CN109208804A - The facing board mounting assembly and installation method of hyperboloid base - Google Patents
The facing board mounting assembly and installation method of hyperboloid base Download PDFInfo
- Publication number
- CN109208804A CN109208804A CN201811121961.2A CN201811121961A CN109208804A CN 109208804 A CN109208804 A CN 109208804A CN 201811121961 A CN201811121961 A CN 201811121961A CN 109208804 A CN109208804 A CN 109208804A
- Authority
- CN
- China
- Prior art keywords
- anchor ear
- keel
- decoration panel
- hyperboloid
- base
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 22
- 238000009434 installation Methods 0.000 title claims abstract description 21
- 238000005034 decoration Methods 0.000 claims abstract description 92
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 38
- 239000010959 steel Substances 0.000 claims abstract description 38
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 claims description 16
- 229910052782 aluminium Inorganic materials 0.000 claims description 16
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 4
- 238000010276 construction Methods 0.000 abstract description 13
- 239000004411 aluminium Substances 0.000 description 4
- 238000010586 diagram Methods 0.000 description 4
- 239000003973 paint Substances 0.000 description 4
- 239000002390 adhesive tape Substances 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 229910001220 stainless steel Inorganic materials 0.000 description 2
- 239000010935 stainless steel Substances 0.000 description 2
- 241000122205 Chamaeleonidae Species 0.000 description 1
- 230000000712 assembly Effects 0.000 description 1
- 238000000429 assembly Methods 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 239000003086 colorant Substances 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 210000005069 ears Anatomy 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 238000012797 qualification Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/003—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation with movable parts, e.g. pivoting panels, access doors
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/04—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation comprising slabs, panels, sheets or the like
- E04B9/0407—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation comprising slabs, panels, sheets or the like being stiff and curved
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/04—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation comprising slabs, panels, sheets or the like
- E04B9/0435—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation comprising slabs, panels, sheets or the like having connection means at the edges
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/06—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
- E04B9/061—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members supporting construction for curved ceilings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/18—Means for suspending the supporting construction
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D13/00—Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
- E04D13/04—Roof drainage; Drainage fittings in flat roofs, balconies or the like
- E04D13/064—Gutters
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Finishing Walls (AREA)
Abstract
The invention discloses a kind of facing board mounting assembly of hyperboloid base and installation methods, the mounting device includes keel, the first anchor ear and the second anchor ear are connected on the inside of keel, first anchor ear and the second anchor ear include hoop body, for accommodating the steel pipe of hyperboloid base inside hoop body, opening is provided on hoop body, opening is connected with the clamping screw for being closed opening, connecting plate is further fixed on hoop body, connecting plate is connected with keel, it is connected with decoration panel on the outside of keel, is connected with drainage gutter on decoration panel.The invention also discloses a kind of facing method of plate installation of hyperboloid base.The configuration of the present invention is simple, it is easy for assemble or unload, it is conducive to reduce difficulty of construction, is conveniently adjusted position and the angle of decoration panel, can effectively ensure that the straight connection between decoration panel and the effective connection and decoration panel of main structure, improves construction quality and efficiency.
Description
Technical field
The present invention relates to technical field of building construction, and in particular to a kind of the facing board mounting assembly and peace of hyperboloid base
Dress method.
Background technique
Existing facing method of plate installation is generally applicable in plane or single-curved surface base, and decoration panel installs base's keel
It is welded in main structure, but with the development of building trade, the shape of building is more and more diversified, especially for master
Structured base layer is for bi-curved building, and decorative cover is made of the decoration panel that many size and shapes are different from, and
Because its main structure base is hyperboloid, when decoration panel is installed, direction and angle when main structure is connected with time structure are difficult to control
System, using existing facing method of plate installation, can not effectively realize the straight connection between decoration panel, easily cause and do over again, and construct
Quality and efficiency are lower, and decoration panel is not easy to mount and dismount, once cause facing to scratch during installation or removal, the later period
Repairing is difficult to effect identical with raw sheet face, is unable to satisfy construction requirement.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of facing board mounting assembly of hyperboloid base and installation method,
Structure is simple, easy for assemble or unload, is conducive to reduce difficulty of construction, is conveniently adjusted position and the angle of decoration panel, can effectively ensure that
Straight connection between decoration panel and the effective connection and decoration panel of main structure improves construction quality and efficiency, reduces scene
It does over again number.
In order to solve the above technical problem, the present invention provides technical solution it is as follows:
A kind of facing board mounting assembly of hyperboloid base, including keel are connected with the first anchor ear and on the inside of the keel
Two anchor ears, first anchor ear and the second anchor ear include hoop body, for accommodating the hyperboloid base inside the hoop body
Steel pipe is provided with opening on the hoop body, and the opening is connected with the clamping screw for being closed the opening, the hoop body
On be further fixed on connecting plate, the connecting plate is connected with the keel, and decoration panel, the decorations are connected on the outside of the keel
Drainage gutter is connected on panel.
The connecting plate is detachably connected with pinboard, and the pinboard is connected with the keel.
Be also connected with aluminum profile on the keel, the edge of the decoration panel be connected to the aluminum profile and the keel it
Between.
The diameter of the hoop body of first anchor ear and the second anchor ear is different.
The support frame for being used to support the drainage gutter, support frame as described above and the row are also connected on the inside of the keel
The outer wall of water gutter is connected.
The decoration panel includes the first plate body and the second plate body, is provided with slot, second plate on first plate body
Convex block is provided on body, the convex block is plugged in the slot.
The junction of the decoration panel and the drainage gutter is connected with waterproof enclosure.
A kind of facing method of plate installation of hyperboloid base, the hyperboloid base include hyperboloid steel truss, described double
Curved surface steel truss is mainly made of the first steel pipe and the second steel pipe, and first steel pipe and the second steel pipe are curved steel tube, should
Installation method the following steps are included:
1) hoop body of the first anchor ear is connected on the first steel pipe, and the hoop body of the second anchor ear is connected on the second steel pipe, so
Adjust the direction of the first anchor ear and the second anchor ear afterwards so that the connecting plate direction on the first anchor ear and the second anchor ear with it is to be installed
The position of decoration panel is adapted;
2) after the adjustment of the direction of the first anchor ear and the second anchor ear, the hoop body of the first anchor ear and the second anchor ear opening is logical
Cross clamping screw locking;
3) connecting plate of the first anchor ear and the second anchor ear is connected with keel inside;
4) decoration panel is fixed on the outside of keel;
5) drainage gutter is fixed on decoration panel.
In above-mentioned installation method, the decoration panel includes the first plate body and the second plate body, is provided on first plate body
Slot is provided with convex block on second plate body, when fixing decoration panel on the outside of keel in the step 4), first by the first plate body
It is mutually fixed with keel, then the second plate body is mutually fixed with keel and is plugged on the convex block of the second plate body the slot of the first plate body
In.
In the step 3), the connecting plate of the first anchor ear and the second anchor ear is detachably connected with keel.
The invention has the following advantages: the configuration of the present invention is simple, easy for assemble or unload, difficulty of construction is reduced, just
Position and angle in adjustment decoration panel, can effectively ensure that between decoration panel and the effective connection and decoration panel of main structure
Straight connection, improve construction quality and efficiency, the scene of substantially reducing is done over again number;Decoration panel is easily installed and dismantles;It mentions
Decoration panel overall aesthetic degree after high construction, decorative effect are preferable.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the facing board mounting assembly of hyperboloid base of the invention;
Fig. 2 is the partial enlargement structural representation in Fig. 1 at A;
Fig. 3 is the partial enlargement structural representation in Fig. 1 at B;
Fig. 4 is the schematic cross-sectional view in the direction K-K in Fig. 1;
Fig. 5 is the partial enlargement structural representation in Fig. 4 at C;
Fig. 6 is the structural schematic diagram of keel in Fig. 1;
Fig. 7 is the structural schematic diagram of support frame in Fig. 1;
Fig. 8 is the structural schematic diagram of waterproof enclosure in Fig. 2;
In figure: 1, first steel pipe, the 2, second steel pipe, 3, keel, the 31, second slotted hole, the 4, first anchor ear, 41, hoop body, 411, open
Mouthful, 42, clamping screw, 43, connecting plate, the 431, first slotted hole, the 5, second anchor ear, 6, pinboard, the 7, first bolt, 8, the
Two bolts, 9, drainage gutter, 10, support frame, 11, aluminum profile, 12, waterproof adhesive tape, 13, third bolt, the 14, the 4th bolt, 15,
Waterproof enclosure, 16, roofing system, 17, decoration panel.
Specific embodiment
The present invention will be further explained below with reference to the attached drawings and specific examples, so that those skilled in the art can be with
It more fully understands the present invention and can be practiced, but illustrated embodiment is not as a limitation of the invention.
As shown in Figure 1 and Figure 4, present embodiment discloses a kind of facing board mounting assemblies of hyperboloid base, including keel
3, the inside of keel 3 is connected with the first anchor ear 4 and the second anchor ear 5, and the first anchor ear 4 and the second anchor ear 5 include hoop body 41, hoop body
41 inside are provided with opening 411, are connected at opening 411 for being closed for accommodating the steel pipe of hyperboloid base on hoop body 41
The clamping screw 42 of opening 411 is further fixed on connecting plate 43 on hoop body 41, and connecting plate 43 is connected with keel 3, keel 3 it is outer
Side is connected with decoration panel 17, and drainage gutter 9 is connected on decoration panel 17.
Wherein, drainage gutter 9 is formed, for draining using stainless steel material is used by stainless-steel sheet bending;Decoration panel
17 use hyperboloid aluminium sheet.
By the setting of the first anchor ear 4 and the second anchor ear 5,17 plate of facing may make to pass through hoop body 41 and hyperboloid base
Steel pipe is connected, and convenient for adjusting the angle and orientation of decoration panel 17 by adjusting 41 position of hoop body, is conducive to guarantee decoration panel 17
Between straight connection.
In a wherein embodiment, isolating pad is respectively connected on 41 inner wall of hoop body of the first anchor ear 4 and the second anchor ear 5
Piece, isolation pad use rubber sheet gasket, and rubber sheet gasket both can protect the surface paint of 41 inside steel pipe of hoop body with a thickness of 1mm
It is not damaged, and the frictional force between hoop body 41 and steel pipe can be increased.
In a wherein embodiment, as shown in figure 4, the cross section of keel 3 is L-shaped.
In a wherein embodiment, connecting plate 43 is detachably connected with pinboard 6, in order to adjust connecting plate
43 position is so as to adjust the height of hoop body 41, and pinboard 6 and keel 3 are detachably connected, in order to the position of adjustment keel 3.
Further, connecting plate 43 is connected with pinboard 6 by the first bolt 7, and pinboard 6 and keel 3 pass through second
Bolt 8 is connected.
In a wherein embodiment, be provided on pinboard 6 the first mounting hole for wearing the first bolt 7 and
For wearing the second mounting hole of the second bolt 8, the first mounting hole and the second mounting hole are circular hole, as shown in figure 3, connecting plate
The first slotted hole 431 for wearing the first bolt 7 is provided on 43, the length of the first slotted hole 431 is greater than the first bolt 7
Diameter, the first bolt 7 is also cross the first mounting hole and the first slotted hole 431, can be with by the setting of the first slotted hole 431
Position of first bolt 7 in the first slotted hole 431 is adjusted, so as to adjust the height of connecting plate 43, and then adjusts hoop body 41
Highly;
As shown in figures 1 to 6, the second slotted hole 31 for wearing the second bolt 8, the second slotted hole 31 are provided on keel 3
Length be greater than the diameter of the second bolt 8, the second bolt 8 passes through second also cross the second mounting hole and the second slotted hole 31
The setting of slotted hole 31, position of adjustable second bolt 8 in the second slotted hole 31, so as to adjust the position of keel 3.
By the setting of above-mentioned first slotted hole 431 and the second slotted hole 31, conducive to the tune of 3 position of hoop body 41 and keel
It is whole, so that the adjustment of more conducively 17 position of decoration panel (including angle), easy to operate, guarantee that the seam between decoration panel 17 is suitable
Directly.
Further, the first slotted hole 431 and the second slotted hole 31 are perpendicular.For example, the length side of the first slotted hole 431
To for vertical direction, in order to adjust the height of hoop body 41, the length direction of the second slotted hole 31 is horizontal direction, in order to adjust
The horizontal position of whole keel 3.
In a wherein embodiment, as shown in Figure 4 and Figure 5, aluminium profiles is also connected with by third bolt 13 on keel 3
Material 11, the edge of decoration panel 17 are connected between aluminum profile 11 and keel 3.
Further, it is connected with waterproof adhesive tape 12 on aluminum profile 11, for preventing water from the company between adjacent decoration panel 17
It meets place and enters inside.
In a wherein embodiment, the first anchor ear 4 is different with the diameter of the hoop body of the second anchor ear 5, double for adapting to
The steel pipe of the different-diameter of curved surface base.
In a wherein embodiment, the inside of keel 3, which also passes through the 4th bolt 14 and is connected with, is used to support draining day
The support frame 10 of ditch 9, support frame 10 are mutually welded with the outer wall of drainage gutter 9.
Further, as shown in fig. 7, being arranged fluted on support frame 10, drainage gutter 9 is placed in groove, and is drained
The outer wall of gutter 9 is fixed on groove.The shape of groove and the shape of drainage gutter 9 are adapted, and drain day with better support
Ditch 9.
In a wherein embodiment, decoration panel 17 includes the first plate body and the second plate body, is provided on the first plate body
Slot is provided with convex block on the second plate body, and convex block is plugged in slot.Due to the size of every piece of decoration panel in hyperboloid base
It is all different, if decoration panel uses integral structure, is not easy between the adjacent decoration panel being located in hyperboloid base closely solid
It is fixed, decoration panel must be removed if there is this phenomenon and is reinstalled again, until reaching construction requirement, greatly reduce construction
Efficiency, and split type structure is set by decoration panel, it can be by adjusting the position of the first plate body and the second plate body, thus well
Structural deviation is adjusted, so that being tightly fastened between adjacent decoration panel be effectively ensured.
In a wherein embodiment, as shown in Fig. 2, the junction of decoration panel 17 and drainage gutter 9 is connected with waterproof
Capping 15 prevents water from flowing into the inside of decoration panel 17.
Further, as shown in Figure 2 and Figure 8, waterproof enclosure 15 uses box body structure, is made of aluminium sheet, box body structure
Bottom opening, the bottom opening of box body structure are fastened on the junction of decoration panel 17 and drainage gutter 9.
A kind of facing method of plate installation of the hyperboloid base of roofing, roofing include roofing system 16, and roofing system 16 is wrapped
Hyperboloid base is included, hyperboloid base includes hyperboloid steel truss, and hyperboloid steel truss is mainly by the first steel pipe 1 and the second steel pipe
2 constitute, the first steel pipe 1 and the second steel pipe 2 are curved steel tube, the installation method the following steps are included:
1) hoop body 41 of the first anchor ear 4 is connected on the first steel pipe 1, and the hoop body 41 of the second anchor ear 5 is connected to the second steel
On pipe 2, the direction of the first anchor ear 4 and the second anchor ear 5 is then adjusted, so that the connecting plate 43 on the first anchor ear 4 and the second anchor ear 5
Direction is adapted with the position of decoration panel 17 to be installed;
2) after the adjustment of the direction of the first anchor ear 4 and the second anchor ear 5, by the hoop body 41 of the first anchor ear 4 and the second anchor ear 5
Opening 411 is locked by corresponding clamping screw 42;
3) connecting plate 43 of the first anchor ear 4 and the second anchor ear 5 is detachably connected with 3 inside of keel;
In a wherein embodiment, the connecting plate 43 of the first anchor ear 4 and the second anchor ear 5 can by pinboard 6 and keel 3
It releasably connects, when connection, one end of pinboard 6 is detachably connected on connecting plate 43, and the other end is detachably connected to
On keel 3.
Further, the first mounting hole for wearing the first bolt 7 is provided on pinboard 6 and for wearing the second spiral shell
Second mounting hole of bolt 8, the first mounting hole and the second mounting hole are circular hole, are provided on connecting plate for wearing the first bolt
7 the first slotted hole 431, the length of the first slotted hole 431 are greater than the diameter of the first bolt 7, are provided on keel 3 for wearing
Second slotted hole 31 of the second bolt 8, the length of the second slotted hole 31 are greater than the diameter of the second bolt 8;Connecting plate 43 and switching
Plate 6 is connected by the first bolt 7, and when connection, the first bolt 7 leads to also cross the first mounting hole and the first slotted hole 431
Overregulate the first bolt 7 in the first slotted hole 431 position and adjust connecting plate 43 together with the whole height of hoop body 41;Pinboard
6 are connected with keel 3 by the second bolt 8, when connection, the second bolt 8 also cross the second mounting hole and the second slotted hole 31,
And 3 position of keel is adjusted by adjusting the second bolt 8 position in the second slotted hole 31.
4) decoration panel 17 is fixed on the outside of keel 3;
In a wherein embodiment, the detailed process of decoration panel 17 is fixed on the outside of keel 3 are as follows: by the on keel 3
Three bolts 13 connect aluminum profile 11, and the edge of decoration panel 17 is connected between aluminum profile 11 and keel 3;Later again in aluminium profiles
Waterproof adhesive tape 12 is clamped on material 11.
Wherein, as shown in figure 5, the edge of decoration panel 17 is provided with flanging, which is connected to aluminum profile 11 and keel 3
Between.
In a wherein embodiment, decoration panel 17 includes the first plate body and the second plate body, is provided on the first plate body
Slot is provided with convex block on the second plate body, when fixing decoration panel 17 on the outside of keel 3, first mutually consolidates the first plate body with keel 3
It is fixed, then adjust the position of the second plate body, the second plate body is mutually fixed with keel 3 then and the convex block of the second plate body is plugged on the
In the slot of one plate body, by adopting a split structure each decoration panel 17, it is conveniently adjusted the installation deviation of decoration panel 17, and
Guarantee being tightly fastened between adjacent decoration panel 17.
Wherein, the edge of the first plate body and the second plate body is connected between aluminum profile 11 and keel 3.
The edge of two neighboring decoration panel 17 is clamped in gap between same aluminum profile 11 and keel 3, simultaneously with convenient
Realization adjacent decoration panel 17 and keel 3 fixation.
5) in the inside of keel 3 by 14 fixing support rack 10 of the 4th bolt, and by the outer of support frame 10 and drainage gutter 9
Wall mutually welds, and then mutually fixes drainage gutter 9 with decoration panel 17.
Further, one end of drainage gutter 9 is mutually fixed with decoration panel 17 by screw, the roofing body of the other end and roofing
It is 16 mutually to be fixed also by screw.
After drainage gutter 9 and decoration panel 17 are fixed, in the fixed waterproof enclosure in the junction of decoration panel 17 and drainage gutter 9
15。
9 phase of drainage gutter of adjacent decoration panel is welded.
Each decoration panel 17 corresponds to an independent keel 3, while each decoration panel 17 corresponds to a drainage gutter
9。
In a wherein embodiment, line setting is carried out also before step 1) to determine the installation of decoration panel 17
Position, and trial assembly is carried out to decoration panel 17 according to line setting position, 17 trial assembly quantity of decoration panel is greater than five, if trial assembly knot
Fruit is qualified, then is formally installed, otherwise need to be adjusted with to decoration panel 17, carry out trial assembly after adjustment again, until trial assembly is closed
Lattice.Wherein when trial assembly, detection trial assembly result whether He Ge method are as follows: inspection trial assembly after the completion of decoration panel 17 corner circular arc
Whether meet mellow and full requirement, and detect whether drainage gutter 9 is adapted with 17 plate of facing and roofing system 16, if decoration panel 17
Corner circular arc is mellow and full and drainage gutter 9 and decoration panel 17 and roofing system 16 are adapted, then can determine that as trial assembly qualification, if not
Meet, then it is unqualified, it need to be adjusted.
In a wherein embodiment, decoration panel 17 with a thickness of 3mm, the surface of decoration panel 17 is coated with skin of paint,
Paint is painted using chameleon, so that can be observed to paint different colors from different perspectives.
The facing board mounting assembly and installation method of the hyperboloid base of the present embodiment, apparatus structure is simple, is easily installed
And disassembly, it is connected by hooping structure with the steel pipe (main structure) of hyperboloid base, is conveniently adjusted the position and angle of decoration panel 17
Degree, so as to quickly and easily realize the adjustment of structural deviation at the scene, on the one hand ensure that decoration panel 17 and main structure
Effective connection, on the other hand be also effectively ensured decoration panel 17 seam it is straight, guarantee straight connection, improve construction matter
Amount and efficiency, greatly reduce the damage ratio of decoration panel 17, decrease later period patch work.Additionally by connecting plate 43,
The setting of second slotted hole 31 on one slotted hole 431 and keel 3 can also be more convenient for adjusting the adjustment of 3 position of anchor ear height and keel,
To better ensure that the straight degree of the seam of decoration panel 17.Above-mentioned mounting device is easily installed and dismantles, processing cost compared with
Low, entire installation method, step is simple to operation, reduces difficulty of construction and cost, improves speed of application, effectively reduces
Scene is done over again, the decoration panel overall aesthetic degree after improving construction, and decorative effect is preferable.
Embodiment described above is only to absolutely prove preferred embodiment that is of the invention and being lifted, protection model of the invention
It encloses without being limited thereto.Those skilled in the art's made equivalent substitute or transformation on the basis of the present invention, in the present invention
Protection scope within.Protection scope of the present invention is subject to claims.
Claims (10)
1. a kind of facing board mounting assembly of hyperboloid base, characterized in that including keel, is connected on the inside of the keel
One anchor ear and the second anchor ear, first anchor ear and the second anchor ear include hoop body, described double for accommodating inside the hoop body
The steel pipe of curved surface base is provided with opening on the hoop body, and the opening is connected with the locking screw for being closed the opening
Bolt is further fixed on connecting plate on the hoop body, and the connecting plate is connected with the keel, and decorations are connected on the outside of the keel
Panel is connected with drainage gutter on the decoration panel.
2. the facing board mounting assembly of hyperboloid base as described in claim 1, characterized in that the connecting plate is detachable
Ground is connected with pinboard, and the pinboard is connected with the keel.
3. the facing board mounting assembly of hyperboloid base as described in claim 1, characterized in that be also connected on the keel
Aluminum profile, the edge of the decoration panel are connected between the aluminum profile and the keel.
4. the facing board mounting assembly of hyperboloid base as described in claim 1, characterized in that first anchor ear and second
The diameter of the hoop body of anchor ear is different.
5. the facing board mounting assembly of hyperboloid base as described in claim 1, characterized in that the inside of the keel also connects
It is connected to the support frame for being used to support the drainage gutter, support frame as described above is connected with the outer wall of the drainage gutter.
6. the facing board mounting assembly of hyperboloid base as described in claim 1, characterized in that the decoration panel includes first
Plate body and the second plate body are provided with slot on first plate body, convex block, the convex block grafting are provided on second plate body
In the slot.
7. the facing board mounting assembly of hyperboloid base as described in claim 1, characterized in that the decoration panel and the row
The junction of water gutter is connected with waterproof enclosure.
8. a kind of facing method of plate installation of hyperboloid base, the hyperboloid base includes hyperboloid steel truss, the hyperbolic
Face steel truss is mainly made of the first steel pipe and the second steel pipe, and first steel pipe and the second steel pipe are curved steel tube, special
Sign is, the installation method the following steps are included:
1) hoop body of the first anchor ear is connected on the first steel pipe, and the hoop body of the second anchor ear is connected on the second steel pipe, so
Adjust the direction of the first anchor ear and the second anchor ear afterwards so that the connecting plate direction on the first anchor ear and the second anchor ear with it is to be installed
The position of decoration panel is adapted;
2) after the adjustment of the direction of the first anchor ear and the second anchor ear, the hoop body of the first anchor ear and the second anchor ear opening is logical
Cross clamping screw locking;
3) connecting plate of the first anchor ear and the second anchor ear is connected with keel inside;
4) decoration panel is fixed on the outside of keel;
5) drainage gutter is fixed on decoration panel.
9. the facing method of plate installation of hyperboloid base as claimed in claim 9, characterized in that the decoration panel includes first
Plate body and the second plate body are provided with slot on first plate body, are provided with convex block on second plate body, in the step 4)
When fixing decoration panel on the outside of keel, first the first plate body is mutually fixed with keel, then the second plate body is mutually fixed and incited somebody to action with keel
The convex block of second plate body is plugged in the slot of the first plate body.
10. the facing method of plate installation of hyperboloid base as claimed in claim 9, characterized in that in the step 3), first
The connecting plate of anchor ear and the second anchor ear is detachably connected with keel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811121961.2A CN109208804A (en) | 2018-09-26 | 2018-09-26 | The facing board mounting assembly and installation method of hyperboloid base |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811121961.2A CN109208804A (en) | 2018-09-26 | 2018-09-26 | The facing board mounting assembly and installation method of hyperboloid base |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109208804A true CN109208804A (en) | 2019-01-15 |
Family
ID=64981640
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811121961.2A Pending CN109208804A (en) | 2018-09-26 | 2018-09-26 | The facing board mounting assembly and installation method of hyperboloid base |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109208804A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117005634A (en) * | 2023-07-04 | 2023-11-07 | 中建一局集团装饰工程有限公司 | Large-span GRC outer wall decoration member splicing structure and construction method thereof |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201474182U (en) * | 2009-05-13 | 2010-05-19 | 中山市博力塑胶建材有限公司 | Roof structural plate |
CN203429854U (en) * | 2013-07-26 | 2014-02-12 | 珠海市晶艺玻璃工程有限公司 | Fixing system for space curved plate |
CN203769200U (en) * | 2014-01-27 | 2014-08-13 | 深圳市方大建科集团有限公司 | Double-curved-surface roof system |
CN205369601U (en) * | 2015-12-14 | 2016-07-06 | 广州赫来斯装饰材料有限公司 | Bullet card formula combination partition wall |
CN205955097U (en) * | 2016-08-16 | 2017-02-15 | 珠海市晶艺玻璃工程有限公司 | Installation fixing device of space curved plate |
CN207525956U (en) * | 2017-11-13 | 2018-06-22 | 深圳市大地幕墙科技有限公司 | Universal adjustment installing mechanism |
-
2018
- 2018-09-26 CN CN201811121961.2A patent/CN109208804A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201474182U (en) * | 2009-05-13 | 2010-05-19 | 中山市博力塑胶建材有限公司 | Roof structural plate |
CN203429854U (en) * | 2013-07-26 | 2014-02-12 | 珠海市晶艺玻璃工程有限公司 | Fixing system for space curved plate |
CN203769200U (en) * | 2014-01-27 | 2014-08-13 | 深圳市方大建科集团有限公司 | Double-curved-surface roof system |
CN205369601U (en) * | 2015-12-14 | 2016-07-06 | 广州赫来斯装饰材料有限公司 | Bullet card formula combination partition wall |
CN205955097U (en) * | 2016-08-16 | 2017-02-15 | 珠海市晶艺玻璃工程有限公司 | Installation fixing device of space curved plate |
CN207525956U (en) * | 2017-11-13 | 2018-06-22 | 深圳市大地幕墙科技有限公司 | Universal adjustment installing mechanism |
Non-Patent Citations (1)
Title |
---|
建设部工程质量安全监督与行业发展司、中国建筑业协会编: "《土木建筑国家级工法汇编 2003-2004年度》", 31 January 2007, 中国计划出版社 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117005634A (en) * | 2023-07-04 | 2023-11-07 | 中建一局集团装饰工程有限公司 | Large-span GRC outer wall decoration member splicing structure and construction method thereof |
CN117005634B (en) * | 2023-07-04 | 2023-12-29 | 中建一局集团装饰工程有限公司 | Large-span GRC outer wall decoration member splicing structure and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105756299B (en) | A kind of color steel tile roof attachments | |
CN109208804A (en) | The facing board mounting assembly and installation method of hyperboloid base | |
CA2476898A1 (en) | Ceiling leak capture and drainage system | |
CN201901964U (en) | Three-dimensional adjustable and disconnectable curtain wall | |
CN209194822U (en) | Switching device is used in the decoration panel installation of hyperboloid base | |
CN106703274B (en) | A kind of waterproof heat insulating roof for being provided with disassembling cleaning part | |
US20200099331A1 (en) | Skirt Mount Attachable to a Solar Panel Module Frame | |
CN106639107B (en) | A kind of curved-surface building structure | |
CN106760121B (en) | A kind of purlin holder structure of curved roof | |
CN206681233U (en) | A kind of double heat-insulation waterproof roofs | |
CN210946992U (en) | Fixing device for building water supply and drainage | |
CN207017442U (en) | A kind of cleaning fixed structure of curved roof | |
CN215814964U (en) | Curved surface adjustment outdoor small-interval LED display screen | |
JPS60165934A (en) | Bathtub attachment structure of bathroom unit | |
CN212743340U (en) | Template back of body net structure and template | |
CN212613309U (en) | Pull rod fixing component for mounting and fixing light steel keel | |
CN114232877A (en) | Fixing structure and mounting method for integral bathroom ceiling | |
CN214302452U (en) | Curtain wall with anti-seepage structure | |
CN206681232U (en) | A kind of curved-surface building structure | |
CN106917917A (en) | A kind of exterior wall pipe installation bracket | |
CN209129501U (en) | A kind of window bucket mounting structure peculiar to vessel | |
CN207278640U (en) | A kind of fix bar arranges | |
CN206495389U (en) | A kind of curved surface waterproof heat insulating roof | |
CN206681228U (en) | A kind of waterproof heat insulating roof for being provided with disassembling cleaning part | |
CN206681231U (en) | A kind of purlin holder structure of curved roof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190115 |
|
RJ01 | Rejection of invention patent application after publication |