CN109226288B - A kind of loop control method being related to when hot-strip tail portion rolls - Google Patents

A kind of loop control method being related to when hot-strip tail portion rolls Download PDF

Info

Publication number
CN109226288B
CN109226288B CN201811304789.4A CN201811304789A CN109226288B CN 109226288 B CN109226288 B CN 109226288B CN 201811304789 A CN201811304789 A CN 201811304789A CN 109226288 B CN109226288 B CN 109226288B
Authority
CN
China
Prior art keywords
control
rack
drop
band steel
tail part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201811304789.4A
Other languages
Chinese (zh)
Other versions
CN109226288A (en
Inventor
陈志军
杨平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maanshan Iron and Steel Co Ltd
Original Assignee
Maanshan Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maanshan Iron and Steel Co Ltd filed Critical Maanshan Iron and Steel Co Ltd
Priority to CN201811304789.4A priority Critical patent/CN109226288B/en
Publication of CN109226288A publication Critical patent/CN109226288A/en
Application granted granted Critical
Publication of CN109226288B publication Critical patent/CN109226288B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B41/00Guiding, conveying, or accumulating easily-flexible work, e.g. wire, sheet metal bands, in loops or curves; Loop lifters
    • B21B41/12Arrangements of interest only with respect to provision for indicating or controlling operations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B37/00Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
    • B21B37/72Rear end control; Front end control

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Control Of Metal Rolling (AREA)

Abstract

The present invention is suitable for Control Technology of Dancer field, provide a kind of loop control method being related to when hot-strip tail portion rolls, method is as follows: when tail part of band steel enters when steel region is thrown in the setting of forebay, control loop carries out drop set, entire drop set process is divided into three phases: the first stage: waiting the drop set control of interdigit for tower-loop control position to first, increases the reduction of speed correction amount of upstream stand by being superimposed offset on the basis of PI gain;Second stage: it waits position to wait the drop of interdigit to cover to second for first and controls, reduction of speed amendment is carried out to upstream stand using fixed compensation erection rate;Phase III: the drop set time of steel section is thrown to forebay is worked as in the second waiting position of control.To entirely drop and cover process subdivision is three phases, and the drop set control mode based on different phase uses different compensation schemes, to achieve the effect that help pull a cart plus open, overcomes and throws the disturbance of steel bring, tail portion tension is promoted, so as to improve whipping.

Description

A kind of loop control method being related to when hot-strip tail portion rolls
Technical field
The invention belongs to hot rolling mill loopers control technology fields, provide a kind of loop being related to when hot-strip tail portion rolls Control method.
Background technique
In the operation of rolling of hot continuous rolling especially in the rolling of limit thin gauge (2.0mm or less) strip, magnetic tape trailer is in essence Usually there is sideslip during throwing steel in mill stand, whipping leads to rotten tail even piling of steel.The stability of tail portion rolling is improved, pole is reduced The rotten tail rate of limit gauge lattice is all significant to raising production efficiency and Improving The Quality of Products.
One main cause of whipping problem are as follows: sideslip caused by the loss of tail part of band steel tension is out of control, when strip is in When portion's stable rolling, seven racks are exceptionally straight by strip, and tension force is stable and sufficient.But when upstream stand throws steel, strip Whole tension reduces therewith, and reduced amplitude is incremented by with being incremented by for steel rack is thrown, and forebay throws steel steel band set amount in addition Mutation and thin gauge frame aft speed promotion, be further exacerbated by the loss of tension, caused strip getting rid of in rear frame Tail, rotten tail, even sideslip piling of steel.Existing tower-loop control is often unable to fully the damage of tension caused by making up due to various reasons It loses, causes strip in the whipping of rear frame, rotten tail, even sideslip piling of steel.
Summary of the invention
The embodiment of the present invention provide it is a kind of be related to the loop control method on hot-strip head, improve tail part of band steel in finish rolling Stability when steel is rolled and thrown in rack, reduces the generation of strip whipping, rotten tail, even sideslip piling of steel phenomenon.
The invention is realized in this way a kind of loop control method being related to when hot-strip tail portion rolls, this method tool Body is as follows:
When tail part of band steel enters when the End-Management region that forebay is set, control loop carries out drop set, entire drop set Process is divided into three phases:
The drop of first stage covers control: waiting the drop of interdigit to cover control for tower-loop control position to first, by PI Offset is superimposed on the basis of gain to increase the reduction of speed correction amount of upstream stand;
The drop of second stage covers control: the drop set control for waiting position to wait interdigit to second for first is mended using fixed It repays erection rate and reduction of speed amendment is carried out to upstream stand;
The drop of phase III covers control: the time control in the stage that conforms to a conventional pattern controls the second waiting position to forebay is worked as and throws steel The drop of section covers the time.
Further, whether detection tail part of band steel enters the tail part of band steel control area of i# rack setting, detection method tool Body is as follows:
Calculate distance Y of the tail part of band steel away from i# racki
If actual range Y of the tail part of band steel away from i# rackiLess than LiWhen, then determine that tail part of band steel enters the setting of i# rack Tail part of band steel control area, wherein LiFor i# rack setting End-Management initial position to i# rack distance.
Further, tail part of band steel is away from i# rack distance YiCalculation method it is specific as follows:
Yi=Yi-1*Fi-1+D(i-1)i
Wherein, D(i-1)iFor (i-1) # rack to the distance of the i-th # rack, Fi-1For the pushing rate of (i-1) # rack, vs For strip linear velocity, D0For the distance of first group of heat inspection to 1# rack, t is the duration that tail part of band steel leaves the inspection of first group of heat.
Further, conforming to a conventional pattern the time for phase III is set based on the thickness of steel grade and rolling steel grade.
The loop control method provided by the invention being related to when hot-strip tail portion rolls has the following beneficial effects:
(1) time-based small set is improved to by the small set control based on distance to control, control here refer to based on when Between trigger the control of small set, improve the accuracy and flexibility of small set control;
(2) will entirely drop set process subdivision is three drop set stages, and the drop set control mode of different phase designs different Compensation control program overcomes to achieve the effect that help pull a cart plus open and throws the disturbance of steel bring, tail portion tension is promoted, so as to improve getting rid of Tail.
(3) can be conformed to a conventional pattern the time according to thickness flexible choice phase III of steel grade and rolling steel grade, to realize more Accurate control.
Detailed description of the invention
Fig. 1 is PI height closed-loop control schematic diagram provided in an embodiment of the present invention;
Fig. 2 is that loop tail portion provided in an embodiment of the present invention compensates control schematic diagram.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.
The substantially loss that the main reason for steel whipping occurs is tail part of band steel tension is thrown, the present invention designs one kind and draws stage by stage The control thought for covering compensation, when tail part of band steel enters the End-Management region of corresponding rack, control loop carries out drop set, drop set Process is divided into the following three stage:
The tower-loop control of first stage, i.e., small set control start, and when being down to the first waiting position, terminate first stage small set control While processed, start the tower-loop control of second stage, reduction of speed amendment, drop are carried out to upstream milling train using fixed compensation erection rate When waiting position to second, terminate the tower-loop control of second stage, the tower-loop control of phase III is started simultaneously at, when control conforms to a conventional pattern Between, that is, it controls from the second loop and waits position to the time for throwing steel when forebay.When therefore, based on the rolling of hot-strip tail portion is related to Loop control method it is specific as follows:
First stage tower-loop control: the drop set control for waiting interdigit to first for controlling position, control position here Refer to the initial position of first stage tower-loop control, or be defined as a position when EP (end of program), by PI gain On the basis of superposition offset come increase upstream stand by fast correction amount, achieve the effect that help pull a cart plus;
In embodiments of the present invention, whether detection tail part of band steel enters the tail part of band steel control area of i# rack setting, inspection Survey method is specific as follows:
When tail part of band steel is away from the actual range Y for working as forebayiLess than LiWhen, LiFor the End-Management starting of i# rack setting Position then determines that tail part of band steel enters when the tail part of band steel control area of forebay setting to the distance of i# rack;Work as reality Distance of the tail part of band steel away from i# rack that detection calculates be less than setting throw steel region initial position away from i# rack apart from when, recognize Fixed to enter the tail part of band steel control area for working as forebay, the small loop control of the i-th # rack starts.
The embodiment of the present invention is tracked the tail portion of strip, and the tracking of tail part of band steel is that first group of heat inspection is left from strip Start, first group of heat inspection is located at the upstream of 1# rack, the distance Y of tail part of band steel tail to 1# rack1Are as follows:Wherein vsFor strip linear velocity, D0It is first group of heat inspection to the distance of 1# rack, t is tail part of band steel Leave the duration of first group of heat inspection;Distance Y of the tail part of band steel to No. 2 racks2Are as follows: Y2=Y1*F1+D12, wherein F1For 1# rack Pushing rate, D12For 1# rack to distance between 2# rack;Distance Y of the tail part of band steel to 3# rack3Are as follows: Y3=Y2*F2+D23, F2 For the pushing rate of 2# rack, D23For 2# rack to the distance of 3# rack, and so on to Yi=Yi-1*Fi-1+D(i-1)i, D(i-1)iFor Distance of (i-1) the # rack to the i-th # rack, Fi-1For the pushing rate of (i-1) # rack, the value of i is 1~6, in the present invention (i-1) # rack pushing rate are as follows:HiFor the steel strip thickness for entering (i-1) # rack, HoFor (i-1) # rack Steel strip thickness after rolling.
Small loop control controls before starting for the looper height stable state in the middle part of strip, is traditional PI height control method, Control principle drawing is as shown in Figure 1.The height of loop, i.e. the metal flow equilibrium valve of upstream and downstream rack, be adjusted by set amount, and Set amount regulated value is realized by the speed correction amount of upstream stand.Wherein, set amount is set as Δ LREF, Δ L is actual set amount, Obtained by angular encoder survey calculation, δ L is deviation set amount, i.e. the difference of actual set amount and setting set amount, and s is transmission function In complex variable;Following gain parameter, K are demarcated by the correction link of PI controllerPGain is controlled for ratio;KIFor integral Control gain;Add master control gain KTAnd angle offset flow gain KC, so that it may calculate the speed amendment of upstream stand Measure Δ V, calculation formula such as formula (1)
When tail part of band steel enters the End-Management region of corresponding rack, i.e., control: this rank is covered into the drop of first stage Duan Zhangli starts to lose, and conventional height control can not make up loss tension.In the drop set control of this method in the first stage Function of helping pull a cart for the first time is designed, basic principle is the overall gain in height PI controller, is superimposed one on the basis of P gain and I gain A offset increases its PI amplitude of accommodation, increases upstream stand reduction of speed correction amount, achievees the effect that help pull a cart plus open, control is former Reason such as Fig. 2.Addition tail portion, which is helped pull a cart, on control master gain controls master gain KTC, tail portion, which is helped pull a cart, controls proportional gain KPC, tail portion is drawn Set control integral gain KIC, wherein KTC、KICAnd KPCIt is empirical parameter, is demarcated by the correction link of PI controller, then The calculating such as formula (2) of the reduction of speed correction amount V of upstream stand.
First stage drop set control in main gain parameter can flexibly be set by level-one, basis of design be second level steel grade and The corresponding level-one of thickness segments tower-loop control parameter list.
The drop of second stage covers control, the drop set control for waiting position to wait position to second for first, using fixed benefit It repays erection rate and reduction of speed amendment is carried out to upstream stand, achieve the effect that help pull a cart plus open;
The drop of second stage covers control: the drop set control of first stage terminates, i.e. looper height PI control terminates, and lives at this time Set is set to the first waiting position by the automatic APC in position control drop, is the starting point of second stage drop set control by this, is down to the Two wait position.It is that will not adjust upstream stand speed by loop control, then under loop since the control of PI height has been switched off Set amount during drop between rack is to maintain constant, and strip is necessarily in out of control and loses state, but also can choose set.So This method devises function of helping pull a cart for the second time, and principle is that take is that upstream stand drops in the amendment of fixed slope and ratio Speed eliminates set amount to reach, helps pull a cart and throw the effect of tail, control principle and process are shown in Fig. 2.The upstream stand of second stage corrects speed Spend Δ V=Δ VC, Δ VCFor the fixed compensation erection rate that conforms to a conventional pattern, this speed variable is flexibly set, basis of design two by level-one Grade steel grade and the corresponding level-one of thickness segment tower-loop control parameter list.
The drop of phase III covers control: the time control in the stage that conforms to a conventional pattern, and falling for steel section is thrown in the second waiting position of control to the machine Cover the time;
The drop of phase III covers control, waits potential drop to throw steel to this rack from second, and controlling the time that conforms to a conventional pattern is t2, the time t2Must be as short as possible, since tail portion tracking is inevitable with the presence of error, but time t2Can not be too short, it needs to select one Suitable time value.Conform to a conventional pattern time t in this method2It can be by flexibly setting, basis of design is second level steel grade and thickness corresponding one Grade subdivision tower-loop control parameter list, time control precision up to Millisecond.
The loop control method provided by the invention being related to when hot-strip tail portion rolls has the following beneficial effects:
(1) time-based small set is improved to by the small set control based on distance to control, control here refer to based on when Between trigger the control of small set, improve the accuracy and flexibility of small set control;
(2) will entirely drop set process subdivision is three drop set stages, and the drop set control mode of different phase is using different Compensation scheme overcomes to achieve the effect that help pull a cart plus open and throws the disturbance of steel bring, tail portion tension is promoted, so as to improve whipping.
(3) can be conformed to a conventional pattern the time according to thickness flexible choice phase III of steel grade and rolling steel grade, to realize more Accurate control.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.

Claims (4)

1. a kind of loop control method being related to when hot-strip tail portion rolls, which is characterized in that the method is specific as follows:
When tail part of band steel enters when the tail part of band steel control area that forebay is set, control loop carries out drop set, entire drop set Process is divided into three phases:
The drop of first stage covers control: waiting the drop of interdigit to cover control for tower-loop control position to first, by PI gain On the basis of superposition offset increase the reduction of speed correction amount of upstream stand;
The drop of second stage covers control: the drop set control for waiting position to wait interdigit to second for first is repaired using fixed compensation Positive speed carries out reduction of speed amendment to upstream stand;
The drop of phase III covers control: the time control in the stage that conforms to a conventional pattern controls the second waiting position to forebay is worked as and throws steel section The drop set time.
2. being related to the loop control method when rolling of hot-strip tail portion as described in claim 1, which is characterized in that detection strip Whether tail portion enters the tail part of band steel control area of i# rack setting, and detection method is specific as follows:
Calculate distance Y of the tail part of band steel away from i# racki
If actual range Y of the tail part of band steel away from i# rackiLess than LiWhen, then determine that tail part of band steel enters the strip of i# rack setting End-Management region, wherein LiFor i# rack setting End-Management initial position to i# rack distance.
3. being related to the loop control method when rolling of hot-strip tail portion as claimed in claim 2, which is characterized in that tail part of band steel Away from i# rack distance YiCalculation method it is specific as follows:
Yi=Yi-1*Fi-1+D(i-1)i
Wherein, D(i-1)iFor (i-1) # rack to the distance of the i-th # rack, Fi-1For the pushing rate of (i-1) # rack, vsFor band Steel wire speed, D0For the distance of first group of heat inspection to 1# rack, t is the duration that tail part of band steel leaves the inspection of first group of heat.
4. being related to the loop control method when rolling of hot-strip tail portion as claimed in claim 2, which is characterized in that be based on steel grade And thickness sets conforming to a conventional pattern the time for phase III.
CN201811304789.4A 2018-11-02 2018-11-02 A kind of loop control method being related to when hot-strip tail portion rolls Active CN109226288B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811304789.4A CN109226288B (en) 2018-11-02 2018-11-02 A kind of loop control method being related to when hot-strip tail portion rolls

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811304789.4A CN109226288B (en) 2018-11-02 2018-11-02 A kind of loop control method being related to when hot-strip tail portion rolls

Publications (2)

Publication Number Publication Date
CN109226288A CN109226288A (en) 2019-01-18
CN109226288B true CN109226288B (en) 2019-11-01

Family

ID=65076857

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811304789.4A Active CN109226288B (en) 2018-11-02 2018-11-02 A kind of loop control method being related to when hot-strip tail portion rolls

Country Status (1)

Country Link
CN (1) CN109226288B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110961469B (en) * 2019-12-19 2021-04-27 北京首钢股份有限公司 Method and device for controlling stability of strip steel head
CN113245380B (en) * 2021-04-16 2023-04-11 首钢集团有限公司 Method for preventing strip steel from piling and related equipment

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2763641B2 (en) * 1990-01-31 1998-06-11 日新製鋼株式会社 Control method of strip removal of strip on hot run table
JP4598112B2 (en) * 2008-09-12 2010-12-15 東芝三菱電機産業システム株式会社 Looper motor controller
DE102010028922A1 (en) * 2010-05-12 2011-11-17 Siemens Aktiengesellschaft A method of adjusting a tension for a metal belt passing through a plant, control and / or regulating device for a metal belt processing plant, and plant for processing metal strip
CN103624086B (en) * 2012-08-24 2015-10-07 攀钢集团攀枝花钢钒有限公司 A kind of method of hot continuous rolling titanium plate rolling tower-loop control
CN106391722B (en) * 2016-11-28 2018-04-03 山西太钢不锈钢股份有限公司 A kind of control method for solving hot-strip silicon steel afterbody drawing down
CN107486472B (en) * 2017-09-12 2019-07-02 首钢集团有限公司 A kind of loop control method

Also Published As

Publication number Publication date
CN109226288A (en) 2019-01-18

Similar Documents

Publication Publication Date Title
CN109226288B (en) A kind of loop control method being related to when hot-strip tail portion rolls
CN109351784A (en) It is a kind of to be related to the loop control method on hot-strip head
CN110227723B (en) Parameter control method for initial section of continuous annealing six-roller cold rolling temper mill
CN103056171B (en) Quadratic curve control method for short stroke of rough rolling vertical roll
JP5587825B2 (en) Tension control device and control method for hot rolling mill
CN103909095A (en) Loop control method and rolling method of hot rolling mill
CN105983584B (en) A kind of continuous hot-rolling mill threading deviation tension control method and its control system
CN107073534B (en) For casting and rolling the method and casting rolling equipment of continuous casting blank material without a head
CN102688899A (en) Control method of percentage elongation of double-stand temper mill
CN104801547A (en) Method for dynamically controlling loop angle of hot continuous rolling mill
JP5733230B2 (en) Control device for hot rolling line
CN106391722B (en) A kind of control method for solving hot-strip silicon steel afterbody drawing down
CN101181723A (en) Elongation controlling means for burnishing machine
CN105499279B (en) A kind of cold-strip plate shape feed forward control method
CN108677002B (en) A kind of furnace internal tension compensating control method suitable for tandem rolling Horizental annealer
KR102313235B1 (en) Temperature control device of endless rolling line
CN105983582A (en) Thickness feedback control method for hot continuous rolling strip steel
CN109731929B (en) Hydraulic loop control method based on pole allocation method
CN107042240B (en) A kind of high precision plate strip rolling process dynamic variable specification implementation method based on feature point tracking
CN110883101B (en) Method and device for controlling thickness of strip steel
KR100518334B1 (en) The method for cooling a hot strip
CN111036690A (en) Method for controlling deflection of rough rolling intermediate billet
CN115401077B (en) Rear sliding speed control method, device, medium and equipment
CN111282995B (en) Control method for improving hot continuous rolling finish rolling strip steel flying shear shearing precision
CN111195655A (en) Control method for high-carbon steel head impact marks

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant