method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109228758A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110194304A (en) * | 2019-06-04 | 2019-09-03 | 嘉兴悦珂贸易有限公司 | A kind of sealing of mail, stamp sticking device and its application method |
-
2018
- 2018-08-23 CN CN201810967015.3A patent/CN109228758A/en not_active Withdrawn
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110194304A (en) * | 2019-06-04 | 2019-09-03 | 嘉兴悦珂贸易有限公司 | A kind of sealing of mail, stamp sticking device and its application method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109256682A (en) | A kind of flexible lightning device and its application method | |
CN107161410B (en) | A kind of intelligent industrial bag forming machine tool arm with swing type claw | |
CN109228758A (en) | A kind of envelope stuffing machine device and its application method | |
CN109338776A (en) | A kind of paper feeder | |
CN109178412A (en) | A kind of envelope stuffing machine device | |
CN108747148A (en) | A kind of stainless steel welded method | |
CN109113424A (en) | A kind of door lock assembly and its application method | |
CN108909308A (en) | A kind of full-automatic envelope stuffing machine device | |
CN109067332A (en) | A kind of device of solar generating | |
CN109256677A (en) | A kind of gas lightning arrester | |
CN109237278A (en) | A kind of intelligent object and intelligent appliance and its application method | |
CN205891510U (en) | Gift box | |
CN109203690A (en) | A kind of ink-jet apparatus | |
CN108997781A (en) | A kind of natural edible flavochrome obtains through refining device | |
CN109051080A (en) | A kind of stable paper-clips | |
CN108819541A (en) | A kind of the hand-operated binder device and its application method of tape punching mechanism | |
CN109088314A (en) | A kind of manufacture high-conductivity atmospheric layer active lightning protection lightning protection method and device | |
CN109209093A (en) | A kind of buffer for drive mechanism of telescopic door | |
CN109080319A (en) | A kind of novel magnetic clipboard | |
CN109113475A (en) | A kind of hinge and its use device and its application method | |
CN109237277A (en) | A kind of intelligent object and intelligent appliance | |
CN108952477A (en) | A kind of intelligence door switch unit | |
CN109209100A (en) | A kind of double-acting door closing device and its control method | |
CN108952398A (en) | A kind of hinge and its use device | |
CN108877051A (en) | A kind of integrated tea cigarette |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20190118 |
|
WW01 | Invention patent application withdrawn after publication |