CN109193816A - Consider the real-time real power control method of new energy power station of malice application with super generating punishment - Google Patents

Consider the real-time real power control method of new energy power station of malice application with super generating punishment Download PDF

Info

Publication number
CN109193816A
CN109193816A CN201811343627.1A CN201811343627A CN109193816A CN 109193816 A CN109193816 A CN 109193816A CN 201811343627 A CN201811343627 A CN 201811343627A CN 109193816 A CN109193816 A CN 109193816A
Authority
CN
China
Prior art keywords
new energy
power station
energy power
application
super generating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811343627.1A
Other languages
Chinese (zh)
Other versions
CN109193816B (en
Inventor
陈堂龙
王宁
徐泰山
郭丹阳
汪马翔
胡本然
周天
彭宇
王昊昊
孟祥星
常康
华科
李吉晨
王玚
扈卫卫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Heilongjiang Electric Power Co Ltd
Nari Technology Co Ltd
NARI Nanjing Control System Co Ltd
Original Assignee
State Grid Heilongjiang Electric Power Co Ltd
Nari Technology Co Ltd
NARI Nanjing Control System Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Heilongjiang Electric Power Co Ltd, Nari Technology Co Ltd, NARI Nanjing Control System Co Ltd filed Critical State Grid Heilongjiang Electric Power Co Ltd
Priority to CN201811343627.1A priority Critical patent/CN109193816B/en
Publication of CN109193816A publication Critical patent/CN109193816A/en
Application granted granted Critical
Publication of CN109193816B publication Critical patent/CN109193816B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • H02J3/48Controlling the sharing of the in-phase component

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses the real-time real power control methods of new energy power station of a kind of application of consideration malice and super generating punishment, specially, the case where for the malice application of new energy power station and super generating, the application that carries out plus contribute to new energy power station according to the corresponding examination moment is examined with super generating, corresponding malice super generating punishment is carried out for the new energy power station that examination moment super generating electricity is more than different limits, it is unable to reach for examination moment active power output plus power output applies for target and the new energy power station of certain time is kept to carry out malice application punishment, to realize new energy power station power generation and add the standard guidance of power output application, reduce new energy power station electricity transaction deviation, ensure that new energy justice participates in marketing, promote new energy consumption.

Description

Consider the real-time real power control method of new energy power station of malice application with super generating punishment
Technical field
The present invention relates to the real-time real power control methods of new energy power station of a kind of application of consideration malice and super generating punishment, belong to Operation and control of electric power system technical field.
Background technique
With the development of China's clean energy, the installed capacity of the new energy based on photovoltaic and wind-powered electricity generation and consumption amount by Year rises, and the access range of electricity transaction also constantly expands, and the ratio for making new energy participate in marketing steps up.So And on the basis of the generation schedule that scheduling institution issues, the fluctuation of new energy itself easily leads to going out in real time for new energy power station There is more large deviation compared to traditional thermoelectricity in power.Generation of electricity by new energy, the reasonable electricity exchange model of design how are made full use of, is subtracted Few new energy power station electricity transaction deviation ensures that new energy justice participates in marketing, improves generation of electricity by new energy and dissolves ratio, subtracts Light rate is abandoned in few abandonment, has become the grid-connected scheduling controlling institute major issue to be solved of new energy power station.
Chinese invention patent " a kind of assessment measuring method of wind-power electricity generation-load real time coordination consumption abandonment " (application number: CN201610264085.3) consider the factors such as wind-powered electricity generation super generating, few hair, establish consumption evaluation index collection, realize wind-power electricity generation- Load real time coordination dissolves the assessment measuring and calculating of abandonment, but to being related to, malice is not applied and the new energy power station of super generating has carried out power control System.
Chinese invention patent " a kind of lotus net source coordination control model under quantity of electricity contract method of commerce " (application number: It CN201610952204.4 is) examination baseline to promise breaking super generating electricity with the agreement consumption generation schedulecurve that control centre issues Few generated energy is examined with breaking a contract, but is only handled from charge calculation angle violation of agreement, not directly to new energy The super generating in source power station and few hair carry out real power control.
Summary of the invention
The technical problem to be solved by the present invention is to overcome the deficiencies of existing technologies, a kind of consideration malice application and super is provided The real-time real power control method of new energy power station for sending out punishment is likely to occur for new energy power station power output under active real-time distribution Deviation situation reduces new energy electricity from the angle of malice application and super generating by formulating corresponding penalty mechanism and control flow It stands output deviation, promotes new energy consumption.
In order to solve the above technical problems, the present invention provides a kind of new energy power station reality for considering malice application with super generating punishment When real power control method, comprising the following steps:
1) present instruction is set to issue constantly as t0, judge t0Moment be need carry out or do not need carry out malice application with At the time of super generating is examined;If current time t0At the time of examination to need to carry out malice application with super generating, then t is initialized0Moment is new The super generating flag bit of energy power station i is 0, is entered step 2);Otherwise continue judgement until current time t0To need to carry out malice At the time of application is examined with super generating, enter step 2);
2) it obtains new energy power station i super generating and counts initial time Tb,iAnd [Tb,i,t0] reality of new energy power station i in section The real-time command curve of border power output and new energy power station i, calculates the power station in [Tb,i,t0] power and super generating should be issued in section Utilize hourageAccording toLocating section carries out super generating punishment to new energy power station i, if carrying out super generating punishment, is transferred to Step 3) is transferred to step 5) if punishing without super generating;It calculates as follows:
Wherein, Pa,i(t) the practical power output for being t moment new energy power station i, Ps,i(t) answering for t moment new energy power station i Issue power, Pprep,i(t) real-time command for being t moment new energy power station i, Pe,iFor the rated capacity of new energy power station i;
3) it reads new energy power station i and adds power output application reply moment Ta,iAnd the time instructions, if plus power output application examination prolong When be td, judge t0Whether [T is belonged toa,i,Ta,i+td] section, according to t0Value interval, carry out plus power output application judgement, if Add power output application qualified, be then transferred to step 5), if plus power output application it is unqualified, be transferred to step 4);
4) value for reading and comparing the super generating flag bit of new energy power station i, propose according to super generating flag bit plus contribute application;
5) it is calculated using linear programming algorithm and issues each new energy power station instruction.
In aforementioned step 1), be configured at the time of malice application is examined with super generating by certain examination period.
In aforementioned step 2), according toLocating section carries out super generating punishment to new energy power station i, including following several Situation:
If 21)Equal to 0, punishes, entered step 3) without super generating;
If 22)Greater than 0 and it is less than real-time super generating threshold valueThe nearly n in the power station month super generating is counted using small When number Nhis,i, judgementWhether " history-real-time " comprehensive super generating threshold value is less thanIfIt is less thanThe super generating flag bit that the new energy power station is arranged is 1, is entered step 3);IfIt is more than or equal toAdjustment The instruction upper limit in a hours i future of new energy power station is Pmax,i, and forbid its application that proposes plus contribute in a hours, empty this The N in power stationhis,i, go to step 5); iIt calculates as follows:
Wherein, C is new energy power station set, Pa.i(t0) it is t0The real-time power output of moment new energy power station i, Lgrid(t0) be t0Moment the whole network Rate of average load, Pe,iFor the rated capacity of new energy power station i, τ is super generating penalty coefficient, and λ is that history super generating is examined Core coefficient;
If 23)Threshold value is punished more than or equal to super generatingRecordWith current time t0It is executed as punishment Start time Te, with the prediction power output P of new energy power station ifo,i(t) on the basis of, computational theory power generation electricity reaches super generating punishment electricity Measure Ep,iRequired super generating Penalty time, forbids the power station to generate electricity during this period of time, then goes to step 5, super generating Penalty time It calculates as follows:
Wherein, Ep,iElectricity, t are punished for the super generating of new energy power station ip,iFor corresponding super generating Penalty time,For new energy Source power station i goes over one week average practical power output hourly.
In aforementioned step 3), carries out plus power output application judges, specific as follows:
31) work as t0Belong to [Ta,i,Ta,i+td] section when, if new energy power station t0Time instructions are greater than plus power output application reply Time instructions, return step 1), wait next round instruction issue continue to examine constantly the power station plus power output application;If new energy Power station t0Time instructions are less than plus power output application reply time instructions, then no longer add power output application to examine this, go to step It is rapid 5);
32) work as t0It is not belonging to [Ta,i,Ta,i+td] section when, in [Ta,i+td,t0] do not surpass in section by interval setting of Δ t M sampled point is crossed, the m sampled point new energy power station i average value contributed is regarded as to the practical power output of new energy power station i, if should Power generating value meets target application power output error bound constraint, then plus power output application is qualified, goes to step 5);If power generating value is discontented Foot-eye application power output error bound constraint, then plus power output application is unqualified, enters step 4);Target application is contributed in error Lower limit constraint is as follows:
Pb.i.0-ΔP≤Pa.i.0≤Pb.i.0+ΔP
Wherein, Pa.i.0For t0The practical power output of moment new energy power station i, Pb.i.0For t0Moment new energy power station i is locating to be added The target power output of power output application, Δ P are the allowable error of target power output.
In aforementioned step 4),
If the super generating flag bit of new energy power station i is 1, new energy power station i is forbidden in b hour following to propose plus contribute Application;
If the super generating flag bit of new energy power station i is 0, new energy power station i is forbidden in c hour following to propose plus contribute Application, wherein c < b.
B value above-mentioned is that 2, c value is 1.5.
By using above-mentioned technical proposal, the present invention achieves following technical effects:
The present invention realizes new energy power station power generation and adds the standard guidance of power output application, reduces new energy power station power output Deviation has ensured that new energy justice participates in marketing, promotes new energy consumption.
Detailed description of the invention
Fig. 1 is the flow chart of the method for the present invention.
Specific embodiment
The invention will be further described below.Following embodiment is only used for clearly illustrating technical side of the invention Case, and not intended to limit the protection scope of the present invention.
The present invention provides the real-time real power control method of new energy power station of a kind of application of consideration malice and super generating punishment, substantially Principle is: that new energy power station is examined under active real-time distribution adds power output application examination and super generating situation, to the examination period Interior active power output is unable to reach plus power output applies for target and the new energy power station of certain time is kept to carry out malice application punishment, right Examining super generating electricity in the period is more than that the new energy power station of different limits carries out corresponding malice super generating punishment, to realize new energy electricity It stands and generates electricity and add the standard guidance contributed and applied, reduce new energy power station output deviation, guarantee new energy justice participates in market friendship Easily, promote new energy consumption.
Referring to Fig. 1, the method for the present invention the specific implementation process is as follows:
Step 1: setting present instruction and issue constantly as t0, judge t0Moment is to need to carry out or do not need to carry out malice Shen At the time of please examination with super generating, in new energy power station, malice application is with certain examination period with super generating appraisal standards Moment;If current time t0At the time of examination to need to carry out malice application with super generating, then t is initialized0Moment new energy power station i Super generating flag bit be 0, enter step 2;Otherwise continue to judge current time t0Until current time t0To need to carry out malice Shen At the time of please examination with super generating, 2 are entered step;
Step 2: obtaining new energy power station i super generating from external system and count initial time Tb,iAnd [Tb,i,t0] in section The practical power output of new energy power station i and the real-time command curve of new energy power station i, calculate the power station in [Tb,i,t0] in section Power and super generating should be issued and utilize hourageSuch as formula (1), according toLocating section carries out super generating punishment to new energy power station i.
Wherein, Pa,i(t) the practical power output for being t moment new energy power station i, Ps,i(t) answering for t moment new energy power station i Issue power, Pprep,i(t) real-time command for being t moment new energy power station i, Pe,iFor the rated capacity of new energy power station i.
If 1)Equal to 0, is punished without super generating, enter step 3;
If 2)Greater than 0 and it is less than real-time super generating threshold valueIt counts the nearly n month super generating in the power station and utilizes hour Number Nhis,i, judgementWhether " history-real-time " comprehensive super generating threshold value is less thanWherein λ is that history super generating is examined Core coefficient, λ belong to section [0,1], can use 0.8.IfIt is less thanThe super generating flag bit that the power station is arranged is 1, Enter step 3;IfIt is more than or equal toAdjusting the instruction upper limit in a hours new energy power station i future is Pmax,i (such as formula (2)-(3)), and forbid its application that proposes plus contribute in a hours, empty the N in the power stationhis,i, go to step 5;
Wherein, C is new energy power station set, Pa.i(t0) it is t0The real-time power output of moment new energy power station i, Lgrid(t0) be t0Moment the whole network Rate of average load, Pe,iFor the rated capacity of new energy power station i, τ is super generating penalty coefficient, may be configured as 0.5.
If 3)Threshold value is punished more than or equal to super generatingRecordWith current time t0It executes and opens as punishment Begin moment Te, with the prediction power output P of new energy power station ifo,i(t) on the basis of, computational theory power generation electricity reaches super generating punishment electricity Ep,iRequired time forbids the power station to generate electricity during this period of time, then goes to step 5, and the calculating of super generating Penalty time is as follows:
Wherein, Ep,iElectricity is punished for the super generating of new energy power station i, is equal to the hair that the power station goes over average one day one week Electricity, tp,iFor corresponding super generating Penalty time,For past one week of new energy power station i average practical power output hourly.
Step 3: reading new energy power station i from external system and add power output application reply moment Ta,iAnd the time instructions, if plus Power output application examination delay is td, judge t0Whether [T is belonged toa,i,Ta,i+td] section,
1) work as t0Belong to [Ta,i,Ta,i+td] section when, if new energy power station t0Time instructions are greater than plus power output application reply Time instructions, return step 1, wait next round instruction issue continue to examine constantly the power station plus power output application;If new energy Power station t0Time instructions are less than plus power output application reply time instructions, then no longer add power output application to examine this, go to step Rapid 5;
2) work as t0It is not belonging to [Ta,i,Ta,i+td] section when, in [Ta,i+td,t0] do not surpass in section by interval setting of Δ t M sampled point is crossed, the m sampled point new energy power station i average value contributed is regarded as to the practical power output of new energy power station i, if should Power generating value meets target application power output error bound constraint (such as formula (5)), then plus power output application is qualified, goes to step 5;If should Power generating value is discontented with foot-eye application power output error bound constraint, then plus power output application is unqualified, enters step 4;
Pb.i.0-ΔP≤Pa.i.0≤Pb.i.0+ΔP (5)
Wherein, Pa.i.0For t0The practical power output of moment new energy power station i, Pb.i.0For t0Moment new energy power station i is locating to be added The target power output of power output application, Δ P are the allowable error of target power output.
Step 4: the value of the super generating flag bit of new energy power station i is read and compares,
If 1) the super generating flag bit of new energy power station i is 1, new energy power station i is forbidden in b hour following to propose plus out Power application, b may be configured as 2;
2) if the super generating flag bit of new energy power station i is 0, (c < b) forbids new energy power station i to mention in c hours following Out plus power output application, c may be configured as 1.5.
Step 5: each new energy power station instruction is calculated and issued using existing linear programming algorithm, terminates this method.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, without departing from the technical principles of the invention, several improvement and deformations can also be made, these improvement and deformations Also it should be regarded as protection scope of the present invention.

Claims (6)

1. considering the real-time real power control method of new energy power station of malice application with super generating punishment, which is characterized in that including following Step:
1) present instruction is set to issue constantly as t0, judge t0Moment is to need to carry out or do not need to carry out malice application and super generating At the time of examination;If current time t0At the time of examination to need to carry out malice application with super generating, then t is initialized0Moment new energy The super generating flag bit of power station i is 0, is entered step 2);Otherwise continue judgement until current time t0To need to carry out malice application At the time of examination with super generating, enter step 2);
2) it obtains new energy power station i super generating and counts initial time Tb,iAnd [Tb,i,t0] reality of new energy power station i goes out in section The real-time command curve of power and new energy power station i calculates the power station in [Tb,i,t0] in section should issue power and super generating utilizes HourageAccording toLocating section carries out super generating punishment to new energy power station i, if carrying out super generating punishment, is transferred to step 3), if punishing without super generating, it is transferred to step 5);It calculates as follows:
Wherein, Pa,i(t) the practical power output for being t moment new energy power station i, Ps,i(t) should issue for t moment new energy power station i Power, Pprep,i(t) real-time command for being t moment new energy power station i, Pe,iFor the rated capacity of new energy power station i;
3) it reads new energy power station i and adds power output application reply moment Ta,iAnd the time instructions, if plus power output application examination delay be td, judge t0Whether [T is belonged toa,i,Ta,i+td] section, according to t0Value interval, carry out plus power output application judgement, if plus go out Power application is qualified, then is transferred to step 5), if plus power output application it is unqualified, be transferred to step 4);
4) value for reading and comparing the super generating flag bit of new energy power station i, propose according to super generating flag bit plus contribute application;
5) it is calculated using linear programming algorithm and issues each new energy power station instruction.
2. the real-time real power control method of new energy power station of the application of consideration malice and super generating punishment according to claim 1, It is characterized in that, be configured at the time of malice application is examined with super generating by certain examination period in the step 1).
3. the real-time real power control method of new energy power station of the application of consideration malice and super generating punishment according to claim 1, It is characterized in that, in the step 2), according toLocating section carries out super generating punishment to new energy power station i, including following several Situation:
If 21)Equal to 0, punishes, entered step 3) without super generating;
If 22)Greater than 0 and it is less than real-time super generating threshold valueIt counts the nearly n month super generating in the power station and utilizes hourage Nhis,i, judgementWhether " history-real-time " comprehensive super generating threshold value is less thanIfIt is less thanThe super generating flag bit that the new energy power station is arranged is 1, is entered step 3);IfIt is more than or equal toAdjustment The instruction upper limit in a hours i future of new energy power station is Pmax,i, and forbid its application that proposes plus contribute in a hours, empty this The N in power stationhis,i, go to step 5);It calculates as follows:
Wherein, C is new energy power station set, Pa.i(t0) it is t0The real-time power output of moment new energy power station i, Lgrid(t0) it is t0When Carve the whole network Rate of average load, Pe,iFor the rated capacity of new energy power station i, τ is super generating penalty coefficient, and λ is history super generating examination system Number;
If 23)Threshold value is punished more than or equal to super generatingRecordWith current time t0When executing beginning as punishment Carve Te, with the prediction power output P of new energy power station ifo,i(t) on the basis of, computational theory power generation electricity reaches super generating punishment electricity Ep,i Required super generating Penalty time, forbids the power station to generate electricity during this period of time, then goes to step 5, the calculating of super generating Penalty time It is as follows:
Wherein, Ep,iElectricity, t are punished for the super generating of new energy power station ip,iFor corresponding super generating Penalty time,For new energy electricity The i that stands goes over one week average practical power output hourly.
4. the real-time real power control method of new energy power station of the application of consideration malice and super generating punishment according to claim 1, It is characterized in that, carry out in the step 3) plus power output application judges, it is specific as follows:
31) work as t0Belong to [Ta,i,Ta,i+td] section when, if new energy power station t0Time instructions are greater than plus the power output application reply moment Instruction, return step 1), wait next round instruction issue continue to examine constantly the power station plus power output application;If new energy power station t0Time instructions are less than plus power output application reply time instructions, then no longer add power output application to examine this, go to step 5);
32) work as t0It is not belonging to [Ta,i,Ta,i+td] section when, in [Ta,i+td,t0] it using Δ t is that interval setting is no more than m in section The m sampled point new energy power station i average value contributed is regarded as the practical power output of new energy power station i, if the power generating value by sampled point Meet target application power output error bound constraint, then plus power output application is qualified, goes to step 5);If power generating value is discontented with foot-eye Application power output error bound constraint, then plus power output application is unqualified, enters step 4);Target application contributes error bound about Beam is as follows:
Pb.i.0-ΔP≤Pa.i.0≤Pb.i.0+ΔP
Wherein, Pa.i.0For t0The practical power output of moment new energy power station i, Pb.i.0For t0Moment new energy power station i is locating plus contributes The target of application is contributed, and Δ P is the allowable error of target power output.
5. the real-time real power control method of new energy power station of the application of consideration malice and super generating punishment according to claim 1, It is characterized in that, in the step 4),
If the super generating flag bit of new energy power station i is 1, new energy power station i is forbidden in b hour following to propose plus contribute Shen Please;
If the super generating flag bit of new energy power station i is 0, new energy power station i is forbidden in c hour following to propose plus contribute Shen Please, wherein c < b.
6. the real-time real power control method of new energy power station of the application of consideration malice and super generating punishment according to claim 5, It is characterized in that, it is 1.5 that the b value, which is 2, c value,.
CN201811343627.1A 2018-11-13 2018-11-13 New energy power station real-time active control method considering malicious application and excessive punishment Active CN109193816B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811343627.1A CN109193816B (en) 2018-11-13 2018-11-13 New energy power station real-time active control method considering malicious application and excessive punishment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811343627.1A CN109193816B (en) 2018-11-13 2018-11-13 New energy power station real-time active control method considering malicious application and excessive punishment

Publications (2)

Publication Number Publication Date
CN109193816A true CN109193816A (en) 2019-01-11
CN109193816B CN109193816B (en) 2021-12-17

Family

ID=64939333

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811343627.1A Active CN109193816B (en) 2018-11-13 2018-11-13 New energy power station real-time active control method considering malicious application and excessive punishment

Country Status (1)

Country Link
CN (1) CN109193816B (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101917023A (en) * 2010-09-01 2010-12-15 国网电力科学研究院 Automatic control method of wind electric active power for wind farm monitoring system
CN102510093A (en) * 2011-12-19 2012-06-20 国网电力科学研究院 Wind power field active power control method based on power forecasting information
CN102780236A (en) * 2012-08-11 2012-11-14 山东大学 Active optimal control system of wind and light storage combined power generation system and method
CN103219751A (en) * 2013-05-08 2013-07-24 东南大学 Control method of active power of clustered wind power plants
CN103248050A (en) * 2013-05-22 2013-08-14 山东大学 Competition game-based cooperative wind power ramp control system and competition game-based cooperative wind power ramp control method
CN104037816A (en) * 2014-06-19 2014-09-10 清华大学 Calculation method for maximum output of wind-solar hybrid power generation in multi-source generation combined operation mode
CN105978031A (en) * 2016-07-06 2016-09-28 国网宁夏电力公司石嘴山供电公司 Method and system for conducting active and reactive coordinated control on photovoltaic device
CN105978041A (en) * 2016-03-23 2016-09-28 三重型能源装备有限公司 Active power control method for wind power station configured with marker post draught fans
CN106655279A (en) * 2016-08-03 2017-05-10 国电南瑞科技股份有限公司 Power plant grid-connection active power real time control method taking electric quantity transaction plan into consideration
CN107196349A (en) * 2017-05-04 2017-09-22 国电南瑞科技股份有限公司 A kind of new energy real power control method of Electricity Market electricity power transaction
CN107947244A (en) * 2017-09-12 2018-04-20 国电南瑞科技股份有限公司 The grid-connected power controls in advance method of new energy power station

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101917023A (en) * 2010-09-01 2010-12-15 国网电力科学研究院 Automatic control method of wind electric active power for wind farm monitoring system
CN102510093A (en) * 2011-12-19 2012-06-20 国网电力科学研究院 Wind power field active power control method based on power forecasting information
CN102780236A (en) * 2012-08-11 2012-11-14 山东大学 Active optimal control system of wind and light storage combined power generation system and method
CN103219751A (en) * 2013-05-08 2013-07-24 东南大学 Control method of active power of clustered wind power plants
CN103248050A (en) * 2013-05-22 2013-08-14 山东大学 Competition game-based cooperative wind power ramp control system and competition game-based cooperative wind power ramp control method
CN104037816A (en) * 2014-06-19 2014-09-10 清华大学 Calculation method for maximum output of wind-solar hybrid power generation in multi-source generation combined operation mode
CN105978041A (en) * 2016-03-23 2016-09-28 三重型能源装备有限公司 Active power control method for wind power station configured with marker post draught fans
CN105978031A (en) * 2016-07-06 2016-09-28 国网宁夏电力公司石嘴山供电公司 Method and system for conducting active and reactive coordinated control on photovoltaic device
CN106655279A (en) * 2016-08-03 2017-05-10 国电南瑞科技股份有限公司 Power plant grid-connection active power real time control method taking electric quantity transaction plan into consideration
CN107196349A (en) * 2017-05-04 2017-09-22 国电南瑞科技股份有限公司 A kind of new energy real power control method of Electricity Market electricity power transaction
CN107947244A (en) * 2017-09-12 2018-04-20 国电南瑞科技股份有限公司 The grid-connected power controls in advance method of new energy power station

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
于昌海,等: "适应发电权交易的可再生能源有功控制策略", 《电力系统自动化》 *
林俐,等: "风电集群有功功率控制及其策略", 《电力系统自动化》 *

Also Published As

Publication number Publication date
CN109193816B (en) 2021-12-17

Similar Documents

Publication Publication Date Title
Zhang et al. An optimal dispatch model for virtual power plant that incorporates carbon trading and green certificate trading
Revesz et al. Managing the future of the electricity grid
US20190228481A1 (en) Intelligent energy management system for distributed energy resources and energy storage systems using machine learning
He et al. Modeling the merit order curve of the European energy exchange power market in Germany
CN106374536A (en) Low-carbon power supply investment decision-making method of power capacity market under new energy access condition
Yuanyuan et al. Distributionally robust comprehensive declaration strategy of virtual power plant participating in the power market considering flexible ramping product and uncertainties
Li et al. A scheduling framework for VPP considering multiple uncertainties and flexible resources
Xu et al. Pricing method of shared energy storage bias insurance service based on large number theorem
CN109193816A (en) Consider the real-time real power control method of new energy power station of malice application with super generating punishment
CN105932711A (en) Evaluation, measurement and calculation method for wind power generation-load real-time coordination of curtailed wind power accommodation
CN110929978A (en) Electric power market risk assessment method and system
Petrou et al. Customer-led operation of residential storage for the provision of energy services
CN115619483A (en) Virtual power plant retail settlement method considering medium-long term and peak regulation market connection
CN113239315A (en) Method for evaluating bidding effect of hydropower participation electric power spot market
Sperstad et al. Probabilistic socio-economic cost assessment integrating power market and reliability analysis
Wang et al. Optimal allocation of customer energy storage based on power big data and improved LSTM load forecasting
Liu Research on Grid‐Connected Optimal Operation Mode between Renewable Energy Cluster and Shared Energy Storage on Power Supply Side
Lavillotti et al. DER Energy & Capacity Market Design
CN109146257A (en) A kind of microgrid schedulability modeling method and evaluation method based on entropy
Sun et al. Prediction-based EV-PV coordination strategy for charging stations using reinforcement learning
Manoharan et al. Improved Social Welfare through Market Event Compensation for Distributed Energy Resources
Wang et al. Optimal capacity planning for heat storage in thermal power plant to accommodate wind power
Qi et al. Market Interaction Model of Demand-Side Adjustable Resources Based on Aggregator
Zhang et al. Mutual conversion mechanisms for environmental interest products to jointly enhance synergistic effect between power, CET and TGC markets in China
Hui et al. The study of spot electricity trading in view of big dispatching mode and market monitoring measurements

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant