CN109214118A CN201811197073.9A CN201811197073A CN109214118A CN 109214118 A CN109214118 A CN 109214118A CN 201811197073 A CN201811197073 A CN 201811197073A CN 109214118 A CN109214118 A CN 109214118A
Authority
CN
China
Prior art keywords
profession
design
bim
bim model
professional
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811197073.9A
Other languages
Chinese (zh)
Inventor
陈建波
任晓林
杨立永
刘阳
刘一阳
王新英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BUILDING MATERIAL INDUSTRY DESIGNING RESEARCH INST OF HEBEI PROV
Original Assignee
BUILDING MATERIAL INDUSTRY DESIGNING RESEARCH INST OF HEBEI PROV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BUILDING MATERIAL INDUSTRY DESIGNING RESEARCH INST OF HEBEI PROV filed Critical BUILDING MATERIAL INDUSTRY DESIGNING RESEARCH INST OF HEBEI PROV
Priority to CN201811197073.9A priority Critical patent/CN109214118A/en
Publication of CN109214118A publication Critical patent/CN109214118A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • General Physics & Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention provides the cement production enterprise Industrial Design Methods based on BIM, it include: the two-dimensional design drawing for obtaining each profession of cement production enterprise, the two-dimensional design drawing of each profession is screened to obtain each professional modular design module, a secondary design is carried out according to modular design module, and two-dimentional drawing and model group and the component race library of a secondary design are obtained, each professional building informationization BIM model is converted by the two-dimensional design drawing of each profession;The adjustment that conflicts is designed detecing wrong, profession between each profession BIM model simultaneously, and each profession BIM model and each Specialty Design standard are compared into verifying, each profession BIM model after being adjusted verifying;Finally each profession BIM model after adjustment verifying is optimized according to prioritization scheme, and management platform is sent by each profession BIM model after optimization and is audited, it can in time, adequately be linked up with each professional auditor, so that design is more acurrate and more saves the time relative to two-dimensional design.

Description

A kind of cement production enterprise Industrial Design Method based on BIM
Technical field
The invention belongs to Design of Industrial Enterprises technical fields, more particularly to the cement production enterprise Industrial Design Method based on BIM.
Background technique
Cement production enterprise industrial design is based on technology major, with building structure profession, electric specialty and plumbing, HVAC The comprehensive designs such as public work profession need each profession to be linked up and cooperated in time.
Currently, traditional cement production enterprise industrial design is based on two-dimensional design, two-dimensional design due to exist link up not in time, It is insufficient, it causes design design mistake and space waste occur, while linking up information with owner and being unable to timely sharing, causes to design There are deviations for content understanding, are unable to satisfy owner and design needs.
Summary of the invention
In view of this, the embodiment of the invention provides the cement production enterprise Industrial Design Method based on BIM, to solve existing skill In art two-dimensional design due to exist link up not in time, it is insufficient, cause design there is design mistake and space waste, while and industry Tap drain communication breath is unable to timely sharing, and design content is caused to understand there are deviation, is unable to satisfy the problem of owner's design needs.
The embodiment of the invention provides a kind of cement production enterprise Industrial Design Method based on BIM, comprising:
The two-dimensional design drawing for obtaining each profession of cement production enterprise, is screened to obtain to the two-dimensional design drawing of each profession Each profession modular design module, carries out a secondary design according to modular design module, and obtain a secondary design two-dimentional drawing and Model group and component race library;
Based on revit, each professional typical module and component race library, each profession is converted by the two-dimensional design drawing of each profession Architecture information BIM model;
The adjustment that conflicts detecing mistake, profession is designed between each profession BIM model, and by each profession BIM model and respectively Specialty Design standard compares verifying, each profession BIM model after being adjusted verifying;
Cement plant total figure arrangement, building fire protection and safe distance are analyzed, and verify reserved space for maintenance and equipment Installation space and needs of production obtain prioritization scheme according to analysis and verification result;
Each profession BIM model after adjustment verifying is optimized according to the prioritization scheme, and will be each special after optimization Industry BIM model is sent to management platform and is audited.
Existing beneficial effect is the embodiment of the present invention compared with prior art: provided in an embodiment of the present invention based on BIM Cement production enterprise Industrial Design Method, the embodiment of the present invention obtains the two-dimensional design drawing of each profession of cement production enterprise first, right The two-dimensional design drawing of each profession is screened to obtain each professional modular design module, is once set according to modular design module Meter, and obtain two-dimentional drawing and model group and the component race library of a secondary design;It is then based on revit, each professional typical module With component race library, each professional building informationization BIM model is converted by the two-dimensional design drawing of each profession;Simultaneously to each profession BIM model, which is designed, detects the adjustment that conflicts between mistake, profession, and each profession BIM model is compared with each Specialty Design standard Verifying, each profession BIM model after being adjusted verifying;Cement plant total figure arrangement, building fire protection and safe distance are divided Analysis, and reserved space for maintenance and equipment installation space and needs of production are verified, optimized according to analysis and verification result Scheme;Finally each profession BIM model after adjustment verifying is optimized according to prioritization scheme, and by each profession after optimization BIM model is sent to management platform and is audited.Due to carrying out the cement production enterprise industrial design based on BIM by BIM model, It can in time, adequately be linked up with each professional auditor, so that being related to more acurrate and when more being saved relative to two-dimensional design Between, while can be linked up in time with owner, so that demand of the design result closer to client.
Detailed description of the invention
It to describe the technical solutions in the embodiments of the present invention more clearly, below will be to embodiment or description of the prior art Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description is only of the invention some Embodiment for those of ordinary skill in the art without any creative labor, can also be according to these Attached drawing obtains other attached drawings.
Fig. 1 is the flow diagram for the cement production enterprise Industrial Design Method based on BIM that one embodiment of the invention provides;
Fig. 2 is the structural block diagram for the cement production enterprise industrial design system based on BIM that one embodiment of the application provides
Fig. 3 is the schematic diagram for the terminal device that one embodiment of the invention provides.
Specific embodiment
In being described below, for illustration and not for limitation, the tool of such as particular system structure, technology etc is proposed Body details, to understand thoroughly the embodiment of the present invention.However, it will be clear to one skilled in the art that there is no these specific The present invention also may be implemented in the other embodiments of details.In other situations, it omits to well-known system, device, electricity The detailed description of road and method, in case unnecessary details interferes description of the invention.
In order to illustrate technical solutions according to the invention, the following is a description of specific embodiments.
With reference to Fig. 1, Fig. 1 is the process for the cement production enterprise Industrial Design Method based on BIM that one embodiment of the invention provides Schematic diagram, the method can be applied to server, which can be one or more, and details are as follows for the method:
S101: the two-dimensional design drawing of each profession of cement production enterprise is obtained, the two-dimensional design drawing of each profession is sieved Choosing obtains each professional modular design module, carries out a secondary design according to modular design module, and obtain the X-Y scheme of a secondary design Paper and model group and component race library.
In the present embodiment, the two-dimensional design drawing of each profession is to utilize CAD (CAD, Computer Aided Design) software design each profession in cement plant two-dimensional design electronic drawing.
To the two-dimensional design drawing of each profession compare to obtain optimization direction be by the two-dimensional design drawing of each profession and The drawing of standard compares, and determines respective optimization direction.
One secondary design is carried out to the two-dimensional design drawing of each profession, obtains each professional typical module and component race library are as follows: right The two-dimensional design drawing of each profession is arranged, and arranges the typical mould of each profession respectively for different scales cement plant different majors Block including building structure module, technology major module, electric specialty module and plumbing, warms up the public professional mould such as dynamic Block.
S102: it based on revit, each professional typical module and component race library, converts the two-dimensional design drawing of each profession to Each professional building informationization BIM model.
In the present embodiment, with reference to each professional typical module, corresponding model group and parametrization race are constructed in revit, It is adjusted in conjunction with each professional CAD X-Y scheme, quickly generates each professional threedimensional model.It is imported on the basis of building structure model Process modeling, electric specialty model and public Professional Model (such as plumbing, HVAC etc.), are finally completed cement plant BIM model Building.
Constructed modularization model group and parametric family may be reused in step.
S103: being designed the adjustment that conflicts detecing wrong, profession between each profession BIM model, and by each profession BIM model and Each Specialty Design standard compares verifying, each profession BIM model after being adjusted verifying.
In the present embodiment, be designed first detect mistake include: each Specialty Design teacher itself profession need to be carried out " leakage, it is wrong, Lack " etc. lower level errors check, conflict adjustment includes: utilization " collision detection " function between profession between then carrying out profession Conflict is adjusted.
S104: analyzing cement plant total figure arrangement, building fire protection and safe distance, and verify reserved space for maintenance and Equipment installation space and needs of production obtain prioritization scheme according to analysis and verification result.
In the present embodiment, whole to design to check, including general layout, building fire protection, security protection away from From etc. major projects, while the normalization of design is examined.
S105: optimizing each profession BIM model after adjustment verifying according to prioritization scheme, and will be each special after optimization Industry BIM model is sent to management platform and is audited.
In the present embodiment, to guarantee effectively to be linked up, management platform (BIM cooperating management platform) is built.It will be excellent Each profession BIM model lightweight (reduce memory space) after change is simultaneously uploaded to management platform and carries out model joint examination.
As can be seen from the above description, the present embodiment obtains the two-dimensional design drawing of each profession of cement production enterprise first, to each special The two-dimensional design drawing of industry is screened to obtain each professional modular design module, carries out a secondary design according to modular design module, And obtain two-dimentional drawing and model group and the component race library of a secondary design, by the two-dimensional design drawing of each profession be converted into it is each specially Industry architecture information BIM model;Conflict detecing wrong, profession is designed between each profession BIM model simultaneously to adjust, and by each profession BIM model and each Specialty Design standard compare verifying, each profession BIM model after being adjusted verifying;It is total to cement plant Figure arrangement, building fire protection and safe distance are analyzed, and verify reserved space for maintenance and equipment installation space and actual production It needs, prioritization scheme is obtained according to analysis and verification result;Finally according to prioritization scheme to each profession BIM after adjustment verifying Model optimizes, and sends management platform for each profession BIM model after optimization and audit.Due to passing through BIM model The cement production enterprise industrial design based on BIM is carried out, can in time, adequately be linked up with each professional auditor, so that being related to more The time more accurately and relative to two-dimensional design is saved, while can be linked up in time with owner, so that design result is closer to client Demand.
In one embodiment of the invention, step S102 is based on revit, each professional typical module and component race library, will The two-dimensional design drawing of each profession is converted into each professional building informationization BIM model, comprising:
S1021: each professional typical module and component race library are sent to by each designer's terminal based on revit, so that design Teacher is based on each professional typical module and component race library, and it is information-based to convert each professional building for the two-dimensional design drawing of each profession BIM model.
S1022: each professional building informationization BIM model that each designer's terminal is sent is received.
In the present embodiment, designer's terminal can be computer or PDA (Personal Digital Assistant, the palm Upper computer).
In one embodiment of the invention, each profession BIM model is designed described in step S103 detect it is wrong, Conflict adjustment between profession, comprising:
S1031: each profession BIM model is sent to corresponding audit server, with the auditor of different majors to right It answers professional BIM model to be designed and detects audit that is wrong, conflicting between profession.
S1032: each profession BIM model after receiving the audit that each audit server returns.
In the present embodiment, REVIT includes designer's terminal and audit server, and each designer is responsible for design and respectively acts on one's own Each modular model is sent to audit server after the completion of design by the modular model of industry, audits server for the mould of modules Type is integrated into the cement plant model an of totality, and auditor audits the model, sends out when finding that certain two component is arranged When raw conflict, auditor sends the terminal of professional of the amending advice to relative ranks rearward according to process sequence.
In one embodiment of the invention, after step S105 further include:
Each profession BIM model after audit is sent to client terminal.By the client terminal of each profession BIM model owner, So as to owner carry out an acceptance inspection verification etc..
In one embodiment of the invention, each professional typical module includes one or more of: building structure Module, technology major module, electric specialty module and plumbing, public professional module.
It should be understood that the size of the serial number of each step is not meant that the order of the execution order in above-described embodiment, each process Execution sequence should be determined by its function and internal logic, the implementation process without coping with the embodiment of the present invention constitutes any limit It is fixed.
Corresponding to the cement production enterprise Industrial Design Method based on BIM of foregoing embodiments, Fig. 2 is that one embodiment of the application mentions The structural block diagram of the cement production enterprise industrial design system based on BIM supplied.For ease of description, it illustrates only and implements with the application The relevant part of example.With reference to Fig. 2, which includes: design cell 51 of model, BIM model conversation unit 52, BIM model Adjustment unit 53, prioritization scheme acquiring unit 54 and BIM model audit unit 55.
Design cell 51 of model, the two-dimensional design drawing of each profession for obtaining cement production enterprise, to each profession Two-dimensional design drawing is screened to obtain each professional modular design module, carries out a secondary design according to modular design module, and obtain Two-dimentional drawing and model group and component race library to a secondary design;
BIM model conversation unit 52, for being based on revit, each professional typical module and component race library, by the two of each profession Dimension design drawing is converted into each professional building informationization BIM model;
BIM model adjustment unit 53, for each profession BIM model is designed detect wrong, profession conflict adjustment, And each profession BIM model and each Specialty Design standard are compared into verifying, each profession BIM model after being adjusted verifying;
Prioritization scheme acquiring unit 54, for analyzing cement plant total figure arrangement, building fire protection and safe distance, and Reserved space for maintenance and equipment installation space and needs of production are verified, prioritization scheme is obtained according to analysis and verification result;
BIM model audit unit 55, for according to the prioritization scheme to adjustment verifying after each profession BIM model into Row optimization, and send management platform for each profession BIM model after optimization and audit.
In one embodiment of the invention, the BIM model conversation unit 52, being specifically used for will be each special based on revit Industry typical module and component race library are sent to each designer's terminal, so that designer is based on each professional typical module and component race The two-dimensional design drawing of each profession is converted each professional building informationization BIM model by library;Receive what each designer's terminal was sent Each professional building informationization BIM model.
In one embodiment of the invention, the BIM model adjustment unit 53 is specifically used for each profession BIM model Be sent to corresponding audit server, corresponding profession BIM model is designed with the auditor of different majors detect it is wrong, special The audit to conflict between industry;Each profession BIM model after receiving the audit that each audit server returns.
In one embodiment of the invention, the BIM model audits unit 55, each profession after being also used to audit BIM model is sent to client terminal.
In one embodiment of the invention, each professional typical module includes one or more of: building structure Module, technology major module, electric specialty module and plumbing, public professional module.
Fig. 3 is the schematic diagram for the terminal device that one embodiment of the invention provides.As shown in figure 3, the terminal of the embodiment is set Standby 6 include: processor 60, memory 61 and are stored in the meter that can be run in the memory 61 and on the processor 60 Calculation machine program 62, such as the cement production enterprise industrial design program based on BIM.The processor 60 executes the computer program 62 Step in the above-mentioned each cement production enterprise Industrial Design Method embodiment based on BIM of Shi Shixian, such as step shown in FIG. 1 101 to 105.Alternatively, the processor 60 realized when executing the computer program 62 each module in above-mentioned each Installation practice/ The function of unit, such as the function of module 51 to 55 shown in Fig. 2.
Illustratively, the computer program 62 can be divided into one or more module/units, it is one or Multiple module/units are stored in the memory 61, and are executed by the processor 60, to complete the present invention.Described one A or multiple module/units can be the series of computation machine program instruction section that can complete specific function, which is used for Implementation procedure of the computer program 62 in the terminal device 6 is described.For example, the computer program 62 can be divided It is cut into design cell 51 of model, BIM model conversation model 52, BIM model adjustment unit 53, prioritization scheme acquiring unit 54 and BIM model audits unit 55.
The terminal device 6 can be the calculating such as desktop PC, notebook, palm PC and cloud server and set It is standby.The terminal device may include, but be not limited only to, processor 60, memory 61.It will be understood by those skilled in the art that Fig. 3 The only example of terminal device 6 does not constitute the restriction to terminal device 6, may include than illustrating more or fewer portions Part perhaps combines certain components or different components, such as the terminal device can also include input-output equipment, net Network access device, bus etc..
Alleged processor 60 can be central processing unit (Central Processing Unit, CPU), can also be Other general processors, digital signal processor (Digital Signal Processor, DSP), specific integrated circuit (Application Specific Integrated Circuit, ASIC), ready-made programmable gate array (Field- Programmable Gate Array, FPGA) either other programmable logic device, discrete gate or transistor logic, Discrete hardware components etc..General processor can be microprocessor or the processor is also possible to any conventional processor Deng.
The memory 61 can be the internal storage unit of the terminal device 6, for example, terminal device 6 hard disk or Memory.The memory 61 is also possible to the External memory equipment of the terminal device 6, such as is equipped on the terminal device 6 Plug-in type hard disk, intelligent memory card (Smart Media Card, SMC), secure digital (Secure Digital, SD) card, Flash card (Flash Card) etc..Further, the memory 61 can also both include the storage inside of the terminal device 6 Unit also includes External memory equipment.The memory 61 is for storing needed for the computer program and the terminal device Other programs and data.The memory 61 can be also used for temporarily storing the data that has exported or will export.
It is apparent to those skilled in the art that for convenience of description and succinctly, only with above-mentioned each function Can unit, module division progress for example, in practical application, can according to need and by above-mentioned function distribution by different Functional unit, module are completed, i.e., the internal structure of described device is divided into different functional unit or module, more than completing The all or part of function of description.Each functional unit in embodiment, module can integrate in one processing unit, can also To be that each unit physically exists alone, can also be integrated in one unit with two or more units, it is above-mentioned integrated Unit both can take the form of hardware realization, can also realize in the form of software functional units.In addition, each function list Member, the specific name of module are also only for convenience of distinguishing each other, the protection scope being not intended to limit this application.Above system The specific work process of middle unit, module, can refer to corresponding processes in the foregoing method embodiment, and details are not described herein.
In the above-described embodiments, it all emphasizes particularly on different fields to the description of each embodiment, is not described in detail or remembers in some embodiment The part of load may refer to the associated description of other embodiments.
Those of ordinary skill in the art may be aware that list described in conjunction with the examples disclosed in the embodiments of the present disclosure Member and algorithm steps can be realized with the combination of electronic hardware or computer software and electronic hardware.These functions are actually It is implemented in hardware or software, the specific application and design constraint depending on technical solution.Professional technician Each specific application can be used different methods to achieve the described function, but this realization is it is not considered that exceed The scope of the present invention.
In embodiment provided by the present invention, it should be understood that disclosed device/terminal device and method, it can be with It realizes by another way.For example, device described above/terminal device embodiment is only schematical, for example, institute The division of module or unit is stated, only a kind of logical function partition, there may be another division manner in actual implementation, such as Multiple units or components can be combined or can be integrated into another system, or some features can be ignored or not executed.Separately A bit, shown or discussed mutual coupling or direct-coupling or communication connection can be through some interfaces, device Or the INDIRECT COUPLING or communication connection of unit, it can be electrical property, mechanical or other forms.
The unit as illustrated by the separation member may or may not be physically separated, aobvious as unit The component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multiple In network unit.It can select some or all of unit therein according to the actual needs to realize the mesh of this embodiment scheme 's.
It, can also be in addition, the functional units in various embodiments of the present invention may be integrated into one processing unit It is that each unit physically exists alone, can also be integrated in one unit with two or more units.Above-mentioned integrated list Member both can take the form of hardware realization, can also realize in the form of software functional units.
If the integrated module/unit be realized in the form of SFU software functional unit and as independent product sale or In use, can store in a computer readable storage medium.Based on this understanding, the present invention realizes above-mentioned implementation All or part of the process in example method, can also instruct relevant hardware to complete, the meter by computer program Calculation machine program can be stored in a computer readable storage medium, the computer program when being executed by processor, it can be achieved that on The step of stating each embodiment of the method.Wherein, the computer program includes computer program code, the computer program Code can be source code form, object identification code form, executable file or certain intermediate forms etc..Computer-readable Jie Matter may include: can carry the computer program code any entity or device, recording medium, USB flash disk, mobile hard disk, Magnetic disk, CD, computer storage, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium etc..It should be noted that described The content that computer-readable medium includes can carry out increasing appropriate according to the requirement made laws in jurisdiction with patent practice Subtract, such as does not include electric carrier signal and electricity according to legislation and patent practice, computer-readable medium in certain jurisdictions Believe signal.
Embodiment described above is merely illustrative of the technical solution of the present invention, rather than its limitations;Although referring to aforementioned reality Applying example, invention is explained in detail, those skilled in the art should understand that: it still can be to aforementioned each Technical solution documented by embodiment is modified or equivalent replacement of some of the technical features;And these are modified Or replacement, the spirit and scope for technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution should all It is included within protection scope of the present invention.

Claims (7)

1. a kind of cement production enterprise Industrial Design Method based on BIM characterized by comprising
The two-dimensional design drawing for obtaining each profession of cement production enterprise is screened to obtain each special to the two-dimensional design drawing of each profession Industry modular design module carries out a secondary design according to modular design module, and obtains the two-dimentional drawing and model of a secondary design Group and component race library;
Based on revit, each professional typical module and component race library, each professional building is converted by the two-dimensional design drawing of each profession Information-based BIM model;
It is designed the adjustment that conflicts detecing wrong, profession between each profession BIM model, and by each profession BIM model and each profession Design standard compares verifying, each profession BIM model after being adjusted verifying;
Cement plant total figure arrangement, building fire protection and safe distance are analyzed, and verify reserved space for maintenance and equipment installation Space and needs of production obtain prioritization scheme according to analysis and verification result;
Each profession BIM model after adjustment verifying is optimized according to the prioritization scheme, and by each profession BIM after optimization Model is sent to management platform and is audited.
2. the cement production enterprise Industrial Design Method based on BIM as described in claim 1, which is characterized in that described to be based on Revit, each professional typical module and component race library, it is information-based to convert each professional building for the two-dimensional design drawing of each profession BIM model, comprising:
Each professional typical module and component race library are sent to each designer's terminal based on revit, so that designer is based on each special The two-dimensional design drawing of each profession is converted each professional building informationization BIM model by industry typical module and component race library;
Receive each professional building informationization BIM model that each designer's terminal is sent.
3. the cement production enterprise Industrial Design Method based on BIM as described in claim 1, which is characterized in that described to described each Professional BIM model, which is designed, detects the adjustment that conflicts between mistake, profession, comprising:
Each profession BIM model is sent to corresponding audit server, with the auditor of different majors to corresponding profession BIM mould Type, which is designed, detects audit that is wrong, conflicting between profession;
Each profession BIM model after receiving the audit that each audit server returns.
4. the cement production enterprise Industrial Design Method based on BIM as described in claim 1, which is characterized in that further include:
Each profession BIM model after audit is sent to client terminal.
5. such as the described in any item cement production enterprise Industrial Design Methods based on BIM of Claims 1-4, which is characterized in that described Each profession typical module includes one or more of: building structure module, technology major module, electric specialty module and being given Draining, public professional module.
6. a kind of terminal device, including memory, processor and storage are in the memory and can be on the processor The computer program of operation, which is characterized in that the processor realizes such as claim 1 to 5 when executing the computer program The step of any one the method.
7. a kind of computer readable storage medium, the computer-readable recording medium storage has computer program, and feature exists In when the computer program is executed by processor the step of any one of such as claim 1 to 5 of realization the method.
CN201811197073.9A 2018-10-15 2018-10-15 A kind of cement production enterprise Industrial Design Method based on BIM Pending CN109214118A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811197073.9A CN109214118A (en) 2018-10-15 2018-10-15 A kind of cement production enterprise Industrial Design Method based on BIM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811197073.9A CN109214118A (en) 2018-10-15 2018-10-15 A kind of cement production enterprise Industrial Design Method based on BIM

Publications (1)

Publication Number Publication Date
CN109214118A true CN109214118A (en) 2019-01-15

Family

ID=64980371

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811197073.9A Pending CN109214118A (en) 2018-10-15 2018-10-15 A kind of cement production enterprise Industrial Design Method based on BIM

Country Status (1)

Country Link
CN (1) CN109214118A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110763809A (en) * 2019-11-15 2020-02-07 中国石油大学(华东) Experimental verification method for optimal arrangement scheme of gas detector
CN111401231A (en) * 2020-03-13 2020-07-10 华黔科技有限公司 Engineering drawing identification and verification method and device
CN113127949A (en) * 2019-12-31 2021-07-16 久瓴(上海)智能科技有限公司 Building model processing method and device, computer equipment and readable storage medium
CN116069834A (en) * 2023-03-07 2023-05-05 武汉东方赛思软件股份有限公司 BIM technology-based enterprise data visual management method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107016625A (en) * 2017-03-13 2017-08-04 同济大学 A kind of total bag enterprise B IM authorizing standard methods of architectural engineering
CN107633137A (en) * 2017-09-21 2018-01-26 中铁八局集团电务工程有限公司 A kind of electromechanical installation of the subway based on BIM and fitting-out work construction method
CN107967399A (en) * 2017-12-19 2018-04-27 广东建远建筑装配工业有限公司 A kind of assembled architecture Deepen Design method based on BIM softwares

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107016625A (en) * 2017-03-13 2017-08-04 同济大学 A kind of total bag enterprise B IM authorizing standard methods of architectural engineering
CN107633137A (en) * 2017-09-21 2018-01-26 中铁八局集团电务工程有限公司 A kind of electromechanical installation of the subway based on BIM and fitting-out work construction method
CN107967399A (en) * 2017-12-19 2018-04-27 广东建远建筑装配工业有限公司 A kind of assembled architecture Deepen Design method based on BIM softwares

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110763809A (en) * 2019-11-15 2020-02-07 中国石油大学(华东) Experimental verification method for optimal arrangement scheme of gas detector
CN113127949A (en) * 2019-12-31 2021-07-16 久瓴(上海)智能科技有限公司 Building model processing method and device, computer equipment and readable storage medium
CN111401231A (en) * 2020-03-13 2020-07-10 华黔科技有限公司 Engineering drawing identification and verification method and device
CN116069834A (en) * 2023-03-07 2023-05-05 武汉东方赛思软件股份有限公司 BIM technology-based enterprise data visual management method

Similar Documents

Publication Publication Date Title
US10963292B2 (en) Techniques to manage virtual classes for statistical tests
CN109214118A (en) A kind of cement production enterprise Industrial Design Method based on BIM
CN104391934B (en) Data verification method and device
An et al. Reliable p-median facility location problem: two-stage robust models and algorithms
CN116882038B (en) Electromechanical construction method and system based on BIM technology
CN111159897B (en) Target optimization method and device based on system modeling application
CN108664241B (en) Method for carrying out simulation verification on SysML model
CN109241068A (en) The method, apparatus and terminal device that foreground and background data compares
CN110895495A (en) Human error analysis method, system, computer device and storage medium
CN110502395A (en) Equipment running status appraisal procedure, terminal device and storage medium based on cluster
CN110222323A (en) A kind of voucher generation method, device, readable storage medium storing program for executing and terminal device
CN113094932A (en) Method, device, equipment and storage medium for acquiring construction cost of power transformation project
Qiao et al. Data driven design and simulation system based on XML
CN118070609A (en) Simulation prediction method, simulation prediction system, simulation prediction device and computer readable storage medium based on finite element parametric modeling and point cloud deep learning
CN118152983A (en) Multi-dimensional data fusion method and system
CN116823026B (en) Engineering data processing system and method based on block chain
Wu et al. Model Healing: Toward a framework for building designs to achieve code compliance
KR101456187B1 (en) Method for evaluating patents based on complex factors
CN114610648A (en) Test method, device and equipment
CN109388685A (en) The method and apparatus that will plan that the spatial data that industry uses is put in storage
CN109918353A (en) The method and terminal device of automated information processing
Guan et al. Optimization of manufacturing systems using Genetic Search and Muti-resolution simulation
CN116841650B (en) Sample construction method, device, equipment and storage medium
CN116611793B (en) Service data induction method and system based on feature analysis
Kerstens et al. Using COVD-19 Mortality to Select Among Hospital Plant Capacity Models: An Empirical Application to the Hubei Province

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190115