CN109214102A - Calculation method for the cold-proof drain cavern length in tunnel in cold regions hole - Google Patents

Calculation method for the cold-proof drain cavern length in tunnel in cold regions hole Download PDF

Info

Publication number
CN109214102A
CN109214102A CN201811107580.9A CN201811107580A CN109214102A CN 109214102 A CN109214102 A CN 109214102A CN 201811107580 A CN201811107580 A CN 201811107580A CN 109214102 A CN109214102 A CN 109214102A
Authority
CN
China
Prior art keywords
cold
tunnel
length
drain cavern
proof drain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811107580.9A
Other languages
Chinese (zh)
Other versions
CN109214102B (en
Inventor
靳宝成
陈霄汉
田鹏
李国良
黄双林
何永旺
谭永庆
符亚鹏
司剑钧
严文翔
徐冲
曹国栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway First Survey and Design Institute Group Ltd
Original Assignee
China Railway First Survey and Design Institute Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway First Survey and Design Institute Group Ltd filed Critical China Railway First Survey and Design Institute Group Ltd
Priority to CN201811107580.9A priority Critical patent/CN109214102B/en
Publication of CN109214102A publication Critical patent/CN109214102A/en
Application granted granted Critical
Publication of CN109214102B publication Critical patent/CN109214102B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F17/00Digital computing or data processing equipment or methods, specially adapted for specific functions
    • G06F17/10Complex mathematical operations
    • G06F17/11Complex mathematical operations for solving equations, e.g. nonlinear equations, general mathematical optimization problems
    • G06F17/12Simultaneous equations, e.g. systems of linear equations
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A90/00Technologies having an indirect contribution to adaptation to climate change
    • Y02A90/10Information and communication technologies [ICT] supporting adaptation to climate change, e.g. for weather forecasting or climate simulation

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Mathematical Physics (AREA)
  • Pure & Applied Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Geometry (AREA)
  • Data Mining & Analysis (AREA)
  • General Engineering & Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Databases & Information Systems (AREA)
  • Software Systems (AREA)
  • Algebra (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Operations Research (AREA)
  • Structural Engineering (AREA)
  • Evolutionary Computation (AREA)
  • Photometry And Measurement Of Optical Pulse Characteristics (AREA)
  • Complex Calculations (AREA)

Abstract

The present invention relates to a kind of calculation method for the cold-proof drain cavern length in tunnel in cold regions hole, analysis is located at cold and tunnel in cold regions hole solar radiation situation, calculates the solar radiation index of tunnel portal;It using tunnel portal solar radiation index, the most cold monthly mean temperature in hole, is completed positioned at the drainage channel icing length of severe cold area railway tunnel actual measurement and corresponding cold-proof drain cavern setting length as calculating parameter, drafts Nonlinear Curved equation form;Using Multiple Non Linear Regression, nonlinear multivariable surface equation undetermined parameter is calculated, obtains the cold-proof drain cavern setting calculating formula of length of tunnel in cold regions.The present invention overcomes the prior arts to be arranged the shortcomings that length is without law theory qualitative and quantitative analysis to cold-proof drain cavern, and proposing has targetedly calculation method, improves the accuracy of the calculating for the cold-proof drain cavern setting length in tunnel in cold regions hole.

Description

Calculation method for the cold-proof drain cavern length in tunnel in cold regions hole
Technical field
The present invention relates to the cold-proof fields in tunnel, and in particular to one kind is used for the cold-proof drain cavern length in tunnel in cold regions hole Calculation method.
Background technique
It is completed tunnel in cold regions Investigation on Frost Damage overview according to China, freezing damage in tunnel is usually locally to tie from drainage channel What ice started.It creates Railway Tunnel to northwest China to count, there are local draining channels after part tunnel is built up The case where icing, seriously threatens traffic safety.The especially tunnel portal Schattenseite and the lower region of temperature that are located at massif freezes Problem is more prominent, and the yin, yang slope of massif judges to be directly affected by solar radiation.
Improving effective drainage system and reliable cold-proof heat insulation measure is the key that prevent freeze injury.China severe cold area tunnel The major measure of the freeze proof section of setting up defences in road has cold-proof drain cavern, cold-proof drain cavern, cold-proof drain cavern and electric tracer heating system.Tunnel portal When cold-proof drain cavern Design of length, usually according to the design experiences of designer, lack quantitative calculation method.
Summary of the invention
It is comprehensive the object of the present invention is to provide a kind of calculation method for the cold-proof drain cavern length in tunnel in cold regions hole It closes and considers the influence factors such as solar radiation quantity and tunnel portal temperature, determine that tunnel in cold regions is cold-proof by nonlinear regression and let out The setting length in water hole.
The technical scheme adopted by the invention is as follows:
Calculation method for the cold-proof drain cavern length in tunnel in cold regions hole, it is characterised in that:
The following steps are included:
Step 1: tunnel portal solar radiation impact analysis:
The solar radiation condition for being located at cold and tunnel in cold regions hole is analyzed, slope where tunnel portal is passed through Three azimuth in face, the natural grade of slope surface and geographic latitude influence factors, the solar radiation that tunnel portal is calculated refer to Mark;
Step 2: equation form is drafted:
Using tunnel portal solar radiation index, the most cold monthly mean temperature in hole as independent variable, it is completed positioned at severe cold The drainage channel icing length of area's railway tunnel actual measurement and corresponding cold-proof drain cavern setting length are drafted more as dependent variable First Nonlinear Curved equation form;
Step 3: Multiple Non Linear Regression:
Nonlinear multivariable surface equation preset parameter undetermined and convergence control coefrficient to be returned is calculated, to polynary Nonlinear Curved equation is matched, and the cold-proof drain cavern setting calculating formula of length of tunnel in cold regions is obtained.
Tunnel portal solar radiation index calculation formula is as follows:
Wherein, IθFor tunnel portal solar radiation index;IFor tunnel portal beam radia intensity;IFor Tunnel Mouth solar scattered radiation intensity;IThe ground return radiation intensity obtained for tunnel portal;IDNFor normal direction intensity of solar radiation, Refer to the beam radia intensity of sunray normal direction, IDN=I0×Pm, I0For solar constant, P is atmosphere coefficient of transparency, m For air quality,H is solar elevation;I is solar incident angle, cosi=cos θ sinh+sin θ coshcos (α-γ), γ are inclined-plane azimuth;α is solar azimuth;IDHFor horizontal direction beam radia intensity, IDH=IDNsinh =I0Pmsinh;IdHFor horizontal direction solar scattered radiation intensityθ is tunnel portal The inclination angle of place slope surface;ρGThe Reflectivity for Growing Season of slope surface where tunnel;IhFor the total radiation intensity of horizontal direction,
Assignment is carried out to Partial Variable when calculating solar radiation index, in which: solar azimuth α is 0, refers to constantly be 12 When solar azimuth;P atmosphere coefficient of transparency is 0.722;The Reflectivity for Growing Season ρ of slope surface where tunnelGIt is 0.2;Solar constant I0 Take 1.
In step 2, using tunnel portal solar radiation index, the most cold monthly mean temperature in hole as independent variable, it is completed position It is used as in the drainage channel icing length of severe cold area railway tunnel actual measurement and corresponding cold-proof drain cavern setting length because becoming Amount, it is as follows to draft nonlinear multivariable equation form;
Wherein, T is the most cold monthly mean temperature in hole;IθFor tunnel portal solar radiation index;L is Railway Tunnel Freeze injury length;A, b, c are preset parameter to be returned, and d is convergence control coefrficient to be returned.
In step 3, Multiple Non Linear Regression is carried out using wheat quart method, nonlinear multivariable surface equation is calculated and waits for Fixed preset parameter and convergence control coefrficient to be returned, and then obtain the cold-proof drain cavern setting length computation of tunnel in cold regions Formula is as follows:
The calculated result of the cold-proof drain cavern setting calculating formula of length of the tunnel in cold regions is established in tunnel portal On the basis of most cold monthly mean temperature, solar radiation index;The cold-proof drain cavern setting length of tunnel in cold regions is also by other The influence of factor, when introducing, hole mima type microrelief, underground water development degree, road gradient in highway tunnel, natural wind direction, wind speed, train driving are fast When other influence factors of degree, needs to increase above-mentioned independent variable in step 2, draft nonlinear multivariable equation form again, and Increase preset parameter to be returned in step 3, re-start Multiple Non Linear Regression:
Wherein, m1m2...mnFor influence tunnel in cold regions cold-proof drain cavern, the calculated result of calculating formula of length is set Other factors, include but are not limited to tunnel portal mima type microrelief, underground water development degree, road gradient in highway tunnel, natural wind direction, wind speed, Train running speed;For calculating process, indicate each influence factor to the influence mode of calculated result.
The invention has the following advantages that
A kind of calculation method for the cold-proof drain cavern setting length in tunnel in cold regions hole of the present invention, for The characteristics of tunnel portal, the azimuth of slope surface where tunnel portal, slope surface three influence factors of natural grade and geographic latitude The solar radiation index for calculating tunnel portal, evaluates the solar radiation size that tunnel portal receives.Analyze Tunnel Mouth solar radiation index, the most cold monthly mean temperature in hole freeze to the drainage channel of cold or severe cold area railway tunnel actual measurement and grow The influence of degree and corresponding heat preservation ditch setting length, has drafted nonlinear multivariable surface equation form, by polynary non-thread Property return, propose tunnel in cold regions cold-proof drain cavern setting calculating formula of length.The present invention overcomes prior art contrapositions In the cold-proof drain cavern in tunnel in cold regions hole setting length is without law theory qualitative and quantitative analysis the shortcomings that, proposes to have and be directed to Property calculation method, improve the accuracy of tunnel in cold regions hole cold-proof drain cavern setting length computation.
Specific embodiment
The present invention will be described in detail With reference to embodiment.
The present invention relates to a kind of calculation methods for the cold-proof drain cavern setting length in tunnel in cold regions hole, comprising:
Step 1: tunnel portal solar radiation impact analysis.To the sun spoke for being located at cold and tunnel in cold regions hole The condition of penetrating is analyzed, and the azimuth of slope surface where tunnel portal, the natural grade of slope surface and geographic latitude three influences are passed through The solar radiation index of tunnel portal is calculated in factor;
Step 2: equation form is drafted.Using tunnel portal solar radiation index, the most cold monthly mean temperature in hole as change certainly Amount, China is completed to be set positioned at the drainage channel icing length of severe cold area railway tunnel actual measurement and corresponding cold-proof drain cavern Length is set as dependent variable, drafts nonlinear multivariable surface equation form;
Step 3: Multiple Non Linear Regression.Nonlinear multivariable surface equation preset parameter undetermined is calculated and wait return The convergence control coefrficient returned, matches nonlinear multivariable surface equation, obtains the cold-proof drain cavern setting of tunnel in cold regions Calculating formula of length.
The step 1 tunnel portal solar radiation index calculation formula is as follows:
Wherein, IθFor tunnel portal solar radiation index;IFor tunnel portal beam radia intensity;IFor Tunnel Mouth solar scattered radiation intensity;IThe ground return radiation intensity obtained for tunnel portal;IDNFor normal direction intensity of solar radiation, Refer to the beam radia intensity of sunray normal direction, IDN=I0×Pm, I0For solar constant, P is atmosphere coefficient of transparency, m For air quality,H is solar elevation;I is solar incident angle, cosi=cos θ sinh+sin θ coshcos (α-γ), γ are inclined-plane azimuth;α is solar azimuth;IDHFor horizontal direction beam radia intensity, IDH=IDNsinh =I0Pmsinh;IdHFor horizontal direction solar scattered radiation intensityθ is tunnel portal The inclination angle of place slope surface;ρGThe Reflectivity for Growing Season of slope surface where tunnel;IhFor the total radiation intensity of horizontal direction,
The solar radiation of the step 1 tunnel portal is by sunray incidence angle, landform, cloud amount, hole mima type microrelief etc. The influence of factor.The website that China directly measures solar radiation is less, and many areas are needed there is no the observation of solar radiation It calculates and obtains indirectly, thus need to select form simple in calculating, the few solar radiation of undetermined parameter calculates model.To simplify meter Calculation process, the present invention carry out assignment to Partial Variable when calculating solar radiation index, in which: solar azimuth α is 0, when referring to Solar azimuth when quarter is 12;P atmosphere coefficient of transparency is 0.722;The Reflectivity for Growing Season ρ of slope surface where tunnelGIt is 0.2;Too Positive constant I0Take 1.
The step 2 is using tunnel portal solar radiation index, the most cold monthly mean temperature in hole as independent variable, and China is It builds up the drainage channel icing length for being located at the actual measurement of severe cold area railway tunnel and corresponding cold-proof drain cavern setting length is made For dependent variable, it is as follows to draft nonlinear multivariable equation form;
Wherein, T is the most cold monthly mean temperature in hole;IθFor tunnel portal solar radiation index;L is Railway Tunnel Freeze injury length;A, b, c are preset parameter to be returned, and d is convergence control coefrficient to be returned.
The step 3 carries out Multiple Non Linear Regression using wheat quart method (Levenberg-Marquardt), calculates To nonlinear multivariable surface equation preset parameter undetermined and convergence control coefrficient to be returned, and then obtain tunnel in cold regions Cold-proof drain cavern setting calculating formula of length is as follows:
The calculated result of the cold-proof drain cavern setting calculating formula of length of the tunnel in cold regions is established in tunnel portal On the basis of most cold monthly mean temperature, solar radiation index.The cold-proof drain cavern setting length of tunnel in cold regions is also by other The influence of factor, when introducing, hole mima type microrelief, underground water development degree, road gradient in highway tunnel, natural wind direction, wind speed, train driving are fast When other influence factors such as degree, needs to increase above-mentioned independent variable in step 2, draft nonlinear multivariable equation form again, and Increase preset parameter to be returned in step 3, re-start Multiple Non Linear Regression:
Wherein, m1m2...mnFor influence tunnel in cold regions cold-proof drain cavern, the calculated result of calculating formula of length is set Other factors, include but are not limited to tunnel portal mima type microrelief, underground water development degree, road gradient in highway tunnel, natural wind direction, wind speed, Train running speed.For calculating process, indicate each influence factor to the influence mode of calculated result.
The fit procedure of the cold-proof drain cavern setting calculating formula of length of tunnel in cold regions is established to be completed in China Positioned at the drainage channel icing length of severe cold area railway tunnel actual measurement and the basis of corresponding cold-proof drain cavern setting length On, tunnel location is in the northwest China area lower region of High aititude temperature, other tunnel in cold regions such as China northeast Applicability needs further demonstration;
It is limited by field data, the cold-proof drain cavern setting calculating formula of length of tunnel in cold regions is only applicable to tunnel portal Most cold monthly mean temperature needs to be arranged the tunnel of cold-proof drain cavern between -7.55 DEG C to -18.0 DEG C, most cold monthly average gas Temperature needs further verifying lower than the adaptability of -18.0 DEG C of tunnel portals.
A kind of calculation method for the cold-proof drain cavern setting length in tunnel in cold regions hole of the present invention, for The characteristics of tunnel portal, the azimuth of slope surface where tunnel portal, slope surface three influence factors of natural grade and geographic latitude The solar radiation index for calculating tunnel portal, evaluates the solar radiation size that tunnel portal receives.Analyze Tunnel Mouth solar radiation index, the most cold monthly mean temperature in hole freeze to the drainage channel of cold or severe cold area railway tunnel actual measurement and grow The influence of degree and corresponding heat preservation ditch setting length, has drafted nonlinear multivariable surface equation form, by polynary non-thread Property return, propose tunnel in cold regions cold-proof drain cavern setting calculating formula of length.The present invention overcomes prior art contrapositions In the cold-proof drain cavern in tunnel in cold regions hole setting length is without law theory qualitative and quantitative analysis the shortcomings that, proposes to have and be directed to Property calculation method, improve the accuracy of tunnel in cold regions hole cold-proof drain cavern setting length computation.
The contents of the present invention are not limited to cited by embodiment, and those of ordinary skill in the art are by reading description of the invention And to any equivalent transformation that technical solution of the present invention is taken, all are covered by the claims of the invention.

Claims (6)

1. being used for the calculation method of the cold-proof drain cavern length in tunnel in cold regions hole, it is characterised in that:
The following steps are included:
Step 1: tunnel portal solar radiation impact analysis:
The solar radiation condition for being located at cold and tunnel in cold regions hole is analyzed, slope surface where tunnel portal is passed through Three azimuth, the natural grade of slope surface and geographic latitude influence factors, are calculated the solar radiation index of tunnel portal;
Step 2: equation form is drafted:
Using tunnel portal solar radiation index, the most cold monthly mean temperature in hole as independent variable, it is completed and is located at severe cold area iron The drainage channel icing length of road tunnel actual measurement and corresponding cold-proof drain cavern setting length are drafted polynary non-as dependent variable Linear surface equation form;
Step 3: Multiple Non Linear Regression:
Nonlinear multivariable surface equation preset parameter undetermined and convergence control coefrficient to be returned is calculated, to polynary non-thread Property surface equation matched, obtain tunnel in cold regions cold-proof drain cavern setting calculating formula of length.
2. the calculation method according to claim 1 for the cold-proof drain cavern length in tunnel in cold regions hole, feature It is:
Tunnel portal solar radiation index calculation formula is as follows:
Wherein, IθFor tunnel portal solar radiation index;IFor tunnel portal beam radia intensity;IToo for tunnel portal Sun scattering radiation intensity;IThe ground return radiation intensity obtained for tunnel portal;IDNFor normal direction intensity of solar radiation, refer to too The beam radia intensity of sunlight line normal direction, IDN=I0×Pm, I0For solar constant, P is atmosphere coefficient of transparency, and m is big Makings amount,H is solar elevation;I is solar incident angle, cosi=cos θ sinh+sin θ coshcos (α- γ), γ is inclined-plane azimuth;α is solar azimuth;IDHFor horizontal direction beam radia intensity, IDH=IDNSinh= I0Pmsinh;IdHFor horizontal direction solar scattered radiation intensityθ is tunnel portal institute At the inclination angle of slope surface;ρGThe Reflectivity for Growing Season of slope surface where tunnel;IhFor the total radiation intensity of horizontal direction,
3. the calculation method according to claim 2 for the cold-proof drain cavern length in tunnel in cold regions hole, feature It is:
Assignment is carried out to Partial Variable when calculating solar radiation index, in which: solar azimuth α is 0, when referring to constantly as 12 Solar azimuth;P atmosphere coefficient of transparency is 0.722;The Reflectivity for Growing Season ρ of slope surface where tunnelGIt is 0.2;Solar constant I0Take 1.
4. the calculation method according to claim 3 for the cold-proof drain cavern length in tunnel in cold regions hole, feature It is:
In step 2, using tunnel portal solar radiation index, the most cold monthly mean temperature in hole as independent variable, it is completed and is located at sternly The drainage channel icing length of cold district railway tunnel actual measurement and corresponding cold-proof drain cavern setting length are intended as dependent variable It is as follows to determine nonlinear multivariable equation form;
Wherein, T is the most cold monthly mean temperature in hole;IθFor tunnel portal solar radiation index;L is the freeze injury of Railway Tunnel Length;A, b, c are preset parameter to be returned, and d is convergence control coefrficient to be returned.
5. the calculation method according to claim 4 for the cold-proof drain cavern length in tunnel in cold regions hole, feature It is:
In step 3, Multiple Non Linear Regression is carried out using wheat quart method, it is undetermined that nonlinear multivariable surface equation is calculated Preset parameter and convergence control coefrficient to be returned, and then obtain the cold-proof drain cavern setting calculating formula of length of tunnel in cold regions It is as follows:
6. the calculation method according to claim 5 for the cold-proof drain cavern length in tunnel in cold regions hole, feature It is:
The calculated result of the cold-proof drain cavern setting calculating formula of length of the tunnel in cold regions is established most cold in tunnel portal On the basis of monthly mean temperature, solar radiation index;The cold-proof drain cavern setting length of tunnel in cold regions is also by other factors Influence, when introducing hole mima type microrelief, underground water development degree, road gradient in highway tunnel, natural wind direction, wind speed, train running speed When other influence factors, needs to increase above-mentioned independent variable in step 2, draft nonlinear multivariable equation form again, and in step Increase preset parameter to be returned in rapid three, re-start Multiple Non Linear Regression:
Wherein, m1m2...mnFor influence tunnel in cold regions cold-proof drain cavern, the other of the calculated result of calculating formula of length are set Factor includes but are not limited to tunnel portal mima type microrelief, underground water development degree, road gradient in highway tunnel, natural wind direction, wind speed, train Travel speed;For calculating process, indicate each influence factor to the influence mode of calculated result.
CN201811107580.9A 2018-09-21 2018-09-21 Method for calculating cold-proof drainage tunnel length at tunnel portal in severe cold region Active CN109214102B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811107580.9A CN109214102B (en) 2018-09-21 2018-09-21 Method for calculating cold-proof drainage tunnel length at tunnel portal in severe cold region

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811107580.9A CN109214102B (en) 2018-09-21 2018-09-21 Method for calculating cold-proof drainage tunnel length at tunnel portal in severe cold region

Publications (2)

Publication Number Publication Date
CN109214102A true CN109214102A (en) 2019-01-15
CN109214102B CN109214102B (en) 2023-04-18

Family

ID=64985085

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811107580.9A Active CN109214102B (en) 2018-09-21 2018-09-21 Method for calculating cold-proof drainage tunnel length at tunnel portal in severe cold region

Country Status (1)

Country Link
CN (1) CN109214102B (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103410563A (en) * 2013-07-23 2013-11-27 同济大学 Cold-proof draining tunnel
US20180252454A1 (en) * 2017-03-06 2018-09-06 Ice Castles, Llc Apparatus and methods for constructing ice structures

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103410563A (en) * 2013-07-23 2013-11-27 同济大学 Cold-proof draining tunnel
US20180252454A1 (en) * 2017-03-06 2018-09-06 Ice Castles, Llc Apparatus and methods for constructing ice structures

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
朱国伟: "寒冷及严寒地区铁路隧道防排水设计探讨", 《铁道工程学报》 *
王英学: "高寒地区高速铁路隧道空气动力学与隧道防冻耦合特性研究", 《学术动态》 *

Also Published As

Publication number Publication date
CN109214102B (en) 2023-04-18

Similar Documents

Publication Publication Date Title
Jun et al. Field measurement of temperature inside tunnel in winter in Gangwon, Korea
Yokobori et al. Effect of land cover on air temperatures involved in the development of an intra-urban heat island
CN106951612A (en) Dynamic water storage capacity Runoff calculation method in freeze-thawing process of soil
Zhao et al. Field measurement of air temperature in a cold region tunnel in northeast China
Lewis et al. Surface energy balance and meltwater production for a Dry Valley glacier, Taylor Valley, Antarctica
Chubb et al. Estimation of wind-induced losses from a precipitation gauge network in the Australian snowy mountains
Johanneck et al. Comprehensive evaluation of effect of climate in mechanistic–empirical pavement design GuidePredictions
CN109492248A (en) For cold and tunnel in cold regions hole heat preservation ditch length calculation method
CN107761528A (en) A kind of asphalt pavement rut forecasting procedure based on real time high temperature weather and the volume of traffic
Wolff et al. Measurements of wind-induced loss of solid precipitation: description of a Norwegian field study
CN115099162A (en) Correction method for wind field under complex terrain
CN114970099B (en) Winter water temperature intelligent forecasting method for open channel of water delivery
Tai et al. Study on thermal performance of novel asymmetric crushed-rock-based embankment on the Qinghai-Tibet Railway in permafrost region
Tian et al. Impact of water vapor transfer on a Circum-Bohai-Sea heavy fog: Observation and numerical simulation
Jiang et al. Thermal characteristics investigation of a high-speed railway tunnel by field monitoring in Northeast of China
Ya-ling et al. Calculation of temperature differences between the sunny slopes and the shady slopes along railways in permafrost regions on Qinghai–Tibet Plateau
CN117951909A (en) Thermal comfort numerical simulation method for water space of shore based on tree water characteristics in severe cold region
CN109214102A (en) Calculation method for the cold-proof drain cavern length in tunnel in cold regions hole
CN109492247A (en) Calculation method for the buried Central drain length in tunnel in cold regions hole
CN109268067A (en) For cold and the cold-proof drainage measure of tunnel in cold regions determination method
Ižvolt et al. Some experience and preliminary conclusions from the experimental monitoring of the temperature regime of subgrade structure
CN110502847B (en) Design and calculation method for permafrost region hot-rod roadbed based on heat balance principle
KR101339937B1 (en) Quantification system for wind effect on daily minimum temperature within cold air pools and method thereof
Abild et al. Application of the wind atlas method to extreme wind speed data
CN116401499A (en) Calculation method for longitudinal air temperature field in winter tunnel of large tunnel operated in cold region

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant