CN109214526A - A kind of rail traffic vehicles module heavy repair task information tracking system and method - Google Patents
A kind of rail traffic vehicles module heavy repair task information tracking system and method Download PDFInfo
- Publication number
- CN109214526A CN109214526A CN201810876010.XA CN201810876010A CN109214526A CN 109214526 A CN109214526 A CN 109214526A CN 201810876010 A CN201810876010 A CN 201810876010A CN 109214526 A CN109214526 A CN 109214526A
- Authority
- CN
- China
- Prior art keywords
- component
- information
- repaired
- job
- module
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000008439 repair process Effects 0.000 title claims abstract description 57
- 238000000034 method Methods 0.000 title claims abstract description 25
- 238000002372 labelling Methods 0.000 claims abstract description 10
- 238000007726 management method Methods 0.000 claims description 29
- 238000012423 maintenance Methods 0.000 claims description 19
- 238000013024 troubleshooting Methods 0.000 claims description 12
- 238000000354 decomposition reaction Methods 0.000 claims description 4
- 238000004891 communication Methods 0.000 abstract description 5
- 238000010586 diagram Methods 0.000 description 4
- 230000008569 process Effects 0.000 description 3
- 230000001755 vocal effect Effects 0.000 description 3
- 210000004556 brain Anatomy 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 230000001133 acceleration Effects 0.000 description 1
- 238000004378 air conditioning Methods 0.000 description 1
- 230000004888 barrier function Effects 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000013439 planning Methods 0.000 description 1
- 230000003252 repetitive effect Effects 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/20—Administration of product repair or maintenance
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06K—GRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
- G06K17/00—Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations
- G06K17/0022—Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisions for transferring data to distant stations, e.g. from a sensing device
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/40—Business processes related to the transportation industry
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- Human Resources & Organizations (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Economics (AREA)
- Operations Research (AREA)
- Entrepreneurship & Innovation (AREA)
- Quality & Reliability (AREA)
- General Engineering & Computer Science (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Train Traffic Observation, Control, And Security (AREA)
Abstract
The present invention relates to a kind of rail traffic vehicles module heavy repair task information tracking system and methods, the system includes being set to the electronic tag (1) in heavy repair task on each component to be repaired, hand-held electronic label reader (2) and server for reading electronic labeling information, hand-held electronic label reader (2) communication connection server, the server is equipped with job information tracking software systems (3), job information tracking software systems (3) connection database (4).Compared with prior art, the present invention can optimize overhaul work flow, raising overhaul efficiency, reduction vehicle and stop the library time, final to improve vehicle utilization rate.
Description
Technical field
The present invention relates to field of track traffic, more particularly, to a kind of rail traffic vehicles module heavy repair task information trace
System and method.
Background technique
With the acceleration of urbanization process, Construction of Urban Rail Traffic welcomes the golden period of development.Metro operation is for vehicle
Repair quality and traffic safety have very high requirement.According to the requirement of " metro design code ", under normal circumstances, every 5 years or every
600000 kilometers of implementation vehicle un-wheeling repairs, every 10 years or 1,200,000 kilometers of implementation overhauls, about 15 years whens, enter the half-life and repair.
Car body needs the main component that overhauls to have: pantograph, air-conditioning, passenger compartment doors, guest room be built-in, drivers' cab, hitch, wind-supply unit,
Traction, subordinate inverter case, braking resistor box and high-voltaghe compartment etc..Around the above rack for assembly unit overhaul, can totally be divided into mechanically and electrically
The big profession of gas two, then divide the work by module of component, several teams and groups' concurrent jobs improve operating efficiency.Vehicle frame overhaul is
What must be carried out in vehicle life cycle management repairs journey, and working, many and diverse, content is huge, need to consider as a whole, planning of science activities.
Deficiency present in current track vehicular traffic heavy repair task process is that the essential information of component to be repaired generally passes through
The maintenance code of hand-written papery records, and is easily lost, and damages, not easy to maintain;Personnel's writing disunity, is not easy to recognize.Do not have still
There is a complete database to store and record all repair messages of component in entire heavy repair task, by between everyone
Verbal communication is saved by simple Microsoft Excel record, and information cannot be shared.
There are some problem and shortage for current vehicle heavy repair task process, are not able to satisfy track transportation industry fast development
It needs, it is therefore desirable to design a kind of rail transit train heavy repair task information tracking method, heavy repair task procedure information can be made
Shared, personnel's division of labor is clear, improves heavy repair task efficiency.
Summary of the invention
It is an object of the present invention to overcome the above-mentioned drawbacks of the prior art and provide a kind of rail traffic vehicles
Module heavy repair task information tracking system and method.
The purpose of the present invention can be achieved through the following technical solutions:
A kind of rail traffic vehicles module heavy repair task information tracking system, the system include being set in heavy repair task respectively
Electronic tag on component to be repaired, hand-held electronic label reader and server for reading electronic labeling information, institute
The hand-held electronic label reader communication connection the stated server, it is soft that the server is equipped with job information tracking
Part system, the job information tracking software systems connect database.
The job information tracks software systems
Resource management interface module: the module is used to show, update the information of component to be repaired and carries out unit failure to be repaired
Report;
Job trace interface module: the module is used to check that the Historical Jobs record of all components to be repaired, classified inquiry to be made
Industry record and troubleshooting;
The resource management interface module and job trace interface module is connected to database.
The essential information of corresponding component to be repaired is stored in the electronic tag, the basic information includes name of parts
Title, component serial number, train number, vehicle number, route/vehicle, date received, job state, operating location and operation people.
A kind of rail traffic vehicles module heavy repair task information tracking method, this method are based on above-mentioned rail traffic vehicles mould
Block heavy repair task information tracking system, the heavy repair task information tracking method include the following steps:
(1) after car body decomposition, an electronic tag is respectively configured for each component to be repaired, electronic tag includes to be repaired
The essential information of component;
(2) maintenance personal enters job information tracking software systems, if desired carries out the information management of each component to be repaired then
Information management is completed into resource management interface module, all component job traces to be repaired is if desired carried out and then enters job trace
Interface module fulfils assignment tracking.
Information management includes the following steps: in step (2)
(211) maintenance personal enters resource management interface module, and to be repaired using the reading of hand-held electronic label reader
The electronic labeling information of component;
(212) resource management interface module will carry out the record in the electronic labeling information and database of the component to be repaired
Matching is extracted component information to be repaired in database and is shown;
(213) maintenance personal chooses whether to update component information to be repaired, if then complete component information to be repaired update or
Trouble Report;
Job trace includes the following steps: in step (2)
(221) maintenance personal enters job trace interface module;
(222) the Historical Jobs record for if desired checking all components to be repaired, then enter and check charge book submodule, look into
See that operation record sub module shows the Historical Jobs record of whole overhaul components;
(223) it if desired inquires by classification, then enters classified inquiry submodule, according to component names, component serial number, train
Number, vehicle number, route/vehicle, date received, job state, operating location, operation people distinguish inquiry job record;
(224) troubleshooting is if desired carried out, then enters troubleshooting submodule and completes troubleshooting.
Compared with prior art, the present invention has the advantage that
Existing heavy repair task flow tracking management method are as follows: wait the component of overhaul to be assigned to after each teams and groups, component
Essential information is shown by verbal communication mutual between teams and groups personnel, repair message by the hand-written maintenance code hung on component, is tieed up
It repairs record and records (note in brain or simply Microsoft Excel) by each maintenance personal in a manner of oneself, information cannot be instant
Shared, rail traffic vehicles module heavy repair task information tracking system of the present invention and method realize heavy repair task procedure information and are total to
It enjoys, improves heavy repair task efficiency, reduce due to teams and groups personnel or maintenance personal's incorrect posting, fault caused by error of omission and repeated work
Make, realizes safety in production.
Detailed description of the invention
Fig. 1 is the structural block diagram of rail traffic vehicles module heavy repair task information tracking system of the present invention;
Fig. 2 is the flow diagram of rail traffic vehicles module heavy repair task information tracking method of the present invention;
Fig. 3 is the flow diagram of rail traffic vehicles module heavy repair task.
In figure, 1 is electronic tag, and 2 be hand-held electronic label reader, and 3 track software systems for job information, and 4 are
Database, 31 be resource management interface module, and 32 be job trace interface module.
Specific embodiment
The present invention is described in detail with specific embodiment below in conjunction with the accompanying drawings.Note that the following embodiments and the accompanying drawings is said
Bright is substantial illustration, and the present invention is not intended to be applicable in it object or its purposes is defined, and the present invention does not limit
In the following embodiments and the accompanying drawings.
Embodiment
As shown in Figure 1, a kind of rail traffic vehicles module heavy repair task information tracking system, which includes being set to greatly
Repair the electronic tag 1 in operation on each component to be repaired, for read the hand-held electronic label reader 2 of electronic labeling information with
And server, hand-held electronic label reader 2 communicate to connect server, server is equipped with job information and tracks software systems
3, job information tracks software systems 3 and connects database 4.
Job information tracks software systems 3
Resource management interface module 31: the module is used to show, update the information of component to be repaired and carries out component event to be repaired
Barrier report;
Job trace interface module 32: the module is used to check the Historical Jobs record of all components to be repaired, classified inquiry
Charge book and troubleshooting;
Resource management interface module 31 and job trace interface module 32 are connected to database 4.
The essential information of corresponding component to be repaired is stored in electronic tag 1, basic information includes component names, component sequence
Number, train number, vehicle number, route/vehicle, date received, job state, operating location and operation people.
As shown in Fig. 2, a kind of rail traffic vehicles module heavy repair task information tracking method, this method is based on above-mentioned track
Vehicular traffic module heavy repair task information tracking system, heavy repair task information tracking method include the following steps:
(1) after car body decomposition, be respectively configured an electronic tag 1 for each component to be repaired, electronic tag 1 include to
Repair the essential information of component;
(2) maintenance personal enters job information tracking software systems 3, if desired carries out the information management of each component to be repaired then
Information management is completed into resource management interface module 31, all component job traces to be repaired is if desired carried out and is then chased after into operation
Track interface module 32 fulfils assignment tracking.
Information management includes the following steps: in step (2)
(211) maintenance personal enters resource management interface module 31, and using hand-held electronic label reader 2 read to
Repair the electronic labeling information of component;
(212) resource management interface module 31 will be by the record in the electronic labeling information of the component to be repaired and database 4
It is matched, extract component information to be repaired in database 4 and is shown;
(213) maintenance personal chooses whether to update component information to be repaired, if then complete component information to be repaired update or
Trouble Report;
Job trace includes the following steps: in step (2)
(221) maintenance personal enters job trace interface module 32;
(222) the Historical Jobs record for if desired checking all components to be repaired, then enter and check charge book submodule, look into
See that operation record sub module shows the Historical Jobs record of whole overhaul components;
(223) it if desired inquires by classification, then enters classified inquiry submodule, according to component names, component serial number, train
Number, vehicle number, route/vehicle, date received, job state, operating location, operation people distinguish inquiry job record;
(224) troubleshooting is if desired carried out, then enters troubleshooting submodule and completes troubleshooting.
It is illustrated in figure 3 the idiographic flow block diagram of rail traffic vehicles module heavy repair task, first progress train preliminary examination, column
Vehicle decomposes to encoding to the train part of decomposition, and then send to technology department/operation area and carry out large repairs operation.Heavy repair task
It including quality inspection, is sent if qualified to heavy repair department, completion gets on the bus static debugging and dynamic debugging until all debugging pass through, and completes
Vehicle delivers for a check shipment, otherwise rectifies and improves to component.
Existing heavy repair task flow tracking management method are as follows: wait the component of overhaul to be assigned to after each teams and groups, component
Essential information is shown by verbal communication mutual between teams and groups personnel, repair message by the hand-written maintenance code hung on component, is tieed up
It repairs record and records (note in brain or simply Microsoft Excel) by each maintenance personal in a manner of oneself, information cannot be instant
It is shared.The present invention is reduced due to teams and groups personnel or maintenance personal's incorrect posting, and fault and repetitive operation caused by error of omission realize safety
Production.Heavy repair task efficiency is improved, personnel's division of labor is specified, reduces human cost, convenient for management.
Above embodiment is only to enumerate, and does not indicate limiting the scope of the invention.These embodiments can also be with other
Various modes are implemented, and can make in the range of not departing from technical thought of the invention it is various omit, displacement, change.
Claims (6)
1. a kind of rail traffic vehicles module heavy repair task information tracking system, which is characterized in that the system includes being set to greatly
Repair the electronic tag (1) in operation on each component to be repaired, the hand-held electronic label reader for reading electronic labeling information
(2) and server, the hand-held electronic label reader (2) communicate to connect the server, the server
It is equipped with job information tracking software systems (3), job information tracking software systems (3) connection database (4).
2. a kind of rail traffic vehicles module heavy repair task information tracking system according to claim 1, which is characterized in that
The job information tracks software systems (3)
Resource management interface module (31): the module is used to show, update the information of component to be repaired and carries out unit failure to be repaired
Report;
Job trace interface module (32): the module is used to check that the Historical Jobs record of all components to be repaired, classified inquiry to be made
Industry record and troubleshooting;
The resource management interface module (31) and job trace interface module (32) is connected to database (4).
3. a kind of rail traffic vehicles module heavy repair task information tracking system according to claim 1, which is characterized in that
The essential information of the corresponding component to be repaired of storage in the electronic tag (1), the basic information includes component names, component
Sequence number, train number, vehicle number, route/vehicle, date received, job state, operating location and operation people.
4. a kind of rail traffic vehicles module heavy repair task information tracking method, which is characterized in that this method is based on claim 1
Rail traffic vehicles module heavy repair task information tracking system described in~3 any one, the heavy repair task information trace
Method includes the following steps:
(1) after car body decomposition, be respectively configured an electronic tag (1) for each component to be repaired, electronic tag (1) include to
Repair the essential information of component;
(2) maintenance personal enters job information tracking software systems (3), if desired carry out the information management of each component to be repaired then into
Enter resource management interface module (31) and complete information management, if desired carries out all component job traces to be repaired and then chased after into operation
Track interface module (32) fulfils assignment tracking.
5. a kind of rail traffic vehicles module heavy repair task information tracking method according to claim 4, which is characterized in that
Information management includes the following steps: in step (2)
(211) maintenance personal enters resource management interface module (31), and using hand-held electronic label reader (2) read to
Repair the electronic labeling information of component;
(212) resource management interface module (31) will be by the record in the electronic labeling information of the component to be repaired and database (4)
It is matched, extract component information to be repaired in database (4) and is shown;
(213) maintenance personal chooses whether to update component information to be repaired, if then completing component information update to be repaired or failure
Report.
6. a kind of rail traffic vehicles module heavy repair task information tracking method according to claim 4, which is characterized in that
Job trace includes the following steps: in step (2)
(221) maintenance personal enters job trace interface module (32);
(222) the Historical Jobs record for if desired checking all components to be repaired, then enter and check charge book submodule, check work
Industry record sub module shows the Historical Jobs record of whole overhaul components;
(223) if desired inquire by classification, then enter classified inquiry submodule, according to component names, component serial number, train number,
Vehicle number, route/vehicle, date received, job state, operating location, operation people distinguish inquiry job record;
(224) troubleshooting is if desired carried out, then enters troubleshooting submodule and completes troubleshooting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810876010.XA CN109214526A (en) | 2018-08-03 | 2018-08-03 | A kind of rail traffic vehicles module heavy repair task information tracking system and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810876010.XA CN109214526A (en) | 2018-08-03 | 2018-08-03 | A kind of rail traffic vehicles module heavy repair task information tracking system and method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109214526A true CN109214526A (en) | 2019-01-15 |
Family
ID=64988059
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810876010.XA Pending CN109214526A (en) | 2018-08-03 | 2018-08-03 | A kind of rail traffic vehicles module heavy repair task information tracking system and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109214526A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109993247A (en) * | 2019-03-29 | 2019-07-09 | 中车广东轨道交通车辆有限公司 | A kind of managerial fit system of car body member |
CN114331126A (en) * | 2021-12-28 | 2022-04-12 | 中车成都机车车辆有限公司 | Rail transit vehicle manufacturing process defect tracking management method and system |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202049528U (en) * | 2011-04-20 | 2011-11-23 | 李光伟 | Locomotive quality detecting and tracking system |
CN102849088A (en) * | 2011-06-29 | 2013-01-02 | 深圳市丰泰瑞达实业有限公司 | Locomotive servicing operation procedure, device and system |
CN104376347A (en) * | 2014-11-19 | 2015-02-25 | 南车青岛四方机车车辆股份有限公司 | Bullet train vehicle equipment information management system and method based on RFID |
US20150066557A1 (en) * | 2013-03-14 | 2015-03-05 | Tim Lichti | System and Method for Tracking and Managing Mobile Resources |
CN204990432U (en) * | 2015-07-31 | 2016-01-20 | 厦门物之联信息技术有限公司 | Equipment inspection management system based on RFID |
CN105302098A (en) * | 2015-11-11 | 2016-02-03 | 同济大学 | Subway vehicle interoperation maintenance and support platform based on IETM and building method thereof |
CN105678357A (en) * | 2016-01-13 | 2016-06-15 | 中国铁道科学研究院电子计算技术研究所 | Electric multiple unit maintenance operation process management and control system and method |
CN107886141A (en) * | 2017-10-30 | 2018-04-06 | 北京建筑大学 | Support and guiding system and method a kind of upkeep operation distal end |
-
2018
- 2018-08-03 CN CN201810876010.XA patent/CN109214526A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202049528U (en) * | 2011-04-20 | 2011-11-23 | 李光伟 | Locomotive quality detecting and tracking system |
CN102849088A (en) * | 2011-06-29 | 2013-01-02 | 深圳市丰泰瑞达实业有限公司 | Locomotive servicing operation procedure, device and system |
US20150066557A1 (en) * | 2013-03-14 | 2015-03-05 | Tim Lichti | System and Method for Tracking and Managing Mobile Resources |
CN104376347A (en) * | 2014-11-19 | 2015-02-25 | 南车青岛四方机车车辆股份有限公司 | Bullet train vehicle equipment information management system and method based on RFID |
CN204990432U (en) * | 2015-07-31 | 2016-01-20 | 厦门物之联信息技术有限公司 | Equipment inspection management system based on RFID |
CN105302098A (en) * | 2015-11-11 | 2016-02-03 | 同济大学 | Subway vehicle interoperation maintenance and support platform based on IETM and building method thereof |
CN105678357A (en) * | 2016-01-13 | 2016-06-15 | 中国铁道科学研究院电子计算技术研究所 | Electric multiple unit maintenance operation process management and control system and method |
CN107886141A (en) * | 2017-10-30 | 2018-04-06 | 北京建筑大学 | Support and guiding system and method a kind of upkeep operation distal end |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109993247A (en) * | 2019-03-29 | 2019-07-09 | 中车广东轨道交通车辆有限公司 | A kind of managerial fit system of car body member |
CN109993247B (en) * | 2019-03-29 | 2023-03-28 | 中车广东轨道交通车辆有限公司 | Management matching system of vehicle body component |
CN114331126A (en) * | 2021-12-28 | 2022-04-12 | 中车成都机车车辆有限公司 | Rail transit vehicle manufacturing process defect tracking management method and system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104477214A (en) | Intelligent electric terminal based train length and vehicle information automatic identification method | |
Bajracharya et al. | Road Transportation Energy Demand and Environmental Emission: A Case of Kathmandu Valley. | |
CN101786461A (en) | Motor train unit position tracking system | |
CN109214526A (en) | A kind of rail traffic vehicles module heavy repair task information tracking system and method | |
CN106314486A (en) | Method for drawing locomotive turnover actual diagram and integrating with map diagram | |
CN112734256A (en) | Intelligent operation and maintenance system for rail transit vehicle | |
CN111626457A (en) | Software system, software product and processing method for vehicle management | |
CN112765877A (en) | Method and device for constructing PHM (hybrid construction model) general system of rolling stock | |
CN202275423U (en) | Train loading device management system based on RFID | |
CN111415604A (en) | Intelligent carriage information display system and operation method | |
CN108032861B (en) | Arrangement structure of working platform of line-in and line-out rail-connecting station of rail transit section field | |
CN115649241A (en) | Railway wagon running mileage calculation method and system based on train running line | |
KR101214293B1 (en) | Apparatus Editing Railway Network and System for Simulating Train Operation Comprising That Apparatus | |
CN110686700B (en) | Railway wagon running mileage statistical method and system | |
Stechert | Integrated Approach of Model-Based Systems Engineering and Augmented Reality for the Development of Rail Vehicles with Alternative Drives | |
CN211719239U (en) | Intelligent carriage information display system | |
CN202257929U (en) | Transport management system | |
Schiavone | Understanding and Applying Advanced On-Board Bus Electronics | |
Tanveer et al. | How Can the ML1 Revitalize the Pakistan Railway System? | |
CN103295092A (en) | Official business vehicle-riding management method | |
Rich | Changing railway technology in the United States and its impact upon railroad employment since 1945 | |
Mast | Progress in Railway Mechanical Engineering 2019–2020 Survey–Locomotives | |
CN110019614A (en) | A kind of design of the intelligent transportation system of GIS technology | |
CN114037312A (en) | Subway construction scheduling system resource conflict checking method | |
Rumsey | Developing standards for new technology signal systems for rail transit applications |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190115 |
|