CN109226275A - Pressure flow hybrid control system and operating method for the high line lubricating arrangement of metallurgy - Google Patents

Pressure flow hybrid control system and operating method for the high line lubricating arrangement of metallurgy Download PDF

Info

Publication number
CN109226275A
CN109226275A CN201810939911.9A CN201810939911A CN109226275A CN 109226275 A CN109226275 A CN 109226275A CN 201810939911 A CN201810939911 A CN 201810939911A CN 109226275 A CN109226275 A CN 109226275A
Authority
CN
China
Prior art keywords
pressurized tank
liquid level
pressure
lubricating arrangement
oil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810939911.9A
Other languages
Chinese (zh)
Other versions
CN109226275B (en
Inventor
李骏霖
王成鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan chuanrun intelligent fluid technology Co.,Ltd.
Original Assignee
SICHUAN CRUN CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SICHUAN CRUN CO Ltd filed Critical SICHUAN CRUN CO Ltd
Priority to CN201810939911.9A priority Critical patent/CN109226275B/en
Publication of CN109226275A publication Critical patent/CN109226275A/en
Application granted granted Critical
Publication of CN109226275B publication Critical patent/CN109226275B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B37/00Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B37/00Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
    • B21B2037/002Mass flow control

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Fluid-Pressure Circuits (AREA)

Abstract

The invention discloses a kind of pressure flow hybrid control systems for the high line lubricating arrangement of metallurgy, including oil pump, pressurized tank, Pneumatic butterfly valve, pressure transmitter, pneumatic control part and the magnetic float liquidlevel meter being mounted on pressurized tank, safety valve and pressure gauge;Control system includes PLC controller, the human-computer interaction device with PLC controller communication connection;PLC controller includes power supply, switching input module, switching value output module, Analog input mModule, analog output module, communication module and central processing unit.The design of the invention is scientific and reasonable, stable can provide lubricating oil to milling train, reliable for operation, guarantees the good lubrication of milling equipment, and system is powered down or the former energy depended on pressure tank of failure continues fuel feeding 3~5 minutes, guarantees milling train safe shutdown.

Description

Pressure flow hybrid control system and operating method for the high line lubricating arrangement of metallurgy
Technical field
The invention belongs to metallurgical high speed wire rolling technical fields, and in particular to a kind of pressure for the high line lubricating arrangement of metallurgy Flow control system and operating method.
Background technique
Its speed can reach 100m/s or more to the high line of metallurgy during the rolling process, thus to the automatic control level of equipment It is required that very high.During high speed wire rolling, a large amount of bearings and gear operate under high speed, higher load condition, the confession of lubricating arrangement Oil-proofness plays the role of highly important.
High-speed wire mill includes thick, middle bundle equipment and finish rolling machine equipment.Wherein thick, the middle lubrication object for pricking equipment is mainly tooth Wheel and rolling bearing, are mainly characterized by low speed, and heavy duty, oil liquid is ejected on gear, need to guarantee enough flows and pressure, Therefore generally require the viscosity of lubricating oil product big.Due to steel mill's milling train characteristic distributions, pipeline is longer, and charge oil pressure, flow are unstable It is fixed, it is bad to will lead to mill lubrication.Finish rolling machine equipment includes pre-finishing mill, finishing mill, reducing sizing mill, Laying head etc..It is such to set Standby revolving speed is high, there is a large amount of rolling bearings and filmatic bearing.Due to having the presence of roll-box, directly receiving rolling load, practical item Part is harsher, and filmatic bearing mostly uses hydrldynamic pressure lubrication, so cleannes and pressure, the traffic requirement to oil product are stringent.
Therefore it provides a kind of pressure flow hybrid control system for the high line lubricating arrangement of metallurgy, offer that can be stable lubricates Oil, it is reliable for operation, guarantee the good lubrication of milling equipment, system is powered down or the former energy depended on pressure tank of failure continues 3~5 points of fuel feeding Clock guarantees milling train safe shutdown, becomes those skilled in the art's urgent problem to be solved.
Summary of the invention
It is an object of the invention to overcome the deficiencies of the prior art and provide a kind of pressure for the high line lubricating arrangement of metallurgy Flow control system and method, milling equipment lubricating arrangement fuel feeding is unstable in the prior art for solution, influences equipment safety operation The problem of.
The purpose of the present invention is achieved through the following technical solutions: a kind of pressure for the high line lubricating arrangement of metallurgy Flow control system, including oil pump, pressurized tank, Pneumatic butterfly valve, pressure transmitter, pneumatic control part and it is mounted on pressurized tank On magnetic float liquidlevel meter, safety valve and pressure gauge;
Control system includes PLC controller, the human-computer interaction device with PLC controller communication connection;
PLC controller includes power supply, switching input module, switching value output module, Analog input mModule, analog quantity Output module, communication module and central processing unit;
Human-computer interaction device is used to carry out parameter setting, Data visualization and the offer operation interface of control system;
At least two, oil pump, two one, oil pump operations one are spare, two oil pumps mutual backup at runtime;
Pressure transmitter at least one, it is installed on the outlet of pressurized tank, the pressure for acquiring and feedback pressure tank exports Power;
Four liquid-level switches are at least installed on magnetic float liquidlevel meter, are respectively intended to high point, the liquid level of detection pressure liquid level Operating point, liquid level low spot and liquid level low spot;
Pneumatic butterfly valve at least one, the feedback signal above with feedback valve opening and closing is installed on after pressure transmitter The outlet of pressurized tank, for controlling the opening and closing of oil-feed port;
Pneumatic control part, comprising bi-bit bi-pass (normally closed) solenoid valve for controlling Pneumatic butterfly valve, when gas supply pneumatic butterfly Valve is closed, and is stopped Pneumatic butterfly valve when gas supply and is opened;For controlling bi-bit bi-pass (normally opened) solenoid valve supplied to pressurized tank, electromagnetism Valve must not supply when electricity to pressurized tank, not supply to pressurized tank when solenoid valve obtains electric, for controlling supply to pressurized tank two It is connected on the same pipeline of position two-way (normally opened) solenoid valve and increases stressed supercharger arrangement, for bleed pressure to be increased, Guarantee that pressure is greater than charge oil pressure.
It is preferred that oil pump the using and the reserved, mutual backup, switching, exchange-column shift, pressure are low when including oil pump fault When switch.
It is preferred that liquid-level switch on pressurized tank, high point, low spot are for alarming, and low spot is for reporting weight failure to stop Machine, work liquid level is for controlling bi-bit bi-pass (normally opened) solenoid valve, and when being higher than work liquid level, solenoid valve power loss is mended to pressurized tank Gas declines liquid level, be lower than work liquid level when, solenoid valve obtain it is electric, stopping give pressurized tank tonifying Qi.
It is preferred that Pneumatic butterfly valve be it is open in usual, not supplying be Pneumatic butterfly valve is opening state, and gas supply is to close shape State can give milling train fuel feeding when guaranteeing lubricating arrangement power down.
It is preferred that being equipped with safety valve on pressurized tank, prevent pressure pressure tank too high, pressure gauge is installed, uses Pressure pressure tank is observed on site, while the volume of pressurized tank wants sufficiently large, when guaranteeing that system is powered down, remain to 3~5 points of fuel feeding Clock guarantees milling train safe shutdown.
It is preferred that PLC controller exports following signals to master control:
The signal of information is provided: pointing out the presence of a condition, saves information record;
System early warning: if alarm is within a certain period of time without processed, issuing terminates rolling signal, and opening terminates rolling Process;
Terminate rolling signal: milling train terminates billet rolling, does not allow to be supplemented steel billet, once steel billet terminates to roll, milling train It shuts down, next stops lubricating arrangement;
Fault-signal: it is cataclasm to cut operation, do not allow rolling mill input, to pressurized tank supply bi-bit bi-pass (normally opened) power loss when It is supplied to pressurized tank, guarantees the regular supply of oil liquid, guarantee safe shutdown.
It is preferred that the invention also includes for controlling and protecting oil pump electrothermal relay, A.C. contactor and Breaker is installed in control cabinet.
It is preferred that the invention also includes control cabinet, PLC controller, electrothermal relay, A.C. contactor, breaker It is mounted in control cabinet, human-computer interaction device is mounted on the door of control cabinet.
It is preferred that PLC controller is Siemens S7-1500PLC controller.
A kind of operating method of the pressure flow hybrid control system for the high line lubricating arrangement of metallurgy, includes the following steps:
Step 1: the current setting of setting motor heating relay, two Oil pump electrical machineries are set as 84.9A, adjustment pressure The pressure of safety valve is 10bar on power tank, sets the supply gas pressure 5bar of system gas source, adjusts liquid-level switch on pressurized tank Sender position: liquid level low spot (the 30% of pressurized tank liquid level), liquid level low spot (the 40% of pressurized tank liquid level), pressure Power tank work liquid level (the 70% of pressurized tank liquid level), liquid level high point (the 90% of pressurized tank liquid level);
Step 2: system electrification, pre-set system operational parameters: system working pressure, the system pressure upper limit and under Limit;Step setting is generally carried out in human-computer interaction device or interface;Crawl Oil pump electrical machinery, checks whether the steering of motor meets Design requirement, if turn on the contrary, if change the motor mode of connection;
Step 3: System self-test, lubricating arrangement, which issues, if normal allows long-range enabling signal;
In general, in System self-test, allow long-range enabling signal, fatal mistake as long as not occurring fatal error and can issue Accidentally such as pressure is too high, oil pump overloads, oil pump inlet valve completely closes, and self-test key sensor is normal (pressure transmitter), closes Key valve position is normal (Pneumatic butterfly valve, in open state);
Step 4: after master control receives the long-range enabling signal of lubricating arrangement permission, lubricating arrangement is given to send driving signal, lubrication After petrol station receives driving signal, lubricating arrangement starts immediately, executes step 6;
Step 5: if lubricating arrangement does not receive driving signal, return step three;
Step 6: the starting oil-filled program of pressurized tank, pressurized tank oil-filled time are 120S,
Step 7: whether detection pressurized tank liquid level is lower than low liquid level;If being lower than low liquid level, bi-bit bi-pass (normally closed) electromagnetism Valve obtain it is electric, give Pneumatic butterfly valve gas supply, make Pneumatic butterfly valve close 10S, open 5S, return step six;
Step 8: until the pressurized tank oil-filled time arrives or pressurized tank liquid level is not less than low liquid level;Then perform the next step;
Step 9: lubricating arrangement starts to start oil-filled completion program, start-up study timer, delay time 10S;
Step 10: delay time arrives, and starts to detect charge oil pressure, and charge oil pressure is low, then spare pump startup, executes step 10 One;If not low, which is run always, executes step 12;
Step 11: it if after spare pump startup, delay 3S stops main pump, and alarms, prompts which pump faulty, executes step Rapid 12;
Step 12: starting pressurized tank supplies program, before lubricating arrangement starting, if pressurized tank liquid level is higher than work liquid level, Then bi-bit bi-pass (normally opened) solenoid valve power loss, to pressurized tank gas supply (be connected with supercharger arrangement behind solenoid valve, be pressurized ratio 2: 1, for air pressure to be increased to 10bar by original 5bar), until liquid level works liquid level lower than pressurized tank, solenoid valve obtains electric, stops Only supplied to pressurized tank;
After lubricating arrangement starting, if pressurized tank liquid level is higher than work liquid level, it is high that delay 5S or pressurized tank liquid level are higher than liquid level Set point, then bi-bit bi-pass (normally opened) solenoid valve power loss give pressurized tank gas supply, until liquid level works liquid level lower than pressurized tank, prolong When 5S, solenoid valve obtain it is electric, stop give pressurized tank gas supply;
In system operation, pressurized tank liquid level is stable always near the work liquid level of pressurized tank setting, guarantees pressure Power tank has enough oil liquid and pressure, guarantees that lubricating arrangement charge oil pressure, flow in the range of setting;
If middle control the operation for needing to stop lubricating arrangement, the driving signal of lubricating arrangement is disconnected, lubricating arrangement starting stops Only program, first oil pump are out of service.
The beneficial effects of the present invention are:
The configuration of the present invention is simple, design is scientific and reasonable, stable can provide lubricating oil to milling train, reliable for operation, guarantees to roll The good lubrication of machine equipment, system is powered down or the former energy depended on pressure tank of failure continues fuel feeding 3~5 minutes, guarantees milling train safe stopping Machine.
Main power source is provided to system by oil pump in the present invention, air supply system provides auxiliary power source, and pressurized tank is used for Systems stabilisation charge oil pressure guarantees charge oil pressure, stability of flow, while storing oil liquid with pressurized tank, guarantees that system is powered down or oil When failure of pump, milling train fuel feeding can persistently be given by appointing, and guarantee milling train safe shutdown.
Very convenient, excellent working performance is safeguarded in present invention maintenance, and long service life can be long-term steady in complex environment Surely it runs.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention.
Specific embodiment
Technical solution of the present invention is described in further detail with reference to the accompanying drawing, but protection scope of the present invention is not limited to It is as described below.
As shown in Figure 1, a kind of pressure flow hybrid control system for the high line lubricating arrangement of metallurgy, lubricating arrangement includes oil Pump, pressurized tank, Pneumatic butterfly valve, pressure transmitter, pneumatic control part and the magnetic float liquidlevel meter being mounted on pressurized tank, peace Full valve and pressure gauge;
Pneumatic control part includes for controlling the bi-bit bi-pass of Pneumatic butterfly valve (normally closed) solenoid valve, for controlling to pressure Bi-bit bi-pass (normally opened) solenoid valve of tank gas supply, and for increasing stressed supercharger arrangement;
Control system includes PLC controller, the human-computer interaction device with PLC controller communication connection;
PLC controller includes power supply, switching input module, switching value output module, Analog input mModule, analog quantity Output module, communication module and central processing unit;
Human-computer interaction device is used to carry out parameter setting, Data visualization and the offer operation interface of control system;
At least two, oil pump, two one, oil pump operations one are spare, two oil pumps mutual backup at runtime;
Pressure transmitter at least one, it is installed on pressurized tank outlet, the pressure for acquiring and feedback pressure tank exports;
Four liquid-level switches are at least installed on magnetic float liquidlevel meter, are respectively intended to high point, the liquid level of detection pressure liquid level Operating point, liquid level low spot and liquid level low spot;
Pneumatic butterfly valve at least one, the feedback signal above with feedback valve opening and closing, after being installed on pressure transmitter Pressurized tank outlet, for controlling the opening and closing of oil-feed port;
Pneumatic control part, comprising bi-bit bi-pass (normally closed) solenoid valve for controlling Pneumatic butterfly valve, when gas supply pneumatic butterfly Valve is closed, and is stopped Pneumatic butterfly valve when gas supply and is opened;For controlling bi-bit bi-pass (normally opened) solenoid valve supplied to pressurized tank, electromagnetism Valve must not supply when electricity to pressurized tank, not supply to pressurized tank when solenoid valve obtains electric, for controlling supply to pressurized tank two It is connected on the same pipeline of position two-way (normally opened) solenoid valve and increases stressed supercharger arrangement, for bleed pressure to be increased, Guarantee that pressure is greater than charge oil pressure.
In a preferred embodiment, oil pump the using and the reserved, mutual backup, include oil pump fault when switching, exchange-column shift, Switch when pressure is low.
In a preferred embodiment, liquid-level switch on pressurized tank, high point, low spot are for alarming, and low spot is for reporting weight Disorderly closedown, work liquid level is for controlling bi-bit bi-pass (normally opened) solenoid valve, when being higher than work liquid level, solenoid valve power loss, to pressure Power tank tonifying Qi, declines liquid level, be lower than work liquid level when, solenoid valve obtain it is electric, stopping give pressurized tank tonifying Qi.
In a preferred embodiment, Pneumatic butterfly valve is open in usual, and not supplying be Pneumatic butterfly valve is opening state, and gas supply is Closed state can give milling train fuel feeding when guaranteeing lubricating arrangement power down.
In a preferred embodiment, safety valve is installed on pressurized tank, prevents pressure pressure tank too high, pressure is installed Table is used for field observation pressure pressure tank, while the volume of pressurized tank wants sufficiently large, when guaranteeing that system is powered down, remain to fuel feeding 3~ 5 minutes, guarantee milling train safe shutdown.
In a preferred embodiment, PLC controller exports following signals to master control:
The signal of information is provided: pointing out the presence of a condition, saves information record;
System early warning: if alarm is within a certain period of time without processed, issuing terminates rolling signal, and opening terminates rolling Process;
Terminate rolling signal: milling train terminates billet rolling, does not allow to be supplemented steel billet, once steel billet terminates to roll, milling train It shuts down, next stops lubricating arrangement;
Fault-signal: it is cataclasm to cut operation, do not allow rolling mill input, to pressurized tank supply bi-bit bi-pass (normally opened) power loss when It is supplied to pressurized tank, guarantees the regular supply of oil liquid, guarantee safe shutdown.
In a preferred embodiment, the invention also includes connect for controlling and protecting the electrothermal relay of oil pump, exchange Tentaculum and breaker, are installed in control cabinet.
In a preferred embodiment, the invention also includes control cabinet, PLC controller, electrothermal relay, A.C. contactor, Breaker is mounted in control cabinet, and human-computer interaction device is mounted on the door of control cabinet.
In a preferred embodiment, PLC controller is Siemens S7-1500PLC controller.
A kind of operating method of the pressure flow hybrid control system for the high line lubricating arrangement of metallurgy, includes the following steps:
Step 1: the current setting of setting motor heating relay, two Oil pump electrical machineries are set as 84.9A, adjustment pressure The pressure of safety valve is 10bar on power tank, sets the supply gas pressure 5bar of system gas source, adjusts liquid-level switch on pressurized tank Sender position: liquid level low spot (the 30% of pressurized tank liquid level), liquid level low spot (the 40% of pressurized tank liquid level), pressure Power tank work liquid level (the 70% of pressurized tank liquid level), liquid level high point (the 90% of pressurized tank liquid level);
Step 2: system electrification, pre-set system operational parameters: system working pressure, the system pressure upper limit and under Limit;Step setting is generally carried out in human-computer interaction device or interface;Crawl Oil pump electrical machinery, checks whether the steering of motor meets Design requirement, if turn on the contrary, if change the motor mode of connection;
Step 3: System self-test, lubricating arrangement, which issues, if normal allows long-range enabling signal;
In general, in System self-test, as long as not occurring, fatal error is i.e. capable of emitting to allow long-range enabling signal (such as pressure Too high, oil pump overload, oil pump inlet valve completely close), key sensor is normal (pressure transmitter), and crucial valve position is normal (Pneumatic butterfly valve, in open state);
Step 4: after master control receives the long-range enabling signal of lubricating arrangement permission, lubricating arrangement is given to send driving signal, lubrication After petrol station receives driving signal, lubricating arrangement starts immediately, executes step 6;
Step 5: if lubricating arrangement does not receive driving signal, return step three;
Step 6: the starting oil-filled program of pressurized tank, pressurized tank oil-filled time are 120S,
Step 7: whether detection pressurized tank liquid level is lower than low liquid level;If being lower than low liquid level, bi-bit bi-pass (normally closed) electromagnetism Valve obtain it is electric, give Pneumatic butterfly valve gas supply, make Pneumatic butterfly valve close 10S, open 5S, return step six;
Step 8: until the pressurized tank oil-filled time arrives or pressurized tank liquid level is not less than low liquid level;Then perform the next step;
Step 9: lubricating arrangement starts to start oil-filled completion program, start-up study timer, delay time 10S;
Step 10: delay time arrives, and starts to detect charge oil pressure, and charge oil pressure is low, then spare pump startup, executes step 10 One;If not low, which is run always, executes step 12;
Step 11: it if after spare pump startup, delay 3S stops main pump, and alarms, prompts which pump faulty, executes step Rapid 12;
Step 12: starting pressurized tank supplies program, before lubricating arrangement starting, if pressurized tank liquid level is higher than work liquid level, Then bi-bit bi-pass (normally opened) solenoid valve power loss, to pressurized tank gas supply (be connected with supercharger arrangement behind solenoid valve, be pressurized ratio 2: 1, for air pressure to be increased to 10bar by original 5bar), until liquid level works liquid level lower than pressurized tank, solenoid valve obtains electric, stops Only supplied to pressurized tank;
After lubricating arrangement starting, if pressurized tank liquid level is higher than work liquid level, it is high that delay 5S or pressurized tank liquid level are higher than liquid level Set point, then bi-bit bi-pass (normally opened) solenoid valve power loss give pressurized tank gas supply, until liquid level works liquid level lower than pressurized tank, prolong When 5S, solenoid valve obtain it is electric, stop give pressurized tank gas supply;
In system operation, pressurized tank liquid level is stable always near the work liquid level of pressurized tank setting, guarantees pressure Power tank has enough oil liquid and pressure, guarantees that lubricating arrangement charge oil pressure, flow in the range of setting;
If middle control the operation for needing to stop lubricating arrangement, the driving signal of lubricating arrangement is disconnected, lubricating arrangement starting stops Only program, first oil pump are out of service.
In a preferred embodiment, whether detection pressurized tank liquid level is higher than work liquid level, two if being higher than work liquid level Position two-way (normally opened) solenoid valve power loss gives pressurized tank gas supply, and until liquid level works liquid level lower than pressurized tank, solenoid valve obtains electric, stops Only supplied to pressurized tank;If liquid level lower than pressurized tank work liquid level, allow solenoid valve always it is electric;Execute: start-up study is closed The Pneumatic butterfly valve of lubricating arrangement fuel feeding button, delay time 30S or pressurized tank liquid level lower than setting low liquid level point, then two Two-way (normally closed) solenoid valve obtain it is electric, give Pneumatic butterfly valve gas supply, close Pneumatic butterfly valve, lubricating arrangement fuel cut-off.
In a preferred embodiment, at any time, if lubricating arrangement oil pump is out of service, milling train operation letter is also received Number, then Pneumatic butterfly valve is opened, while being supplied to pressurized tank always, so that the oil liquid of pressurized tank is supplied milling train always, is guaranteed milling train Safe operation;
In a preferred embodiment, at any time, as long as Lubrication Control System power down, Pneumatic butterfly valve is opened, together Shi Yizhi is supplied to pressurized tank, and the oil liquid of pressurized tank is made to supply milling train always;The volume of pressurized tank in this are as follows: 3258L, lubrication The metered flow of device is 736L/min;When guaranteeing that system is powered down, appointing can be fuel feeding 3~5 minute, guarantees milling train safe shutdown.
Device therefor and electronic component of the present invention are existing known device and electronic component, by will be above-mentioned existing Equipment and electronic component are cleverly combined by science, efficiently solve milling equipment lubricating arrangement fuel feeding in the prior art It is unstable, the problem of influencing equipment safety operation;When guaranteeing that system is powered down simultaneously, appointing can be fuel feeding 3~5 minute, guarantees milling train peace Full cut-off machine.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, it is noted that all Made any modifications, equivalent replacements, and improvements etc. within the spirit and principles in the present invention should be included in guarantor of the invention Within the scope of shield.

Claims (7)

1. a kind of pressure flow hybrid control system for the high line lubricating arrangement of metallurgy, it is characterised in that: including oil pump, pressurized tank, Pneumatic butterfly valve, pressure transmitter, pneumatic control part and the magnetic float liquidlevel meter being mounted on pressurized tank, safety valve and pressure Table;
Control system includes PLC controller, the human-computer interaction device with PLC controller communication connection;
PLC controller includes power supply, switching input module, switching value output module, Analog input mModule, analog output Module, communication module and central processing unit;
Human-computer interaction device is used to carry out parameter setting, Data visualization and the offer operation interface of control system;
At least two, oil pump, two one, oil pump operations one are spare;
Pressure transmitter at least one, it is installed on the outlet of pressurized tank, the pressure for acquiring and feedback pressure tank exports;
Four liquid-level switches are at least installed on magnetic float liquidlevel meter, are respectively intended to high point, the liquid level work of detection pressure liquid level Point, liquid level low spot and liquid level low spot;
Pneumatic butterfly valve at least one, the feedback signal above with feedback valve opening and closing is installed on pressure after pressure transmitter The outlet of tank, for controlling the opening and closing of oil-feed port;
Pneumatic control part, comprising bi-bit bi-pass (normally closed) solenoid valve for controlling Pneumatic butterfly valve, Pneumatic butterfly valve is closed when gas supply It closes, stops Pneumatic butterfly valve when gas supply and open;For controlling bi-bit bi-pass (normally opened) solenoid valve supplied to pressurized tank, solenoid valve is not It gives pressurized tank to supply when obtaining electric, pressurized tank is not given to supply when solenoid valve obtains electric, for controlling two two supplied to pressurized tank It is connected on the same pipeline of logical (normally opened) solenoid valve and increases stressed supercharger arrangement, for increasing bleed pressure, guaranteed Pressure is greater than charge oil pressure.
2. a kind of pressure flow hybrid control system for the high line lubricating arrangement of metallurgy according to claim 1, feature exist Be in: Pneumatic butterfly valve it is open in usual, not supplying be Pneumatic butterfly valve is opening state, and gas supply is closed state, guarantees lubricating arrangement dress When setting power down, milling train fuel feeding can be given.
3. a kind of pressure flow hybrid control system for the high line lubricating arrangement of metallurgy according to claim 1, feature exist In: PLC controller exports following signals to master control:
The signal of information is provided: pointing out the presence of a condition, saves information record;
System early warning: if alarm is within a certain period of time without processed, issuing terminates rolling signal, and opening terminates rolling stream Journey;
Terminate rolling signal: milling train terminates billet rolling, does not allow to be supplemented steel billet, once steel billet terminates to roll, milling train is shut down, Next stop lubricating arrangement;
Fault-signal: it is cataclasm to cut operation, do not allow rolling mill input, to pressurized tank supply bi-bit bi-pass (normally opened) power loss when to pressure Power tank gas supply, guarantees the regular supply of oil liquid, guarantees safe shutdown.
4. a kind of pressure flow hybrid control system for the high line lubricating arrangement of metallurgy according to claim 1, feature exist In: further include the electrothermal relay, A.C. contactor and breaker for controlling and protecting oil pump, is installed in control cabinet.
5. a kind of pressure flow hybrid control system for the high line lubricating arrangement of metallurgy according to claim 1, feature exist In: it further include control cabinet, PLC controller, electrothermal relay, A.C. contactor, breaker are mounted in control cabinet, and human-computer interaction is set It is standby to be mounted on the door of control cabinet.
6. a kind of pressure flow hybrid control system for the high line lubricating arrangement of metallurgy according to claim 1, feature exist In: PLC controller is Siemens S7-1500PLC controller.
7. a kind of operating method of the pressure flow hybrid control system for the high line lubricating arrangement of metallurgy, which is characterized in that including such as Lower step:
Step 1: the current setting of setting motor heating relay, two Oil pump electrical machineries are set as 84.9A, adjust pressurized tank The pressure of upper safety valve is 10bar, sets the supply gas pressure 5bar of system gas source, adjusts the hair of liquid-level switch on pressurized tank Interrogate position: liquid level low spot, liquid level low spot, pressurized tank work liquid level, liquid level high point;
Step 2: system electrification, pre-set system operational parameters: system working pressure, the system pressure upper limit and lower limit;Point Dynamic Oil pump electrical machinery, checks whether the steering of motor meets design requirement, if turn on the contrary, if change the motor mode of connection;
Step 3: System self-test, lubricating arrangement, which issues, if normal allows long-range enabling signal;
Step 4: after master control receives the long-range enabling signal of lubricating arrangement permission, lubricating arrangement is given to send driving signal, lubricating oil station After receiving driving signal, lubricating arrangement starts immediately, executes step 6;
Step 5: if lubricating arrangement does not receive driving signal, return step three;
Step 6: the starting oil-filled program of pressurized tank, pressurized tank oil-filled time are 120S,
Step 7: whether detection pressurized tank liquid level is lower than low liquid level;If being lower than low liquid level, bi-bit bi-pass (normally closed) solenoid valve is obtained Electricity is supplied to Pneumatic butterfly valve, and Pneumatic butterfly valve is made to close 10S, is opening 5S, return step six;
Step 8: until the pressurized tank oil-filled time arrives or pressurized tank liquid level is not less than low liquid level;Then perform the next step;
Step 9: lubricating arrangement starts to start oil-filled completion program, start-up study timer, delay time 10S;
Step 10: delay time arrives, and starts to detect charge oil pressure, and charge oil pressure is low, then spare pump startup, executes step 11; If not low, which is run always, executes step 12;
Step 11: it if after spare pump startup, delay 3S stops main pump, and alarms, prompts which pump faulty, executes step 10 Two;
Step 12: starting pressurized tank supply program, lubricating arrangement starting before, if pressurized tank liquid level be higher than work liquid level, two Position two-way (normally opened) solenoid valve power loss gives pressurized tank gas supply, and until liquid level works liquid level lower than pressurized tank, solenoid valve obtains electric, stops Only supplied to pressurized tank;
After lubricating arrangement starting, if pressurized tank liquid level is higher than work liquid level, delay 5S or pressurized tank liquid level are set higher than liquid level height Point, then bi-bit bi-pass (normally opened) solenoid valve power loss, supplies to pressurized tank, and until liquid level is lower than pressurized tank work liquid level, be delayed 5S, Solenoid valve obtain it is electric, stop give pressurized tank gas supply;
In system operation, pressurized tank liquid level is stable always near the work liquid level of pressurized tank setting, guarantees pressurized tank There are enough oil liquid and pressure, guarantees that lubricating arrangement charge oil pressure, flow in the range of setting;
If middle control the operation for needing to stop lubricating arrangement, the driving signal of lubricating arrangement is disconnected, lubricating arrangement starting stops journey Sequence, first oil pump are out of service.
CN201810939911.9A 2018-08-17 2018-08-17 Pressure flow control system for metallurgy high-speed wire lubricating device and operation method Active CN109226275B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810939911.9A CN109226275B (en) 2018-08-17 2018-08-17 Pressure flow control system for metallurgy high-speed wire lubricating device and operation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810939911.9A CN109226275B (en) 2018-08-17 2018-08-17 Pressure flow control system for metallurgy high-speed wire lubricating device and operation method

Publications (2)

Publication Number Publication Date
CN109226275A true CN109226275A (en) 2019-01-18
CN109226275B CN109226275B (en) 2020-02-18

Family

ID=65071676

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810939911.9A Active CN109226275B (en) 2018-08-17 2018-08-17 Pressure flow control system for metallurgy high-speed wire lubricating device and operation method

Country Status (1)

Country Link
CN (1) CN109226275B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2531228Y (en) * 2001-12-29 2003-01-15 首钢总公司 Thin oil central lubrication system
RU2278755C1 (en) * 2004-11-10 2006-06-27 Открытое акционерное общество "Новолипецкий металлургический комбинат" (ОАО "НЛМК") Apparatus for supplying lubricating and cooling fluid at skin pass rolling
CN201764228U (en) * 2010-05-17 2011-03-16 攀钢集团钢铁钒钛股份有限公司 Intelligent lubricating system for rolling mill
CN203488955U (en) * 2013-08-27 2014-03-19 天津市宇润德金属制品有限公司 Lubricating oil filling circulating system for rolling mill supporting roller bearing blocks
CN203664361U (en) * 2013-11-19 2014-06-25 启东中冶润滑液压设备有限公司 Rolling oil system for hot rolling strip steel finishing mill process
CN203847678U (en) * 2014-05-30 2014-09-24 浙江明贺钢管有限公司 Gear box thin oil lubricating alarming control device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2531228Y (en) * 2001-12-29 2003-01-15 首钢总公司 Thin oil central lubrication system
RU2278755C1 (en) * 2004-11-10 2006-06-27 Открытое акционерное общество "Новолипецкий металлургический комбинат" (ОАО "НЛМК") Apparatus for supplying lubricating and cooling fluid at skin pass rolling
CN201764228U (en) * 2010-05-17 2011-03-16 攀钢集团钢铁钒钛股份有限公司 Intelligent lubricating system for rolling mill
CN203488955U (en) * 2013-08-27 2014-03-19 天津市宇润德金属制品有限公司 Lubricating oil filling circulating system for rolling mill supporting roller bearing blocks
CN203664361U (en) * 2013-11-19 2014-06-25 启东中冶润滑液压设备有限公司 Rolling oil system for hot rolling strip steel finishing mill process
CN203847678U (en) * 2014-05-30 2014-09-24 浙江明贺钢管有限公司 Gear box thin oil lubricating alarming control device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈微: "高线稀油润滑D站控制系统的研究与设计", 《中国优秀硕士学位论文 信息科技辑》 *

Also Published As

Publication number Publication date
CN109226275B (en) 2020-02-18

Similar Documents

Publication Publication Date Title
CN109681443A (en) A kind of revolution speed control system and method for nuclear power station turbine driven feedwater pump
CN110080934B (en) Water turbine speed regulator with start-stop protection function
CN109226275A (en) Pressure flow hybrid control system and operating method for the high line lubricating arrangement of metallurgy
CN102913388B (en) Emergency propeller retraction system of wind generating set and control method
CN210239900U (en) Hydraulic turbine speed regulator with start-stop protection function
CN101787969B (en) Numerical control system of minimum flow valve of governing feedwater pump and minimum flow control method thereof
CN208428970U (en) A kind of pantograph closed-loop control device
CN205779454U (en) A kind of turbine-generator units speed regulator system using emergency shutdown dual redundant to configure
CN202531349U (en) PLC (programmable logic controller)-based hydraulic generator protection device
CN113638940B (en) Emergency air and oil supplementing system and method for pressure vessel of hydraulic system of hydraulic turbine governor
CN208474149U (en) A kind of closed-up water circulation control system of invariable pressure
CN210637170U (en) Fuel pipeline redundancy device of diesel generator
CN212005130U (en) Pressure flow control device of phase modulation engine oil system
CN215762597U (en) Control device for speed regulator hydraulic system of giant hydroelectric generating set
CN201202584Y (en) Splashing-proof and signal apparatus of small-sized hydroelectric generating set
CN204028648U (en) A kind of thermal power plant control system temperature breaking protection logical connection structure
CN109442214B (en) Gas transmission method for natural gas station
CN201486833U (en) Minimum flow valve numerical control system of variable speed water feeding pump
CN202867090U (en) Emergency oar-retracting of wind generating set
CN102778847B (en) Automatic shutdown method of electric towing turbine unit in failure of controlling system and oil system
CN213116483U (en) Engine oil circuit clamping stagnation and overspeed parking system
CN105137834A (en) Generator set distribution system for ships
CN218291867U (en) Pressure relief device suitable for water supply system with backpressure technology
CN115341515B (en) Pressure relief device suitable for water supply system with back pressure technology and control method
CN219509685U (en) Safety control system for preventing automobile from galloping

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201207

Address after: No.1901, 19 / F, unit 1, building 6, no.695, Tianfu 1st Street, Chengdu hi tech Zone, Sichuan 610000

Patentee after: Sichuan chuanrun intelligent fluid technology Co.,Ltd.

Address before: 611743 Sichuan province Chengdu city Chengdu District PI Du modern industrial port area

Patentee before: SICHUAN CRUN Co.,Ltd.