CN109184635A - A kind of method of discrimination of coal bed gas well main product gas-bearing formation - Google Patents

A kind of method of discrimination of coal bed gas well main product gas-bearing formation Download PDF

Info

Publication number
CN109184635A
CN109184635A CN201811149491.0A CN201811149491A CN109184635A CN 109184635 A CN109184635 A CN 109184635A CN 201811149491 A CN201811149491 A CN 201811149491A CN 109184635 A CN109184635 A CN 109184635A
Authority
CN
China
Prior art keywords
gas
coal
packer
mining
coal seam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811149491.0A
Other languages
Chinese (zh)
Other versions
CN109184635B (en
Inventor
季长江
郝春生
信凯
鲁博
贾晋生
常会珍
杨昌永
田庆玲
邵显华
陈召英
姚晋宝
于振锋
崔宇翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Jincheng Anthracite Mining Group Co Ltd
Original Assignee
Shanxi Jincheng Anthracite Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Jincheng Anthracite Mining Group Co Ltd filed Critical Shanxi Jincheng Anthracite Mining Group Co Ltd
Priority to CN201811149491.0A priority Critical patent/CN109184635B/en
Publication of CN109184635A publication Critical patent/CN109184635A/en
Application granted granted Critical
Publication of CN109184635B publication Critical patent/CN109184635B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/006Production of coal-bed methane
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/14Obtaining from a multiple-zone well
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/34Arrangements for separating materials produced by the well
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells

Landscapes

  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geophysics (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Examining Or Testing Airtightness (AREA)
  • Loading And Unloading Of Fuel Tanks Or Ships (AREA)

Abstract

The invention belongs to cbm development and mining technical field, the method for discrimination of specifically a kind of coal bed gas well main product gas-bearing formation.Include the following steps, the existing oil pipe of coal bed gas well is produced into water, the mining system of annular space production gas is changed to oil pipe and produces gas water production system;In oil pipe bottom connector rails formula plunger pump, upper and lower in pump is separately connected mechanical packer;According to the different buried depths of multilayer coal, position is specifically fixed toward deep pump setting depth and the packer of being sequentially adjusted in from shallow, by opening packer, realizes effective packing and single layer mining to adjacent coal seam above and below target zone;To target zone mining certain time, after gas yield is basicly stable, packer is closed, adjust position corresponding to pump setting depth to next layer of purpose coal seam, after gas stable yield, successively adjustment pump hangs the position with packer downwards, realizes the single layer mining one by one to multilayer coal;Average product after stablizing according to each purpose coal seam mining, judges the main product gas-bearing formation of coal bed gas well.

Description

A kind of method of discrimination of coal bed gas well main product gas-bearing formation
Technical field
The invention belongs to cbm development and mining technical field, the differentiation side of specifically a kind of coal bed gas well main product gas-bearing formation Method.
Background technique
In the cbm development in multilayer coal region, in order to improve cbm development efficiency, cost, many coal bed gas are reduced Well carries out coal-bed gas exploitation by the way of developing multiple target zones simultaneously.But it should tend not to clearly judge in the process Which coal seam the gas of coal bed gas well output is mainly derived from, and brings additional trouble to coal bed gas extraction instead, or even have Interlayer interference can be generated between a little coal seams, the whole of coal bed gas well is reduced and produces gas effect.Therefore, a regional coal-seam gas well is found out It is significant to improve gas producing efficiency to cbm development is instructed for main product gas-bearing formation.
Summary of the invention
For the present invention in order to solve in multiple seam regional coal-seam gas development process, main product gas-bearing formation is indefinite to produce band to coal bed gas The problem come, provides a kind of method of discrimination of coal bed gas well main product gas-bearing formation.
The present invention takes following technical scheme: a kind of method of discrimination of coal bed gas well main product gas-bearing formation, comprising the following steps:
1) in oil pipe bottom connector rails formula plunger pump, bottom union tail and silk plug are pumped.
2) it is separately connected a mechanical packer in the top/bottom part of rod-type plunger pump, the spacing of two packers is greater than quilt Test the thickness in coal seam.
3) by packer and plunger pump tripping in, temporary close packer.
4) mining equipment is run after being installed, water flooding is entered in oil pipe by plunger pump, and via ground tubes rows Out.
5) after when shaft bottom, head of liquid is reduced to coal seam critical desorption pressures, coal seam starts to desorb, when well head pressure gauge is rigid When having pressure display, packer work is opened, realizes the effect insulated to coal seam top/bottom part.
6) it is again started up mining system, gas liquid mixture is discharged well head through oil pipe and enters in moisture trap, separates Water afterwards enters in blowoff basin, and the gas after separation enters gathering station through appendix.
7) after mining, coal bed gas well gas production is relatively stable, without when changing by a relatively large margin, records coal bed gas in the period The daily output after the total gas production and stabilization of well.
8) plunger pump and packer are adjusted to next purpose coal seam, recycle coal by the length for increasing oil pipe by ground The draining of layer, until daily output tends towards stability, then carries out the packing in third coal seam, test, repeatedly.
9) the production gas situation in the multiple coal seams of Comprehensive Correlation, judges the main product gas-bearing formation of coal bed gas well.
Compared with prior art, the invention has the following advantages:
(1) it is simple to sentence knowledge method, strong operability.The coal bed gas well main product gas-bearing formation sentences knowledge method core component only by two Packer and plunger pump composition, downhole tool is few, and connection structure is simple, can reduce the failure rate in the course of work, improves system Operability.
(2) main product layer identifying result is reliable.Effectively purpose coal seam can be kept apart by the effect of two packers, The interference for avoiding closing on coal seam divides the conjunction layer mining in multiple coal seams and is independent single layer coal mining unit, ensures main product gas Layer sentences the reliability of knowledge.
Detailed description of the invention
Fig. 1 is that coal bed gas well main product gas-bearing formation sentences knowledge method connection schematic diagram;
The coal seam 1- in figure, the coal seam 2-, the coal seam 3-, 4- silk plug, 5- tail pipe, 6- packer, 7- plunger pump, 8- casing, 9- oil jacket ring Sky, 10- oil pipe, 11- sucker rod, 12- pressure gauge, 13- ring flange, 14- pressure limiting valve, 15- moisture trap, 16- electronic flow Meter, 17- appendix, 18- solenoid valve, 19- blowoff basin.
Specific embodiment
Fig. 1 is that coal bed gas well main product gas-bearing formation sentences knowledge method connection schematic diagram, and packer and plunger pump are lowered into top coal The position of layer 1.Packer is closed in advance, runs ground mining system, and ground is discharged in the well tubing in pit shaft.Work as well head pressure When table has pressure display, packer is opened, 1 top and the bottom of coal seam are insulated, avoids closing on coal seam its yield is affected.This When, the gas liquid mixture of output enters ground moisture trap through oil pipe, when the liquid isolated ought highly reach setting When position, solenoid valve is opened, and water is entered in blowoff basin by drainpipe.The gas isolated, well air delivering pipeline enter gathering station, When coal seam 1 is after the mining certain time daily output is stablized, the mining for stopping this layer of coal is tested, and can pass through electronic flowmeter meter at this time Cumulative gas production and the daily output after stabilization since amount mining.
A kind of method of discrimination of coal bed gas well main product gas-bearing formation, comprising the following steps:
1) in 10 bottom connector rails formula plunger pump 7 of oil pipe, bottom union tail 5 and silk plug 4 are pumped;
2) it is separately connected a mechanical packer 6 in the top/bottom part of rod-type plunger pump 7, the spacing of two packers 6 is greater than quilt Test the thickness in coal seam;
3) by 7 tripping in of packer 6 and plunger pump, temporary close packer 6;
4) mining equipment is run after being installed, water flooding is entered in oil pipe 10 by plunger pump 7, and via ground tubes rows Out;
5) after when shaft bottom, head of liquid is reduced to 1 critical desorption pressures of coal seam, coal seam 1 starts to desorb, when well head pressure gauge 12 is rigid When having pressure display, opens packer 6 and work, realize the effect insulated to 1 top/bottom part of coal seam;
6) it is again started up mining system, gas liquid mixture is discharged well head through oil pipe and enters in moisture trap 15, after separation Water enter in blowoff basin 19, the gas after separation through appendix 17 enter gathering station;
7) after mining, coal bed gas well gas production is relatively stable, without when changing by a relatively large margin, records coal bed gas well in the period The daily output after total gas production and stabilization;
8) plunger pump 7 and packer 6 are adjusted to next purpose coal seam 2, recycle coal by the length for increasing oil pipe 10 by ground The draining of layer 1, until daily output tends towards stability, then carries out the packing in third coal seam 3, test, repeatedly;
9) the production gas situation in the multiple coal seams of Comprehensive Correlation, judges the main product gas-bearing formation of coal bed gas well.

Claims (1)

1. a kind of method of discrimination of coal bed gas well main product gas-bearing formation, it is characterised in that: the following steps are included: 1) in oil pipe (10) bottom It connects rod-type plunger pump (7), pump bottom union tail (5) and silk plug (4);
2) mechanical packer (6), the spacing of two packers (6) are separately connected in the top/bottom part of rod-type plunger pump (7) Greater than the thickness in tested coal seam;
3) by packer (6) and plunger pump (7) tripping in, temporary close packer (6);
4) mining equipment is run after being installed, water flooding is entered in oil pipe (10) by plunger pump (7), and via ground pipeline Discharge;
5) after when shaft bottom, head of liquid is reduced to coal seam (1) critical desorption pressures, coal seam (1) starts to desorb, and works as well head pressure gauge (12) when just having pressure display, packer (6) work is opened, realizes the effect insulated to coal seam (1) top/bottom part;
6) it is again started up mining system, gas liquid mixture is discharged well head through oil pipe and enters in moisture trap (15), separates Water afterwards enters in blowoff basin (19), and the gas after separation enters gathering station through appendix (17);
7) after mining, coal bed gas well gas production is relatively stable, without when changing by a relatively large margin, records coal bed gas well in the period The daily output after total gas production and stabilization;
8) length for increasing oil pipe (10) by ground, is adjusted to next purpose coal seam for plunger pump (7) and packer (6) (2), the draining of coal seam (1) is recycled, until daily output tends towards stability, then carries out the packing of third coal seam (3), test, such as This is repeatedly;
9) the production gas situation in the multiple coal seams of Comprehensive Correlation, judges the main product gas-bearing formation of coal bed gas well.
CN201811149491.0A 2018-09-29 2018-09-29 Method for judging main gas production layer of coal-bed gas well Active CN109184635B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811149491.0A CN109184635B (en) 2018-09-29 2018-09-29 Method for judging main gas production layer of coal-bed gas well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811149491.0A CN109184635B (en) 2018-09-29 2018-09-29 Method for judging main gas production layer of coal-bed gas well

Publications (2)

Publication Number Publication Date
CN109184635A true CN109184635A (en) 2019-01-11
CN109184635B CN109184635B (en) 2021-05-14

Family

ID=64907978

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811149491.0A Active CN109184635B (en) 2018-09-29 2018-09-29 Method for judging main gas production layer of coal-bed gas well

Country Status (1)

Country Link
CN (1) CN109184635B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114922594A (en) * 2022-07-21 2022-08-19 太原理工大学 Method for deep crack type geothermal segmented packing and layered mining

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2382028Y (en) * 1998-11-16 2000-06-07 马建国 Dynamic casing well tester
CN102191933A (en) * 2011-03-30 2011-09-21 北京万普隆能源技术有限公司 Process for measuring and controlling produced gas of coal bed gas well
US20130180709A1 (en) * 2012-01-17 2013-07-18 Chevron U.S.A. Inc. Well Completion Apparatus, System and Method
CN103590813A (en) * 2013-10-30 2014-02-19 中国石油天然气股份有限公司 Method, tubular column and device for testing dynamic reserves of two-layer commingled gas production well
CN104747144A (en) * 2015-02-06 2015-07-01 中国石油天然气股份有限公司 Geological stratum selection method based on natural gas multilayer system partial pressure solution
CN106499384A (en) * 2016-11-16 2017-03-15 中煤科工集团西安研究院有限公司 Coal bed gas directional well injection/pressure fall-off test test device and its method
CN107201893A (en) * 2017-07-28 2017-09-26 中国矿业大学 A kind of multiple seam gas well throughput contribution rate test grading device
CN107218036A (en) * 2017-07-28 2017-09-29 中国矿业大学 A kind of multiple seam gas well air-water two phase flow lamination test device
CN107476784A (en) * 2017-07-21 2017-12-15 山西晋城无烟煤矿业集团有限责任公司 A kind of CBM Drainage mining method of oil pipe production aquatic products gas

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2382028Y (en) * 1998-11-16 2000-06-07 马建国 Dynamic casing well tester
CN102191933A (en) * 2011-03-30 2011-09-21 北京万普隆能源技术有限公司 Process for measuring and controlling produced gas of coal bed gas well
US20130180709A1 (en) * 2012-01-17 2013-07-18 Chevron U.S.A. Inc. Well Completion Apparatus, System and Method
CN103590813A (en) * 2013-10-30 2014-02-19 中国石油天然气股份有限公司 Method, tubular column and device for testing dynamic reserves of two-layer commingled gas production well
CN104747144A (en) * 2015-02-06 2015-07-01 中国石油天然气股份有限公司 Geological stratum selection method based on natural gas multilayer system partial pressure solution
CN106499384A (en) * 2016-11-16 2017-03-15 中煤科工集团西安研究院有限公司 Coal bed gas directional well injection/pressure fall-off test test device and its method
CN107476784A (en) * 2017-07-21 2017-12-15 山西晋城无烟煤矿业集团有限责任公司 A kind of CBM Drainage mining method of oil pipe production aquatic products gas
CN107201893A (en) * 2017-07-28 2017-09-26 中国矿业大学 A kind of multiple seam gas well throughput contribution rate test grading device
CN107218036A (en) * 2017-07-28 2017-09-29 中国矿业大学 A kind of multiple seam gas well air-water two phase flow lamination test device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114922594A (en) * 2022-07-21 2022-08-19 太原理工大学 Method for deep crack type geothermal segmented packing and layered mining

Also Published As

Publication number Publication date
CN109184635B (en) 2021-05-14

Similar Documents

Publication Publication Date Title
CA2665035C (en) A method and apparatus for separating downhole oil and water and reinjecting separated water
RU2380522C1 (en) Equipment for multi-reservoir well sumultanious-separate recearch and production with electircal submersible pump (versions)
CN105804680B (en) A kind of oil gas field workover operation device with pressure and method
CN103015955A (en) Open-hole horizontal well multi-cluster sliding sleeve staged fracturing string and fracturing method thereof
CN109630060A (en) A kind of complete well operation tubing string of repeatable no killing well and construction technology
CN109252853A (en) Underground oil-water separation same-well injection-production system and method
CN208702393U (en) With well intelligence injection-production technical tubing string
RU2296213C2 (en) Packer pumping plant for well formations operation
CN205605156U (en) Workover device is pressed in oil gas field area
US10914156B2 (en) Frac pulser system and method of use thereof
CN109184635A (en) A kind of method of discrimination of coal bed gas well main product gas-bearing formation
CN107387020A (en) A kind of common device for picking of two gas
CN110593846A (en) Gas well gas-liquid separate production well completion pipe string
RU2456441C1 (en) Production method of high-viscous oil by means of simultaneous pumping of steam and extraction of liquid from single horizontal well
CN103061724A (en) Layered pressure control combined drainage-production device for double coal-beds prone to dust and sand spraying
RU2480581C1 (en) Method to isolate inflow of reservoir water in low-angle and horizontal wells
RU2418162C1 (en) Method for improving permeability of bed during extraction of high-viscosity oil
US10415361B1 (en) Separating gas and liquid in a wellbore
RU2524800C1 (en) Development of inhomogeneous deposit by inclined and horizontal wells
RU2401937C1 (en) Procedure for development of watered oil deposit
RU2738615C1 (en) Method for simultaneous separate production of oil from two formations of one well by production string
RU2608107C1 (en) Method of hydrodynamic surveys and thief zones isolation
RU2560763C1 (en) Method to open and develop multipay field with low poroperm reservoirs
RU2738145C1 (en) Development method of powerful low-permeability oil deposit
RU2491418C1 (en) Method to develop multizone oil reservoir

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant