CN109214118A - A kind of cement production enterprise Industrial Design Method based on BIM - Google Patents
A kind of cement production enterprise Industrial Design Method based on BIM Download PDFInfo
- Publication number
- CN109214118A CN109214118A CN201811197073.9A CN201811197073A CN109214118A CN 109214118 A CN109214118 A CN 109214118A CN 201811197073 A CN201811197073 A CN 201811197073A CN 109214118 A CN109214118 A CN 109214118A
- Authority
- CN
- China
- Prior art keywords
- profession
- design
- bim
- bim model
- professional
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000013461 design Methods 0.000 title claims abstract description 118
- 239000004568 cement Substances 0.000 title claims abstract description 40
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 36
- 238000000034 method Methods 0.000 title claims abstract description 36
- 238000012913 prioritisation Methods 0.000 claims abstract description 15
- 238000007726 management method Methods 0.000 claims abstract description 10
- 238000005457 optimization Methods 0.000 claims abstract description 10
- 238000012550 audit Methods 0.000 claims description 25
- 238000004590 computer program Methods 0.000 claims description 16
- 238000003860 storage Methods 0.000 claims description 8
- 238000004458 analytical method Methods 0.000 claims description 7
- 238000009434 installation Methods 0.000 claims description 7
- 238000012795 verification Methods 0.000 claims description 7
- 238000005516 engineering process Methods 0.000 claims description 6
- 238000012423 maintenance Methods 0.000 claims description 6
- 230000006870 function Effects 0.000 description 12
- 238000010586 diagram Methods 0.000 description 6
- 238000009428 plumbing Methods 0.000 description 5
- 238000011960 computer-aided design Methods 0.000 description 4
- 238000012545 processing Methods 0.000 description 4
- 238000004891 communication Methods 0.000 description 3
- 238000010168 coupling process Methods 0.000 description 3
- 238000005859 coupling reaction Methods 0.000 description 3
- 230000008878 coupling Effects 0.000 description 2
- 230000005611 electricity Effects 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004422 calculation algorithm Methods 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 230000010485 coping Effects 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000010606 normalization Methods 0.000 description 1
- 238000005192 partition Methods 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Geometry (AREA)
- Theoretical Computer Science (AREA)
- Computer Hardware Design (AREA)
- General Physics & Mathematics (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Computational Mathematics (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention provides the cement production enterprise Industrial Design Methods based on BIM, it include: the two-dimensional design drawing for obtaining each profession of cement production enterprise, the two-dimensional design drawing of each profession is screened to obtain each professional modular design module, a secondary design is carried out according to modular design module, and two-dimentional drawing and model group and the component race library of a secondary design are obtained, each professional building informationization BIM model is converted by the two-dimensional design drawing of each profession;The adjustment that conflicts is designed detecing wrong, profession between each profession BIM model simultaneously, and each profession BIM model and each Specialty Design standard are compared into verifying, each profession BIM model after being adjusted verifying;Finally each profession BIM model after adjustment verifying is optimized according to prioritization scheme, and management platform is sent by each profession BIM model after optimization and is audited, it can in time, adequately be linked up with each professional auditor, so that design is more acurrate and more saves the time relative to two-dimensional design.
Description
Technical field
The invention belongs to Design of Industrial Enterprises technical fields, more particularly to the cement production enterprise Industrial Design Method based on BIM.
Background technique
Cement production enterprise industrial design is based on technology major, with building structure profession, electric specialty and plumbing, HVAC
The comprehensive designs such as public work profession need each profession to be linked up and cooperated in time.
Currently, traditional cement production enterprise industrial design is based on two-dimensional design, two-dimensional design due to exist link up not in time,
It is insufficient, it causes design design mistake and space waste occur, while linking up information with owner and being unable to timely sharing, causes to design
There are deviations for content understanding, are unable to satisfy owner and design needs.
Summary of the invention
In view of this, the embodiment of the invention provides the cement production enterprise Industrial Design Method based on BIM, to solve existing skill
In art two-dimensional design due to exist link up not in time, it is insufficient, cause design there is design mistake and space waste, while and industry
Tap drain communication breath is unable to timely sharing, and design content is caused to understand there are deviation, is unable to satisfy the problem of owner's design needs.
The embodiment of the invention provides a kind of cement production enterprise Industrial Design Method based on BIM, comprising:
The two-dimensional design drawing for obtaining each profession of cement production enterprise, is screened to obtain to the two-dimensional design drawing of each profession
Each profession modular design module, carries out a secondary design according to modular design module, and obtain a secondary design two-dimentional drawing and
Model group and component race library;
Based on revit, each professional typical module and component race library, each profession is converted by the two-dimensional design drawing of each profession
Architecture information BIM model;
The adjustment that conflicts detecing mistake, profession is designed between each profession BIM model, and by each profession BIM model and respectively
Specialty Design standard compares verifying, each profession BIM model after being adjusted verifying;
Cement plant total figure arrangement, building fire protection and safe distance are analyzed, and verify reserved space for maintenance and equipment
Installation space and needs of production obtain prioritization scheme according to analysis and verification result;
Each profession BIM model after adjustment verifying is optimized according to the prioritization scheme, and will be each special after optimization
Industry BIM model is sent to management platform and is audited.
Existing beneficial effect is the embodiment of the present invention compared with prior art: provided in an embodiment of the present invention based on BIM
Cement production enterprise Industrial Design Method, the embodiment of the present invention obtains the two-dimensional design drawing of each profession of cement production enterprise first, right
The two-dimensional design drawing of each profession is screened to obtain each professional modular design module, is once set according to modular design module
Meter, and obtain two-dimentional drawing and model group and the component race library of a secondary design;It is then based on revit, each professional typical module
With component race library, each professional building informationization BIM model is converted by the two-dimensional design drawing of each profession;Simultaneously to each profession
BIM model, which is designed, detects the adjustment that conflicts between mistake, profession, and each profession BIM model is compared with each Specialty Design standard
Verifying, each profession BIM model after being adjusted verifying;Cement plant total figure arrangement, building fire protection and safe distance are divided
Analysis, and reserved space for maintenance and equipment installation space and needs of production are verified, optimized according to analysis and verification result
Scheme;Finally each profession BIM model after adjustment verifying is optimized according to prioritization scheme, and by each profession after optimization
BIM model is sent to management platform and is audited.Due to carrying out the cement production enterprise industrial design based on BIM by BIM model,
It can in time, adequately be linked up with each professional auditor, so that being related to more acurrate and when more being saved relative to two-dimensional design
Between, while can be linked up in time with owner, so that demand of the design result closer to client.
Detailed description of the invention
It to describe the technical solutions in the embodiments of the present invention more clearly, below will be to embodiment or description of the prior art
Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description is only of the invention some
Embodiment for those of ordinary skill in the art without any creative labor, can also be according to these
Attached drawing obtains other attached drawings.
Fig. 1 is the flow diagram for the cement production enterprise Industrial Design Method based on BIM that one embodiment of the invention provides;
Fig. 2 is the structural block diagram for the cement production enterprise industrial design system based on BIM that one embodiment of the application provides
Fig. 3 is the schematic diagram for the terminal device that one embodiment of the invention provides.
Specific embodiment
In being described below, for illustration and not for limitation, the tool of such as particular system structure, technology etc is proposed
Body details, to understand thoroughly the embodiment of the present invention.However, it will be clear to one skilled in the art that there is no these specific
The present invention also may be implemented in the other embodiments of details.In other situations, it omits to well-known system, device, electricity
The detailed description of road and method, in case unnecessary details interferes description of the invention.
In order to illustrate technical solutions according to the invention, the following is a description of specific embodiments.
With reference to Fig. 1, Fig. 1 is the process for the cement production enterprise Industrial Design Method based on BIM that one embodiment of the invention provides
Schematic diagram, the method can be applied to server, which can be one or more, and details are as follows for the method:
S101: the two-dimensional design drawing of each profession of cement production enterprise is obtained, the two-dimensional design drawing of each profession is sieved
Choosing obtains each professional modular design module, carries out a secondary design according to modular design module, and obtain the X-Y scheme of a secondary design
Paper and model group and component race library.
In the present embodiment, the two-dimensional design drawing of each profession is to utilize CAD (CAD, Computer
Aided Design) software design each profession in cement plant two-dimensional design electronic drawing.
To the two-dimensional design drawing of each profession compare to obtain optimization direction be by the two-dimensional design drawing of each profession and
The drawing of standard compares, and determines respective optimization direction.
One secondary design is carried out to the two-dimensional design drawing of each profession, obtains each professional typical module and component race library are as follows: right
The two-dimensional design drawing of each profession is arranged, and arranges the typical mould of each profession respectively for different scales cement plant different majors
Block including building structure module, technology major module, electric specialty module and plumbing, warms up the public professional mould such as dynamic
Block.
S102: it based on revit, each professional typical module and component race library, converts the two-dimensional design drawing of each profession to
Each professional building informationization BIM model.
In the present embodiment, with reference to each professional typical module, corresponding model group and parametrization race are constructed in revit,
It is adjusted in conjunction with each professional CAD X-Y scheme, quickly generates each professional threedimensional model.It is imported on the basis of building structure model
Process modeling, electric specialty model and public Professional Model (such as plumbing, HVAC etc.), are finally completed cement plant BIM model
Building.
Constructed modularization model group and parametric family may be reused in step.
S103: being designed the adjustment that conflicts detecing wrong, profession between each profession BIM model, and by each profession BIM model and
Each Specialty Design standard compares verifying, each profession BIM model after being adjusted verifying.
In the present embodiment, be designed first detect mistake include: each Specialty Design teacher itself profession need to be carried out " leakage, it is wrong,
Lack " etc. lower level errors check, conflict adjustment includes: utilization " collision detection " function between profession between then carrying out profession
Conflict is adjusted.
S104: analyzing cement plant total figure arrangement, building fire protection and safe distance, and verify reserved space for maintenance and
Equipment installation space and needs of production obtain prioritization scheme according to analysis and verification result.
In the present embodiment, whole to design to check, including general layout, building fire protection, security protection away from
From etc. major projects, while the normalization of design is examined.
S105: optimizing each profession BIM model after adjustment verifying according to prioritization scheme, and will be each special after optimization
Industry BIM model is sent to management platform and is audited.
In the present embodiment, to guarantee effectively to be linked up, management platform (BIM cooperating management platform) is built.It will be excellent
Each profession BIM model lightweight (reduce memory space) after change is simultaneously uploaded to management platform and carries out model joint examination.
As can be seen from the above description, the present embodiment obtains the two-dimensional design drawing of each profession of cement production enterprise first, to each special
The two-dimensional design drawing of industry is screened to obtain each professional modular design module, carries out a secondary design according to modular design module,
And obtain two-dimentional drawing and model group and the component race library of a secondary design, by the two-dimensional design drawing of each profession be converted into it is each specially
Industry architecture information BIM model;Conflict detecing wrong, profession is designed between each profession BIM model simultaneously to adjust, and by each profession
BIM model and each Specialty Design standard compare verifying, each profession BIM model after being adjusted verifying;It is total to cement plant
Figure arrangement, building fire protection and safe distance are analyzed, and verify reserved space for maintenance and equipment installation space and actual production
It needs, prioritization scheme is obtained according to analysis and verification result;Finally according to prioritization scheme to each profession BIM after adjustment verifying
Model optimizes, and sends management platform for each profession BIM model after optimization and audit.Due to passing through BIM model
The cement production enterprise industrial design based on BIM is carried out, can in time, adequately be linked up with each professional auditor, so that being related to more
The time more accurately and relative to two-dimensional design is saved, while can be linked up in time with owner, so that design result is closer to client
Demand.
In one embodiment of the invention, step S102 is based on revit, each professional typical module and component race library, will
The two-dimensional design drawing of each profession is converted into each professional building informationization BIM model, comprising:
S1021: each professional typical module and component race library are sent to by each designer's terminal based on revit, so that design
Teacher is based on each professional typical module and component race library, and it is information-based to convert each professional building for the two-dimensional design drawing of each profession
BIM model.
S1022: each professional building informationization BIM model that each designer's terminal is sent is received.
In the present embodiment, designer's terminal can be computer or PDA (Personal Digital Assistant, the palm
Upper computer).
In one embodiment of the invention, each profession BIM model is designed described in step S103 detect it is wrong,
Conflict adjustment between profession, comprising:
S1031: each profession BIM model is sent to corresponding audit server, with the auditor of different majors to right
It answers professional BIM model to be designed and detects audit that is wrong, conflicting between profession.
S1032: each profession BIM model after receiving the audit that each audit server returns.
In the present embodiment, REVIT includes designer's terminal and audit server, and each designer is responsible for design and respectively acts on one's own
Each modular model is sent to audit server after the completion of design by the modular model of industry, audits server for the mould of modules
Type is integrated into the cement plant model an of totality, and auditor audits the model, sends out when finding that certain two component is arranged
When raw conflict, auditor sends the terminal of professional of the amending advice to relative ranks rearward according to process sequence.
In one embodiment of the invention, after step S105 further include:
Each profession BIM model after audit is sent to client terminal.By the client terminal of each profession BIM model owner,
So as to owner carry out an acceptance inspection verification etc..
In one embodiment of the invention, each professional typical module includes one or more of: building structure
Module, technology major module, electric specialty module and plumbing, public professional module.
It should be understood that the size of the serial number of each step is not meant that the order of the execution order in above-described embodiment, each process
Execution sequence should be determined by its function and internal logic, the implementation process without coping with the embodiment of the present invention constitutes any limit
It is fixed.
Corresponding to the cement production enterprise Industrial Design Method based on BIM of foregoing embodiments, Fig. 2 is that one embodiment of the application mentions
The structural block diagram of the cement production enterprise industrial design system based on BIM supplied.For ease of description, it illustrates only and implements with the application
The relevant part of example.With reference to Fig. 2, which includes: design cell 51 of model, BIM model conversation unit 52, BIM model
Adjustment unit 53, prioritization scheme acquiring unit 54 and BIM model audit unit 55.
Design cell 51 of model, the two-dimensional design drawing of each profession for obtaining cement production enterprise, to each profession
Two-dimensional design drawing is screened to obtain each professional modular design module, carries out a secondary design according to modular design module, and obtain
Two-dimentional drawing and model group and component race library to a secondary design;
BIM model conversation unit 52, for being based on revit, each professional typical module and component race library, by the two of each profession
Dimension design drawing is converted into each professional building informationization BIM model;
BIM model adjustment unit 53, for each profession BIM model is designed detect wrong, profession conflict adjustment,
And each profession BIM model and each Specialty Design standard are compared into verifying, each profession BIM model after being adjusted verifying;
Prioritization scheme acquiring unit 54, for analyzing cement plant total figure arrangement, building fire protection and safe distance, and
Reserved space for maintenance and equipment installation space and needs of production are verified, prioritization scheme is obtained according to analysis and verification result;
BIM model audit unit 55, for according to the prioritization scheme to adjustment verifying after each profession BIM model into
Row optimization, and send management platform for each profession BIM model after optimization and audit.
In one embodiment of the invention, the BIM model conversation unit 52, being specifically used for will be each special based on revit
Industry typical module and component race library are sent to each designer's terminal, so that designer is based on each professional typical module and component race
The two-dimensional design drawing of each profession is converted each professional building informationization BIM model by library;Receive what each designer's terminal was sent
Each professional building informationization BIM model.
In one embodiment of the invention, the BIM model adjustment unit 53 is specifically used for each profession BIM model
Be sent to corresponding audit server, corresponding profession BIM model is designed with the auditor of different majors detect it is wrong, special
The audit to conflict between industry;Each profession BIM model after receiving the audit that each audit server returns.
In one embodiment of the invention, the BIM model audits unit 55, each profession after being also used to audit
BIM model is sent to client terminal.
In one embodiment of the invention, each professional typical module includes one or more of: building structure
Module, technology major module, electric specialty module and plumbing, public professional module.
Fig. 3 is the schematic diagram for the terminal device that one embodiment of the invention provides.As shown in figure 3, the terminal of the embodiment is set
Standby 6 include: processor 60, memory 61 and are stored in the meter that can be run in the memory 61 and on the processor 60
Calculation machine program 62, such as the cement production enterprise industrial design program based on BIM.The processor 60 executes the computer program 62
Step in the above-mentioned each cement production enterprise Industrial Design Method embodiment based on BIM of Shi Shixian, such as step shown in FIG. 1
101 to 105.Alternatively, the processor 60 realized when executing the computer program 62 each module in above-mentioned each Installation practice/
The function of unit, such as the function of module 51 to 55 shown in Fig. 2.
Illustratively, the computer program 62 can be divided into one or more module/units, it is one or
Multiple module/units are stored in the memory 61, and are executed by the processor 60, to complete the present invention.Described one
A or multiple module/units can be the series of computation machine program instruction section that can complete specific function, which is used for
Implementation procedure of the computer program 62 in the terminal device 6 is described.For example, the computer program 62 can be divided
It is cut into design cell 51 of model, BIM model conversation model 52, BIM model adjustment unit 53, prioritization scheme acquiring unit
54 and BIM model audits unit 55.
The terminal device 6 can be the calculating such as desktop PC, notebook, palm PC and cloud server and set
It is standby.The terminal device may include, but be not limited only to, processor 60, memory 61.It will be understood by those skilled in the art that Fig. 3
The only example of terminal device 6 does not constitute the restriction to terminal device 6, may include than illustrating more or fewer portions
Part perhaps combines certain components or different components, such as the terminal device can also include input-output equipment, net
Network access device, bus etc..
Alleged processor 60 can be central processing unit (Central Processing Unit, CPU), can also be
Other general processors, digital signal processor (Digital Signal Processor, DSP), specific integrated circuit
(Application Specific Integrated Circuit, ASIC), ready-made programmable gate array (Field-
Programmable Gate Array, FPGA) either other programmable logic device, discrete gate or transistor logic,
Discrete hardware components etc..General processor can be microprocessor or the processor is also possible to any conventional processor
Deng.
The memory 61 can be the internal storage unit of the terminal device 6, for example, terminal device 6 hard disk or
Memory.The memory 61 is also possible to the External memory equipment of the terminal device 6, such as is equipped on the terminal device 6
Plug-in type hard disk, intelligent memory card (Smart Media Card, SMC), secure digital (Secure Digital, SD) card,
Flash card (Flash Card) etc..Further, the memory 61 can also both include the storage inside of the terminal device 6
Unit also includes External memory equipment.The memory 61 is for storing needed for the computer program and the terminal device
Other programs and data.The memory 61 can be also used for temporarily storing the data that has exported or will export.
It is apparent to those skilled in the art that for convenience of description and succinctly, only with above-mentioned each function
Can unit, module division progress for example, in practical application, can according to need and by above-mentioned function distribution by different
Functional unit, module are completed, i.e., the internal structure of described device is divided into different functional unit or module, more than completing
The all or part of function of description.Each functional unit in embodiment, module can integrate in one processing unit, can also
To be that each unit physically exists alone, can also be integrated in one unit with two or more units, it is above-mentioned integrated
Unit both can take the form of hardware realization, can also realize in the form of software functional units.In addition, each function list
Member, the specific name of module are also only for convenience of distinguishing each other, the protection scope being not intended to limit this application.Above system
The specific work process of middle unit, module, can refer to corresponding processes in the foregoing method embodiment, and details are not described herein.
In the above-described embodiments, it all emphasizes particularly on different fields to the description of each embodiment, is not described in detail or remembers in some embodiment
The part of load may refer to the associated description of other embodiments.
Those of ordinary skill in the art may be aware that list described in conjunction with the examples disclosed in the embodiments of the present disclosure
Member and algorithm steps can be realized with the combination of electronic hardware or computer software and electronic hardware.These functions are actually
It is implemented in hardware or software, the specific application and design constraint depending on technical solution.Professional technician
Each specific application can be used different methods to achieve the described function, but this realization is it is not considered that exceed
The scope of the present invention.
In embodiment provided by the present invention, it should be understood that disclosed device/terminal device and method, it can be with
It realizes by another way.For example, device described above/terminal device embodiment is only schematical, for example, institute
The division of module or unit is stated, only a kind of logical function partition, there may be another division manner in actual implementation, such as
Multiple units or components can be combined or can be integrated into another system, or some features can be ignored or not executed.Separately
A bit, shown or discussed mutual coupling or direct-coupling or communication connection can be through some interfaces, device
Or the INDIRECT COUPLING or communication connection of unit, it can be electrical property, mechanical or other forms.
The unit as illustrated by the separation member may or may not be physically separated, aobvious as unit
The component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multiple
In network unit.It can select some or all of unit therein according to the actual needs to realize the mesh of this embodiment scheme
's.
It, can also be in addition, the functional units in various embodiments of the present invention may be integrated into one processing unit
It is that each unit physically exists alone, can also be integrated in one unit with two or more units.Above-mentioned integrated list
Member both can take the form of hardware realization, can also realize in the form of software functional units.
If the integrated module/unit be realized in the form of SFU software functional unit and as independent product sale or
In use, can store in a computer readable storage medium.Based on this understanding, the present invention realizes above-mentioned implementation
All or part of the process in example method, can also instruct relevant hardware to complete, the meter by computer program
Calculation machine program can be stored in a computer readable storage medium, the computer program when being executed by processor, it can be achieved that on
The step of stating each embodiment of the method.Wherein, the computer program includes computer program code, the computer program
Code can be source code form, object identification code form, executable file or certain intermediate forms etc..Computer-readable Jie
Matter may include: can carry the computer program code any entity or device, recording medium, USB flash disk, mobile hard disk,
Magnetic disk, CD, computer storage, read-only memory (ROM, Read-Only Memory), random access memory (RAM,
Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium etc..It should be noted that described
The content that computer-readable medium includes can carry out increasing appropriate according to the requirement made laws in jurisdiction with patent practice
Subtract, such as does not include electric carrier signal and electricity according to legislation and patent practice, computer-readable medium in certain jurisdictions
Believe signal.
Embodiment described above is merely illustrative of the technical solution of the present invention, rather than its limitations;Although referring to aforementioned reality
Applying example, invention is explained in detail, those skilled in the art should understand that: it still can be to aforementioned each
Technical solution documented by embodiment is modified or equivalent replacement of some of the technical features;And these are modified
Or replacement, the spirit and scope for technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution should all
It is included within protection scope of the present invention.
Claims (7)
1. a kind of cement production enterprise Industrial Design Method based on BIM characterized by comprising
The two-dimensional design drawing for obtaining each profession of cement production enterprise is screened to obtain each special to the two-dimensional design drawing of each profession
Industry modular design module carries out a secondary design according to modular design module, and obtains the two-dimentional drawing and model of a secondary design
Group and component race library;
Based on revit, each professional typical module and component race library, each professional building is converted by the two-dimensional design drawing of each profession
Information-based BIM model;
It is designed the adjustment that conflicts detecing wrong, profession between each profession BIM model, and by each profession BIM model and each profession
Design standard compares verifying, each profession BIM model after being adjusted verifying;
Cement plant total figure arrangement, building fire protection and safe distance are analyzed, and verify reserved space for maintenance and equipment installation
Space and needs of production obtain prioritization scheme according to analysis and verification result;
Each profession BIM model after adjustment verifying is optimized according to the prioritization scheme, and by each profession BIM after optimization
Model is sent to management platform and is audited.
2. the cement production enterprise Industrial Design Method based on BIM as described in claim 1, which is characterized in that described to be based on
Revit, each professional typical module and component race library, it is information-based to convert each professional building for the two-dimensional design drawing of each profession
BIM model, comprising:
Each professional typical module and component race library are sent to each designer's terminal based on revit, so that designer is based on each special
The two-dimensional design drawing of each profession is converted each professional building informationization BIM model by industry typical module and component race library;
Receive each professional building informationization BIM model that each designer's terminal is sent.
3. the cement production enterprise Industrial Design Method based on BIM as described in claim 1, which is characterized in that described to described each
Professional BIM model, which is designed, detects the adjustment that conflicts between mistake, profession, comprising:
Each profession BIM model is sent to corresponding audit server, with the auditor of different majors to corresponding profession BIM mould
Type, which is designed, detects audit that is wrong, conflicting between profession;
Each profession BIM model after receiving the audit that each audit server returns.
4. the cement production enterprise Industrial Design Method based on BIM as described in claim 1, which is characterized in that further include:
Each profession BIM model after audit is sent to client terminal.
5. such as the described in any item cement production enterprise Industrial Design Methods based on BIM of Claims 1-4, which is characterized in that described
Each profession typical module includes one or more of: building structure module, technology major module, electric specialty module and being given
Draining, public professional module.
6. a kind of terminal device, including memory, processor and storage are in the memory and can be on the processor
The computer program of operation, which is characterized in that the processor realizes such as claim 1 to 5 when executing the computer program
The step of any one the method.
7. a kind of computer readable storage medium, the computer-readable recording medium storage has computer program, and feature exists
In when the computer program is executed by processor the step of any one of such as claim 1 to 5 of realization the method.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811197073.9A CN109214118A (en) | 2018-10-15 | 2018-10-15 | A kind of cement production enterprise Industrial Design Method based on BIM |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811197073.9A CN109214118A (en) | 2018-10-15 | 2018-10-15 | A kind of cement production enterprise Industrial Design Method based on BIM |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109214118A true CN109214118A (en) | 2019-01-15 |
Family
ID=64980371
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811197073.9A Pending CN109214118A (en) | 2018-10-15 | 2018-10-15 | A kind of cement production enterprise Industrial Design Method based on BIM |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109214118A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110763809A (en) * | 2019-11-15 | 2020-02-07 | 中国石油大学(华东) | Experimental verification method for optimal arrangement scheme of gas detector |
CN111401231A (en) * | 2020-03-13 | 2020-07-10 | 华黔科技有限公司 | Engineering drawing identification and verification method and device |
CN113127949A (en) * | 2019-12-31 | 2021-07-16 | 久瓴(上海)智能科技有限公司 | Building model processing method and device, computer equipment and readable storage medium |
CN116069834A (en) * | 2023-03-07 | 2023-05-05 | 武汉东方赛思软件股份有限公司 | BIM technology-based enterprise data visual management method |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107016625A (en) * | 2017-03-13 | 2017-08-04 | 同济大学 | A kind of total bag enterprise B IM authorizing standard methods of architectural engineering |
CN107633137A (en) * | 2017-09-21 | 2018-01-26 | 中铁八局集团电务工程有限公司 | A kind of electromechanical installation of the subway based on BIM and fitting-out work construction method |
CN107967399A (en) * | 2017-12-19 | 2018-04-27 | 广东建远建筑装配工业有限公司 | A kind of assembled architecture Deepen Design method based on BIM softwares |
-
2018
- 2018-10-15 CN CN201811197073.9A patent/CN109214118A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107016625A (en) * | 2017-03-13 | 2017-08-04 | 同济大学 | A kind of total bag enterprise B IM authorizing standard methods of architectural engineering |
CN107633137A (en) * | 2017-09-21 | 2018-01-26 | 中铁八局集团电务工程有限公司 | A kind of electromechanical installation of the subway based on BIM and fitting-out work construction method |
CN107967399A (en) * | 2017-12-19 | 2018-04-27 | 广东建远建筑装配工业有限公司 | A kind of assembled architecture Deepen Design method based on BIM softwares |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110763809A (en) * | 2019-11-15 | 2020-02-07 | 中国石油大学(华东) | Experimental verification method for optimal arrangement scheme of gas detector |
CN113127949A (en) * | 2019-12-31 | 2021-07-16 | 久瓴(上海)智能科技有限公司 | Building model processing method and device, computer equipment and readable storage medium |
CN111401231A (en) * | 2020-03-13 | 2020-07-10 | 华黔科技有限公司 | Engineering drawing identification and verification method and device |
CN116069834A (en) * | 2023-03-07 | 2023-05-05 | 武汉东方赛思软件股份有限公司 | BIM technology-based enterprise data visual management method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10963292B2 (en) | Techniques to manage virtual classes for statistical tests | |
CN109214118A (en) | A kind of cement production enterprise Industrial Design Method based on BIM | |
CN104391934B (en) | Data verification method and device | |
An et al. | Reliable p-median facility location problem: two-stage robust models and algorithms | |
CN116882038B (en) | Electromechanical construction method and system based on BIM technology | |
CN111159897B (en) | Target optimization method and device based on system modeling application | |
CN108664241B (en) | Method for carrying out simulation verification on SysML model | |
CN109241068A (en) | The method, apparatus and terminal device that foreground and background data compares | |
CN110895495A (en) | Human error analysis method, system, computer device and storage medium | |
CN110502395A (en) | Equipment running status appraisal procedure, terminal device and storage medium based on cluster | |
CN110222323A (en) | A kind of voucher generation method, device, readable storage medium storing program for executing and terminal device | |
CN113094932A (en) | Method, device, equipment and storage medium for acquiring construction cost of power transformation project | |
Qiao et al. | Data driven design and simulation system based on XML | |
CN118070609A (en) | Simulation prediction method, simulation prediction system, simulation prediction device and computer readable storage medium based on finite element parametric modeling and point cloud deep learning | |
CN118152983A (en) | Multi-dimensional data fusion method and system | |
CN116823026B (en) | Engineering data processing system and method based on block chain | |
Wu et al. | Model Healing: Toward a framework for building designs to achieve code compliance | |
KR101456187B1 (en) | Method for evaluating patents based on complex factors | |
CN114610648A (en) | Test method, device and equipment | |
CN109388685A (en) | The method and apparatus that will plan that the spatial data that industry uses is put in storage | |
CN109918353A (en) | The method and terminal device of automated information processing | |
Guan et al. | Optimization of manufacturing systems using Genetic Search and Muti-resolution simulation | |
CN116841650B (en) | Sample construction method, device, equipment and storage medium | |
CN116611793B (en) | Service data induction method and system based on feature analysis | |
Kerstens et al. | Using COVD-19 Mortality to Select Among Hospital Plant Capacity Models: An Empirical Application to the Hubei Province |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190115 |