Summary of the invention
It is an object of the invention to overcome shield tail silt cleaning in the double-shielded TBM constructing tunnel in the presence of the prior art
It is manually operation, labor intensive and material resources are more, and the above-mentioned deficiency that effect is slower, provide one kind and quickly clean double shields
The construction method of TBM shield tail silt.
In order to achieve the above-mentioned object of the invention, the present invention provides following technical schemes:
A kind of construction method quickly cleaning double-shielded TBM shield tail silt, comprising the following steps:
A, the depth of shield tail silt and the water surface is measured, installation silt cleaning plant is prepared, the cleaning plant includes leading firmly
Pipe and snorkel, one end of the snorkel are connected to the fibre conduit tube wall, and the other end of the snorkel is for being connected to
Air compressor machine, the relatively described fibre conduit of the snorkel is obliquely installed, relative to the snorkel inclined direction on the fibre conduit
The other end for connecting silt transfer container;
B, by the other end connection of the snorkel and the air compressor machine;
C, the cleaning plant is put into shield tail silt and water for clearance, and the fibre conduit and the snorkel
Junction is totally submerged in underwater, and the snorkel inclined direction is towards shield bottom;
D, the other end on the fibre conduit relative to the snorkel inclined direction is connected to the transfer container;
E, start the ventilation of air compressor, gas enters the fibre conduit by the snorkel, is located at the fibre conduit
It is discharged with the silt and water of upper bit with gas with the snorkel junction, it is locally true to form segment in the fibre conduit
Sky, silt and water in shield tail are squeezed into the fibre conduit under the action of gas impact in external atmosphere pressure and in managing, and pass through
The fibre conduit is gradually discharged to the transfer container.
Using a kind of construction method for quickly cleaning double-shielded TBM shield tail silt of the present invention, cleaning plant is put
Enter in shield tail silt and water for clearance, it is ensured that fibre conduit and snorkel junction are totally submerged in underwater, and snorkel inclines
Tilted direction is arranged with the silt and water of upper bit with gas towards shield bottom, ventilation of air compressor positioned at fibre conduit and snorkel junction
Out, segment parital vacuum is formed in fibre conduit, air pressure, which reduces, even if there is the tonifying Qi of air compressor machine, in fibre conduit is less than ambient atmosphere
Pressure, silt and water in shield tail are squeezed into fibre conduit under the action of external atmosphere pressure and gas are impacted, and by fibre conduit by
Step is discharged, and completes the clear water work husky clearly of double-shielded TBM shield tail, and the construction method step is simple, easy to operate, is worked well,
Manual labor is significantly reduced, silt cleaning efficiency is improved, the mud being also applied in the tunnel of other way excavation
Sand cleaning, the cleaning of municipal wastewater well etc., society is beneficial to high efficiency.
Preferably, after executing the step E, remaining mud is defeated by manual work after absorbing cleaning by the cleaning plant
It is sent to the transfer container.
Preferably, after executing the step E, silt is transported by the transfer container to discharge outside Tunnel.
Preferably, the cleaning plant further includes air hose, and one end of the air hose connects the snorkel, institute
The other end for stating air hose connects the air compressor machine.
Preferably, the air hose is rubber hose.
Preferably, pneumatic control valve is equipped between the snorkel and the air compressor machine.
Preferably, the cleaning plant further includes defeated mud hose and inhales mud hose, and one end of the defeated mud hose connects institute
The other end on fibre conduit relative to the snorkel inclined direction is stated, the other end of the defeated mud hose is for connecting described turn
Container is transported, described one end for inhaling mud hose connects one end that the snorkel inclined direction is corresponded on the fibre conduit, the suction
The other end of mud hose is for drawing shield tail silt.
Preferably, the defeated mud hose and the suction mud hose are rubber hose.
Preferably, after executing the step A, check that the fibre conduit both ends are separately connected the defeated mud hose and the suction
The tightness of mud hose, it is ensured that it is air tight, then execute the step B.
Preferably, the fibre conduit and the snorkel are metal tube.
Preferably, the fibre conduit and the snorkel are steel pipe, and the snorkel is welded in the fibre conduit.
Preferably, the fibre conduit and the snorkel are integrally formed component.
Preferably, the tilt angle of the relatively described fibre conduit of the snorkel is 10 ° -80 °.
Preferably, the tilt angle of the relatively described fibre conduit of the snorkel is 30 ° -60 °.
Using this structure setting, be conducive to gas in snorkel and be directed into fibre conduit, is unlikely to angle too atmospheric
Loss is big, drive the component of silt small or angle is too small is inconvenient to the problems such as implementing operation.
In conclusion by adopting the above-described technical solution, the beneficial effects of the present invention are:
1, with a kind of construction method for quickly cleaning double-shielded TBM shield tail silt of the present invention, by cleaning plant
It is put into shield tail silt and water for clearance, it is ensured that fibre conduit and snorkel junction are totally submerged in underwater, and snorkel
Inclined direction is towards shield bottom, ventilation of air compressor, positioned at fibre conduit and snorkel junction with the silt and water of upper bit with gas
Discharge forms segment parital vacuum in fibre conduit, even if there is the tonifying Qi of air compressor machine, air pressure reduces big less than extraneous in fibre conduit
Air pressure, silt and water in shield tail are squeezed into fibre conduit under the action of external atmosphere pressure and gas are impacted, and pass through fibre conduit
It is gradually discharged, completes the clear water work husky clearly of double-shielded TBM shield tail, the construction method step is simple, and easy to operate, effect is good
It is good, manual labor is significantly reduced, silt cleaning efficiency is improved, is also applied in the tunnel of other way excavation
Silt cleaning, the cleaning of municipal wastewater well etc., society is beneficial to high efficiency;
2, with a kind of construction method for quickly cleaning double-shielded TBM shield tail silt of the present invention, the snorkel
The tilt angle of the relatively described fibre conduit is 30 ° -60 °, using this structure setting, is conducive to gas in snorkel and is directed into
Fibre conduit, is unlikely to that angle too atmosphere bulk diffusion is big, drive the component of silt small or angle is too small be inconvenient to implement to operate etc.
Problem.
Embodiment
As shown in Figure 1, a kind of construction method for quickly cleaning double-shielded TBM shield tail silt of the present invention, including with
Lower step:
A, the depth of shield tail silt and the water surface is measured, installation silt cleaning plant is prepared, the cleaning plant includes leading firmly
Pipe 1, snorkel 2, air hose 4, defeated mud hose 5 and suction mud hose 6, one end of the snorkel 2 is connected to the fibre conduit 1
Tube wall, one end of the air hose 4 connect the snorkel 2, and the other end of the air hose 4 connects the air compressor machine 3,
Pneumatic control valve is equipped between the air hose 4 and the air compressor machine 3, the relatively described fibre conduit 1 of the snorkel 2 tilts
30 ° of settings, one end of the defeated mud hose 5 connects on the fibre conduit 1 relative to the another of 2 inclined direction of snorkel
End, for connecting silt transfer container 7, one end connection for inhaling mud hose 6 is described to be led the other end of the defeated mud hose 5 firmly
One end of 2 inclined direction of snorkel is corresponded on pipe 1, the other end for inhaling mud hose 6 is for drawing shield tail silt;
B, check that 1 both ends of fibre conduit are separately connected the defeated mud hose 5 and the tightness for inhaling mud hose 6, really
It protects air tight;
C, by the other end connection of the snorkel 2 and the air compressor machine 3;
D, the cleaning plant is put into shield tail silt and water for clearance, and the fibre conduit 1 and the snorkel 2
Junction be totally submerged in underwater, and 2 inclined direction of the snorkel is towards shield bottom;
E, the other end on the fibre conduit 1 relative to 2 inclined direction of snorkel is connected to the transfer container
7;
F, start the air compressor machine 3 to ventilate, gas enters the fibre conduit 1 by the snorkel 2, leads firmly positioned at described
Pipe 1 and 2 junction of the snorkel are discharged with the silt and water of upper bit with gas, and segment office is formed in the fibre conduit 1
Portion's vacuum, silt and water in shield tail are squeezed into the fibre conduit 1 under the action of gas impact in external atmosphere pressure and in managing, and
The transfer container 7 is gradually discharged to by the fibre conduit 1;
G, the transfer container 7 is transported to by manual work by remaining mud after cleaning plant absorption cleaning;
H, silt is transported by the transfer container 7 to discharge outside Tunnel.
As a preferred embodiment of the present embodiment, the fibre conduit 1 is length 1200mm, wall thickness 3.5mm, outer diameter
The steel pipe of 600mm, the snorkel 2 are 3/4 cun of the steel pipe of length 200mm, and the snorkel 2 is welded in the fibre conduit 1,
The air hose 4, the defeated mud hose 5 and the suction mud hose 6 are rubber hose.
With a kind of construction method for quickly cleaning double-shielded TBM shield tail silt of the present invention, which is put into
In shield tail silt and water for clearance, it is ensured that fibre conduit 1 and 2 junction of snorkel are totally submerged in underwater, and snorkel 2 inclines
Tilted direction is towards shield bottom, and air compressor machine 3 is ventilated, positioned at fibre conduit 1 and 2 junction of snorkel with the silt and water of upper bit with gas
Discharge forms segment parital vacuum in fibre conduit 1, even if there is the tonifying Qi of air compressor machine 3, air pressure is reduced less than outer in fibre conduit 1
Boundary's atmospheric pressure, silt and water in shield tail are squeezed into fibre conduit 1 under the action of external atmosphere pressure and gas are impacted, and by hard
Conduit 1 is gradually discharged, and completes the clear water work husky clearly of double-shielded TBM shield tail, and snorkel 2 is with respect to the tilt angle of fibre conduit 1
30 °, be conducive to gas in snorkel 2 and be directed into fibre conduit 1, is unlikely to point that angle too atmosphere bulk diffusion is big, drives silt
Power is small or angle is too small is inconvenient to the problems such as implementing operation, and the construction method step is simple, easy to operate, works well, greatly
Manual labor is alleviated greatly, improves silt cleaning efficiency, the silt being also applied in the tunnel of other way excavation
Cleaning, the cleaning of municipal wastewater well etc., society is beneficial to high efficiency.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention
Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.