CN109184641A - A kind of system and method that injection well injectability is improved based on bottom pressure telemetering - Google Patents

A kind of system and method that injection well injectability is improved based on bottom pressure telemetering Download PDF

Info

Publication number
CN109184641A
CN109184641A CN201811054875.4A CN201811054875A CN109184641A CN 109184641 A CN109184641 A CN 109184641A CN 201811054875 A CN201811054875 A CN 201811054875A CN 109184641 A CN109184641 A CN 109184641A
Authority
CN
China
Prior art keywords
bottom pressure
pressure data
well
ground
injection well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811054875.4A
Other languages
Chinese (zh)
Inventor
王全
康晓东
张健
王旭东
李强
陈冠中
未志杰
赵娟
石爻
何春百
刘玉洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Offshore Oil Corp CNOOC
CNOOC Research Institute Co Ltd
Original Assignee
China National Offshore Oil Corp CNOOC
CNOOC Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Offshore Oil Corp CNOOC, CNOOC Research Institute Co Ltd filed Critical China National Offshore Oil Corp CNOOC
Priority to CN201811054875.4A priority Critical patent/CN109184641A/en
Publication of CN109184641A publication Critical patent/CN109184641A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/01Devices for supporting measuring instruments on drill bits, pipes, rods or wirelines; Protecting measuring instruments in boreholes against heat, shock, pressure or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/06Measuring temperature or pressure
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/12Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling
    • E21B47/13Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling by electromagnetic energy, e.g. radio frequency

Landscapes

  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geophysics (AREA)
  • Remote Sensing (AREA)
  • Electromagnetism (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The present invention relates to a kind of system and method for improving injection well injectability based on bottom pressure telemetering, it is characterised in that: it includes the downhole system being arranged at the implanted layer position of underground and the ground system being arranged in outside injection-gathering well head.Downhole system is periodically monitored the bottom pressure data of injection well, and sends wireless pulse signals to ground system according to bottom pressure data;Ground system is decoded received wireless pulse signals to obtain actual bottom pressure data, and is adjusted according to well head injection rate of the bottom pressure data to injection well.The real-time monitoring of injection well bottom pressure may be implemented in the present invention, in the case where bottom pressure situation can be grasped in real time, it can be under the premise of guaranteeing that bottom pressure is no more than formation fracture pressure, the well head injection rate for more reasonably adjusting polymer solution, to effectively improve the injectability of injection well.

Description

A kind of system and method that injection well injectability is improved based on bottom pressure telemetering
Technical field
The invention belongs to oil field developments to exploit field, improve injection well note based on bottom pressure telemetering more particularly to one kind Enter the system and method for ability.
Background technique
Polymer flooding has been used widely in oil field development as a kind of important development scheme, and is achieved good Effect.The injectability of injection well is rational proration injection allocation, the important indicator for ensureing polymer flooding effect, how to improve injection well Injectability be important topic that researcher is paid close attention to all the time.Injectability is closely related with injection pressure, just In normal injection process, it is desirable that bottom pressure is not above formation fracture pressure, to eliminate risk of the stratum by pressure break, therefore well The monitoring of bottom pressure just becomes an important process.However, in practical mining site, due to the complexity of injection well shaft column, Shaft bottom is difficult the conventional pressure manometers for keeping tripping in rely on cable transmission signal for a long time, and bottom pressure monitoring data are deficient, practical past Injection rate is controlled toward according to the maximum wellhead pressure converted by formation fracture pressure along pit shaft.It controls by this method The problem of injection process it is clear that injection well because well head pressure height due to cause injection rate that injection allocation is not achieved the case where when have hair It is raw, and practical bottom pressure situation is unknown, due to being widely present of being lost along wellbore pressure and complexity, bottom pressure The degree close to formation fracture pressure may be reached far away, may objectively result in the loss of injectability.Thus cause Stratum energy cannot get timely and effective supplement, and polymer flooding effect also will certainly just be affected.
Summary of the invention
Injection well injectability is improved based on bottom pressure telemetering in view of the above-mentioned problems, the object of the present invention is to provide one kind System and method, which can carry out real-time monitoring to practical bottom pressure, and according to actual pressure data to injection well Injection rate is adjusted, and effectively improves the injectability of injection well.
To achieve the above object, the present invention takes following technical scheme: one kind improving injection well based on bottom pressure telemetering The system of injectability, it is characterised in that: it includes the downhole system being arranged at the implanted layer position of underground and is arranged in injection well Ground system outside well head.Downhole system is periodically monitored the bottom pressure data of injection well, and according to shaft bottom Pressure data sends wireless pulse signals to ground system;Ground system is decoded to obtain reality to received wireless pulse signals The bottom pressure data on border, and be adjusted according to well head injection rate of the bottom pressure data to injection well.
The downhole system includes underground central control system, pulse signal generator, pressure monitoring and controlling device and supplying cell;Institute It states the instruction that pressure monitoring and controlling device is sent according to the underground central control system and periodical acquisition is carried out to bottom pressure data, and will The bottom pressure data of acquisition are transmitted through the cable to the underground central control system;The underground central control system is according to receiving Bottom pressure data encoding controls the pulse signal generator and issues one group of pressure pulse corresponding with bottom pressure data Signal is to ground system, and the supplying cell is for powering to the downhole system.
The ground system includes ground central control system, pulsed signal device and monitoring interface, and the pulse signal connects It receives device and receives the pressure pulse signal that the downhole system uploads, and be transmitted through the cable to the ground central control system, it is described The pressure pulse signal received is reduced into bottom pressure data by ground central control system, and is shown in the monitoring interface.
The downhole system is integrated and connected on infusing poly- tubing string, at the implanted layer position of tubing string lower going-into-well bottom.
The well head that injection well to be monitored is arranged in the pulsed signal device is infused on poly- pipeline.
A method of injection well injectability is improved based on bottom pressure telemetering, it is characterised in that the following steps are included:
1) downhole system is installed: being filled underground central control system with pulse signal generator, pressure testing and controlling respectively by cable It sets to connect with supplying cell and integrate, and connect on infusing poly- tubing string, at the implanted layer position of tubing string lower going-into-well bottom;
2) ground system is installed: the setting of pulsed signal device being infused on poly- pipeline in well head, and passes through cable and ground Central control system connection, ground central control system are connect with monitoring interface;
3) monitoring time is preset then, downhole system is acquired bottom pressure, and generates and bottom pressure data phase Corresponding wireless pulse signals are sent to ground system;
4) ground system is decoded the wireless pulse signals received, obtains the practical bottom pressure number of injection well According to being adjusted according to the practical bottom pressure data to the well head injection rate of injection well;
5) acquisition of bottom pressure data, upload finish, and downhole system reenters dormant state;
6) next monitoring time then, circulating repetition step 3) -5), realize the real-time monitoring of the bottom pressure of injection well.
In the step 3), downhole system is acquired bottom pressure, and generates corresponding with bottom pressure data The method that wireless pulse signals are sent to ground system, comprising the following steps:
3.1) preset monitoring time then, underground central control system by dormant state to working condition, transmission Monitoring instruction to Pressure monitoring and controlling device;
3.2) pressure monitoring and controlling device Monitoring instruction based on the received, acquires the bottom pressure data of the implanted layer position, and lead to It crosses cable and bottom pressure data is transferred to underground central control system;
3.3) after underground central control system receives the bottom pressure data that pressure monitoring and controlling device acquires, according to set coding Bottom pressure data conversion at one group of instruction, and is sent an instruction to pulse signal generator by rule;
3.4) it after pulse signal generator receives the instruction that underground central control system is sent, issues according to instruction and is pressed with shaft bottom The corresponding pulse signal of force data, pulse signal transmit upwards.
In the step 4), ground system is decoded the wireless pulse signals received, obtains the reality of injection well Bottom pressure data, according to the method that the practical bottom pressure data are adjusted the well head injection rate of injection well, including with Lower step:
4.1) pulsed signal device receives the pressure pulse signal that downhole system transmission comes, and is transmitted to ground Central control system;
4.2) after ground central control system receives the pressure pulse signal that the transmission of pulsed signal device comes, by pressure pulse Signal decoded back is transferred to monitoring interface and shows at bottom pressure data;
4.3) according to bottom pressure data point reuse well head injection rate, to improve the injectability of the injection well.
The invention adopts the above technical scheme, which has the following advantages: 1, bottom pressure number may be implemented in the present invention According to wireless transmission, do not need the preset cable transmission signal of pit shaft, solve conventional pressure manometers due to shaft column complexity without Method keeps the problem at long-term lower going-into-well bottom, realizes the real-time monitoring of injection well bottom pressure.2, downhole system is with tubing string tripping in Shaft bottom does not need complex job, has saved time and construction cost, is a kind of advanced, direct, efficient raising injection well injection The method of ability.3, the present invention does not need the intensive upload of data since actual bottom pressure monitors, when need to only fix daily Between upload one group of pressure data (specific data uplink time, frequency is adjustable), remaining time downhole system in a dormant state, and And system uses long-endurance high energy supplying cell, and long-term (3-5) stable operation of downhole system may be implemented, be not required to Lower tubular column is frequently played, is not affected the normal production.The present invention can be widely applied in the monitoring of oilfield injection well bottom pressure.
Detailed description of the invention
Fig. 1 is the schematic diagram of bottom pressure telemetering wireless transmitting system of the present invention.
Specific embodiment
The present invention is described in detail below with reference to the accompanying drawings and embodiments.
As shown in Figure 1, a kind of system that injection well injectability is improved based on bottom pressure telemetering provided by the invention, Including the ground system 3 that the downhole system 2 at 1 underground implanted layer position of injection well is arranged in and is arranged in outside 1 well head of injection well. Downhole system 2 is periodically monitored the bottom pressure data of injection well, and obtains nothing according to bottom pressure data encoding Line pulse signal is sent to ground system 3;Ground system 3 is decoded received wireless pulse signals to obtain actual shaft bottom After pressure data, it is adjusted according to well head injection rate of the bottom pressure data to injection well 1.
Downhole system 2 includes underground central control system 21, pulse signal generator 22, pressure monitoring and controlling device 23 and supplying cell 24.Wherein, pressure monitoring and controlling device 23 carries out periodical acquisition to bottom pressure data according to the instruction of underground central control system 21, and The bottom pressure data of acquisition are transmitted through the cable to underground central control system 21;Underground central control system 21 is according to the well received Control wave generator 22 issues one group of pressure pulse letter corresponding with bottom pressure data after bottom pressure data encoding Number arrive ground system 3, supplying cell 24 be used for downhole system 2 power.
Ground system 3 includes ground central control system 31, pulsed signal device 32 and monitoring interface 33, pulsed signal Device 32 is used to receive the pressure pulse signal of downhole system upload, and is transmitted through the cable to ground central control system 31, in ground The pressure pulse signal received is reduced into bottom pressure data by control system 31, and is shown in monitoring interface 33.
As a preferred embodiment, downhole system 2 is integrated and connected on infusing poly- tubing string, enters with tubing string lower going-into-well rising pouring At layer position.
As a preferred embodiment, in ground system 3, the setting of pulsed signal device 32 infuses poly- pipeline in well head On.
As a preferred embodiment, supplying cell 24 uses long-endurance high energy supplying cell, downhole system It can long-term (3-5) stable operation.
According to the above-mentioned system for improving injection well injectability based on bottom pressure telemetering, the present invention also provides one kind to be based on The method of bottom pressure telemetering raising injection well injectability, comprising the following steps:
1) downhole system is installed: being surveyed underground central control system 21 with pulse signal generator 22, pressure respectively by cable It controls device 23 and the connection of supplying cell 24 is integrated, and connect on infusing poly- tubing string, at the implanted layer position of tubing string lower going-into-well bottom;
2) ground system is installed: the setting of pulsed signal device 32 being infused on poly- pipeline in well head, and passes through cable and ground Face central control system 31 connects, and ground central control system 31 is connect with monitoring interface 33;
3) monitoring time is preset then, downhole system 2 is acquired bottom pressure, and generates and bottom pressure data phase Corresponding wireless pulse signals are sent to ground system 3;
Bottom pressure monitors the intensive upload for not needing data, and the daily set time is only needed to upload one group of pressure data, tool Volume data acquisition, uplink time and frequency are controlled by the underground central control system 5 for being embedded with set control program, remaining time underground System is in a dormant state.Specifically, the following steps are included:
3.1) monitoring time is preset then, underground central control system 21 sends Monitoring instruction by dormant state to working condition To pressure monitoring and controlling device 23;
3.2) Monitoring instruction based on the received of pressure monitoring and controlling device 23, acquires the bottom pressure data of the implanted layer position, and Bottom pressure data are transferred to underground central control system 21 by cable;
3.3) after underground central control system 21 receives the bottom pressure data that pressure monitoring and controlling device 23 acquires, according to set Bottom pressure data conversion at one group of instruction, and is sent an instruction to pulse signal generator 22 by coding rule;
3.4) after pulse signal generator 22 receives the instruction that underground central control system 21 is sent, according to instruction sending and well The corresponding pulse signal of base pressure force data, pulse signal transmit upwards.
4) ground system 3 is decoded the wireless pulse signals received, obtains the practical bottom pressure number of injection well According to, the well head injection rate of injection well is adjusted according to the practical bottom pressure data, specifically includes the following steps:
4.1) pulsed signal device 32 receives the pressure pulse signal that downhole system transmission comes, and is transmitted to ground Face central control system 31;
4.2) ground central control system 31 receives the pressure pulse signal that the transmission of pulsed signal device 32 comes, according to set Decoding rule by pressure pulse signal decoded back at bottom pressure data, and be transferred to monitoring interface 33 display;
4.3) well head injection rate is reasonably adjusted according to bottom pressure data, to improve the injectability of the injection well.
5) acquisition of bottom pressure data, upload finish, and downhole system reenters dormant state.
6) next monitoring time then, circulating repetition step 3) -5), so that it may realize the bottom pressure of injection well again Real-time monitoring.
The various embodiments described above are merely to illustrate the present invention, wherein the structure of each component, connection type and manufacture craft etc. are all It can be varied, all equivalents and improvement carried out based on the technical solution of the present invention should not exclude Except protection scope of the present invention.

Claims (8)

1. a kind of system for improving injection well injectability based on bottom pressure telemetering, it is characterised in that: it includes being arranged in well Downhole system at lower implanted layer position and the ground system being arranged in outside injection-gathering well head.Downhole system is periodically poly- to note The bottom pressure data of well are monitored, and send wireless pulse signals to ground system according to bottom pressure data;Ground system System is decoded received wireless pulse signals to obtain actual bottom pressure data, and according to the bottom pressure data to note The well head injection rate of poly- well is adjusted.
2. a kind of system for improving injection well injectability based on bottom pressure telemetering as described in claim 1, feature exist In: the downhole system includes underground central control system, pulse signal generator, pressure monitoring and controlling device and supplying cell;The pressure The instruction that power measure and control device is sent according to the underground central control system carries out periodical acquisition to bottom pressure data, and will acquisition Bottom pressure data be transmitted through the cable to the underground central control system;The underground central control system is according to the shaft bottom received Pulse signal generator described in pressure data coding-control issues one group of pressure pulse signal corresponding with bottom pressure data To ground system, the supplying cell is used to power to the downhole system.
3. a kind of system for improving injection well injectability based on bottom pressure telemetering as described in claim 1, feature exist In: the ground system includes ground central control system, pulsed signal device and monitoring interface, and the pulsed signal device connects The pressure pulse signal that the downhole system uploads is received, and is transmitted through the cable to the ground central control system, in the ground The pressure pulse signal received is reduced into bottom pressure data by control system, and is shown in the monitoring interface.
4. a kind of system for improving injection well injectability based on bottom pressure telemetering as claimed in claim 2, feature exist In: downhole system is integrated and connected on infusing poly- tubing string, at the implanted layer position of tubing string lower going-into-well bottom.
5. a kind of system for improving injection well injectability based on bottom pressure telemetering as claimed in claim 3, feature exist In: the well head that injection well to be monitored is arranged in the pulsed signal device is infused on poly- pipeline.
6. it is a kind of using as described in any one of Claims 1 to 5 system based on bottom pressure telemetering improve injection well injection energy The method of power, it is characterised in that the following steps are included:
1) install downhole system: by cable by underground central control system respectively with pulse signal generator, pressure monitoring and controlling device and Supplying cell connection is integrated, and connects on infusing poly- tubing string, at the implanted layer position of tubing string lower going-into-well bottom;
2) ground system is installed: the setting of pulsed signal device being infused on poly- pipeline in well head, and by being controlled in cable and ground System connection, ground central control system are connect with monitoring interface;
3) monitoring time is preset then, downhole system is acquired bottom pressure, and generates corresponding with bottom pressure data Wireless pulse signals be sent to ground system;
4) ground system is decoded the wireless pulse signals received, obtains the practical bottom pressure data of injection well, root The well head injection rate of injection well is adjusted according to the practical bottom pressure data;
5) acquisition of bottom pressure data, upload finish, and downhole system reenters dormant state;
6) next monitoring time then, circulating repetition step 3) -5), realize the real-time monitoring of the bottom pressure of injection well.
7. a kind of method for improving injection well injectability based on bottom pressure telemetering as claimed in claim 6, feature exist In: in the step 3), downhole system is acquired bottom pressure, and generates wireless arteries and veins corresponding with bottom pressure data Rush the method that signal is sent to ground system, comprising the following steps:
3.1) monitoring time is preset then, underground central control system sends Monitoring instruction to pressure by dormant state to working condition Measure and control device;
3.2) pressure monitoring and controlling device Monitoring instruction based on the received, acquires the bottom pressure data of the implanted layer position, and pass through electricity Bottom pressure data are transferred to underground central control system by cable;
3.3) after underground central control system receives the bottom pressure data that pressure monitoring and controlling device acquires, according to set coding rule By bottom pressure data conversion at one group of instruction, and send an instruction to pulse signal generator;
3.4) it after pulse signal generator receives the instruction that underground central control system is sent, is issued and bottom pressure number according to instruction According to corresponding pulse signal, pulse signal transmits upwards.
8. a kind of method for improving injection well injectability based on bottom pressure telemetering as claimed in claim 6, feature exist In: in the step 4), ground system is decoded the wireless pulse signals received, obtains the real well base pressure of injection well Force data, the method that the well head injection rate of injection well is adjusted according to the practical bottom pressure data, comprising the following steps:
4.1) pulsed signal device receives the pressure pulse signal that downhole system transmission comes, and is transmitted in ground and controls System;
4.2) after ground central control system receives the pressure pulse signal that the transmission of pulsed signal device comes, by pressure pulse signal Decoded back is transferred to monitoring interface and shows at bottom pressure data;
4.3) according to bottom pressure data point reuse well head injection rate, to improve the injectability of the injection well.
CN201811054875.4A 2018-09-11 2018-09-11 A kind of system and method that injection well injectability is improved based on bottom pressure telemetering Pending CN109184641A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811054875.4A CN109184641A (en) 2018-09-11 2018-09-11 A kind of system and method that injection well injectability is improved based on bottom pressure telemetering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811054875.4A CN109184641A (en) 2018-09-11 2018-09-11 A kind of system and method that injection well injectability is improved based on bottom pressure telemetering

Publications (1)

Publication Number Publication Date
CN109184641A true CN109184641A (en) 2019-01-11

Family

ID=64915792

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811054875.4A Pending CN109184641A (en) 2018-09-11 2018-09-11 A kind of system and method that injection well injectability is improved based on bottom pressure telemetering

Country Status (1)

Country Link
CN (1) CN109184641A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111190365A (en) * 2019-12-31 2020-05-22 中国海洋石油集团有限公司 Two-stage wake-up circuit for underwater acoustic communication and wake-up method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203584394U (en) * 2013-09-27 2014-05-07 西安思坦仪器股份有限公司 Intelligent underground instrument for automatically measuring and adjusting polymer injection flow
CN104343426A (en) * 2013-08-02 2015-02-11 中国石油天然气股份有限公司 Natural gas underground intelligent throttling system and process method
CN105909240A (en) * 2016-04-14 2016-08-31 中国海洋石油总公司 Bottom hole pressure testing, polymer displacement front edge position monitoring and reservoir assessment method
CN106089186A (en) * 2016-08-21 2016-11-09 中国石油化工股份有限公司 Subsection water injection well well head and shaft bottom signal wireless transmitter and radio transmitting method
CN106958442A (en) * 2017-05-04 2017-07-18 中国海洋石油总公司 A kind of mud-pulse Transmission system and method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104343426A (en) * 2013-08-02 2015-02-11 中国石油天然气股份有限公司 Natural gas underground intelligent throttling system and process method
CN203584394U (en) * 2013-09-27 2014-05-07 西安思坦仪器股份有限公司 Intelligent underground instrument for automatically measuring and adjusting polymer injection flow
CN105909240A (en) * 2016-04-14 2016-08-31 中国海洋石油总公司 Bottom hole pressure testing, polymer displacement front edge position monitoring and reservoir assessment method
CN106089186A (en) * 2016-08-21 2016-11-09 中国石油化工股份有限公司 Subsection water injection well well head and shaft bottom signal wireless transmitter and radio transmitting method
CN106958442A (en) * 2017-05-04 2017-07-18 中国海洋石油总公司 A kind of mud-pulse Transmission system and method

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
刘东升: "《聚合物驱注采井节点系统分析方法及其应用》", 31 May 2001, 石油工业出版社 *
张永成: "《注浆技术》", 31 July 2012, 煤炭工业出版社 *
聂向荣等: "《考虑弹性效应的聚合物驱压力响应》", 《油气井测试》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111190365A (en) * 2019-12-31 2020-05-22 中国海洋石油集团有限公司 Two-stage wake-up circuit for underwater acoustic communication and wake-up method thereof
CN111190365B (en) * 2019-12-31 2021-04-06 中国海洋石油集团有限公司 Two-stage wake-up circuit for underwater acoustic communication and wake-up method thereof

Similar Documents

Publication Publication Date Title
CN109025926B (en) Centralized control type intelligent separate-layer water injection string and regulation and control system
CN201448100U (en) Automatic control device for down-hole flow of water injection well
CN109252841A (en) The system and method for improving injection well injectability based on electromagnetic wave wireless monitor
CN103244184B (en) A kind of down-hole combined mining working ore deposit pressure real-time monitoring system
CN105649583B (en) Electric control intelligent well completion testing and adjusting system and method
CN110735621B (en) Method and system for intelligent testing and adjusting underground wireless layered water distribution
CN107313764B (en) Cable-free oil extraction well layered production allocation device and method
CN106032745A (en) Digital layered water injection ground control system and method
CN106121987A (en) A kind of electric submersible pump oil pumping system intelligent flushing secondary control device and control method
CN109184641A (en) A kind of system and method that injection well injectability is improved based on bottom pressure telemetering
CN205977640U (en) Electronic intelligence frequency of stroke controlling means of oil pump oil pumping system that dives
CN203730347U (en) Automatic control system for protecting submerged pump
CN109538179B (en) Underground self-adaptive water injection control device and control method
CN103510945A (en) Multifunctional downhole intelligent actuator under control of superlong wave and pressure wave encoding
CN107781175A (en) Oil-submersible electric pump co-well injection oil production intelligent monitoring system
CN107219866A (en) A kind of deep basal pit Yield rainfall relation control system and control method based on technology of Internet of things
CN103883316A (en) Intelligent oil extraction control and measurement system
CN204024644U (en) Ground and underground equipment two-way communication inclinometer
CN208203248U (en) Intelligent water distribution device for high-pressure well
CN204028688U (en) Oil well production remote data acquiring and transmission system
CN201588627U (en) Power driver for slurry pulse generator
US20160215613A1 (en) Optically-controlled switching of power to downhole devices
CN203248147U (en) Both-way communication system with measurement while drilling
CN212479189U (en) Reservoir exploitation device
CN209603958U (en) Underground self-adaptive water injection control device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190111

RJ01 Rejection of invention patent application after publication