CN109193916A - The capacity and Main Wire Connection Scheme of mirror field load ups power Accessory Battery group - Google Patents

The capacity and Main Wire Connection Scheme of mirror field load ups power Accessory Battery group Download PDF

Info

Publication number
CN109193916A
CN109193916A CN201811036585.7A CN201811036585A CN109193916A CN 109193916 A CN109193916 A CN 109193916A CN 201811036585 A CN201811036585 A CN 201811036585A CN 109193916 A CN109193916 A CN 109193916A
Authority
CN
China
Prior art keywords
power
ups
mirror field
load
capacity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811036585.7A
Other languages
Chinese (zh)
Inventor
王淑娥
吴乾
张汉卿
曹晓良
马雪燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Hongrui Power Engineering Consulting Co Ltd
Original Assignee
Qingdao Hongrui Power Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Hongrui Power Engineering Consulting Co Ltd filed Critical Qingdao Hongrui Power Engineering Consulting Co Ltd
Priority to CN201811036585.7A priority Critical patent/CN109193916A/en
Publication of CN109193916A publication Critical patent/CN109193916A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • H02J9/04Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
    • H02J9/06Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/70Hybrid systems, e.g. uninterruptible or back-up power supplies integrating renewable energies
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems

Landscapes

  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The present invention relates to the capacity and Main Wire Connection Scheme of mirror field load ups power Accessory Battery group, belong to the applied technical field of solar energy thermal-power-generating.The capacity C h of mirror field load ups power Accessory Battery group are as follows:The ups power power distribution cabinet external photo-thermal power generation mirror field load of mirror field load;Power distribution cabinet input terminal is divided into two-way, connects mainframe by ac-dc conversion module and straight exchange conversion module all the way, and another way connects bypass cabinet by sing phase bridges and AC transformer;The battery group as UPS backup power source is connected between ac-dc conversion module and straight exchange conversion module.The capacity and Main Wire Connection Scheme of load ups power Accessory Battery group in mirror field provided by the invention, optimize the design scheme of the mirror field ionization source circuit of photo-thermal power station, improve the electrical stability of mirror field load, the requirement for overcoming traditional emergency power supply 15s starting time meets the requirement for instantaneously completing to defocus, receive mirror in normal power source power down.

Description

The capacity and Main Wire Connection Scheme of mirror field load ups power Accessory Battery group
Technical field
The present invention relates to the capacity and Main Wire Connection Scheme of mirror field load ups power Accessory Battery group, belong to solar heat The applied technical field of power generation.
Background technique
Photo-thermal power generation Jing Chang, a large amount of motor drivens are in random start stopping mode and run, and the duty ratio of working time is not To 10%, this will lead to, and power consumption fluctuation in mirror field is very big, and mirror field output power is very high, and the mean power of Jing Chang consumption is very It is low.If centrally connected power supply, if output power backbone failure, whole audience power supply power generation can all be affected;Such as according to tradition Diesel-driven generator as emergency power supply, then have the starting time of at least 15S, mirror field is complete when cannot achieve electrical power mains line failure At instantaneous focal, receive mirror movement.
Summary of the invention
The object of the present invention is to provide the capacity and Main Wire Connection Scheme of mirror field load ups power Accessory Battery group, optimizations The plan of establishment of the mirror field ionization source circuit of photo-thermal power station, improves the electrical stability of mirror field load, overcomes traditional guarantor Pacify the requirement of power supply 15s starting time, meets the requirement for instantaneously completing to defocus, receive mirror in normal power source power down.
To achieve the goals above, the technical solution adopted by the present invention is that:
The capacity calculation methods of mirror field load ups power Accessory Battery group,
The calculating of battery statistics load when single group ups power works under battery operational mode in the mirror field areas Process, comprising:
P0=Pout/ η,
Wherein, the PoutIndicate UPS output power;The P(VA)Indicate UPS volt-amperes of numbers;Indicate power factor; The P0Indicate that battery counts load;The η indicates inverter efficiency;
The capacity calculation methods of the Accessory Battery group include:
Ch=P/Ks,
P=P0K1Kt,
Wherein, the Ch indicates accumulator capacity;The P indicates battery calculated load;The Ks indicates electric power storage pool capacity Measure conversion coefficient;The P0Indicate that battery counts load;The K1 indicates battery aging factor;The Kt indicates battery Temperature correction coefficient;
The above-mentioned correlation formula of simultaneous, the capacity C h of the Accessory Battery group of the UPS circuit of mirror field load are as follows:
Technical solution of the present invention further improvement lies in that: battery aging factor K1 value be 1.25.
A kind of ups power Main Wire Connection Scheme of mirror field load designs, power distribution cabinet external photo-thermal power generation mirror field load;Power distribution cabinet Input terminal is divided into two-way, connects mainframe by ac-dc conversion module and straight exchange conversion module all the way, and another way connection is single Phase electric bridge input terminal simultaneously connects bypass cabinet by sing phase bridges and AC transformer;Ac-dc conversion module and straight exchange conversion mould The battery group as UPS backup power supply is connected between block.
Technical solution of the present invention further improvement lies in that: further include: two mainframes share a bypass cabinet, with bypass There are two sing phase bridges for the output end parallel connection of the AC transformer of cabinet connection;The output end and two sides mainframe of two sing phase bridges The output end of ac-dc conversion module connects same power distribution cabinet input terminal together on route.
Technical solution of the present invention further improvement lies in that: further include dual-power transfer switch, dual power supply conversion is opened Both ends are closed to be connected between the input terminal of two power distribution cabinets.
By adopting the above-described technical solution, the technical effect that the present invention obtains has:
The capacity calculation methods of Accessory Battery group provided by the invention are fully considering mirror field provided by the invention load Ups power structure on the basis of, consider power factor and UPS inverter efficiency, in conjunction with need to the calculating of average UPS volt-ampere numbers Battery counts load;And on the basis of being actually not required to consider design margin, the aging of practical battery use process is considered The influence problem of problem and temperature change to battery-active, and consider accumulator capacity conversion coefficient, finally solve required storage Battery capacity.
The capacity calculation methods of Accessory Battery group provided by the invention, having fully considered influences to restrict accumulator capacity Various factors, and rule of thumb data or test statistics data etc., seek optimal relevant parameter numerical value, in the hope of last optimal And the capacity of practical target configuration battery group.
The ups power power supply plan of mirror field provided by the invention load compared with traditional diesel engine is as emergency power supply, The requirement for overcoming the diesel engine 15s starting time is able to satisfy the requirement for instantaneously completing to defocus, receive mirror in normal power source power down; Three kinds of Main Wire Connection Schemes provide thinking for the design of photo-thermal power station mirror field ionization source simultaneously.Accessory Battery group provided by the invention Capacity calculation methods carry accumulator capacity calculating for ups power and provide method.
The ups power Main Wire Connection Scheme of mirror field provided by the invention load designs, under present technical conditions, UPS electricity The probability very little that source is broken down, reliability itself is relatively high, and natural economy is exactly the choosing of mirror field ups power Main Wire Connection Scheme An important factor for when selecting.
The ups power Main Wire Connection Scheme of the first mirror field load provided by the invention, maximumlly considers circuit itself Economy and practical application economy, guarantee it is most basic as ups power on the basis of utmostly simplified circuit Structure and required cable;The circuit is complete suitable for distribution network, requires not the rate of online at full capacity of photo-thermal power station High environment
The ups power Main Wire Connection Scheme of second of mirror provided by the invention field load, two mainframes share a bypass Cabinet, and in the parallel connection of power distribution cabinet input terminal, there are two sing phase bridges, improve the reliability of ups power circuit, keep circuit simultaneous Care for the economy and reliability of photo-thermal power station.Improve the scope of application of mirror field load ups power.
The ups power Main Wire Connection Scheme of the third mirror field load provided by the invention, increases dual-power transfer switch, can So that the UPS circuit device of two the first mirror field loads provided by the invention is combined into one;So that two lateral circuits is mutually backups, has There is high reliability, improve stability of the UPS circuit as backup power source, be suitable for power distribution network weakness, photo-thermal power station rises Support power grid effect power station.
Detailed description of the invention
Fig. 1 is a kind of UPS Main Wire Connection Scheme of mirror field load provided by the invention;
Fig. 2 is the UPS Main Wire Connection Scheme of another mirror field provided by the invention load;
Fig. 3 is the UPS Main Wire Connection Scheme of another mirror field load provided by the invention.
Specific embodiment
With reference to the accompanying drawing and specific embodiment is described in further details the present invention:
The invention discloses the capacity and Main Wire Connection Scheme of mirror field load ups power Accessory Battery group, belong to solar energy The applied technical field of heat power generation.Here is specific embodiment.
Photo-thermal power generation process synthesis considers economy and reliability, and mirror field ionization source concentrates design by region, by point of mirror Cloth situation, point several regions, each region need a set of ups power of centralized arrangement for region load power supply.
The present invention provides the capacity calculation methods of mirror field load ups power Accessory Battery group.
Since ups power needs to be AC power source by inverter inversion under battery operational mode to be load power supply, Therefore it needs to consider power factor in battery load calculating processAnd inverter efficiency η.
Battery statistics load when single group ups power works under battery operational mode in mirror field ionization source region Calculating process, comprising:
P0=Pout/ η,
Wherein, the PoutIndicate UPS output power;The P(VA)Indicate UPS volt-amperes of numbers;Indicate power factor; The P0Indicate that battery counts load;The η indicates inverter efficiency;
And the scale of general Jing Chang is terminal scale, therefore battery capacity is without the concern for design margin, it only need to be with UPS electricity The one-to-one Capacity design in source.
In view of battery needs after running for a period of time, because pole plate salinization problem causes accumulator capacity to reduce, because This needs to set the aging factor of certain value when initially carrying out Capacity Selection;Simultaneously according to the difference of running environment, also It needs to carry out accumulator capacity certain temperature-compensating.
Therefore the capacity calculation methods of Accessory Battery group include:
Ch=P/Ks,
P=P0K1Kt,
Wherein, the Ch indicates accumulator capacity;The P indicates battery calculated load;The Ks indicates electric power storage pool capacity Measure conversion coefficient;The P0Indicate that battery counts load;The K1 indicates battery aging factor;The Kt indicates battery Temperature correction coefficient;
Recommend battery aging factor reference value K1=1.25 according to engineering practice.
The above-mentioned correlation formula of simultaneous, the capacity C h of the Accessory Battery group of the UPS circuit of mirror field load are as follows:
K1=1.25 is taken,
Further, the present invention also provides the ups power Main Wire Connection Schemes of mirror field load.Due in present technology item Under part, the probability very little that ups power breaks down, reliability itself is very high, then economy is exactly the selection of mirror field ups power Key factor.In conjunction with Fig. 1, a kind of ups power Main Wire Connection Scheme of mirror field load provided by the invention.The external photo-thermal hair of power distribution cabinet Electronic Speculum field load;Power distribution cabinet input terminal is divided into two-way, passes through ac-dc conversion module and straight exchange conversion module connection master all the way Cabinet, another way connect sing phase bridges input terminal and connect bypass cabinet by sing phase bridges and AC transformer;Ac-dc conversion The battery group as UPS backup power supply is connected between module and straight exchange conversion module.
The UPS circuit device of above-mentioned mirror field load, maximumlly optimizes the economy of circuit, and structure is simple, and cable is used Amount is few, cheap, economical and practical;It is complete suitable for distribution network, it is of less demanding to the rate of online at full capacity of photo-thermal power station Circuit environment.But if UPS host and battery failure problem, the mirror field areas of ups power power supply will stop transport, Therefore it breaks down and the probability that cannot be settled a dispute by the parties concerned themselves in time is relatively large.
In conjunction with Fig. 2, the UPS circuit device of another kind mirror field provided by the invention load.Two mainframes share a side Road cabinet, there are two sing phase bridges for the output end parallel connection for the AC transformer connecting with bypass cabinet;The output end of two sing phase bridges And the output end of ac-dc conversion module connects same power distribution cabinet input terminal together on the mainframe route of two sides;The external light of power distribution cabinet Hot power generation mirror field load.
The sing phase bridges of side where two sides mainframe passes through ac-dc conversion module and the connection of straight exchange conversion module Output end, and the battery group as UPS backup power supply is connected between ac-dc conversion module and straight exchange conversion module.
Foregoing circuit device improves the reliability of ups power circuit compared to the UPS circuit device of offer shown in Fig. 1, Circuit is set to take into account the economy and reliability of photo-thermal power station, cost is moderate, high reliablity, is the best Jing Chang of versatility negative Lotus UPS circuit.
In conjunction with Fig. 3, the UPS circuit device of another mirror field load provided by the invention.Two adjacent shown in FIG. 1 The UPS circuit lower end of mirror field load, further includes a dual-power transfer switch, and the dual-power transfer switch both ends are connected to two Between the input terminal of two power distribution cabinets in the UPS circuit of side mirror field load as shown in Figure 1.
Foregoing circuit device increases dual-power transfer switch compared to the UPS circuit device of offer shown in Fig. 1, can make Two circuits are combined into one, and two UPS circuits are mutually backups, and improve stability of the UPS circuit as backup power source, have pole High reliability, is suitable for power distribution network weakness, and photo-thermal power station plays the power station of support power grid effect;But it is more to consume cable, makes Valence is also relatively high.
The plan of establishment of the UPS circuit device of three kinds of mirror field loads in summary is specifically adopted in physical cabling application With which kind of, economy and reliability and other factors when needing to comprehensively consider practical application, there are also between each correlative factor Stressing property.
Obviously, the above embodiments are merely examples for clarifying the description, and does not limit the embodiments.It is right For those of ordinary skill in the art, can also make on the basis of the above description it is other it is various forms of variation or It changes.There is no necessity and possibility to exhaust all the enbodiments.And it is extended from this it is obvious variation or It changes still within the protection scope of the invention.

Claims (5)

1. the capacity calculation methods of mirror field load ups power Accessory Battery group, it is characterised in that:
The calculating of battery statistics load when single group ups power works under battery operational mode in the mirror field areas Journey, comprising:
P0=Pout/ η,
Wherein, the PoutIndicate UPS output power;The P(VA)Indicate UPS volt-amperes of numbers;Indicate power factor;The P0 Indicate that battery counts load;The η indicates inverter efficiency;
The capacity calculation methods of the Accessory Battery group include:
Ch=P/Ks,
P=P0K1Kt,
Wherein, the Ch indicates accumulator capacity;The P indicates battery calculated load;The Ks indicates that accumulator capacity is changed Calculate coefficient;The P0Indicate that battery counts load;The K1 indicates battery aging factor;The Kt indicates battery temp Compensation coefficient;
The above-mentioned correlation formula of simultaneous, the capacity C h of the Accessory Battery group of the UPS circuit of mirror field load are as follows:
2. the capacity calculation methods of the Accessory Battery group of the ups power of mirror field according to claim 1 load, feature It is:
Battery aging factor K1 value is 1.25.
3. a kind of ups power Main Wire Connection Scheme of mirror field load, it is characterised in that:
Power distribution cabinet external photo-thermal power generation mirror field load;Power distribution cabinet input terminal is divided into two-way, all the way by ac-dc conversion module and Straight exchange conversion module connects mainframe, and another way connects sing phase bridges input terminal and connected by sing phase bridges and AC transformer Connect bypass cabinet;The battery group as UPS backup power source is connected between ac-dc conversion module and straight exchange conversion module.
4. the ups power Main Wire Connection Scheme of mirror field according to claim 3 load, it is characterised in that: further include:
Two mainframes share a bypass cabinet, and there are two single-phase electricities for the output end parallel connection for the AC transformer connecting with bypass cabinet Bridge;The output end of ac-dc conversion module connects same match together on the output end and two sides mainframe route of two sing phase bridges Electric cabinet input terminal.
5. the ups power Main Wire Connection Scheme of mirror field according to claim 3 load, it is characterised in that:
It further include dual-power transfer switch, the dual-power transfer switch both ends are connected between the input terminal of two power distribution cabinets.
CN201811036585.7A 2018-09-06 2018-09-06 The capacity and Main Wire Connection Scheme of mirror field load ups power Accessory Battery group Pending CN109193916A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811036585.7A CN109193916A (en) 2018-09-06 2018-09-06 The capacity and Main Wire Connection Scheme of mirror field load ups power Accessory Battery group

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811036585.7A CN109193916A (en) 2018-09-06 2018-09-06 The capacity and Main Wire Connection Scheme of mirror field load ups power Accessory Battery group

Publications (1)

Publication Number Publication Date
CN109193916A true CN109193916A (en) 2019-01-11

Family

ID=64914944

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811036585.7A Pending CN109193916A (en) 2018-09-06 2018-09-06 The capacity and Main Wire Connection Scheme of mirror field load ups power Accessory Battery group

Country Status (1)

Country Link
CN (1) CN109193916A (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103532224A (en) * 2013-10-23 2014-01-22 中国能源建设集团广东省电力设计研究院 Method for configuring UPS (uninterrupted power supply) in offshore wind plant

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103532224A (en) * 2013-10-23 2014-01-22 中国能源建设集团广东省电力设计研究院 Method for configuring UPS (uninterrupted power supply) in offshore wind plant

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
张红启: "UPS的概述及配置计算", 《当代化工》 *
张陈: "变电站直流系统蓄电池容量计算探析", 《中国高新技术企业》 *
鲍金春等: "大机组UPS系统若干问题探讨", 《华北电力技术》 *

Similar Documents

Publication Publication Date Title
CN109995083B (en) Hybrid inverter power control system for PV strings, batteries, grids and backup loads
Arai et al. Power electronics and its applications to renewable energy in Japan
Bragard et al. The balance of renewable sources and user demands in grids: Power electronics for modular battery energy storage systems
US10666058B2 (en) Intergrated fuel cell and energy storage systems and method of operating thereof
CN103036243A (en) Energy storage system and controlling method of the same
Nazemi et al. Techno-economic analysis and optimization of a microgrid considering demand-side management
CN104467509B (en) A kind of bidirectional energy-storage current transformer
Chauhan et al. DC distribution system for energy efficient buildings
Uthirasamy et al. Design of Boosted Multilevel DC‐DC Converter for Solar Photovoltaic System
Chiu et al. Design and implementation of a high‐efficiency bidirectional DC‐DC Converter for DC micro‐grid system applications
CN104578433A (en) Switchable electric energy storage system and using method thereof
JP2011205824A (en) Power storage system
CN107425733A (en) A kind of low-voltage electric energy router topology and control method
CN103872747A (en) Uninterrupted 12V direct-current power system
Parashar et al. Power quality analysis of grid connected solar powered EV charging station: a review
CN103888004A (en) Single-phase PWM rectifier for railway AC/DC/AC standby power supply
Marquet et al. DC power wide spread in Telecom/Datacenter and in home/office with renewable energy and energy autonomy
CN212435428U (en) Uninterruptible power supply
Mondal et al. Efficient data center design using novel modular DC UPS, server power supply with DC voltage and modular CDU cooling
Ahmadi et al. Selective source power converter for improved photovoltaic power utilization
JP6478032B2 (en) Control device and power distribution system using the same
CN109193916A (en) The capacity and Main Wire Connection Scheme of mirror field load ups power Accessory Battery group
Yang et al. An integrated equalization charger for series‐connected energy storage cells
Mane et al. Power Quality issues in Solar Powered Fast Charging Station for Electric Vehicle: Comprehensive Review & Mitigation Measures
WO2017132802A1 (en) Inverter control device and method for energy interconnection and energy storage of ac bus

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190111

RJ01 Rejection of invention patent application after publication