CN109191701A - Electric power metering method, system and server - Google Patents

Electric power metering method, system and server Download PDF

Info

Publication number
CN109191701A
CN109191701A CN201811057381.1A CN201811057381A CN109191701A CN 109191701 A CN109191701 A CN 109191701A CN 201811057381 A CN201811057381 A CN 201811057381A CN 109191701 A CN109191701 A CN 109191701A
Authority
CN
China
Prior art keywords
electricity consumption
terminal device
predeterminable area
time
target
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811057381.1A
Other languages
Chinese (zh)
Other versions
CN109191701B (en
Inventor
郭威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd
State Grid Hebei Energy Technology Service Co Ltd
Marketing Service Center of State Grid Hebei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd
State Grid Hebei Energy Technology Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd, State Grid Hebei Energy Technology Service Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201811057381.1A priority Critical patent/CN109191701B/en
Publication of CN109191701A publication Critical patent/CN109191701A/en
Application granted granted Critical
Publication of CN109191701B publication Critical patent/CN109191701B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07FCOIN-FREED OR LIKE APPARATUS
    • G07F15/00Coin-freed apparatus with meter-controlled dispensing of liquid, gas or electricity
    • G07F15/12Coin-freed apparatus with meter-controlled dispensing of liquid, gas or electricity in which metering is on a time basis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q20/00Payment architectures, schemes or protocols
    • G06Q20/08Payment architectures
    • G06Q20/14Payment architectures specially adapted for billing systems
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Accounting & Taxation (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • General Business, Economics & Management (AREA)
  • Finance (AREA)
  • Health & Medical Sciences (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Water Supply & Treatment (AREA)
  • Public Health (AREA)
  • Primary Health Care (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The present invention is suitable for field of measuring techniques, discloses a kind of electric power metering method, system and server, comprising: receives the power information for the intelligent power equipment that the corresponding terminal device of each user in predeterminable area is sent;The electricity consumption of each user within a preset time in predeterminable area is determined according to power information, and stores electricity consumption sequentially in time;Electricity consumption is broadcasted into each terminal device in notice predeterminable area, electricity consumption is used to indicate each terminal device in predeterminable area and stores electricity consumption sequentially in time.The present invention can solve problem wrong due to electric-power metering caused by artificially modifying ammeter record in the prior art, it can be realized each terminal device and server and store electricity consumption all in accordance with time sequencing, even if user modifies the electricity consumption of its corresponding terminal device storage, server can also guarantee the accuracy of the electricity consumption of the user by the information that the information and other terminal devices of oneself storage store.

Description

Electric power metering method, system and server
Technical field
The invention belongs to field of measuring techniques more particularly to a kind of electric power metering methods, system and server.
Background technique
It is continuously increased with social and household electricity load, requirement of the power customer to power supply reliability is also constantly mentioning It is high.
Currently, electric-power metering mainly passes through the electricity usage situation that ammeter records each power consumer, pass through manual metering Or ammeter it is automatic on offer the electricity consumption situation for obtaining each power consumer.But since power consumer can not be prevented artificially Ammeter record is modified, ammeter misregister is be easy to cause, causes electric-power metering wrong.
Summary of the invention
In view of this, the embodiment of the invention provides a kind of electric power metering method, system and server, to solve existing skill Due to artificially modifying the problem that electric-power metering is wrong caused by ammeter records in art.
The first aspect of the embodiment of the present invention provides a kind of electric power metering method, comprising:
Receive the power information for the intelligent power equipment that the corresponding terminal device of each user in predeterminable area is sent;
The electricity consumption of each user within a preset time in predeterminable area is determined according to power information, and suitable according to the time Sequence stores electricity consumption;
Electricity consumption is broadcasted into each terminal device in notice predeterminable area, electricity consumption is used to indicate every in predeterminable area A terminal device stores electricity consumption sequentially in time.
The second aspect of the embodiment of the present invention provides a kind of electric power metering system, comprising:
Power information receiving module, the intelligence sent for receiving the corresponding terminal device of each user in predeterminable area The power information of electrical equipment;
Electricity consumption determining module, for determining each user in predeterminable area within a preset time according to power information Electricity consumption, and electricity consumption is stored sequentially in time;
Electricity consumption broadcast module, for electricity consumption to be broadcasted to each terminal device in notice predeterminable area, electricity consumption is used Electricity consumption is stored sequentially in time in each terminal device in instruction predeterminable area.
The third aspect of the embodiment of the present invention provides a kind of server, including memory, processor and is stored in In reservoir and the computer program that can run on a processor, processor are realized as described in relation to the first aspect when executing computer program Electric power metering method the step of.
The fourth aspect of the embodiment of the present invention provides a kind of computer readable storage medium, computer readable storage medium It is stored with computer program, kilowatt meter as described in relation to the first aspect is realized when computer program is executed by one or more processors The step of amount method.
Existing beneficial effect is the embodiment of the present invention compared with prior art: the embodiment of the present invention receives preset areas first The power information for the intelligent power equipment that the corresponding terminal device of each user in domain is sent, then determines according to power information The electricity consumption of each user within a preset time in predeterminable area, and electricity consumption is stored sequentially in time, finally by electricity consumption Amount broadcast notice predeterminable area in each terminal device, electricity consumption be used to indicate each terminal device in predeterminable area according to Time sequencing stores electricity consumption, the use for the intelligent power equipment that the embodiment of the present invention is sent automatically by each terminal device of reception Power information calculates the electricity consumption of each user within a preset time by power information, and broadcasts all ends in notification area End equipment saves the electricity consumption, can be realized each terminal device and server all in accordance with time sequencing and stores electricity consumption, even if User modifies the electricity consumption of its corresponding terminal device storage, and server can also pass through the information and other terminals of oneself storage The information of equipment storage guarantees the accuracy of the electricity consumption of the user.
Detailed description of the invention
It to describe the technical solutions in the embodiments of the present invention more clearly, below will be to embodiment or description of the prior art Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description is only of the invention some Embodiment for those of ordinary skill in the art without any creative labor, can also be according to these Attached drawing obtains other attached drawings.
Fig. 1 is the implementation process schematic diagram for the electric power metering method that one embodiment of the invention provides;
Fig. 2 be another embodiment of the present invention provides electric power metering method implementation process schematic diagram;
Fig. 3 is the implementation process schematic diagram for the electric power metering method that further embodiment of this invention provides;
Fig. 4 is the schematic block diagram for the electric power metering system that one embodiment of the invention provides;
Fig. 5 is the schematic block diagram for the server that one embodiment of the invention provides.
Specific embodiment
In being described below, for illustration and not for limitation, the tool of such as particular system structure, technology etc is proposed Body details, so as to provide a thorough understanding of the present application embodiment.However, it will be clear to one skilled in the art that there is no these specific The application also may be implemented in the other embodiments of details.In other situations, it omits to well-known system, device, electricity The detailed description of road and method, so as not to obscure the description of the present application with unnecessary details.
In order to illustrate technical solutions according to the invention, the following is a description of specific embodiments.
Fig. 1 is the implementation process schematic diagram for the electric power metering method that one embodiment of the invention provides, for ease of description, only Show part related to the embodiment of the present invention.The executing subject of the embodiment of the present invention can be server.As shown in Figure 1, This method may comprise steps of:
Step S101: the use for the intelligent power equipment that the corresponding terminal device of each user in predeterminable area is sent is received Power information.
Wherein, server divides region according to certain rules in advance, that is, presets which user belongs to the same area. For example, the user that same cell can be set belongs to the same area.User refers to power consumer, can distinguish difference with user number User, each user has a corresponding terminal device, and terminal device can store information and processing sequentially in time Information etc..
Each user can have multiple intelligent power equipment, and intelligent power equipment, which refers to, can automatically record itself electricity consumption The electrical equipment of information.For example, intelligent power equipment may include detection module, detection module is used to detect intelligent power equipment Start time, shut-in time and electricity consumption duration etc..The intelligent power equipment that each user has can be corresponding with the user Terminal device be communicatively coupled, the terminal device can be sent in real time by the power information of record, which can To store the power information sequentially in time, and by the power information broadcast each terminal device in notice predeterminable area and After server, each terminal device and server receive the power information, the power information is stored sequentially in time.
Terminal device and server all possess timestamp, timestamp when storing information sequentially in time every time automatically It can be detail time when storage information, when terminal device and server modify the information of itself storage, after saving modification Information can also possess timestamp, i.e. modification time, the random modification information of user can be prevented in this way by being arranged.
In embodiments of the present invention, server receives the intelligence that the corresponding terminal device of each user in predeterminable area is sent The power information of energy electrical equipment, and the power information is stored sequentially in time.Wherein, the corresponding terminal of each user is set The power information for the intelligent power equipment that preparation is sent can be the power information of multiple intelligent power equipment.Intelligent power equipment Power information may include starting the electricity consumption time and terminating the electricity consumption time, or, starting electricity consumption time and electricity consumption duration.
Step S102: determining the electricity consumption of each user within a preset time in predeterminable area according to power information, and Electricity consumption is stored sequentially in time.
In embodiments of the present invention, the facility information after the audit of all intelligent power equipment is prestored in server is examined Facility information after core may include the letters such as device identification, device model, device class, family number belonging to rated power and equipment Breath.
Server can determine the corresponding intelligent power equipment of each user within a preset time according to the power information Electricity consumption time span, which obtains the intelligent power equipment multiplied by the rated power of the intelligent power equipment and exists The summation of electricity consumption in preset time, the electricity consumption of the corresponding intelligent power equipment of each user within a preset time is each The electricity consumption of user within a preset time.Wherein, preset time can be set according to the actual situation, for example, can be set For some moon.
Server stores each user sequentially in time and exists after determining the electricity consumption of each user within a preset time Electricity consumption in preset time possesses timestamp, that is, the time stored when storing electricity consumption.
Step S103: electricity consumption is broadcasted into each terminal device in notice predeterminable area, electricity consumption is used to indicate default Each terminal device in region stores electricity consumption sequentially in time.
In embodiments of the present invention, electricity consumption broadcast notice predeterminable area of the server by each user within a preset time Interior each terminal device, each terminal device are pressed after receiving the electricity consumption of each user within a preset time The electricity consumption of each user within a preset time is stored according to time sequencing.
The electricity consumption of each user within a preset time can also be sent respectively to each user corresponding end by server End equipment, terminal device stores the electricity consumption after receiving electricity consumption sequentially in time, and the electricity consumption is broadcasted and is led to Each terminal device in predeterminable area is known, so that each terminal device stores the electricity consumption sequentially in time.That is server The electricity consumption of user A within a preset time is sent to the corresponding terminal device of user A, the corresponding terminal device of user A according to Time sequencing stores the electricity consumption, and the electricity consumption is broadcasted each terminal device in notice predeterminable area, so that each end End equipment stores the electricity consumption sequentially in time.
Seen from the above description, the intelligent power equipment that the embodiment of the present invention is sent automatically by receiving each terminal device Power information, the electricity consumption of each user within a preset time is calculated by power information, and broadcast the institute in notification area There is terminal device to save the electricity consumption, can be realized each terminal device and server all in accordance with time sequencing and store electricity consumption, Even if user modifies the electricity consumption of its corresponding terminal device storage, server can also be by the information of oneself storage and other The information of terminal device storage guarantees the accuracy of the electricity consumption of the user, may be implemented server and each terminal device it Between supervise mutually, improve electricity consumption statistical accuracy, and the use of counting user can be realized without ammeter in the embodiment of the present invention Electricity.
Fig. 2 be another embodiment of the present invention provides electric power metering method implementation process schematic diagram.As shown in Fig. 2, On the basis of above-described embodiment, after step s 103, can with the following steps are included:
Step S201: the electricity consumption error message that target terminal equipment is sent is received, electricity consumption error message includes target Each terminal device in electricity consumption and predeterminable area is to the judgement of target electricity consumption as a result, target terminal equipment is predeterminable area Any one in interior terminal device.
In embodiments of the present invention, the terminal device for sending electricity consumption error message is known as target terminal equipment, target Terminal device can be any one in the terminal device in predeterminable area;The electricity consumption mistake that target terminal equipment is sent The electricity consumption for including in information is known as target electricity consumption.
Each user can check the use of the intelligent power equipment of each user in its affiliated area by terminal device The electricity consumption of facility information and each user within a preset time after power information and audit, and can be according to each user Intelligent power equipment power information and the facility information after audit judge that the electricity consumption of each user within a preset time is It is no accurate.
When the corresponding user of target terminal equipment has found target electricity consumption mistake, target electricity consumption can be broadcasted and be notified Each terminal device in predeterminable area;Each terminal device in predeterminable area after receiving target electricity consumption, according to The power information of the corresponding intelligent power equipment of the target electricity consumption that each terminal device prestores and the facility information after audit are sentenced Whether disconnected target electricity consumption is implicitly present in mistake, and will determine that result is sent to target terminal equipment;Target terminal equipment receives After the judgement result sent to each terminal device, each terminal device in target electricity consumption and predeterminable area uses target The judgement result (i.e. electricity consumption error message) of electricity is sent to server;Server receives the electricity consumption that target terminal equipment is sent Measure error message.
Step S202: according to judgement as a result, judging whether that the terminal device confirmation target electricity consumption more than preset ratio has Accidentally.
Server is after the electricity consumption error message for receiving the transmission of target terminal equipment, according to each of in predeterminable area Terminal device is to the judgement of the target electricity consumption as a result, judging whether that the terminal device confirmation target for having more than preset ratio is used Electricity is wrong.Preset ratio can be arranged according to the actual situation, such as can be set to 50%, 60% or 80% etc..It is more than Preset ratio refers to that the quantity of the wrong terminal device of confirmation target electricity consumption accounts for the total quantity of the terminal device in predeterminable area Ratio be more than preset ratio.
Step S203: if wrong more than the terminal device of preset ratio confirmation target electricity consumption, according to target electricity consumption Whether corresponding power information confirmation target electricity consumption is wrong.
If wrong more than the terminal device of preset ratio confirmation target electricity consumption, according to the corresponding user of target electricity consumption The terminal device power information of intelligent power equipment sent and the audit of the intelligent power equipment prestored after equipment letter Whether breath confirmation target electricity consumption is wrong.
If the terminal device confirmation target electricity consumption for being less than preset ratio is wrong, and target electricity consumption broadcast notice is pre- If each terminal device in region, so that whether each terminal device to reaffirm target electricity consumption wrong, if there are still ends Whether end equipment confirms that target electricity consumption is wrong, then had according to the corresponding power information confirmation target electricity consumption of target electricity consumption Accidentally.
Step S204: if wrong according to the corresponding power information confirmation target electricity consumption of target electricity consumption, target is modified Electricity consumption obtains modified target electricity consumption, and stores modified target electricity consumption sequentially in time.
In embodiments of the present invention, if server confirmation target electricity consumption is wrong, target electricity consumption is modified, is modified Target electricity consumption afterwards, and modified target electricity consumption is stored sequentially in time.
If server confirms that target electricity consumption is errorless, target electricity consumption is broadcasted into each terminal in notice predeterminable area Equipment, so that each terminal device reaffirms whether target electricity consumption is wrong, if there are still terminal devices to confirm target electricity consumption It measures wrong, then applies for that manpower intervention is confirmed.
Step S205: modified target electricity consumption is broadcasted into each terminal device in notice predeterminable area, after modification Target electricity consumption be used to indicate each terminal device in predeterminable area and store modified target electricity consumption sequentially in time Amount.
In embodiments of the present invention, modified target electricity consumption is broadcasted each end in notice predeterminable area by server End equipment, each terminal device in predeterminable area are deposited sequentially in time after receiving modified target electricity consumption Store up modified target electricity consumption.
Seen from the above description, the embodiment of the present invention can be by supervising mutually, to protect between server and terminal device Demonstrate,prove the accuracy of electricity consumption.
As further embodiment of this invention, in the intelligence for receiving the corresponding terminal device transmission of each user in predeterminable area After the power information of energy electrical equipment, further includes:
The supply load of each user in predeterminable area is determined according to power information, and storage power supply sequentially in time Load;
Supply load is broadcasted into each terminal device in notice predeterminable area, supply load is used to indicate in predeterminable area Each terminal device store supply load sequentially in time.
In embodiments of the present invention, server can determine the corresponding intelligent power of current each user according to power information Equipment whether in electricity consumption, can by current each user it is corresponding just the rated power of the intelligent power equipment of electricity consumption respectively into Row summation obtains the supply load of each user, and stores supply load sequentially in time.Power supply company can be according to power supply Load is powered.
The supply load of each user can be broadcasted each terminal device in notice predeterminable area, preset areas by server Each terminal device in domain stores sequentially in time after receiving the supply load of each user of server transmission The supply load of each user.
Fig. 3 is the implementation process schematic diagram for the electric power metering method that further embodiment of this invention provides.As shown in figure 3, On the basis of above-described embodiment, before step S101, can with the following steps are included:
Step S301: the facility information for the intelligent power equipment that receiving terminal apparatus is sent, and whether judge facility information It is wrong.
In embodiments of the present invention, the facility information of corresponding intelligent power equipment is sent service by terminal device Device;The facility information of the intelligent power equipment of each model of each type is prestored in server, it can be according to the intelligence prestored The facility information of electrical equipment judges whether the facility information for the intelligent power equipment that terminal device is sent is wrong.Wherein, terminal The facility information for the intelligent power equipment that equipment is sent may include: belonging to device model, device class, rated power and equipment The information such as family number.
Step S302: if it is determined that facility information is errorless, then it is intelligent power equipment generating device mark, device identification is added It is added in facility information, the facility information after being audited, and the facility information after storage audit sequentially in time.
Specifically, if server determines that the facility information for the intelligent power equipment that terminal device is sent is errorless, for the intelligence Energy electrical equipment generating device mark, and device identification is added in the facility information of the intelligent power equipment, it is audited Facility information afterwards, and the facility information after storage audit sequentially in time.Wherein, device identification can be since 1 according to Secondary incremental natural number.
If server determines that the facility information for the intelligent power equipment that terminal device is sent is wrong, the equipment of mistake is believed Breath sends back terminal device, so that the facility information of terminal device modification mistake, and clothes are sent by modified facility information Business device, is audited again, until the facility information for the intelligent power equipment that confirmation terminal device is sent is errorless.
Step S303: by each terminal device in the facility information broadcast notice predeterminable area after audit, after audit Facility information is used to indicate each terminal device in predeterminable area and stores the facility information after audit sequentially in time.
In embodiments of the present invention, the facility information broadcast after audit is notified each terminal in predeterminable area by server Equipment, each terminal device in predeterminable area is after receiving the facility information after audit, storage audit sequentially in time Facility information afterwards.
Server only can also send corresponding terminal device for the device identification of generation, and corresponding terminal device is connecing After receiving device identification, device identification is added in the facility information of corresponding intelligent power equipment, setting after being audited Standby information, and by each terminal device in the facility information broadcast notice predeterminable area after audit, so that in predeterminable area Each terminal device stores the facility information after audit sequentially in time.
Seen from the above description, being stored with each user in each terminal device in server and predeterminable area has Intelligent power equipment audit after facility information.
As further embodiment of this invention, facility information includes the rated power of intelligent power equipment;
And sequentially in time storage audit after facility information after, further includes:
Predeterminable area is determined according to the rated power of the corresponding intelligent power equipment of all terminal devices in predeterminable area Total supply load, and store total supply load sequentially in time.
Total supply load is broadcasted into each terminal device in notice predeterminable area, total supply load is used to indicate in default Each terminal device store total supply load sequentially in time.
In embodiments of the present invention, server sets the corresponding all intelligent powers of all terminal devices in predeterminable area Standby rated power is summed, and obtains total supply load of predeterminable area, and store total supply load sequentially in time.Clothes Total supply load is broadcasted each terminal device in notice predeterminable area by business device, and each terminal device in predeterminable area is connecing After receiving total supply load, total supply load is stored sequentially in time.Power supply company can be supplied according to total supply load Electricity.
Seen from the above description, server and each terminal device are stored with the power supply of total supply load and each user Load, in the case where intelligent power equipment is constant, total supply load is also constant, if the supply load of some user is more than The rated power summation of its corresponding intelligent power equipment, then other users may just will appear the not enough situation of electricity, because This, each terminal device can be according to the facility information after the audit of the corresponding intelligent power equipment of each terminal device of storage Real-time oversight is carried out to the supply load of each user, prevents above situation, simultaneously, it can be ensured that each reporting of user The accuracy of the information of intelligent power equipment.
Fig. 4 be one embodiment of the invention provide electric power metering system schematic block diagram, for ease of description, only show with The relevant part of the embodiment of the present invention.
In embodiments of the present invention, electric power metering system 4 includes:
Power information receiving module 41, the intelligence sent for receiving the corresponding terminal device of each user in predeterminable area The power information of energy electrical equipment;
Electricity consumption determining module 42, for determining each user in predeterminable area within a preset time according to power information Electricity consumption, and store electricity consumption sequentially in time;
Electricity consumption broadcast module 43, for electricity consumption to be broadcasted to each terminal device in notice predeterminable area, electricity consumption The each terminal device being used to indicate in predeterminable area stores electricity consumption sequentially in time.
Optionally, electric power metering system 4 further include:
Error message receiving module, for receiving the electricity consumption error message of target terminal equipment transmission, electricity consumption mistake Information include each terminal device in target electricity consumption and predeterminable area to the judgement of target electricity consumption as a result, target terminal is set Any one in the standby terminal device in predeterminable area;
First judgment module, for according to determine as a result, judge whether more than preset ratio terminal device confirm target Electricity consumption is wrong;
Confirmation module is used if the terminal device confirmation target electricity consumption for being more than preset ratio is wrong according to target Whether the corresponding power information confirmation target electricity consumption of electricity is wrong;
Modified module, if being modified for wrong according to the corresponding power information confirmation target electricity consumption of target electricity consumption Target electricity consumption obtains modified target electricity consumption, and stores modified target electricity consumption sequentially in time;
Broadcast module is modified, is set for modified target electricity consumption to be broadcasted each terminal in notice predeterminable area It is standby, modified target electricity consumption be used to indicate each terminal device in predeterminable area store sequentially in time it is modified Target electricity consumption.
Optionally, electric power metering system 4 further include:
Supply load determining module, for determining the supply load of each user in predeterminable area according to power information, And supply load is stored sequentially in time;
Supply load broadcast module, for supply load to be broadcasted to each terminal device in notice predeterminable area, power supply Load is used to indicate each terminal device in predeterminable area and stores supply load sequentially in time.
Optionally, electric power metering system 4 further include:
Facility information receiving module for the facility information for the intelligent power equipment that receiving terminal apparatus is sent, and judges Whether facility information is wrong;
Device identification generation module, is used for if it is determined that facility information is errorless, then is intelligent power equipment generating device mark, Device identification is added in facility information, the facility information after being audited, and setting after storage audit sequentially in time Standby information;
Facility information broadcast module, for setting each terminal in the facility information broadcast notice predeterminable area after audit Standby, the facility information after audit is used to indicate each terminal device in predeterminable area and stores setting after auditing sequentially in time Standby information.
Optionally, facility information includes the rated power of intelligent power equipment;
Electric power metering system 4 further include:
Total supply load determining module, for according to the corresponding intelligent power equipment of all terminal devices in predeterminable area Rated power determine total supply load of predeterminable area, and store total supply load sequentially in time;
Total supply load broadcast module, for total supply load to be broadcasted to each terminal device in notice predeterminable area, Total supply load is used to indicate each terminal device in presetting and stores total supply load sequentially in time.
It is apparent to those skilled in the art that for convenience of description and succinctly, only with above-mentioned each function Can unit, module division progress for example, in practical application, can according to need and by above-mentioned function distribution by different Functional unit, module are completed, i.e., the internal structure of the electric power metering system is divided into different functional unit or module, with Complete all or part of function described above.Each functional unit in embodiment, module can integrate single in a processing In member, it is also possible to each unit and physically exists alone, can also be integrated in one unit with two or more units, on It states integrated unit both and can take the form of hardware realization, can also realize in the form of software functional units.In addition, each Functional unit, module specific name be also only for convenience of distinguishing each other, the protection scope being not intended to limit this application.On The specific work process for stating unit in device, module, can refer to corresponding processes in the foregoing method embodiment, no longer superfluous herein It states.
Fig. 5 is the schematic block diagram for the server that one embodiment of the invention provides.As shown in figure 5, the server 5 of the embodiment Include: one or more processors 50, memory 51 and is stored in the memory 51 and can be on the processor 50 The computer program 52 of operation.The processor 50 realizes above-mentioned each electric power metering method when executing the computer program 52 Step in embodiment, such as step S101 to S103 shown in FIG. 1.Alternatively, the processor 50 executes the computer journey The function of each module/unit in above-mentioned electric power metering system embodiment, such as the function of module 41 to 43 shown in Fig. 4 are realized when sequence 52 Energy.
Illustratively, the computer program 52 can be divided into one or more module/units, it is one or Multiple module/units are stored in the memory 51, and are executed by the processor 50, to complete the application.Described one A or multiple module/units can be the series of computation machine program instruction section that can complete specific function, which is used for Implementation procedure of the computer program 52 in the server 5 is described.For example, the computer program 52 can be divided At power information receiving module, electricity consumption determining module and electricity consumption broadcast module, the concrete function of modules is as follows:
Power information receiving module, the intelligence sent for receiving the corresponding terminal device of each user in predeterminable area The power information of electrical equipment;
Electricity consumption determining module, for determining each user in predeterminable area within a preset time according to power information Electricity consumption, and electricity consumption is stored sequentially in time;
Electricity consumption broadcast module, for electricity consumption to be broadcasted to each terminal device in notice predeterminable area, electricity consumption is used Electricity consumption is stored sequentially in time in each terminal device in instruction predeterminable area.
Other modules or unit can refer to the description in embodiment shown in Fig. 4, and details are not described herein.
The server can be desktop PC, notebook, palm PC and cloud server etc. and calculate equipment.Institute It states server 5 and includes but are not limited to processor 50, memory 51.It will be understood by those skilled in the art that Fig. 5 is only to service One example of device, does not constitute the restriction to server 5, may include than illustrating more or fewer components, or combination Certain components or different components, such as the server 5 can also be set including input equipment, output equipment, network insertion Standby, bus etc..
The processor 50 can be central processing unit (Central Processing Unit, CPU), can also be Other general processors, digital signal processor (Digital Signal Processor, DSP), specific integrated circuit (Application Specific Integrated Circuit, ASIC), field programmable gate array (Field- Programmable Gate Array, FPGA) either other programmable logic device, discrete gate or transistor logic, Discrete hardware components etc..General processor can be microprocessor or the processor is also possible to any conventional processor Deng.
The memory 51 can be the internal storage unit of the server, such as the hard disk or memory of server.Institute The plug-in type hard disk being equipped on the External memory equipment that memory 51 is also possible to the server, such as the server is stated, Intelligent memory card (Smart Media Card, SMC), secure digital (Secure Digital, SD) card, flash card (Flash Card) etc..Further, the memory 51 can also both include the internal storage unit of server or set including external storage It is standby.The memory 51 is for other programs and data needed for storing the computer program 52 and the server.Institute Stating memory 51 can be also used for temporarily storing the data that has exported or will export.
In the above-described embodiments, it all emphasizes particularly on different fields to the description of each embodiment, is not described in detail or remembers in some embodiment The part of load may refer to the associated description of other embodiments.
Those of ordinary skill in the art may be aware that list described in conjunction with the examples disclosed in the embodiments of the present disclosure Member and algorithm steps can be realized with the combination of electronic hardware or computer software and electronic hardware.These functions are actually It is implemented in hardware or software, the specific application and design constraint depending on technical solution.Professional technician Each specific application can be used different methods to achieve the described function, but this realization is it is not considered that exceed Scope of the present application.
In embodiment provided herein, it should be understood that disclosed electric power metering system and method, Ke Yitong Other modes are crossed to realize.For example, electric power metering system embodiment described above is only schematical, for example, described The division of module or unit, only a kind of logical function partition, there may be another division manner in actual implementation, such as more A unit or assembly can be combined or can be integrated into another system, or some features can be ignored or not executed.It is another Point, shown or discussed mutual coupling or direct-coupling or communication connection can be through some interfaces, device or The INDIRECT COUPLING or communication connection of unit can be electrical property, mechanical or other forms.
The unit as illustrated by the separation member may or may not be physically separated, aobvious as unit The component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multiple In network unit.It can select some or all of unit therein according to the actual needs to realize the mesh of this embodiment scheme 's.
It, can also be in addition, each functional unit in each embodiment of the application can integrate in one processing unit It is that each unit physically exists alone, can also be integrated in one unit with two or more units.Above-mentioned integrated list Member both can take the form of hardware realization, can also realize in the form of software functional units.
If the integrated module/unit be realized in the form of SFU software functional unit and as independent product sale or In use, can store in a computer readable storage medium.Based on this understanding, the application realizes above-mentioned implementation All or part of the process in example method, can also instruct relevant hardware to complete, the meter by computer program Calculation machine program can be stored in a computer readable storage medium, the computer program when being executed by processor, it can be achieved that on The step of stating each embodiment of the method.Wherein, the computer program includes computer program code, the computer program generation Code can be source code form, object identification code form, executable file or certain intermediate forms etc..The computer-readable medium It may include: any entity or device, recording medium, USB flash disk, mobile hard disk, magnetic that can carry the computer program code Dish, CD, computer storage, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium etc..It should be noted that described The content that computer-readable medium includes can carry out increasing appropriate according to the requirement made laws in jurisdiction with patent practice Subtract, such as in certain jurisdictions, according to legislation and patent practice, computer-readable medium do not include be electric carrier signal and Telecommunication signal.
Embodiment described above is only to illustrate the technical solution of the application, rather than its limitations;Although referring to aforementioned reality Example is applied the application is described in detail, those skilled in the art should understand that: it still can be to aforementioned each Technical solution documented by embodiment is modified or equivalent replacement of some of the technical features;And these are modified Or replacement, the spirit and scope of each embodiment technical solution of the application that it does not separate the essence of the corresponding technical solution should all Comprising within the scope of protection of this application.

Claims (10)

1. a kind of electric power metering method characterized by comprising
Receive the power information for the intelligent power equipment that the corresponding terminal device of each user in predeterminable area is sent;
Determine the electricity consumption of each user within a preset time in the predeterminable area according to the power information, and according to when Between electricity consumption described in sequential storage;
Electricity consumption broadcast is notified into each terminal device in the predeterminable area, the electricity consumption is used to indicate described pre- If each terminal device in region stores the electricity consumption sequentially in time.
2. electric power metering method according to claim 1, which is characterized in that the electricity consumption is broadcasted notice institute described After stating each terminal device in predeterminable area, further includes:
The electricity consumption error message that target terminal equipment is sent is received, the electricity consumption error message includes target electricity consumption and institute Each terminal device in predeterminable area is stated to the judgement of the target electricity consumption as a result, the target terminal equipment is described pre- If any one in the terminal device in region;
Determined according to described as a result, judging whether to confirm that the target electricity consumption is wrong more than the terminal device of preset ratio;
It is corresponding according to the target electricity consumption if confirming that the target electricity consumption is wrong more than the terminal device of preset ratio Power information confirms whether the target electricity consumption is wrong;
If confirming that the target electricity consumption is wrong according to the corresponding power information of the target electricity consumption, modifies the target and use Electricity obtains modified target electricity consumption, and stores the modified target electricity consumption sequentially in time;
The modified target electricity consumption broadcast is notified into each terminal device in the predeterminable area, it is described modified Target electricity consumption is used to indicate each terminal device in the predeterminable area and stores the modified mesh sequentially in time Mark electricity consumption.
3. electric power metering method according to claim 1, which is characterized in that each use in the reception predeterminable area After the power information for the intelligent power equipment that the corresponding terminal device in family is sent, further includes:
The supply load of each user in the predeterminable area is determined according to the power information, and is stored sequentially in time The supply load;
Each terminal device in the predeterminable area, the supply load is notified to be used to indicate institute supply load broadcast The each terminal device stated in predeterminable area stores the supply load sequentially in time.
4. electric power metering method according to claim 1, which is characterized in that each use in the reception predeterminable area Before the power information for the intelligent power equipment that the corresponding terminal device in family is sent, further includes:
The facility information for the intelligent power equipment that receiving terminal apparatus is sent, and judge whether the facility information is wrong;
If it is determined that the facility information is errorless, then it is intelligent power equipment generating device mark, the device identification is added It is added in the facility information, the facility information after being audited, and stores the letter of the equipment after the audit sequentially in time Breath;
Facility information broadcast after the audit is notified into each terminal device in the predeterminable area, setting after the audit Standby information is used to indicate each terminal device in the predeterminable area and stores the letter of the equipment after the audit sequentially in time Breath.
5. electric power metering method according to claim 4, which is characterized in that the facility information includes intelligent power equipment Rated power;
Described and store after the facility information after the audit sequentially in time, further includes:
It is determined according to the rated power of the corresponding intelligent power equipment of all terminal devices in the predeterminable area described default Total supply load in region, and total supply load is stored sequentially in time;
Total supply load broadcast is notified into each terminal device in the predeterminable area, total supply load is for referring to Show that each terminal device in described preset stores total supply load sequentially in time.
6. a kind of electric power metering system characterized by comprising
Power information receiving module, the intelligent power sent for receiving the corresponding terminal device of each user in predeterminable area The power information of equipment;
Electricity consumption determining module, for determining each user in the predeterminable area in preset time according to the power information Interior electricity consumption, and the electricity consumption is stored sequentially in time;
Electricity consumption broadcast module, it is described for electricity consumption broadcast to be notified each terminal device in the predeterminable area Electricity consumption is used to indicate each terminal device in the predeterminable area and stores the electricity consumption sequentially in time.
7. electric power metering system according to claim 6, which is characterized in that further include:
Error message receiving module, for receiving the electricity consumption error message of target terminal equipment transmission, the electricity consumption mistake Information include each terminal device in target electricity consumption and the predeterminable area to the judgement of the target electricity consumption as a result, institute Target terminal equipment is stated as any one in the terminal device in the predeterminable area;
First judgment module, for being determined according to described as a result, judging whether described in the terminal device confirmation more than preset ratio Target electricity consumption is wrong;
Confirmation module, if for being more than that the terminal device of preset ratio confirms that the target electricity consumption is wrong, according to the mesh Mark the corresponding power information of electricity consumption confirms whether the target electricity consumption is wrong;
Modified module, if for confirming that the target electricity consumption is wrong according to the corresponding power information of the target electricity consumption, The target electricity consumption is modified, modified target electricity consumption is obtained, and stores the modified target sequentially in time Electricity consumption;
Broadcast module is modified, for the modified target electricity consumption broadcast to be notified each terminal in the predeterminable area Equipment, the modified target electricity consumption are used to indicate each terminal device in the predeterminable area and deposit sequentially in time Store up the modified target electricity consumption.
8. electric power metering system according to claim 6, which is characterized in that further include:
Supply load determining module, the power supply for determining each user in the predeterminable area according to the power information are negative Lotus, and the supply load is stored sequentially in time;
Supply load broadcast module, for supply load broadcast to be notified each terminal device in the predeterminable area, The supply load is used to indicate each terminal device in the predeterminable area and stores the supply load sequentially in time.
9. a kind of server, including memory, processor and storage can transport in the memory and on the processor Capable computer program, which is characterized in that the processor realizes such as claim 1 to 5 times when executing the computer program The step of one electric power metering method.
10. a kind of computer readable storage medium, which is characterized in that the computer-readable recording medium storage has computer journey Sequence realizes the electric-power metering as described in any one of claim 1 to 5 when the computer program is executed by one or more processors The step of method.
CN201811057381.1A 2018-09-11 2018-09-11 Power metering method, system and server Active CN109191701B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811057381.1A CN109191701B (en) 2018-09-11 2018-09-11 Power metering method, system and server

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811057381.1A CN109191701B (en) 2018-09-11 2018-09-11 Power metering method, system and server

Publications (2)

Publication Number Publication Date
CN109191701A true CN109191701A (en) 2019-01-11
CN109191701B CN109191701B (en) 2020-12-08

Family

ID=64910141

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811057381.1A Active CN109191701B (en) 2018-09-11 2018-09-11 Power metering method, system and server

Country Status (1)

Country Link
CN (1) CN109191701B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115021395A (en) * 2022-04-07 2022-09-06 南方电网数字电网研究院有限公司 Method and device for processing electricity utilization information, intelligent ammeter and storage medium

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2727847Y (en) * 2004-06-09 2005-09-21 李世学 Intelligent power supplying and electricity stolen proofing network management system
JP2006060355A (en) * 2004-08-18 2006-03-02 Matsushita Electric Ind Co Ltd Update system and method for equipment program
CN201910962U (en) * 2011-01-07 2011-07-27 蒋正坤 Lighting control device for auxiliary device of high-speed railway
CN103954816A (en) * 2014-04-30 2014-07-30 国网上海市电力公司 Inelegant remote anti-electricity-stealing inspection method
CN203871698U (en) * 2014-06-16 2014-10-08 许昌学院 Electric energy control device
CN204177865U (en) * 2014-11-25 2015-02-25 国家电网公司 A kind of electricity-measuring meter with earth leakage detection functions
CN104868326A (en) * 2015-05-28 2015-08-26 深圳华淩科技有限公司 Smart socket system for monitoring and controlling load electric appliances and control method thereof
CN107577152A (en) * 2017-08-30 2018-01-12 苏州麦喆思科电子有限公司 A kind of smart home power consumption control system based on civil power
CN107919706A (en) * 2017-11-27 2018-04-17 江阴长仪集团有限公司 The wireless interconnected charging pile and cell phone application charge control method of a kind of intelligent control

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2727847Y (en) * 2004-06-09 2005-09-21 李世学 Intelligent power supplying and electricity stolen proofing network management system
JP2006060355A (en) * 2004-08-18 2006-03-02 Matsushita Electric Ind Co Ltd Update system and method for equipment program
CN201910962U (en) * 2011-01-07 2011-07-27 蒋正坤 Lighting control device for auxiliary device of high-speed railway
CN103954816A (en) * 2014-04-30 2014-07-30 国网上海市电力公司 Inelegant remote anti-electricity-stealing inspection method
CN203871698U (en) * 2014-06-16 2014-10-08 许昌学院 Electric energy control device
CN204177865U (en) * 2014-11-25 2015-02-25 国家电网公司 A kind of electricity-measuring meter with earth leakage detection functions
CN104868326A (en) * 2015-05-28 2015-08-26 深圳华淩科技有限公司 Smart socket system for monitoring and controlling load electric appliances and control method thereof
CN107577152A (en) * 2017-08-30 2018-01-12 苏州麦喆思科电子有限公司 A kind of smart home power consumption control system based on civil power
CN107919706A (en) * 2017-11-27 2018-04-17 江阴长仪集团有限公司 The wireless interconnected charging pile and cell phone application charge control method of a kind of intelligent control

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115021395A (en) * 2022-04-07 2022-09-06 南方电网数字电网研究院有限公司 Method and device for processing electricity utilization information, intelligent ammeter and storage medium

Also Published As

Publication number Publication date
CN109191701B (en) 2020-12-08

Similar Documents

Publication Publication Date Title
CN108445438A (en) The detection method and device of false wiring of electric energy metering equipment
CN109800250A (en) The monitoring method and exploitation for energy information management system of garden energy information
CN106597901B (en) Distributed Integration managing power consumption and analysis method and system based on cloud service
CN104407189A (en) Electricity stealing prevention system and method for distribution transformer
CN108181546A (en) Localization method, positioning device and the terminal device of distribution network failure
CN109064104A (en) Material equipment management method, system and terminal device
CN101520919B (en) Public electricity utilization management system
CN116231633A (en) Method, device, equipment and storage medium for monitoring carbon emission of power distribution network
CN114839433A (en) Electricity stealing behavior determining method and device and electronic equipment
CN107886252A (en) Electricity electricity charge review method, system and terminal device
CN117097768B (en) Intelligent ammeter secure communication transmission system and method based on big data
CN109191701A (en) Electric power metering method, system and server
Azad‐Farsani et al. Stochastic locational marginal price calculation in distribution systems using game theory and point estimate method
CN116613894B (en) Method and device for processing electricity consumption data
CN103680106A (en) Intelligent air switch system
CN108416634A (en) Digital asset forming method, forms equipment and storage medium at forming apparatus
CN109063926A (en) Plan generated energy determines method, system and terminal device in period
CN115333089A (en) Method for analyzing electric power quota according to meter information database of intelligent electric meter
CN110059971A (en) Energy monitoring management method and device
CN109901551A (en) Information acquisition method, information acquisition device and the terminal device of industrial control equipment
CN109450044A (en) Charging pile electric energy management method and system
CN108846706A (en) Offline businesses' promotion method, device and server
CN114330914A (en) Building carbon emission management method, system and device
CN115225982A (en) Data transmission method and device of distributed energy transaction system
CN113313614A (en) Property fee payment management method, system, electronic equipment and medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210927

Address after: 050021 No. 238 South Sports street, Hebei, Shijiazhuang

Patentee after: STATE GRID HEBEI ELECTRIC POWER Research Institute

Patentee after: Marketing service center of State Grid Hebei Electric Power Co.,Ltd.

Patentee after: STATE GRID CORPORATION OF CHINA

Patentee after: STATE GRID HEBEI ENERGY TECHNOLOGY SERVICE Co.,Ltd.

Address before: 050011 no.238, TIYU South Street, Yuhua District, Shijiazhuang City, Hebei Province

Patentee before: STATE GRID HEBEI ELECTRIC POWER Research Institute

Patentee before: STATE GRID CORPORATION OF CHINA

Patentee before: STATE GRID HEBEI ENERGY TECHNOLOGY SERVICE Co.,Ltd.