CN109194530A - Active and standby method for synchronously switching and communication equipment - Google Patents

Active and standby method for synchronously switching and communication equipment Download PDF

Info

Publication number
CN109194530A
CN109194530A CN201811313975.4A CN201811313975A CN109194530A CN 109194530 A CN109194530 A CN 109194530A CN 201811313975 A CN201811313975 A CN 201811313975A CN 109194530 A CN109194530 A CN 109194530A
Authority
CN
China
Prior art keywords
data
master control
agreement
protocol
mapping tables
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811313975.4A
Other languages
Chinese (zh)
Inventor
林汉忠
李振华
秦骏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Forward Industrial Co Ltd
Original Assignee
Shenzhen Forward Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Forward Industrial Co Ltd filed Critical Shenzhen Forward Industrial Co Ltd
Priority to CN201811313975.4A priority Critical patent/CN109194530A/en
Publication of CN109194530A publication Critical patent/CN109194530A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/06Management of faults, events, alarms or notifications
    • H04L41/0654Management of faults, events, alarms or notifications using network fault recovery
    • H04L41/0663Performing the actions predefined by failover planning, e.g. switching to standby network elements
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/10Protocols in which an application is distributed across nodes in the network
    • H04L67/104Peer-to-peer [P2P] networks

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

The invention proposes a kind of active and standby method for synchronously switching and communication equipments, this method comprises: primary master control is configured and acquired to ppp protocol the critical data of the ppp protocol of each interface and stores critical data to the first data mapping tables, and configuration data and the first data mapping tables are synchronized to spare master control;Spare master control stores the first data mapping tables to the second data mapping tables, and restores LCP agreement according to the corresponding critical data of LCP agreement in the second data mapping tables;Whether, in primary master switching to spare master control, spare master control restores according to configuration data of the configuration data to ppp protocol, and judge in the second data mapping tables comprising the corresponding critical data of NCP agreement;If comprising spare master control restores NCP agreement according to the corresponding critical data of NCP agreement.The present invention guarantees the ppp protocol configuration data of spare master control and primary master control and the consistency of critical data in primary master control and spare master switching, improves the reliability of ppp link between communication equipment.

Description

Active and standby method for synchronously switching and communication equipment
Technical field
The present invention relates to the active and standby simultaneous techniques field of communication equipment, in particular to a kind of active and standby method for synchronously switching and logical Believe equipment.
Background technique
With the rapid development of the communication technology, communication equipment is also more and more high-end.The communication equipment of rack can have Dual master control, a primary master control, a spare master control.Ppp protocol (Point to Point is run in primary master control Protocol, point-to-point protocol), after primary master control and spare master switching, spare master control need to be switched to primary master control after It is continuous that ppp protocol is provided.However, ppp protocol is RFC standard, GR standard is not provided, it is standby if being not carried out the active and standby synchronization of PPP With also there is no the data for carrying out ppp negotiation with link opposite end in master control, when being switched between primary master control and spare master control, Ppp link will interrupt, and only wait until that new primary master control carries out configuration recovery, after the completion of ppp link renegotiates, PPP chain The business datum forwarding of road could restore normal.
Summary of the invention
For the defects in the prior art, the embodiment of the present invention is intended to provide a kind of active and standby method for synchronously switching and communication is set It is standby, so as to solve the deficiencies in the prior art.
According to embodiment of the present invention, a kind of active and standby method for synchronously switching is provided, applied to support ppp protocol Communication equipment, the communication equipment include two master controls, and a master control is primary master control, another master control is spare master control, institute Stating ppp protocol includes LCP agreement and NCP agreement, this method comprises:
The primary master control carries out configuration to the ppp protocol of each interface and is synchronized to configuration data described spare Master control;
The primary master control acquires the critical data of the ppp protocol of each interface, and the critical data is stored The spare master control is synchronized to the first data mapping tables, and by first data mapping tables;
The spare master control stores received first data mapping tables to the second data mapping tables, judges described It whether include the corresponding critical data of the LCP agreement in two data mapping tables;
If in second data mapping tables include the corresponding critical data of the LCP agreement, the spare master control according to The LCP agreement corresponding critical data recovery LCP agreement;
In the primary master switching to when the spare master control, the spare master control based on the received configuration data to institute Whether the configuration data for stating ppp protocol is restored, and judge corresponding comprising the NCP agreement in second data mapping tables Critical data;
If in second data mapping tables include the corresponding critical data of the NCP agreement, the spare master control according to The NCP agreement corresponding critical data recovery NCP agreement.
In above-mentioned active and standby method for synchronously switching, the critical data includes protocol name, protocol negotiation state and association Quotient's option data.
It is described " first data mapping tables to be synchronized to the spare master in above-mentioned active and standby method for synchronously switching Control " include:
After the primary master control and the spare master control successful connection for the first time, the primary master control is by described the of storage One data mapping tables are pushed to the spare master control;
When the protocol negotiation state of the corresponding ppp protocol of interface of the primary master control changes, the primary master Control acquires the critical data of the ppp protocol of the interface, updates first data mapping tables according to the critical data of acquisition;
The spare master control is sent by the data updated in first data mapping tables.
In above-mentioned active and standby method for synchronously switching, the protocol negotiation state changes including from Not Opened shape State is converted to Opened state and is converted to Not Opened state from Opened state.
In above-mentioned active and standby method for synchronously switching, the ppp protocol further includes authentication protocol;
Configuration data restores the configuration data of the ppp protocol based on the received for the spare master control, and judges It whether include the corresponding critical data of the authentication protocol in second data mapping tables;
If in second data mapping tables include the corresponding critical data of the authentication protocol, the spare master control according to The authentication protocol corresponding critical data recovery authentication protocol.
It is described " according to the corresponding critical data recovery of the NCP agreement in above-mentioned active and standby method for synchronously switching NCP agreement " includes:
Judge in the configuration data with the protocol-dependent data of the NCP whether with the NCP agreement corresponding key Data are consistent;
If critical data one corresponding with the protocol-dependent data of the NCP and the NCP agreement in the configuration data It causes, the NCP agreement is restored according to the corresponding critical data of the NCP agreement;
If critical data corresponding with the protocol-dependent data of the NCP and the NCP agreement is not in the configuration data Unanimously, it abandons restoring the NCP agreement.
In above-mentioned active and standby method for synchronously switching, first data mapping tables are additionally provided with update mark, in basis When the critical data of acquisition updates first data mapping tables, flag set will be updated in first data mapping tables, After the data updated in first data mapping tables are synchronized to the spare master control by the primary master control, set described in removing Position.
In above-mentioned active and standby method for synchronously switching, described " the primary master control carries out configuration to ppp protocol and will configuration Data are synchronized to the spare master control " before further include:
Two master controls are held consultation with the determination primary master control and the spare master control in the communication equipment.
In above-mentioned active and standby method for synchronously switching, described configuration data is synchronized to the spare master control is that will hold The configuration data of the corresponding ppp protocol of order of row operation is synchronized to the spare master control.
Another embodiment of the present invention provides a kind of active and standby synchronous switching device, applied to the communication for supporting ppp protocol Equipment, the communication equipment include two master controls, and a master control is primary master control, another master control is spare master control, the PPP Agreement includes LCP agreement and NCP agreement, which includes:
Synchronization module is configured, carry out configuration for the ppp protocol of the primary master control to each interface and will be configured Data are synchronized to the spare master control;
Memory module is acquired, the critical data of the ppp protocol of each interface is acquired for the primary master control, and will The critical data is stored to the first data mapping tables;
Synchronization module, for first data mapping tables to be synchronized to the spare master control;
Judgment module is stored, stores received first data mapping tables to the second data for the spare master control Whether mapping table judges in second data mapping tables comprising the corresponding critical data of the LCP agreement;
First recovery module, it is described if in second data mapping tables including the corresponding critical data of the LCP agreement First recovery module restores the LCP agreement according to the corresponding critical data of the LCP agreement for the spare master control;
Restore judgment module, in the primary master switching to when the spare master control, the recovery judgment module is used for Configuration data restores the configuration data of the ppp protocol based on the received for the spare master control, and judges described second It whether include the corresponding critical data of the NCP agreement in data mapping tables;
Second recovery module, it is described if in second data mapping tables including the corresponding critical data of the NCP agreement Second recovery module restores the NCP agreement according to the corresponding critical data of the NCP agreement for the spare master control.
Another embodiment of the invention provides a kind of communication equipment, and the communication equipment is used to implement above-mentioned active and standby same Walk switching method.
Yet further embodiment of the invention provides a kind of computer readable storage medium, is stored with above-mentioned communication and sets The computer program used in standby.
Active and standby method for synchronously switching and communication equipment provided in an embodiment of the present invention at least provide following technical effect: will lead With the equal real-time synchronization of the relevant critical data of the ppp protocol of master control to spare master control, reduce data in handoff procedure it is synchronous and Recovery time, while avoiding occurring suddenly as primary master control primary master control caused by the abnormal conditions such as crash, failure and spare The problem of cannot being switched between master control;The relevant critical data of the ppp protocol to change is synchronized and restored, is subtracted Data volume that is few synchronous and restoring, guarantee spare master control and primary master control ppp protocol configuration data and critical data it is consistent Property, improve the reliability of ppp link between communication equipment.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment attached Figure is briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not construed as pair The restriction of range for those of ordinary skill in the art without creative efforts, can also be according to this A little attached drawings obtain other relevant attached drawings.
Fig. 1 is a kind of flow diagram for active and standby method for synchronously switching that first embodiment of the invention proposes.
Fig. 2 a to Fig. 2 b is a kind of flow diagram for active and standby method for synchronously switching that second embodiment of the invention proposes.
Fig. 3 is a kind of active and standby synchronous switching device structural schematic diagram that the embodiment of the present invention proposes.
Main element symbol description:
The active and standby synchronous switching device of 400-;410- configures synchronization module;420- acquires memory module;430- synchronization module; 440- memory module;The first recovery module of 450-;460- restores judgment module;The second recovery module of 470-.
Specific embodiment
Hereinafter, the various embodiments of the disclosure will be described more fully.The disclosure can have various embodiments, and It can adjust and change wherein.It should be understood, however, that: there is no the various embodiments of the disclosure are limited to spy disclosed herein Determine the intention of embodiment, but the disclosure should be interpreted as in the spirit and scope for covering the various embodiments for falling into the disclosure All adjustment, equivalent and/or optinal plan.
Hereinafter, can the term " includes " used in the various embodiments of the disclosure or " may include " instruction disclosed in Function, operation or the presence of element, and do not limit the increase of one or more functions, operation or element.In addition, such as existing Used in the various embodiments of the disclosure, term " includes ", " having " and its cognate are meant only to indicate special characteristic, number Word, step, operation, the combination of element, component or aforementioned item, and be understood not to exclude first one or more other Feature, number, step, operation, element, component or aforementioned item combined presence or increase one or more features, number, Step, operation, element, component or aforementioned item combination a possibility that.
In the various embodiments of the disclosure, states "or" or " at least one of A or/and B " includes listing file names with Any combination of text or all combinations.For example, statement " A or B " or " at least one of A or/and B " may include A, may include B may include A and B both.
The statement (" first ", " second " etc.) used in the various embodiments of the disclosure can be modified in various implementations Various constituent element in example, but respective sets can not be limited into element.For example, the above statement is not intended to limit the suitable of the element Sequence and/or importance.The above statement is only used for the purpose for differentiating an element and other elements.For example, the first user fills It sets and indicates different user device with second user device, although the two is all user apparatus.For example, not departing from each of the disclosure In the case where the range of kind embodiment, first element is referred to alternatively as second element, and similarly, second element is also referred to as first Element.
It should also be noted that if a constituent element ' attach ' to another constituent element by description, it can be by the first composition member Part is directly connected to the second constituent element, and " connection " third can form between the first constituent element and the second constituent element Element.On the contrary, when a constituent element " being directly connected to " is arrived another constituent element, it will be appreciated that in the first constituent element And second third constituent element is not present between constituent element.
The term used in the various embodiments of the disclosure " user " can be indicated using the people of electronic device or using electricity The device (for example, artificial intelligence electronic device) of sub-device.
The term used in the various embodiments of the disclosure is used only for the purpose of describing specific embodiments and not anticipates In the various embodiments of the limitation disclosure.As used herein, singular is intended to also include plural form, unless context is clear Chu it is indicated otherwise.Unless otherwise defined, otherwise all terms (including technical terms and scientific terms) used herein have There is meaning identical with the various normally understood meanings of embodiment one skilled in the art of the disclosure.The term (term such as limited in the dictionary generally used) is to be interpreted as having and situational meaning in the related technical field Identical meaning and it will be interpreted as having Utopian meaning or meaning too formal, unless in the various of the disclosure It is clearly defined in embodiment.
Embodiment 1
Fig. 1 is a kind of flow diagram for active and standby method for synchronously switching that first embodiment of the invention proposes.This method is answered For supporting that the communication equipment of ppp protocol, the communication equipment include two master controls, a master control is primary master control, another Master control be spare master control, the ppp protocol include LCP agreement (Link Control Protocol, Link Control Protocol) and NCP agreement (Network Control Protocol, Network Control Protocol), the NCP agreement include IPCP agreement (IP Control Protocol, IP control protocol), IPV6CP agreement (IPv6 Control Protocol, IPv6 control protocol), MPLSCP agreement (MPLS Control Protocol, MPLS control protocol) and OSINLCP agreement (OSI Network Layer Control Protocol, OSI network layer control protocol).
The ppp protocol further includes authentication protocol, and the authentication protocol includes PAP agreement and CHAP agreement.
In the present embodiment, the communication equipment can be the routing device of support ppp protocol, gateway etc..
The communication equipment includes at least one interface, is connect for the interface with other communication equipments to realize that two lead to Believe the communication between equipment.
Interface described in all embodiments of the invention refers both to support the interface of ppp protocol, for example, supporting ppp protocol Common interface includes POS, E1 etc..
Method includes the following steps:
Step S110, primary master control configure to the ppp protocol of each interface and configuration data are synchronized to spare master Control.
Primary master control configures each control protocol in the ppp protocol of each interface, for example, in NCP agreement When IPCP agreement is configured, the configuration order of ip address 1.1.1.1/24 is executed under interface modes, configures interface The address ip, IPCP protocol configuration is exactly that (primary master control described in link and the communication where the spare master control are set local terminal here The one end at standby place) interface enables ipcp negotiation, and specifies interface IP address used in the ipcp negotiation of this end interface.
After the completion of primary master control is to each configuration in the ppp protocol of each interface, the configuration in protocol configuration process is saved Data, such as when IPCP protocol configuration, local terminal IP address of configuration etc..
The configuration data of preservation is sent spare master control by primary master control.
It should be noted that configuration data is synchronized to standby by primary master control before primary master switching to spare master control Subsequent primary master control and spare master are used for so that the configuration of the ppp protocol of primary master control and spare master control is consistent with master control When control switching, spare master control protocol configuration is reverted to and the consistent configuration of primary master control.
Step S120, primary master control acquires the critical data of the ppp protocol of each interface, and critical data is stored to One data mapping tables, and the first data mapping tables are synchronized to spare master control.
Further, the critical data includes protocol name, protocol negotiation state and negotiation option data etc..
The agreement includes LCP agreement, IPCP agreement, IPV6CP agreement, MPLSCP agreement, OSINLCP agreement, PAP association Discuss (Password Authentication Protocol, password authentication protocol) and CHAP agreement (Challenge Handshake Authentication Protocol, handshake authentication) etc..
Each agreement is corresponding with corresponding key message.Protocol name is for identifying agreement described in critical data.
The negotiation state refers to the state of the negotiation state machine of ppp protocol.Negotiation state includes: Opened state, table Show and negotiates successfully;Not Opened state indicates to negotiate or holding consultation without enabled, corresponding data forwarding not into Row.
The negotiation option data, the specific option for referring to that the ppp protocol of both link ends communication equipment is negotiated correspond to parameter. At the both ends of ppp link, local terminal and opposite end can negotiate to generate the option data approved jointly, these negotiate option data, need It could be generated jointly after the joint consultation of both ends.
First data mapping tables are the mapping tables based on interface, and the spare master control for preserving communication equipment restores PPP The critical data of the ppp protocol of used interface when agreement.
The critical data not only includes the critical data of this communication equipment, further includes that there are chains between this communication equipment The critical data of the opposite end communication equipment on road.For example, both link ends communication equipment carry out IPCP protocol negotiation, critical data in addition to It can also include the interface IP address of opposite end communication equipment, because IPCP can outside interface IP address including local terminal communication equipment With joint consultation local terminal and the IP address used end interface.
A record in first data mapping tables can include: the corresponding crucial number of interface index (interface ID), LCP agreement According to, the corresponding critical data of IPCP agreement, the corresponding critical data of IPV6CP agreement, the corresponding critical data of MPLSCP agreement, The corresponding critical data of OSINLCP agreement, PAP agreement and the corresponding critical data of CHAP agreement etc..
Interface index is the unique identification of interface, and the interface index of same communication equipment be it is unique, primary master control and The interface of spare master control common user communication equipment, thus primary master control can be set in advance as with the interface index of spare master control it is consistent 's.
Mark is updated, each agreement corresponding one updates mark in the first data mapping tables, corresponding for tag protocol Whether critical data has update, and critical data has the agreement of update to need the data of update being synchronized to spare master control, primary master Control will update flag set before the data of update are synchronized to spare master control, in primary master control that the data of update are synchronous To after spare master control, the set is removed.
Step S130, spare master control store received first data mapping tables to the second data mapping tables.
Received first data are reflected the first data mapping tables active push to spare master control, spare master control by primary master control Firing table is stored to the second data mapping tables, completes synchronizing process with this.
A record in second data mapping tables can include: interface index (interface ID), the corresponding key of LCP agreement The corresponding crucial number of data, the corresponding critical data of IPCP agreement, the corresponding critical data of IPV6CP agreement, MPLSCP agreement According to, the corresponding critical data of OSINLCP agreement, PAP agreement and the corresponding critical data of CHAP agreement etc..
Whether step S140 judges in the second data mapping tables comprising the corresponding critical data of LCP agreement.
Spare master control stores the first data mapping tables to the second data mapping tables, judges each in the second data mapping tables It whether include the corresponding critical data of LCP agreement in the critical data of the ppp protocol of interface, if respectively being connect in the second data mapping tables Include the corresponding critical data of LCP agreement in the critical data of the ppp protocol of mouth, advances to step S150;If the second data are reflected Do not include the corresponding critical data of LCP agreement in the critical data of the ppp protocol of each interface in firing table, advances to step S160.
Step S150, spare master control restore LCP agreement according to the corresponding critical data of LCP agreement.
If in the second data mapping tables including the corresponding critical data of LCP agreement, spare master control is assisted according to the LCP of each interface Corresponding critical data is discussed, sets consistent with critical data in the second data mapping tables for the parameter of the LCP of corresponding interface The LCP agreement of each interface of spare master control is reverted to the consistent configuration of primary master control corresponding interface LCP agreement by data, in order to When primary master switching to spare master control, LCP agreement had with the consistent protocol negotiation parameter of the communication equipment of link opposite end, The LCP ECHO link keep-alive request message that link opposite equip. interface can be responded, so that local terminal and opposite end link processing keep-alive State, link not will disconnect, and business datum also normally forwards.
Step S160, spare master control do not restore LCP agreement.
Step S170, in primary master switching to spare master control, configuration data assists PPP based on the received for spare master control The configuration data of view is restored.
In primary master switching to spare master control, spare master control is matched according to the allocation data recovering ppp protocol of storage It sets.
Whether step S180 judges in the second data mapping tables comprising the corresponding critical data of NCP agreement.
While spare master control is configured according to allocation data recovering ppp protocol, check whether wrap in the second data mapping tables The corresponding critical data of NCP agreement is included, if including the corresponding critical data of NCP agreement in the second data mapping tables, advances to step Rapid S190;If not including the corresponding critical data of NCP agreement in the second data mapping tables, step S200 is advanced to.
Step S190, spare master control restore NCP agreement according to the corresponding critical data of NCP agreement.
Step S200, spare master control do not restore NCP agreement.
Embodiment 2
Fig. 2 a to Fig. 2 b is a kind of flow diagram for active and standby method for synchronously switching that second embodiment of the invention proposes.
This method is applied to support that the communication equipment of ppp protocol, the communication equipment include two master controls, and a master control is Primary master control, another master control are spare master control, and the ppp protocol includes LCP agreement and NCP agreement, and the NCP agreement includes IPCP agreement, IPV6CP agreement, MPLSCP agreement and OSINLCP agreement.
The ppp protocol further includes authentication protocol, and the authentication protocol includes PAP agreement and CHAP agreement.
In the present embodiment, the communication equipment can be the routing device of support ppp protocol, gateway etc..
The communication equipment includes that at least one supports ppp protocol interface, is connect for the interface with other communication equipments To realize the communication between two communication equipments.
Method includes the following steps:
Step S210, two master controls are held consultation with the primary master control of determination and spare master control, and to primary in communication equipment Master control and spare master control are initialized respectively.
Before communication equipment initialization, the negotiations process of primary master control and spare master control can be carried out in advance, it is primary with determination Master control and spare master control, the data transmitted between two communication equipments are sent to the processing that primary master control carries out next step.
Primary master control and spare master control are according to negotiation as a result, being respectively completed the work of primary master control and spare master control.
In initialization, primary master control and spare master control are respectively completed respective initialization.
Step S220, primary master control configure ppp protocol, by matching for the order for having executed operation in ppp protocol It sets data and is synchronized to spare master control.
In order to avoid the protocol configuration of ppp protocol and the critical data appearance of ppp protocol are inconsistent, primary master control will be defined The configuration data for needing to save is synchronized to spare master control, the configuration data not saved clearly, asynchronous to arrive spare master control.
Further, the configuration data for clearly requiring preservation can be the corresponding PPP of order for having executed operation The configuration data of agreement.
Configuration is generally saved on communication equipment, is to need operator clearly to execute configuration and save to order currently to match to save It sets.For example, if current-configuration need to be saved, when executing write command operation, then can be saved when being configured to ppp protocol Execute the configuration data of ppp protocol current when the write command, i.e. operator's current-configuration clearly to be saved;Do not hold The write that went operation, also just without clearly to save configuration.
Ppp protocol is configured in primary master control, the ppp protocol of the order of operation will have been executed in primary master control Configuration data is synchronized to after spare master control, before primary master switching to spare master control, if the configuration of the ppp protocol occurs Variation, changed configuration data is also synchronized to spare master control by primary master control, so that primary master control and spare master control are matched Set data realtime uniform.
Step S230, primary master control acquires the critical data of the ppp protocol of each interface, and critical data is stored to One data mapping tables.
Primary master control is previously stored with the first data mapping tables, and the original records in first data mapping tables can be Ppp protocol critical data when primary master control initializes.
For example, following table is the example of the critical data of acquisition.
In upper table, the negotiation option data of LCP agreement acquisition includes Magic value and opposite end MRU, and Magic value is for identifying Whether LCP message is what oneself sent, and checks that link whether there is loop, after the completion of LCP negotiates, the meeting of ppp link both ends LCP ECHO message interaction is carried out, realizes keepalive feature.Therefore to the front and back of spare master control, Magic is needed primary master switching If approving jointly by the negotiation of ppp link both ends, however there is no GR standards for ppp protocol, cannot renegotiate disconnection Under the premise of ppp link business datum forwards, that is, need configuration, the critical data etc. between primary master control and spare master control The synchronization of data, after guaranteeing primary master switching to spare master control, the Magic value that ppp link local terminal uses be by with opposite end Negotiate approval.
Others negotiate option data, have the synchronous reason similar with above-mentioned Magic value, no longer describe one by one here.
After configuration data is synchronized to spare master control by primary master control, the ppp protocol in primary master control start carry out LCP and NCP negotiates, and when the negotiation state of LCP and NCP changes between Opened state and Not Opened state, acquisition is every The critical data of the ppp protocol of one interface.
It stores by the critical data of the ppp protocol of each interface to the first data mapping tables, while advancing to step S240 and step S260.
Step S240, after primary master control and spare master control successful connection for the first time, primary master control is by the first data of storage Mapping table is pushed to spare master control.
Spare master control is reliably connected request after primary master control initialization to primary master control initiation and begins listening for being reliably connected Request, listen to from spare master control be reliably connected request after, with spare master control foundation be reliably connected.
In the present embodiment, spare master control can periodically be initiated to be reliably connected request, until between primary master control can By successful connection.
The second data mapping tables are previously stored in spare master control, primary data may include spare in the second data mapping tables The critical data of ppp protocol when master control initializes.
After primary master control and spare master control successful connection for the first time, primary master control actively pushes the first data to spare master control Mapping table, the specific steps are as follows:
The total interface of first data mapping tables of primary master control traversal current cache corresponds to the critical data of agreement, does not examine Look into update mark.
If not having critical data in the first data mapping tables of current cache, the mapping of the first data is pushed to spare master control The message that table empties, spare master control receive the message that the first data mapping tables empty, will cached in spare master control immediately Two data mapping tables empty, while checking in the second data mapping tables whether there is the corresponding critical data of LCP agreement, if there is LCP LCP agreement is reset to init state by the corresponding critical data of agreement.
If the critical data for having interface to correspond to agreement in the first data mapping tables of current cache, pushes away to spare master control The critical data for sending the first data mapping tables total interface to correspond to agreement will after spare master control receives the first data mapping tables All the elements are stored to the second data mapping tables in first data mapping tables.
Step S250, spare master control store received first data mapping tables to the second data mapping tables.
Step S260, judges whether the negotiation state of the corresponding ppp protocol of the interface of primary master control changes.
It stores by the critical data of the ppp protocol of interface to the first data mapping tables, primary master control also judges interface Whether the negotiation state of corresponding ppp protocol changes, preceding if the negotiation state of the ppp protocol of the interface changes Proceed to step S270;If the negotiation state of ppp protocol does not change, step S300 is advanced to.
Further, the protocol negotiation state changes including being converted to Opened state from Not Opened state Not Opened state is converted to from Opened state.
Since the expression of Not Opened state is being held consultation, there is no progress, primary master control is cut for corresponding data forwarding When shifting to spare master control, data forwarding will not influence, therefore, the critical data of Not Opened state, it is not necessary to need to be synchronized to Spare master control reduces data volume that is synchronous and restoring, avoids simultaneously compared to the scheme that all data are synchronized to spare master control Configuration data and the inconsistent situation of critical data, because the configuration of primary master control may not save and be synchronized to spare master Control.
Step S270, the critical data of the ppp protocol of primary master control acquisition interface update the according to the critical data of acquisition One data mapping tables, and flag set will be updated.
It further include updating mark in first data mapping tables.
In the LCP and NCP of the ppp protocol of the interface, in TLU, (This-Layer-UP, corresponding negotiation state are from Not Opened state is converted to Opened state) and TLD (This-Layer-Down, corresponding negotiation state are to turn from Opened state Be changed to Not Opened state) movement when, acquire the critical data of the ppp protocol of the interface.
The first data mapping tables are updated according to the critical data of the ppp protocol of the interface of acquisition, and the first data are mapped Flag set is updated in table.The set indicates that the critical data of corresponding agreement has update.
For example, following table is the example of the first data mapping tables.
As shown above, LCP agreement, IPCP agreement, the IPV6CP agreement of interface A has update to indicate, the negotiation of agreement State is Opened, can indicate that the LCP agreement, IPCP agreement, IPV6CP agreement of interface A just negotiates to complete, also will not more New data is synchronized to spare master control, and primary master control can push away LCP agreement, IPCP agreement and the corresponding critical data of IPV6CP agreement It is sent to spare master control, after pushing successfully, removes the set for updating mark;MPLSCP agreement, the OSINLCP agreement of interface A does not have Mark is updated, protocol negotiation state is Opened, can indicate that the MPLSCP agreement of interface A, OSINLCP agreement have been negotiated At, and completed to synchronize, primary master control will not again repeat MPLSCP agreement, the corresponding critical data of OSINLCP agreement same Walk spare master control.
The LCP agreement of interface B, the negotiation state of IPCP agreement are Not Opened state, and have update to indicate, can With indicate interface B LCP agreement, IPCP agreement just from Opened state to Not Opened state, LCP agreement, IPCP agreement Critical data just updated completion, there are no be synchronized to spare master control;Interface B do not record IPV6CP agreement, MPLSCP agreement, OSINLCP agreement can indicate that the enabled unlatching of the IPV6CP agreement, MPLSCP agreement, OSINLCP agreement of interface B is negotiated, The corresponding critical data of agreement is not just collected.
Step S280 sends spare master control for the data updated in the first data mapping tables, and removes set.
The data updated in the first data mapping tables are sent spare master control, after sending successfully, master control by primary master control The set for updating mark is removed in master control.
First data mapping tables are based on interface and agreement, and updating the first data mapping tables is exactly to update the first data to reflect The critical data of the corresponding agreement of interface in firing table, setting updates mark after update.
There is no the critical data of interface and agreement in the first data mapping tables when initialization, is not provided with update mark yet Will.When data never arrive sometimes in the first data mapping tables, update mark is arranged in the first data mapping tables of update simultaneously, will more New flag set;When in the first data mapping tables data from have to it is no when, remove the first data mapping tables in correspond to agreement Critical data, and the set for updating mark is removed simultaneously, set message is removed to push to spare master control.It is reflected in the first data In firing table, only interface, the corresponding critical data of agreement and update mark without when, spare master control just can be from the second data The list item of interface and the corresponding critical data of agreement is deleted in mapping table.
Step S290, spare master control update the second data mapping tables according to the data of update.
The data for the update that spare master control is sent according to primary master control update the second data mapping tables.
Whether step S300 judges in the second data mapping tables comprising the corresponding critical data of LCP agreement.
If including the corresponding critical data of LCP agreement in the second data mapping tables, step S310 is advanced to;If the second data Do not include the corresponding critical data of LCP agreement in mapping table, advances to step S320.
Step S310, spare master control restore LCP agreement according to the corresponding critical data of LCP agreement.
After initialization is completed in spare master control, data-pushing of the monitoring reception from primary master control is begun to, push is received The agreement critical data received is cached to the second data mapping tables based on interface by data.Key corresponding for LCP agreement Data restore LCP protocol data according to the corresponding critical data of LCP agreement immediately.
During being primarily due to primary master control and spare master switching the reason of recovering immediately, for handling link The LCP echo request request message of opposite end responds LCP echo reply message.Key number corresponding for NCP agreement According to being cached, in subsequent primary master control and spare master switching, complete the recovery of NCP agreement.
The first data mapping tables on the second data mapping tables and primary master control in spare master control are essentially identical, the second number Indicate according to update not set in mapping table.No longer draw the second data mapping tables herein, by taking the first data mapping tables as an example into Row explanation.
For example, in the second data mapping tables there is the corresponding key of LCP agreement in interface A and interface B in above table Data restore the LCP agreement of interface A according to the corresponding critical data of LCP agreement of interface A, and according to interface B's The corresponding critical data of LCP agreement restores the LCP agreement of interface B.
There are the corresponding critical datas of IPV6CP agreement by interface A, then it represents that in primary master control and spare master switching, connects Mouthful A has IPV6CP agreement to need to restore, and interface B does not have the corresponding critical data of IPV6CP agreement, then it represents that in primary master control and When spare master switching, interface B does not have IPV6CP agreement to need to restore.
Step S320, spare master control do not restore LCP agreement.
Step S330, when primary master switching to spare master control, spare master control based on the received configuration data to ppp protocol Configuration data restored.
Whether step S340 judges in the second data mapping tables comprising the corresponding critical data of NCP agreement.
Since when receiving primary master control and sending more new data, LCP agreement has been restored for spare master control, spare Master control checks in second interface mapping table after configuration data restores the configuration data of ppp protocol based on the received It whether include the corresponding critical data of NCP agreement, it is preceding if in the second data mapping tables including the corresponding critical data of NCP agreement Proceed to step S350;If not including the corresponding critical data of NCP agreement in the second data mapping tables, step S370 is advanced to.
For example, when the IP address configuration order of interface A executes recovery, spare master control checks second as in above-mentioned table There is IPCP agreement critical data in data mapping tables, then it represents that need to restore IPCP agreement;Match the address IPv6 of interface B When setting order execution recovery, there is no IPV6CP agreement critical data in spare the second data mapping tables of master control inspection, then it represents that no It needs to restore IPV6CP agreement.
Step S350, judge in configuration data critical data corresponding with the protocol-dependent data of NCP and NCP agreement whether one It causes.
Spare master control before restoring to NCP agreement, also judge be with the protocol-dependent data of NCP in configuration data No critical data corresponding with NCP agreement is consistent, i.e. the value of the intersection part of configuration data critical data corresponding with NCP agreement It is whether consistent, if critical data corresponding with the protocol-dependent data of NCP and NCP agreement is consistent in configuration data, advance to step Rapid S360;If critical data corresponding with the protocol-dependent data of NCP and NCP agreement is inconsistent in configuration data, step is advanced to Rapid S370.
Step S360, spare master control restore NCP agreement according to the corresponding critical data of NCP agreement.
Step S370, spare master control do not restore NCP agreement.
Whether step S380 judges in the second data mapping tables comprising the corresponding critical data of authentication protocol.
It further include authentication protocol, so spare master control is also since ppp protocol is other than including LCP agreement and NCP agreement For restoring to authentication protocol.
The authentication protocol includes PAP agreement and CHAP agreement.
Spare master control traverses the second data mapping tables, judge in the second data mapping tables whether include PAP agreement and/or The corresponding critical data of CHAP agreement, if including the corresponding crucial number of PAP agreement and/or CHAP agreement in the second data mapping tables According to advancing to step S390;If in the second data mapping tables not including PAP agreement and/or the corresponding critical data of CHAP agreement, Advance to step S410.
It is worth noting that, spare master control is also used to assist PPP other than LCP agreement, NCP agreement and authentication protocol Other agreements in view are restored.
Step S390, judge in configuration data data relevant to authentication protocol whether with authentication protocol corresponding key number According to consistent.
If deterministic process in step S350 is identical, that is, judge the intersection of configuration data critical data corresponding with authentication protocol Whether partial value is consistent, if data relevant to authentication protocol and the corresponding critical data one of authentication protocol in configuration data It causes, advances to step S400;If data relevant to authentication protocol and the corresponding critical data of authentication protocol are not in configuration data Unanimously, step S410 is advanced to.
Step S400, spare master control restore authentication protocol according to the corresponding critical data of authentication protocol.
Step S410, spare master control do not restore authentication protocol.
After the completion of the configuration data of ppp protocol and ppp protocol restore, at this point, primary master control has switched to spare master Control checks ppp protocol at this point, can also carry out the consistency check of the configuration data of ppp protocol and the critical data of ppp protocol Configuration data and ppp protocol critical data it is inconsistent when, be purged respectively ppp protocol critical data and resetting PPP Agreement is init state.
Embodiment 3
Fig. 3 is a kind of active and standby synchronous switching device structural schematic diagram that the embodiment of the present invention proposes.The active and standby synchronism switching Device 400 corresponds to the active and standby method for synchronously switching in embodiment 1, and any option in embodiment 1 is also applied for this implementation Example, I will not elaborate.
The active and standby synchronous switching device 400 is applied to support that the communication equipment of ppp protocol, the communication equipment include two A master control is set primary master control by master control, sets spare master control for another master control, the ppp protocol includes LCP association View, NCP agreement and authentication protocol, the NCP agreement include IPCP agreement, IPV6CP agreement, MPLSCP agreement and OSINLCP association View, the authentication protocol includes PAP agreement and CHAP agreement.
In the present embodiment, the communication equipment can be the routing device of support ppp protocol, gateway etc..
The communication equipment includes at least one interface, is connect for the interface with other communication equipments to realize that two lead to Believe the communication between equipment.Each interface supports ppp protocol.
The active and standby synchronous switching device 400 includes: configuration synchronization module 410, acquisition memory module 420, synchronization module 430, memory module 440, the first recovery module 450, recovery judgment module 460 and the second recovery module 470.
Synchronization module 410 is configured, configure and will match for the ppp protocol of the primary master control to each interface It sets data and is synchronized to the spare master control.
Memory module 420 is acquired, the critical data of the ppp protocol of each interface is acquired for the primary master control, And the critical data is stored to the first data mapping tables.
Synchronization module 430, for first data mapping tables to be synchronized to the spare master control.
Memory module 440 stores received first data mapping tables to the second data for the spare master control Whether mapping table judges in second data mapping tables comprising the corresponding critical data of the LCP agreement.
First recovery module 450, if in second data mapping tables including the corresponding critical data of the LCP agreement, First recovery module 450 is restored the LCP according to the corresponding critical data of the LCP agreement for the spare master control and is assisted View.
Restore judgment module 460, in the primary master switching to when the spare master control, the recovery judgment module 460 are used for the spare master control, and configuration data restores the configuration data of the ppp protocol based on the received, and judges institute It whether states in the second data mapping tables comprising the corresponding critical data of the NCP agreement.
Second recovery module 470, if in second data mapping tables including the corresponding critical data of the NCP agreement, Second recovery module 470 is restored the NCP according to the corresponding critical data of the NCP agreement for the spare master control and is assisted View.
Another embodiment of the present invention additionally provides a kind of communication equipment, and the communication equipment is used to implement above-mentioned active and standby Method for synchronously switching.
Yet another embodiment of the present invention additionally provides a kind of computer readable storage medium, is stored with above-mentioned communication The computer program used in equipment.
With this, the embodiment of the present invention proposes a kind of active and standby method for synchronously switching and communication equipment, by the PPP of primary master control The protocol-dependent equal real-time synchronization of critical data reduces data synchronization and the recovery time in handoff procedure, together to spare master control When avoid occurring suddenly as primary master control cannot between primary master control and spare master control caused by the abnormal conditions such as crash, failure The problem of switching over;The relevant critical data of the ppp protocol to change is synchronized and restored, reduce synchronous and is restored Data volume, guarantee the ppp protocol configuration data of spare master control and primary master control and the consistency of critical data, improve communication and set The reliability of ppp link between standby.
In several embodiments provided herein, it should be understood that disclosed system and method can also pass through Other modes are realized.System embodiment described above is only schematical, for example, flow chart and structure in attached drawing Figure shows the system frame in the cards of the system of multiple embodiments according to the present invention, method and computer program product Structure, function and operation.In this regard, each box in flowchart or block diagram can represent a module, section or code A part, a part of the module, section or code includes one or more for implementing the specified logical function Executable instruction.It should also be noted that function marked in the box can also be to be different from the implementation as replacement The sequence marked in attached drawing occurs.For example, two continuous boxes can actually be basically executed in parallel, they are sometimes It can execute in the opposite order, this depends on the function involved.It is also noted that in structure chart and/or flow chart The combination of each box and the box in structure chart and/or flow chart, can function or movement as defined in executing it is dedicated Hardware based system realize, or can realize using a combination of dedicated hardware and computer instructions.
In addition, each functional module or unit in each embodiment of the present invention can integrate one independence of formation together Part, be also possible to modules individualism, an independent part can also be integrated to form with two or more modules.
It, can be with if the function is realized and when sold or used as an independent product in the form of software function module It is stored in a computer readable storage medium.Based on this understanding, technical solution of the present invention is substantially in other words The part of the part that contributes to existing technology or the technical solution can be embodied in the form of software products, the meter Calculation machine software product is stored in a storage medium, including some instructions are used so that a computer equipment (can be intelligence Can mobile phone, personal computer, server or network equipment etc.) execute each embodiment the method for the present invention whole or Part steps.And storage medium above-mentioned include: USB flash disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), Random access memory (RAM, Random Access Memory), magnetic or disk etc. be various to can store program code Medium.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any Those familiar with the art in the technical scope disclosed by the present invention, can easily think of the change or the replacement, and should all contain Lid is within protection scope of the present invention.

Claims (10)

1. a kind of active and standby method for synchronously switching, which is characterized in that applied to the communication equipment for supporting ppp protocol, the communication is set Standby includes two master controls, and a master control is primary master control, another master control is spare master control, and the ppp protocol includes LCP agreement And NCP agreement, this method comprises:
The primary master control configure to the ppp protocol of each interface and configuration data is synchronized to the spare master Control;
The primary master control acquires the critical data of the ppp protocol of each interface, and the critical data is stored to One data mapping tables, and first data mapping tables are synchronized to the spare master control;
The spare master control stores received first data mapping tables to the second data mapping tables, judges second number It whether include the corresponding critical data of the LCP agreement according in mapping table;
If including the corresponding critical data of the LCP agreement in second data mapping tables, the spare master control is according to The corresponding critical data of LCP agreement restores the LCP agreement;
In the primary master switching to when the spare master control, the spare master control based on the received configuration data to described Whether the configuration data of ppp protocol is restored, and judge corresponding comprising the NCP agreement in second data mapping tables Critical data;
If including the corresponding critical data of the NCP agreement in second data mapping tables, the spare master control is according to The corresponding critical data of NCP agreement restores the NCP agreement.
2. active and standby method for synchronously switching as described in claim 1, which is characterized in that the critical data include protocol name, Protocol negotiation state and negotiation option data.
3. active and standby method for synchronously switching as claimed in claim 2, which is characterized in that described " by first data mapping tables It is synchronized to the spare master control " include:
After the primary master control and the spare master control successful connection for the first time, the primary master control is counted described the first of storage The spare master control is pushed to according to mapping table;
When the protocol negotiation state of the corresponding ppp protocol of interface of the primary master control changes, the primary master control is adopted The critical data for collecting the ppp protocol of the interface updates first data mapping tables according to the critical data of acquisition;
The spare master control is sent by the data updated in first data mapping tables.
4. active and standby method for synchronously switching as claimed in claim 3, which is characterized in that the protocol negotiation state changes packet It includes and is converted to Opened state from Not Opened state and is converted to Not Opened state from Opened state.
5. active and standby method for synchronously switching as described in claim 1, which is characterized in that the ppp protocol further includes authentication protocol;
Configuration data restores the configuration data of the ppp protocol based on the received for the spare master control, and described in judgement It whether include the corresponding critical data of the authentication protocol in second data mapping tables;
If including the corresponding critical data of the authentication protocol in second data mapping tables, the spare master control is according to The corresponding critical data of authentication protocol restores the authentication protocol.
6. active and standby method for synchronously switching as described in claim 1, which is characterized in that described " corresponding according to the NCP agreement Critical data restores the NCP agreement " include:
Judge in the configuration data with the protocol-dependent data of the NCP whether with the NCP agreement corresponding critical data Unanimously;
If critical data corresponding with the protocol-dependent data of the NCP and the NCP agreement is consistent in the configuration data, root Restore the NCP agreement according to the corresponding critical data of the NCP agreement;
If critical data corresponding with the protocol-dependent data of the NCP and the NCP agreement is inconsistent in the configuration data, It abandons restoring the NCP agreement.
7. active and standby method for synchronously switching as described in claim 1, which is characterized in that first data mapping tables are additionally provided with Mark is updated, it, will be in first data mapping tables when updating first data mapping tables according to the critical data of acquisition Flag set is updated, the data updated in first data mapping tables are synchronized to the spare master control in the primary master control Afterwards, the set is removed.
8. active and standby method for synchronously switching as described in claim 1, which is characterized in that described " the primary master control is to ppp protocol Configure and configuration data be synchronized to the spare master control " before further include:
Two master controls are held consultation with the determination primary master control and the spare master control in the communication equipment.
9. active and standby method for synchronously switching described in claim 1, which is characterized in that it is described configuration data is synchronized to it is described spare Master control is that the configuration data for the corresponding ppp protocol of order for having executed operation is synchronized to the spare master control.
10. a kind of communication equipment, which is characterized in that the communication equipment is for implementing as claim 1-9 is described in any item Active and standby method for synchronously switching.
CN201811313975.4A 2018-11-06 2018-11-06 Active and standby method for synchronously switching and communication equipment Pending CN109194530A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811313975.4A CN109194530A (en) 2018-11-06 2018-11-06 Active and standby method for synchronously switching and communication equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811313975.4A CN109194530A (en) 2018-11-06 2018-11-06 Active and standby method for synchronously switching and communication equipment

Publications (1)

Publication Number Publication Date
CN109194530A true CN109194530A (en) 2019-01-11

Family

ID=64942191

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811313975.4A Pending CN109194530A (en) 2018-11-06 2018-11-06 Active and standby method for synchronously switching and communication equipment

Country Status (1)

Country Link
CN (1) CN109194530A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115766625A (en) * 2022-09-07 2023-03-07 迈普通信技术股份有限公司 Interface resource synchronization method and device and distributed switch

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1458747A (en) * 2002-05-13 2003-11-26 华为技术有限公司 Method for main control board data thermal backup
CN1980154A (en) * 2006-11-21 2007-06-13 华为技术有限公司 Wireless communication apparatus interface replacing method and device
CN102142999A (en) * 2011-03-28 2011-08-03 华为技术有限公司 Method, equipment and system for recovering links
US20120151550A1 (en) * 2009-08-20 2012-06-14 Bin Zhang Method for switching node main-standby controllers based on content delivery network (cdn) and cdn thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1458747A (en) * 2002-05-13 2003-11-26 华为技术有限公司 Method for main control board data thermal backup
CN1980154A (en) * 2006-11-21 2007-06-13 华为技术有限公司 Wireless communication apparatus interface replacing method and device
US20120151550A1 (en) * 2009-08-20 2012-06-14 Bin Zhang Method for switching node main-standby controllers based on content delivery network (cdn) and cdn thereof
CN102142999A (en) * 2011-03-28 2011-08-03 华为技术有限公司 Method, equipment and system for recovering links

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115766625A (en) * 2022-09-07 2023-03-07 迈普通信技术股份有限公司 Interface resource synchronization method and device and distributed switch

Similar Documents

Publication Publication Date Title
US8402132B2 (en) Method, system and device for device capabilities exchange
US7363534B1 (en) Method and system for stateful switch-over in a high-availability point to point system
EP3073705A1 (en) Channel establishing method and apparatus
CN101515891B (en) Method for processing border gateway protocol routing and router
CN101789981B (en) Method and equipment for dual-stack data transmission
CN109391502A (en) A kind of information configuring methods and administrative unit
CN109922144A (en) Method and apparatus for handling data
CN110222280A (en) Data processing method and device for sharing
CN103618795B (en) Document handling method, the client and server of striding equipment
CN109194530A (en) Active and standby method for synchronously switching and communication equipment
EP2197169A1 (en) VoIP registration with multiple call servers
CN105591892B (en) A kind of starting method and apparatus of smooth restarting process
CN114900496A (en) Communication method and related equipment
CN103607311B (en) System and method for reestablishing TCP connection seamlessly
CN109087096A (en) Block chain account checking method, device, equipment and storage medium
CN106936718B (en) PPPoE message transmission method and PPPoE server
CN107609197A (en) A kind of method of data synchronization, data synchronization unit and mobile terminal
CN110535959A (en) A kind of method, apparatus and computer readable storage medium for transmitting data
CN109413118A (en) A kind of method, apparatus that realizing session synchronization and storage medium, program product
CN102281194A (en) Message transmission method and network equipment
CN111181766B (en) Redundant FC network system and method for realizing dynamic configuration of switch
CN110830477B (en) Service identification method, device, gateway, system and storage medium
CN105591938B (en) Keep alive Packet processing method and processing device
CN106411570A (en) Method for realizing SCTP (streaming control transmission protocol) protocol hot backup, system and server host
CN102821118A (en) Method and system for backing up services in network with heterogeneous nodes

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190111