CN109208788A - A kind of computer room light lath wall construction method - Google Patents
A kind of computer room light lath wall construction method Download PDFInfo
- Publication number
- CN109208788A CN109208788A CN201811227544.6A CN201811227544A CN109208788A CN 109208788 A CN109208788 A CN 109208788A CN 201811227544 A CN201811227544 A CN 201811227544A CN 109208788 A CN109208788 A CN 109208788A
- Authority
- CN
- China
- Prior art keywords
- computer room
- batten
- light lath
- lath wall
- construction method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 39
- 238000009434 installation Methods 0.000 claims abstract description 43
- 239000004793 Polystyrene Substances 0.000 claims abstract description 9
- 229920002223 polystyrene Polymers 0.000 claims abstract description 9
- 238000005259 measurement Methods 0.000 claims abstract description 8
- 239000003795 chemical substances by application Substances 0.000 claims description 10
- 229910001335 Galvanized steel Inorganic materials 0.000 claims description 7
- 239000008397 galvanized steel Substances 0.000 claims description 7
- 229910000831 Steel Inorganic materials 0.000 claims description 6
- 239000010959 steel Substances 0.000 claims description 6
- 230000003014 reinforcing effect Effects 0.000 claims description 4
- 239000011248 coating agent Substances 0.000 claims description 3
- 238000000576 coating method Methods 0.000 claims description 3
- 238000009413 insulation Methods 0.000 abstract description 6
- 239000002131 composite material Substances 0.000 abstract description 5
- 239000000463 material Substances 0.000 abstract description 3
- 238000004134 energy conservation Methods 0.000 abstract description 2
- 230000007613 environmental effect Effects 0.000 abstract description 2
- 230000002265 prevention Effects 0.000 abstract description 2
- 238000000034 method Methods 0.000 description 5
- 238000007689 inspection Methods 0.000 description 4
- 238000005192 partition Methods 0.000 description 4
- 239000011230 binding agent Substances 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 239000004744 fabric Substances 0.000 description 2
- 239000004570 mortar (masonry) Substances 0.000 description 2
- 229910000746 Structural steel Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000001125 extrusion Methods 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 239000003550 marker Substances 0.000 description 1
- 229920006389 polyphenyl polymer Polymers 0.000 description 1
- 238000010079 rubber tapping Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000007711 solidification Methods 0.000 description 1
- 230000008023 solidification Effects 0.000 description 1
- 230000001550 time effect Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/74—Removable non-load-bearing partitions; Partitions with a free upper edge
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/74—Removable non-load-bearing partitions; Partitions with a free upper edge
- E04B2/7401—Removable non-load-bearing partitions; Partitions with a free upper edge assembled using panels without a frame or supporting posts, with or without upper or lower edge locating rails
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/74—Removable non-load-bearing partitions; Partitions with a free upper edge
- E04B2/82—Removable non-load-bearing partitions; Partitions with a free upper edge characterised by the manner in which edges are connected to the building; Means therefor; Special details of easily-removable partitions as far as related to the connection with other parts of the building
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H5/00—Buildings or groups of buildings for industrial or agricultural purposes
- E04H5/02—Buildings or groups of buildings for industrial purposes, e.g. for power-plants or factories
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The present invention relates to construction engineering technical fields, more particularly to a kind of computer room light lath wall construction method, after the typesetting figure that light lath wall is measured and drawn according to measurement result by the installation site of the light lath wall in computer room, installation site according to the typesetting figure in light lath wall installs square tube column, beam is to form door and window and hole, and the installation site according to the typesetting figure in the light lath wall installs batten using the sequence from side to the other side, constructed using fabricated mode, to improve construction efficiency, reduce construction cost, and since granular polystyrene composite sandwich panel is with light weight, intensity is high, insulation, sound insulation, fire prevention, the energy conservation and environmental protection material for the advantages that can sawing can be cut, it is used in data center computer room, it is heat-insulated that its can be given full play to, the advantages that sound insulation, room is sufficiently expanded simultaneously The space in room, effectively increases space utilization rate.
Description
Technical field
The present invention relates to construction engineering technical field more particularly to a kind of computer room light lath wall construction methods.
Background technique
Data center computer room stores various main frame and server, since these main frames and server work
When need good working environment, the partition wall of data center computer room is required to heat-insulating sound-insulating, and the partition wall of current data center computer room every
Heat, sound insulation are poor, take up space big, and constructed using non-assembled mode, construction efficiency is poor, at high cost;These are all these
What field technical staff did not expected to see.
Summary of the invention
In view of the above problems, the invention discloses a kind of computer room light lath wall construction methods, wherein including such as
Lower step:
Step S1 measures the installation site of light lath wall in computer room and draws the lightweight according to measurement result
The typesetting figure of board wall, and mark in the typesetting figure position of the position of every block of batten installation, door and window and hole;
Step S2 installs square tube column, square tube beam in the installation site of the light lath wall according to the typesetting figure with shape
At the door and window and hole;
Step S3, according to the typesetting figure in the light lath wall installation site using suitable from side to the other side
Sequence installs batten;
Wherein, when installation, after filling cementing agent prior to the top of batten and side, then batten installed to installation site,
And it is solid that setscrew, nailing or galvanized steel plain sheet fastener are all made of between batten and computer room top Roofing slab and lower part bottom of the building plate
Fixed connection, is all made of reinforcing bar between adjacent strip and batten and the concrete walls of computer room, concrete column and is fixedly connected, batten with
Positioning Bolted angle connection is all made of between the square tube column, square tube beam;
Step S4 checks the mounted light lath wall, and clogs cementing agent in adjacent strip piece;
Step S5 carries out gap processing to batten piece after by the scheduled time.
Above-mentioned computer room light lath wall construction method, wherein in the step S1, door described in the typesetting figure
Window, hole two sides batten be whole plate.
Above-mentioned computer room light lath wall construction method, wherein the installation site of light lath wall carries out in computer room
Before measurement, further includes:
In the step of wall position line is arranged in the bottom of the installation site of light lath wall in computer room.
Above-mentioned computer room light lath wall construction method, wherein in the step S3, using electric hammer drill by batten with swollen
Swollen bolt, nailing or galvanized steel plain sheet fastener are fixedly connected with computer room top Roofing slab and lower part bottom of the building plate.
Above-mentioned computer room light lath wall construction method, wherein in the step S3, after one block of batten is installed, adjustment
The verticality of the good batten and the flatness of the batten and adjacent strip, and reached in the verticality and flatness for checking the batten
To after pre-provisioning request, then next block of batten is installed.
Above-mentioned computer room light lath wall construction method, wherein the batten is granular polystyrene composite sandwich panel.
Above-mentioned computer room light lath wall construction method, wherein the square tube column and square tube beam are coating steel pipe.
Above-mentioned computer room light lath wall construction method, wherein polyphenyl is filled in the square tube column and square tube beam
Grain concrete.
Above-mentioned computer room light lath wall construction method, wherein the computer room is data center computer room.
Above-mentioned computer room light lath wall construction method, wherein the scheduled time is 15~25 days.
Foregoing invention is with the following advantages or beneficial effects:
The invention discloses a kind of computer room light lath wall construction methods, pass through the installation of the light lath wall in computer room
After position measures and draws the typesetting figure of light lath wall according to measurement result, according to the typesetting figure in light lath wall
Installation site installs square tube column, beam to form door and window and hole, and according to the typesetting figure in the installation position of the light lath wall
It sets using the sequence installation batten from side to the other side, i.e., is constructed using fabricated mode, to improve construction
Efficiency, reduces construction cost, and due to granular polystyrene composite sandwich panel be with light weight, intensity height, insulation, every
Sound, fire prevention, the energy conservation and environmental protection material that can cut the advantages that can sawing, use in data center computer room, can give full play to its heat-insulated, sound insulation etc.
Advantage, while the space in house is sufficiently expanded, effectively increase space utilization rate.
Detailed description of the invention
Upon reading the detailed description of non-limiting embodiments with reference to the following drawings, the present invention and its feature, outer
Shape and advantage will become more apparent.Identical label indicates identical part in all the attached drawings.Not can according to than
Example draws attached drawing, it is preferred that emphasis is shows the gist of the present invention.
Fig. 1 is the flow chart of computer room light lath wall construction method in the embodiment of the present invention;
Fig. 2 is the typesetting figure of a board wall in the embodiment of the present invention;
Fig. 3 is the connection schematic diagram of bar shaped wall and square tube column beam in the embodiment of the present invention.
Specific embodiment
As shown in Figure 1, the invention discloses a kind of computer room light lath wall construction methods, specifically, the construction method packet
Include following steps:
Step S1 measures the installation site of light lath wall in computer room and draws light lath according to measurement result
The typesetting figure of wall, and mark in typesetting figure the position of the position of every block of batten installation, door and window and hole, wherein if lightweight item
When having door and window, door opening on board wall, then batten plate-laying should be carried out from the two sides at door and window, hole, so that door-window opening in typesetting figure
The batten of two sides is whole plate.
Specifically, before the installation site of light lath wall measures in computer room, above-mentioned steps S1 further include: in
The step of wall position line is arranged in the bottom of the installation site of light lath wall in computer room.
Preferably, above-mentioned batten is granular polystyrene composite sandwich panel.
Step S2, according to typesetting figure in light lath wall installation site installation square tube column, square tube beam with formed door and window and
Hole.
Preferably, above-mentioned square tube column and square tube beam are coating steel pipe.
Preferably, granular polystyrene concrete is filled in above-mentioned square tube column and square tube beam.
Step S3 uses the sequence mounting bar from side to the other side in the installation site of light lath wall according to typesetting figure
Plate;Wherein, when installation, after filling cementing agent prior to the top of batten and side, then batten installed to installation site, and batten
It is all made of setscrew, nailing or galvanized steel plain sheet fastener between computer room top Roofing slab and lower part bottom of the building plate to be fixedly connected, phase
It is all made of reinforcing bar between adjacent batten and batten and the concrete walls of computer room, concrete column to be fixedly connected, batten and square tube column, side
Positioning Bolted angle connection is all made of between Guan Liang.
Specifically, using electric hammer drill by batten expansion bolt, nailing or galvanized steel plain sheet fastener and computer room top Roofing slab
It is fixedly connected with lower part bottom of the building plate.
Herein, it should be noted that after one block of batten is installed, adjust the verticality and the batten and phase of the batten
The flatness of adjacent batten, and after the verticality and flatness for checking the batten reach pre-provisioning request, then next block of batten is installed.
Step S4 checks mounted light lath wall, and clogs cementing agent in adjacent strip piece;
Step S5 carries out gap processing to batten piece after by the scheduled time.
Preferably, the above-mentioned scheduled time is 15~25 days.
With reference to the accompanying drawing to this hair by taking the 120mm thickness granular polystyrene composite sandwich lightweight wallboard of data center computer room inside as an example
Bright further instruction, but it is not as the limitation of the invention.
Construction technology process can be summarized as: in-site measurement, positioning → structure metope, slab surfaces carry out clearing up → stepping bullet
Line, reserves door opening position and water is used in reserved equipment installation cavity → steel column installation → batten in place, centering, fixation → as required
Mud bonding mortar tamps plate stitch → inspection wall body vertical, flatness, removes timber wedge filling-up hole → plate after partial trim → mortar solidification
Seam processing → wall carries out patch grid cloth processing → examination to wallboard after conserving → 20 days.
Specific construction method
Step 1: the wall position line put well according to construction site, and to the installation site of light lath wall in computer room
The typesetting figure for measuring and drawing according to measurement result light lath wall marks position, the door and window, hole of the installation of every block of batten
Position, unwrapping wire should be clear, position should be accurate, if having door and window, hole on partition wall, should protect from door and window, hole to two sides plate-laying
Holding hole two sides is whole plate, structure as shown in Figure 2.Square tube column, the square tube beam 120*120*3mm for getting out dimension are zinc-plated
Steel pipe (having filled granular polystyrene light aggregate concrete in advance), plate and auxiliary material are transported to construction site.Institute is bonded for plate stitch
Binder configures in advance, but can not disposably configure too many, too long causes to lose in order to avoid binder cannots be used up dead time
Effect waste;, should be from door-window opening to two sides plate-laying if having door-window opening on partition wall, holding hole two sides are whole plate;
Step 2: according to typesetting figure in light lath wall installation site installation square tube column, square tube beam with formed door and window and
Hole.
Step 3: using the sequence mounting bar from side to the other side in the installation site of light lath wall according to typesetting figure
Plate;Wherein, when installation, after filling cementing agent prior to the top of batten and side, then batten installed to installation site, and install
Batten positioning in the process follows following principle:
1. the connection type of batten and top Roofing slab and lower part bottom of the building plate is to be bored by 45° angle by item with electric hammer drill (6mm)
Plate expansion bolt, nailing or galvanized steel plain sheet fastener are fixed on top Roofing slab and lower part bottom of the building plate.
2. at adjacent strip longitudinal seam and batten and concrete walls, column connecting place: by 45° angle iron hammer by 6 reinforcing bar of Φ
Squeeze into positioning.
3. batten and 120*120*3 square tube column, square tube beam connecting place: using positioning Bolted angle connection, positioning angle steel spacing is
500mm, structure as shown in Figure 3.
Specifically, the line of ink marker (the wall position line) of the lower edge alignment wall position of batten is first used crowbar when installation
Agitating in board bottom is moved to batten slowly at correct position, and board bottom is then clogged leveling levelling batten with two groups of timber wedges,
It is fixed, so that its edges of boards is rubbed to squeeze and tightly is held out against, and the dedicated cementing agent of extrusion is struck off, it is vertical with guiding ruler inspection plate body
Degree, makes plate in vertical state, then installs another block of adjacent plate again, it should be noted that should closely connect between batten and batten
It connects, the flatness of verticality and adjacent plate face should be adjusted, and should be after the verticality of plate face and flatness passed examination, it can
Carry out the installation of next block of plate.
Step 4: on inspection after acceptance(check), being repaired in plate piece with dedicated cementing agent when whole face board wall installs
It clogs closely knit.Timber wedge is extracted after about 2 days, timber wedge is left into hole plug sternly with same binder.
Herein, it should be noted that batten wall is forbidden tapping wall or being shaken after installing in 10 days;
Step 5: plate stitch does not crack in the future to ensure, plate stitch is not handled immediately in batten installation process,
Gap processing is carried out to plate stitch bonding grid cloth again after 20 days.Grid is covered with patch two face of wallboard to be smeared with dedicated cementing agent again
It is flat.
Tolerance is installed and the method for inspection is as shown in the table
It should be appreciated by those skilled in the art that those skilled in the art are combining the prior art and above-described embodiment can be with
Realize change case, this will not be repeated here.Such change case does not affect the essence of the present invention, and it will not be described here.
Presently preferred embodiments of the present invention is described above.It is to be appreciated that the invention is not limited to above-mentioned
Particular implementation, devices and structures not described in detail herein should be understood as gives reality with the common mode in this field
It applies;Anyone skilled in the art, without departing from the scope of the technical proposal of the invention, all using the disclosure above
Methods and technical content many possible changes and modifications are made to technical solution of the present invention, or be revised as equivalent variations etc.
Embodiment is imitated, this is not affected the essence of the present invention.Therefore, anything that does not depart from the technical scheme of the invention, foundation
Technical spirit of the invention any simple modifications, equivalents, and modifications made to the above embodiment, still fall within the present invention
In the range of technical solution protection.
Claims (10)
1. a kind of computer room light lath wall construction method, which comprises the steps of:
Step S1 measures the installation site of light lath wall in computer room and draws the light lath according to measurement result
The typesetting figure of wall, and mark in the typesetting figure position of the position of every block of batten installation, door and window and hole;
Step S2 installs square tube column, square tube beam in the installation site of the light lath wall according to the typesetting figure to be formed
State door and window and hole;
Step S3, the installation site according to the typesetting figure in the light lath wall are pacified using the sequence from side to the other side
Batten;
Wherein, when installation, after filling cementing agent prior to the top of batten and side, then batten installed to installation site, and item
The fixed company of setscrew, nailing or galvanized steel plain sheet fastener is all made of between plate and computer room top Roofing slab and lower part bottom of the building plate
Connect, be all made of reinforcing bar between adjacent strip and batten and the concrete walls of computer room, concrete column and be fixedly connected, batten with it is described
Positioning Bolted angle connection is all made of between square tube column, square tube beam;
Step S4 checks the mounted light lath wall, and clogs cementing agent in adjacent strip piece;
Step S5 carries out gap processing to batten piece after by the scheduled time.
2. computer room light lath wall construction method as described in claim 1, which is characterized in that in the step S1, described
Door and window described in typesetting figure, hole two sides batten be whole plate.
3. computer room light lath wall construction method as described in claim 1, which is characterized in that the light lath wall in computer room
Installation site measure before, further includes:
In the step of wall position line is arranged in the bottom of the installation site of light lath wall in computer room.
4. computer room light lath wall construction method as described in claim 1, which is characterized in that in the step S3, use
Electric hammer drill fixes batten expansion bolt, nailing or galvanized steel plain sheet fastener and computer room top Roofing slab and lower part bottom of the building plate
Connection.
5. computer room light lath wall construction method as described in claim 1, which is characterized in that
In the step S3, after one block of batten is installed, the verticality and the batten and adjacent strip of the batten are adjusted
Flatness, and after the verticality and flatness for checking the batten reach pre-provisioning request, then next block of batten is installed.
6. computer room light lath wall construction method as described in claim 1, which is characterized in that the batten is multiple for granular polystyrene
Co-clip core.
7. computer room light lath wall construction method as described in claim 1, which is characterized in that the square tube column and square tube beam are equal
For coating steel pipe.
8. computer room light lath wall construction method as described in claim 1, which is characterized in that in the square tube column and square tube beam
It is filled with granular polystyrene concrete.
9. computer room light lath wall construction method as described in claim 1, which is characterized in that the computer room is data center computer room.
10. computer room light lath wall construction method as described in claim 1, which is characterized in that the scheduled time is 15
~25 days.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811227544.6A CN109208788A (en) | 2018-10-22 | 2018-10-22 | A kind of computer room light lath wall construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811227544.6A CN109208788A (en) | 2018-10-22 | 2018-10-22 | A kind of computer room light lath wall construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109208788A true CN109208788A (en) | 2019-01-15 |
Family
ID=64979591
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811227544.6A Pending CN109208788A (en) | 2018-10-22 | 2018-10-22 | A kind of computer room light lath wall construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109208788A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113389287A (en) * | 2021-06-21 | 2021-09-14 | 中铁十二局集团有限公司 | Construction method of autoclaved aerated concrete precast slab |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201521057U (en) * | 2009-10-13 | 2010-07-07 | 迈特建筑科技(武汉)有限公司 | Building cold bending thin-wall truss type door and window lintel |
CN101906834A (en) * | 2009-06-05 | 2010-12-08 | 武汉国祥龙建材科技有限公司 | Method for constructing light-weight composite self-insulation wall |
CN101974975A (en) * | 2010-08-17 | 2011-02-16 | 龙信建设集团有限公司 | Method for constructing ash concrete hollow partition plate |
CN202658763U (en) * | 2012-06-25 | 2013-01-09 | 中建八局第二建设有限公司 | Plate type light partition wall with reinforced door opening |
CN104060913A (en) * | 2014-06-30 | 2014-09-24 | 安徽富煌钢构股份有限公司 | Complete set door frame special for steel structural workshop |
CN205399727U (en) * | 2016-02-05 | 2016-07-27 | 良固建筑工程(上海)有限公司 | Door -window structure of outer wall self preservation temperature system |
CN106223497A (en) * | 2016-08-18 | 2016-12-14 | 潮峰钢构集团有限公司 | A kind of operational approach of Applying Steel Structures To A Villa integrated system |
CN106368436A (en) * | 2016-08-30 | 2017-02-01 | 中国建筑第七工程局有限公司 | Installation method of light inner wall plate |
CN206000349U (en) * | 2016-08-31 | 2017-03-08 | 东亚装饰股份有限公司 | Partition wall door opening structure |
CN106592859A (en) * | 2016-12-13 | 2017-04-26 | 山东隆和节能科技股份有限公司 | Interior partition board and construction method |
CN206396888U (en) * | 2016-12-13 | 2017-08-11 | 山东隆和节能科技股份有限公司 | The integrated house system that a kind of lightgage steel joist is combined with Light trabses |
CN206903044U (en) * | 2017-04-26 | 2018-01-19 | 厦门尚匠住工建筑科技有限公司 | A kind of pre-cast building wall |
-
2018
- 2018-10-22 CN CN201811227544.6A patent/CN109208788A/en active Pending
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101906834A (en) * | 2009-06-05 | 2010-12-08 | 武汉国祥龙建材科技有限公司 | Method for constructing light-weight composite self-insulation wall |
CN201521057U (en) * | 2009-10-13 | 2010-07-07 | 迈特建筑科技(武汉)有限公司 | Building cold bending thin-wall truss type door and window lintel |
CN101974975A (en) * | 2010-08-17 | 2011-02-16 | 龙信建设集团有限公司 | Method for constructing ash concrete hollow partition plate |
CN202658763U (en) * | 2012-06-25 | 2013-01-09 | 中建八局第二建设有限公司 | Plate type light partition wall with reinforced door opening |
CN104060913A (en) * | 2014-06-30 | 2014-09-24 | 安徽富煌钢构股份有限公司 | Complete set door frame special for steel structural workshop |
CN205399727U (en) * | 2016-02-05 | 2016-07-27 | 良固建筑工程(上海)有限公司 | Door -window structure of outer wall self preservation temperature system |
CN106223497A (en) * | 2016-08-18 | 2016-12-14 | 潮峰钢构集团有限公司 | A kind of operational approach of Applying Steel Structures To A Villa integrated system |
CN106368436A (en) * | 2016-08-30 | 2017-02-01 | 中国建筑第七工程局有限公司 | Installation method of light inner wall plate |
CN206000349U (en) * | 2016-08-31 | 2017-03-08 | 东亚装饰股份有限公司 | Partition wall door opening structure |
CN106592859A (en) * | 2016-12-13 | 2017-04-26 | 山东隆和节能科技股份有限公司 | Interior partition board and construction method |
CN206396888U (en) * | 2016-12-13 | 2017-08-11 | 山东隆和节能科技股份有限公司 | The integrated house system that a kind of lightgage steel joist is combined with Light trabses |
CN206903044U (en) * | 2017-04-26 | 2018-01-19 | 厦门尚匠住工建筑科技有限公司 | A kind of pre-cast building wall |
Non-Patent Citations (1)
Title |
---|
马老师: "聚苯颗粒水泥夹芯复合条板施工方案", 《HTTPS://WWW.MAYIWENKU.COM/P-699534.HTML》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113389287A (en) * | 2021-06-21 | 2021-09-14 | 中铁十二局集团有限公司 | Construction method of autoclaved aerated concrete precast slab |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9856639B2 (en) | Wall assembly and a building structure including the wall assembly | |
CN204112532U (en) | Integral light grouting heat-preserving wall | |
CN102777045A (en) | Construction method for assembling light energy-saving composite wallboards on separation wall | |
US20170306621A1 (en) | An exterior wall and a method for constructing an exterior wall | |
CN211286074U (en) | Self-heat-insulation system for prefabricated light high-strength foam concrete filled wallboard outer wall | |
CN111042392A (en) | Construction method of SDHH type disassembly-free formwork foam concrete partition wall | |
CN106337516A (en) | Construction method of light-steel keel partition wall | |
CN210369561U (en) | Fireproof and decorative integrated steel beam | |
CN109208788A (en) | A kind of computer room light lath wall construction method | |
CN114250885B (en) | Construction method of assembled ALC (aluminum cement concrete) outer wall window opening | |
CN214941262U (en) | Assembled internal partition wall body | |
CN110259144A (en) | A kind of novel energy-saving environment-friendly ash concrete lightweight wall plate construction method | |
CN107190989A (en) | Shaped steel partition plate external wall construction method | |
Peng | New ALC panel wall installation quality control and reinforcement measures | |
CN219298535U (en) | Combined light partition board partition system | |
CN105064710B (en) | It is a kind of to be used for insulate against sound the outrigger formula balcony reinforcement means transformed and ruggedized construction | |
CN115217340B (en) | Anchor-bolt-free unbonded installation method suitable for outer thermal insulation layer of steel structure building | |
RU2762659C1 (en) | Method for mounting sandwich-structured panels for wall fencing in half-timbered houses | |
CN219732312U (en) | BIM-based residential apartment AAC outer wall slat angle steel inverted installation structure | |
KR102390555B1 (en) | Basic structure construction system for wooden buildings | |
CN217601782U (en) | Anti structure of splitting of indoor large-scale abnormal shape light gauge steel wall body | |
CN112211322A (en) | Mounting construction method of autoclaved ceramsite reinforced concrete light wall board | |
Kornilov et al. | Heat losses through reinforced concrete columns and pile grillages of buildings | |
Sun et al. | Research and Application of Prefabricated Steel Structure Inner Partition Connection Technology | |
CN113389287A (en) | Construction method of autoclaved aerated concrete precast slab |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190115 |