Heat dissipation equipment for large-scale communication machine room
Technical Field
The invention relates to a heat dissipation device, in particular to a heat dissipation device for a large-scale communication machine room, and belongs to the technical field of application of heat dissipation devices.
Background
Along with the rapid development of the living standard of people, more and more communication base stations are established in life, a communication machine room is indispensable in the construction of the communication base stations, and the communication machine room is mainly used for containing and amplifying a large amount of communication equipment so as to conveniently communicate and transmit signals.
Communication equipment in the large-scale communication computer lab when the work uses, can produce very big heat, it is very high to lead to the inside temperature of computer lab, if the inside heat of computer lab can not in time effluvium, the cooling, can reduce communication equipment's in the computer lab life, influence communication equipment's work performance, the current heat abstractor who is used for large-scale communication computer lab is poor to the inside radiating efficiency of large-scale communication computer lab, and air conditioner among the current heat abstractor generally all through the support mounting on the inside wall of computer lab, the maintainer of not being convenient for overhauls or adjusts air conditioner's air-out heat dissipation height and position, the flexibility is poor, and the comdenstion water that air conditioner work produced can not be quick, comprehensive logical goes out to the computer lab outside, the easy ponding of computer lab inside.
Disclosure of Invention
The invention aims to solve the problems that when communication equipment in a large-scale communication machine room works and uses, great heat is generated, the temperature in the machine room is high, if the heat in the machine room can not be dissipated and cooled in time, the service life of the communication equipment in the machine room can be reduced, the working use performance of the communication equipment is influenced, the existing heat dissipation equipment for the large-scale communication machine room has poor heat dissipation efficiency for the interior of the large-scale communication machine room, moreover, the air conditioner in the existing heat dissipation equipment is generally arranged on the wall in the machine room through a bracket, so that the air conditioner is inconvenient for the maintainers to overhaul or adjust the air outlet heat dissipation height and position of the air conditioner, the flexibility is poor, and the condensed water produced by the work of the air conditioner can not be quickly and comprehensively led out of the machine room, and water is easily accumulated in the machine room, so that the heat dissipation equipment for the large-scale communication machine room is provided.
The purpose of the invention can be realized by the following technical scheme: a heat dissipation device for a large-scale communication machine room comprises two mounting frames and sleeve seats, wherein the two mounting frames are longitudinally arranged, the two mounting frames are horizontally provided with a plurality of sleeve seats in a penetrating manner, the sleeve seats are provided with rectangular frame assembling frames, clamping grooves are formed in the frame assembling frames, two air conditioners are clamped in the frame assembling frames, cylindrical screw rods are vertically arranged on the side walls of the two ends of the frame assembling frames, the two ends of each air conditioner are horizontally welded with rectangular welding tables, clamping blocks are vertically arranged on the side walls of the two ends of each welding table, inserting plates are arranged on the clamping blocks, movable rods are vertically arranged in the back surfaces of the inserting plates, a clamping ring is arranged on one side of each movable rod, a sliding bin matched with the movable rods is arranged in the clamping ring, the inserting plates are connected into the sliding bin through the movable rods, springs are vertically arranged at the two ends of the back surfaces of the inserting plates, two all vertically be provided with two steel sheets on the mounting bracket, two steel sheet lateral wall equidistant be provided with a plurality of and take over the hole, and two the inside water service tank that vertically is provided with of steel sheet, two be provided with between the steel sheet with screw rod assorted clamping bar groove, two the steel sheet bottom is passed through the welding rod and is connected, the inside collector pipe that conveniently communicates two water service tanks that is provided with of welding rod, and two the mounting bracket bottom all runs through and is provided with water outlet main, two the mounting bracket bottom all is provided with the support perpendicularly.
Preferably, two the mounting bracket is the symmetry setting, and the below vertical welding has the welding plate between two mounting brackets, makes to connect more firmly between two mounting brackets through the welding plate, guarantees that the air conditioner during operation of fixing on the mounting bracket is more stable.
Preferably, the screw rods at the two ends of the sleeve seat penetrate through the clamping rod grooves in the two mounting frames respectively, the diameter of each screw rod is matched with the width of the corresponding clamping rod groove, and the connecting part of each screw rod and the corresponding clamping rod groove is provided with the fixed screw ring, so that when an operator lifts the screw rods up and down, the sleeve seat moves more stably, and the operator can fix the screw rods and the mounting frames more firmly by screwing the fixed screw rings clockwise.
Preferably, the lateral wall level in air conditioner below is provided with the air outlet, and air conditioner leads to pipe through water pipe and takes over jogged joint, blows off the cold wind that air conditioner led to through the air outlet and dispels the heat to the computer lab, cools down the heat dissipation to communication equipment.
Preferably, the bolts are installed at the two ends of the support in a penetrating mode, screw grooves matched with the bolts are formed in the support, an operator rotates the bolts on the support at the bottom of the mounting frame clockwise in a rotating mode, the bolts are connected with the ground fixing part, and the heat dissipation device is integrally fixed.
Preferably, the pipe connecting hole, the water through groove, the collecting pipe and the water outlet main pipe are communicated with each other, the water outlet main pipe is of a hollow structure, and condensed water generated by the operation of the air conditioner is discharged to the outside of the machine room through the pipe connecting hole, the water through groove, the collecting pipe and the water outlet main pipe.
Preferably, the inside both ends of dress frame all are provided with clamp splice assorted card and put the groove, and movable rod one end both sides all are provided with first dog, and dress circle inside both ends all be provided with first dog assorted second dog, block the first dog through the second dog when the movable rod horizontal slip, guarantee that movable rod one end can not break away from with dress circle.
A heat dissipation method for a large-scale communication machine room specifically comprises the following steps:
the method comprises the following steps: the two mounting frames are attached to the wall of the machine room, the distance between the two mounting frames is adjusted to be matched with the width of the sleeve seat, the screw rods at the two ends of the sleeve seat penetrate through the clamping rod grooves in the mounting frames and are fixedly connected with the mounting frames through the fixing screw rings on the screw rods;
step two: an operator presses an inserting plate of a clamping block on the air conditioner, the inserting plate slides into a sliding bin through a movable rod on the back side, a spring on the back side of the inserting plate is synchronously compressed, the clamping block is clamped into a clamping groove of a mounting frame on a sleeve seat, so that the air conditioner is mounted in the sleeve seat, an external power supply supplies power to the air conditioner, the air conditioner is connected with an external machine, and the air is discharged through an air outlet to cool and dissipate heat inside a machine room;
step three: after the air conditioner is installed, an operator rotates a bolt on a support at the bottom of the installation frame clockwise, the bolt is connected with a ground fixing part, the whole heat dissipation device is fixed, the air conditioner is connected to a connecting pipe hole of a steel plate on the installation frame through a water pipe, and condensed water generated by the work of the air conditioner is discharged outside a machine room through the connecting pipe hole, a water tank, a collecting pipe and a water outlet main pipe.
Compared with the prior art: the invention has the beneficial effects that:
1. when the air conditioner is used, the air conditioner can be clamped in the framing clamping grooves through the clamping blocks on the welding tables at the two ends, the clamping plates are extruded and fixed in the clamping grooves through the springs on the clamping blocks, the air conditioner is ensured to be more stable and firm in working, the clamping blocks on the air conditioner are clamped in the clamping grooves through the spring compression activity, the air conditioner is ensured to be more convenient to mount and fix the air conditioner by the heat dissipation equipment, and an operator can conveniently overhaul and dismount the air conditioner.
2. During the screw rod at cover seat both ends runs through the clamping bar groove on the mounting bracket, operating personnel through the screw rod that slides from top to bottom in the clamping bar groove, adjust the radiating high position of air conditioner air-out on the cover seat, guarantee that air conditioner's installation service position is more accurate, suitable, and operating personnel can be according to actual computer lab heat dissipation needs, the cover seat of the different numbers of installation on the mounting bracket, adjust air conditioner's installation, use number, adjustable extensive nature has been guaranteed.
3. The mounting frame is formed by welding and combining two steel plates, a water through groove is formed in each steel plate and is connected with the outside through a plurality of pipe connecting holes formed in the side wall of each steel plate at equal intervals, the air conditioner on the sleeve seat is connected with the pipe connecting holes through water pipes, condensed water generated when the air conditioners work is collected through the water through grooves and collecting pipes and finally guided to the outside of the machine room through a main water outlet pipe, the space utilization rate of the equipment is improved, and water generated by the work of the air conditioners is guided to flow out more comprehensively and thoroughly; the heat dissipation device has good social benefits and is suitable for popularization and use.
Drawings
In order to facilitate understanding for those skilled in the art, the present invention will be further described with reference to the accompanying drawings.
Fig. 1 is a front view of the overall structure of the present invention.
Fig. 2 is a front view of the nest of the present invention.
FIG. 3 is a framed sectional view of the invention.
Fig. 4 is a cross-sectional view of the inventive mount.
Fig. 5 is a front view of the air conditioner of the present invention.
Fig. 6 is a side view of the air conditioner of the present invention.
FIG. 7 is a top view of a clamp block of the present invention.
Fig. 8 is an exploded cross-sectional view of the support of the present invention.
In the figure: 1. a mounting frame; 2. a sleeve seat; 3. a pipe connecting hole; 4. a water outlet main pipe; 5. a support; 6. welding the plate; 7. framing; 8. a clamping groove; 9. an air conditioner; 10. a screw; 11. fixing the coil; 12. clamping and placing the groove; 13. a steel plate; 14. a clamping bar slot; 15. welding rods; 16. a water trough; 17. a collector pipe; 18. a welding table; 19. a clamping block; 20. an air outlet; 21. inserting plates; 22. a movable rod; 23. assembling a ring; 24. sliding the bin; 25. a first stopper; 26. a second stopper; 27. a spring; 28. a bolt; 29. and (4) a spiral groove.
Detailed Description
The technical solutions of the present invention will be described clearly and completely with reference to the following embodiments, and it should be understood that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-8, a heat dissipation apparatus for a large-scale communication machine room comprises two mounting frames 1 and sleeve seats 2, wherein the two mounting frames 1 are longitudinally arranged, the two mounting frames 1 are horizontally provided with a plurality of sleeve seats 2 in a penetrating manner, the plurality of sleeve seats 2 are respectively provided with a rectangular frame 7, the frame 7 is provided with a clamping groove 8, two air conditioners 9 are clamped in the frame 7, the side walls of the two ends of the frame 7 are respectively and vertically provided with a cylindrical screw 10, an operator can adjust the height and the position of the sleeve seat 2 by lifting the screw 10 up and down in the clamping bar groove, the two ends of the air conditioners 9 are respectively and horizontally welded with rectangular welding tables 18, the side walls of the two ends of the welding tables 18 are respectively and vertically provided with clamping blocks 19, the plurality of clamping blocks 19 are respectively provided with an inserting plate 21, a movable rod 22 is vertically arranged in the back of the inserting plate 21, and a clamping ring 23 is arranged on one side of the movable rod 22, a sliding bin 24 matched with the movable rod 22 is arranged inside the containing ring 23, the inserting plate 21 is connected into the sliding bin 24 through the movable rod 22, the sliding bin 24 is convenient for the movable rod 22 to drive the inserting plate 21 to move back and forth, springs 27 are vertically arranged at two ends of the back of the inserting plate 21, the clamping plate 19 is fixed in the clamping groove 8 in an extruding mode through the springs 27 to ensure that the air conditioner is more stable and firm in work, two steel plates 13 are longitudinally arranged on the two mounting frames 1, a plurality of connecting pipe holes 3 are formed in the side walls of the two steel plates 13 at equal intervals, water through grooves 16 are longitudinally arranged inside the two steel plates 13, a clamping rod groove 14 matched with the screw rod 10 is arranged between the two steel plates 13, the bottoms of the two steel plates 13 are connected through welding rods 15, a collecting pipe 17 convenient for communicating the two water through grooves 16 is arranged inside the welding rods 15, and condensed, The collector pipe 17 and the water outlet header pipe 4 are arranged outside the machine room, the water outlet header pipe 4 is arranged at the bottom of each of the two mounting frames 1 in a penetrating mode, the supports 5 are vertically arranged at the bottom of each of the two mounting frames 1, the mounting frames 1 are supported and fixed through the supports 5, and the stability of the whole working process of the equipment is improved.
As a technical optimization scheme of the invention, the two mounting frames 1 are symmetrically arranged, the welding plate 6 is vertically welded below the two mounting frames 1, the two mounting frames 1 are connected more firmly through the welding plate, and the air conditioner 9 fixed on the mounting frames 1 is ensured to be more stable in working.
As a technical optimization scheme of the invention, the screw rods 10 at the two ends of the sleeve base 2 respectively penetrate through the clamping rod grooves 14 on the two mounting frames 1, and the diameter of the screw rods 10 is matched with the width of the clamping rod grooves 14, so that when an operator lifts the screw rods 10 up and down, the sleeve base 2 moves more stably, the fixed screw ring 11 is installed at the joint of the screw rods 10 and the clamping rod grooves 14, and the screw rods 10 and the mounting frames 1 are connected and fixed more firmly by clockwise screwing the fixed screw ring 11.
As a technical optimization scheme of the invention, an air outlet 20 is horizontally arranged on the side wall below the air conditioner 9, the air conditioner 9 is connected with the connecting pipe hole 3 through a water pipe, and cold air led out from the air conditioner 9 is blown to a machine room through the air outlet 20 to cool and radiate communication equipment.
As a technical optimization scheme of the invention, bolts 28 are installed at both ends of the support 5 in a penetrating manner, screw grooves 29 matched with the bolts 28 are formed in the support 5, and an operator rotates the bolts 28 on the support 5 at the bottom of the mounting frame 1 clockwise, so that the bolts 28 are connected with a ground fixing part to fix the whole heat radiating equipment.
As a technical optimization scheme of the invention, the interior of the connecting pipe hole 3, the water trough 16, the collecting pipe 17 and the water outlet main pipe 4 are communicated with each other, the water outlet main pipe 4 is of a hollow structure, and condensed water generated by the operation of the air conditioner 9 is discharged to the outside of the machine room through the connecting pipe hole 3, the water trough 16, the collecting pipe 17 and the water outlet main pipe 4.
As a technical optimization scheme of the invention, the clamping grooves 12 matched with the clamping blocks 19 are arranged at two ends in the containing frame 7, the first stop blocks 25 are arranged at two sides of one end of the movable rod 22, the second stop blocks 26 matched with the first stop blocks 25 are arranged at two ends in the containing ring 23, and the second stop blocks 26 block the first stop blocks 25 when the movable rod 22 slides left and right, so that one end of the movable rod 22 is ensured not to be separated from the containing ring 23.
A heat dissipation method for a large-scale communication machine room specifically comprises the following steps:
the method comprises the following steps: the two mounting frames 1 are attached to the wall of a machine room, the distance between the two mounting frames 1 is adjusted to be matched with the width of the sleeve seat 2, the screw rods 10 at the two ends of the sleeve seat 2 penetrate through and are mounted in the clamping rod grooves 14 on the mounting frames 1, and the screw rods 10 are connected and fixed with the mounting frames 1 through the fixing screw rings 11 on the screw rods 10;
step two: an operator presses an inserting plate 21 of a clamping block 19 on an air conditioner 9, the inserting plate 21 slides into a sliding bin 24 through a movable rod 22 on the back side, a spring 27 on the back side of the inserting plate 21 is synchronously compressed, the clamping block 19 is clamped into a clamping groove 12 of an upper installing frame 7 of a sleeve seat 2, the air conditioner 9 is installed in the sleeve seat 2, an external power supply supplies power to the air conditioner 9, the air conditioner 9 is connected with an external machine, and the air is discharged through an air outlet 20 to cool and dissipate heat inside a machine room;
step three: after the air conditioner 9 is installed, an operator rotates the bolt 28 on the support 5 at the bottom of the installation frame 1 clockwise, the bolt 28 is connected with a ground fixing part, the whole radiating equipment is fixed, the air conditioner 9 is connected to the pipe connecting hole 3 of the steel plate 13 on the installation frame 1 through a water pipe, and condensed water generated by the operation of the air conditioner 9 is discharged outside a machine room through the pipe connecting hole 3, the water through groove 16, the collecting pipe 17 and the water outlet main pipe 4.
When the air conditioner is used, firstly, two mounting frames 1 are tightly attached to the wall of a machine room, the distance between the two mounting frames 1 is adjusted to be matched with the width of a sleeve seat 2, screw rods 10 at two ends of the sleeve seat 2 penetrate through clamping rod grooves 14 on the mounting frames 1, and the screw rods 10 are connected and fixed with the mounting frames 1 through fixing screw rings 11 on the screw rods 10, the manufacturer of the air conditioner 9 used by the air conditioner is American, the type is KFR-35GW/WDBN8A3@, an operator presses an inserting plate 21 of a clamping block on the air conditioner 9, the inserting plate 21 slides into a sliding bin 24 through a movable rod 22 at the back side, a spring 27 at the back side of the inserting plate 21 is synchronously compressed, the clamping block 19 is clamped into a clamping groove 12 of an upper mounting frame 7 of the sleeve seat 2, so that the air conditioner 9 is mounted in the sleeve seat 2, an external power supply supplies power to the air conditioner 9, and the air conditioner 9 is connected with an external machine, through the inside cooling heat dissipation of air-out to the computer lab of air outlet 20, after air conditioner 9 installs, operating personnel revolves the bolt 28 on the wrong mounting bracket 1 bottom support 5 of twisting clockwise, bolt 28 is connected with ground fixed part, wholly fix this heat-radiating equipment, air conditioner 9 leads to pipe to be connected to mounting bracket 1 in the take-over hole 3 of steel sheet 13, the comdenstion water that air conditioner 9 work produced is arranged to the computer lab outside through take-over hole 3, water trough 16, collector pipe 17 and exhalant main 4.
The preferred embodiments of the invention disclosed above are intended to be illustrative only. The preferred embodiments are not intended to be exhaustive or to limit the invention to the precise forms disclosed. Obviously, many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the invention and the practical application, to thereby enable others skilled in the art to best utilize the invention. The invention is limited only by the claims and their full scope and equivalents.