CN109183581A - A kind of bridge floor road construction dustcloth bedding equipment - Google Patents
A kind of bridge floor road construction dustcloth bedding equipment Download PDFInfo
- Publication number
- CN109183581A CN109183581A CN201811233488.7A CN201811233488A CN109183581A CN 109183581 A CN109183581 A CN 109183581A CN 201811233488 A CN201811233488 A CN 201811233488A CN 109183581 A CN109183581 A CN 109183581A
- Authority
- CN
- China
- Prior art keywords
- dustcloth
- shaft
- right sides
- bridge floor
- water tank
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C23/00—Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
- E01C23/03—Arrangements for curing paving; Devices for applying curing means; Devices for laying prefabricated underlay, e.g. sheets, membranes; Protecting paving under construction or while curing, e.g. use of tents
Abstract
The present invention relates to a kind of bedding equipment more particularly to a kind of bridge floor road construction dustcloth bedding equipment.Technical problems to be solved are as follows: providing one kind can make people more easily by dustcloth bedding on bridge floor, relatively labor-saving, and the bridge floor road construction dustcloth bedding equipment that can also be sprinkled upon water on dustcloth.The technical scheme is that a kind of bridge floor road construction dustcloth bedding equipment, includes bottom plate, wheel, N-shaped frame, bearing block, shaft, fixed plate etc.;Bottom base plate left and right sides symmetrical expression is equipped with support plate, and the connection wheel of left and right sides support plate lateral surface lower rotational formula, N-shaped frame is two.The present invention is by the way that dustcloth to be fixed on the connecting plate of the left and right sides, push the present apparatus can be by dustcloth bedding on bridge floor again, without people constantly mobile hand by dustcloth bedding on bridge floor, it is time saving and energy saving, and pass through water injector, water can be sprayed on to dustcloth both ends to be drenched, so that the effect of dustcloth bedding is more preferable.
Description
Technical field
The present invention relates to a kind of bedding equipment more particularly to a kind of bridge floor road construction dustcloth bedding equipment.
Background technique
After the completion of bridge floor road construction, due to surrounding environment influence, dust is easy to fall on bridge floor for a long time, then needs
Will on bridge floor bedding dustcloth, prevent dust from falling on bridge floor, usual people are that dustcloth is laid on bridge floor with hand
On, since bridge floor area is larger, people is needed constantly to move, it is relatively elaborate, and in order to keep dustcloth bedding effect more preferable, people
Can water is sprinkled upon on dustcloth again after bedding, it is cumbersome, thus need more people simultaneously by dustcloth bedding on bridge floor,
And water is sprinkled upon on dustcloth by some people, such high labor cost.
Summary of the invention
In order to overcome bridge floor area larger, people is needed constantly to move, it is relatively elaborate, and in order to imitate dustcloth bedding
Fruit is more preferable, and water can be sprinkled upon on dustcloth by people again after bedding, cumbersome disadvantage, technical problems to be solved are as follows: mention
People can be made more easily by dustcloth bedding on bridge floor for one kind, it is relatively labor-saving, and water can also be sprinkled upon dustcloth
On bridge floor road construction dustcloth bedding equipment.
The technical scheme is that a kind of bridge floor road construction dustcloth bedding equipment, includes bottom plate, wheel, n
Type frame, bearing block, shaft, fixed plate, sliding sleeve, connecting rod, connecting plate, the first spring, nut, bull stick, rubbing device and support plate, bottom
Symmetrical expression is equipped with support plate, the connection wheel of left and right sides support plate lateral surface lower rotational formula, n at left and right sides of board bottom portion
Type frame is two, and one of N-shaped frame is installed on left-side bottom top left side, another N-shaped frame is installed at the top of the bottom plate of right side
Right side, N-shaped frame left and right sides middle part is all Embedded to be equipped with bearing block, and the bearing in shaft and left and right sides bearing block connects
It connects, rubbing device is equipped between shaft and N-shaped frame inner top, left and right sides shaft inner end is all connected with fixed plate, left side shaft
Right part and right side shaft left part are all provided with screw thread, and shaft is equipped with nut, nut be threadedly engaged, sliding sleeve is additionally provided in shaft,
Left and right sides fixed plate lateral surface is all evenly spaced to be hinged with multiple connecting rods, and left and right sides sliding sleeve medial surface is also evenly spaced
Be hinged with multiple connecting rods, be connected with connecting plate that can be fixed by dustcloth between the connecting rod inner end of the left and right sides, connecting plate medial surface with turn
Between axis uniformly by be connected with the first spring, bull stick two that connecting plate is mobile can be made, bull stick is respectively arranged in nut top
Among bottom.
Rubbing device includes casing, motion bar, second spring, arc panel and friction pulley in one of the embodiments,
Left side shaft left part and right side shaft right part are fitted with friction pulley, and friction pulley is located in N-shaped frame, peace among N-shaped frame inner top
Equipped with the casing playing the guiding role, motion bar is located in casing and cooperates with it, connects between motion bar top and N-shaped frame inner top
There is second spring, the arc panel for increasing resistance is installed on motion bar bottom end, and arc panel is contacted with friction pulley.
It in one of the embodiments, further include having water injector, water injector includes water tank, plug, handle, cross
Bar, guide sleeve, guide rod, antipriming pipe, outlet pipe, valve and limited block, the outer top center of N-shaped frame, which bolts, water tank, in tank top
Between be equipped with the plug that water can be made to be added, left side water tank lower right side and right side water tank left lower be all connected with outlet pipe, is discharged
Pipe with water tank in be connected to, outlet pipe be equipped with valve, can by water spray antipriming pipe be connect with outlet pipe tail end, antipriming pipe and out
Connection in water pipe, antipriming pipe are located above connecting plate, and left side water tank external right side face lower part and the outer left side lower part of right side water tank are all pacified
Equipped with cross bar, left and right sides cross bar inner end is connected with guide sleeve, and guide rod is located in guide sleeve and cooperates with it, guide rod bottom end and porous tube top
Connection among portion, can make more convenient handle two for pushing the present apparatus of operator, and handle is respectively arranged in outside the water tank of left side
Left side top and right side water tank external right side face top, limited block are installed on guide rod top.
It in one of the embodiments, further include having bracing wire, cutting ferrule, kelly and reel, reel is installed on left side bottom
Plate right flank middle part is wound with bracing wire on reel, and bracing wire tail end is equipped with kelly, and right side bottom plate left side top is connected with card
Set, kelly are located in cutting ferrule.
It in one of the embodiments, further include having magnet and iron block, left side antipriming pipe top left side and right side antipriming pipe
Top right side is fitted with magnet, and left side cross bar bottom right and right side cross bar bottom left are fitted with iron block, iron block and magnetic
Iron cooperation.
It is operated first personnel the present apparatus is moved on bridge floor, extremely further according to connecting plate at left and right sides of the width movement of dustcloth
Suitable distance, then by a roll of dust jacket between the connecting plate of the left and right sides, twisting right side bull stick is rotated forward to be inverted with left side bull stick,
Right side bull stick, which rotates forward, drives right side nut to rotate forward, and nut rotating forward in right side is moved inward by screw thread, and right side nut moves inward band
Dynamic right side sliding sleeve moves inward, and right side sliding sleeve travels inward through right side connecting rod and right side connecting plate is driven to be displaced outwardly, the first spring
It stretching, right side connecting plate, which is displaced outwardly, fixes dustcloth right end, stop twisting right side bull stick, meanwhile, bull stick reversion in left side drives
The reversion of left side nut, left side nut are moved right by left side screw thread, and left side nut moves inward drive left side sliding sleeve and inwardly moves
Dynamic, left side sliding sleeve travels inward through left side connecting rod and left side connecting plate is driven to be displaced outwardly, and left side connecting plate is displaced outwardly dustcloth
Left end is fixed, and stops twisting left side bull stick, operator can pull dustcloth head end bedding to be fixed on bridge floor, by water
Dustcloth both ends are poured on, then push the present apparatus to move on bridge floor by wheel, the present apparatus is mobile to drive dustcloth to rotate bedding
On bridge floor, meanwhile, dustcloth rotation drives connecting plate rotation, and connecting plate rotation drives shaft rotation, and rubbing device then turns shaft
Dynamic power is buffered.Similarly, when bridge floor upper berth covers dustcloth, the mobile present apparatus can be stopped, twisting left side bull stick is just
Turn to invert with right side bull stick, and then because of the effect of the first spring, connecting plate, which moves inward, unclamps dustcloth, stop twisting bull stick,
Remaining dustcloth can be removed.
When operator pushes the present apparatus by dustcloth bedding on bridge floor, shaft rotation drives friction pulley rotation, arc
Shape plate increases resistance when then rotating to friction pulley, and because of the effect of second spring, arc panel is contacted with friction pulley always.In this way, can
It is too fast when preventing dustcloth from rotating to cause to loosen influence bedding effect.
It is operated first personnel and pulls up plug from water tank, then water is poured into water tank, it, will when having suitable water in water tank
Plug is got back into water tank, then antipriming pipe is pulled to be moved upward to suitable position, and antipriming pipe, which moves up, drives guide rod upward
It is mobile, when can be fixed on dustcloth on connecting plate, after dustcloth fixes, antipriming pipe is unclamped, it is porous because of the influence of gravity
Pipe moves down recovery to original position, and it is excessive that limited block can then prevent antipriming pipe from moving down, and opens valve, and the water in water tank is discharged into
In outlet pipe, the water in outlet pipe is sprayed by antipriming pipe, and water is sprayed on dustcloth both ends and is drenched.It is appropriate when having on dustcloth
Water when, close valve, water stops spraying, and can hold the dustcloth bedding after handle pushes the present apparatus is mobile will to drench in bridge
On face.In this way, dustcloth can be made to be tightly attached on bridge floor, bedding effect is more preferable.
When the present apparatus is moved on bridge floor, operator can extract kelly out of cutting ferrule, further according to dustcloth
The mobile left and right sides connecting plate of width when dustcloth is fixed on the connecting plate of the left and right sides, then pulls kelly to move to suitable distance
In dynamic insertion cutting ferrule, and then the present apparatus is moved by dustcloth bedding when on bridge floor, and bracing wire plays position-limiting action, in this way, can prevent
The bedding of the outside bias effect dustcloth of left and right sides connecting plate.
When operator pulls antipriming pipe to move up, antipriming pipe also band moving magnet is moved up, and magnet moves up
When contacting with iron block, magnet cooperates with iron block fixes antipriming pipe, can unclamp antipriming pipe.When dustcloth is fixed on the left and right sides
When on connecting plate, antipriming pipe can be pulled to move down recovery to original position, magnet and iron block and be detached from.In this way, being not necessarily to operator one
Vertical pulling moves antipriming pipe, convenient and efficient.
Beneficial effects of the present invention: the present invention then pushes the present apparatus by the way that dustcloth to be fixed on the connecting plate of the left and right sides
Can by dustcloth bedding on bridge floor, without people constantly mobile hand by dustcloth bedding on bridge floor, it is time saving and energy saving, and
And by water injector, water can be sprayed on to dustcloth both ends and drenched, so that the effect of dustcloth bedding is more preferable, pass through bracing wire
Effect, can prevent the left and right sides the outside bias effect dustcloth of connecting plate bedding can be to more by the effect of magnet and iron block
The fixation of hole pipe hauls always without operator, convenient and efficient.
Detailed description of the invention
Fig. 1 is schematic view of the front view of the invention.
Fig. 2 is the first part schematic view of the front view of the invention.
Fig. 3 is second of part schematic view of the front view of the invention.
Drawing reference numeral: 1 bottom plate, 2 wheels, 3 N-shaped framves, 4 bearing blocks, 5 shafts, 6 fixed plates, 7 sliding sleeves, 8 connect
Bar, 9 connecting plates, 10 first springs, 11 nuts, 12 bull sticks, 13 rubbing devices, 131 casings, 132 motion bars, 133
Two springs, 134 arc panels, 135 friction pulleys, 14 support plates, 15 water injectors, 151 water tanks, 152 plugs, 153
Hand, 154 cross bars, 155 guide sleeves, 156 guide rods, 157 antipriming pipes, 158 outlet pipes, 159 valves, 1510 limited blocks, 16
Bracing wire, 17 cutting ferrules, 18 kellies, 19 reels, 20 magnet, 21 iron blocks.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of bridge floor road construction dustcloth bedding equipment, as shown in Figure 1-3, include bottom plate 1, wheel 2, N-shaped frame 3, axis
Hold seat 4, shaft 5, fixed plate 6, sliding sleeve 7, connecting rod 8, connecting plate 9, the first spring 10, nut 11, bull stick 12, rubbing device 13 and branch
Fagging 14,1 bottom of bottom plate left and right sides symmetrical expression are equipped with support plate 14,14 lateral surface lower rotational of left and right sides support plate
The connection wheel 2 of formula, N-shaped frame 3 are two, and one of N-shaped frame 3 is installed on 1 top left side of left-side bottom, another N-shaped frame 3
It is installed on right side 1 top right side of bottom plate, 3 left and right sides middle part of N-shaped frame is all Embedded to be equipped with bearing block 4, shaft 5 and left and right
Bearing connection in two side shaft holders 4, is equipped with rubbing device 13 between 3 inner top of shaft 5 and N-shaped frame, in left and right sides shaft 5
End is all connected with fixed plate 6, and 5 right part of left side shaft and 5 left part of right side shaft are all provided with screw thread, and shaft 5 is equipped with nut 11, spiral shell
Mother 11 be threadedly engaged, be additionally provided with sliding sleeve 7 in shaft 5,6 lateral surface of left and right sides fixed plate all it is evenly spaced be hinged with it is multiple
Connecting rod 8, sliding sleeve 7 medial surface in the left and right sides is also evenly spaced to be hinged with multiple connecting rods 8, consolidates between 8 inner end of left and right sides connecting rod
Be connected to connecting plate 9 that can be fixed by dustcloth, between 9 medial surface of connecting plate and shaft 5 uniformly by be connected with the first spring 10, can make
The mobile bull stick 12 of connecting plate 9 is two, and bull stick 12 is respectively arranged among 11 top and bottom of nut.
Embodiment 2
A kind of bridge floor road construction dustcloth bedding equipment, as shown in Figure 1-3, include bottom plate 1, wheel 2, N-shaped frame 3, axis
Hold seat 4, shaft 5, fixed plate 6, sliding sleeve 7, connecting rod 8, connecting plate 9, the first spring 10, nut 11, bull stick 12, rubbing device 13 and branch
Fagging 14,1 bottom of bottom plate left and right sides symmetrical expression are equipped with support plate 14,14 lateral surface lower rotational of left and right sides support plate
The connection wheel 2 of formula, N-shaped frame 3 are two, and one of N-shaped frame 3 is installed on 1 top left side of left-side bottom, another N-shaped frame 3
It is installed on right side 1 top right side of bottom plate, 3 left and right sides middle part of N-shaped frame is all Embedded to be equipped with bearing block 4, shaft 5 and left and right
Bearing connection in two side shaft holders 4, is equipped with rubbing device 13 between 3 inner top of shaft 5 and N-shaped frame, in left and right sides shaft 5
End is all connected with fixed plate 6, and 5 right part of left side shaft and 5 left part of right side shaft are all provided with screw thread, and shaft 5 is equipped with nut 11, spiral shell
Mother 11 be threadedly engaged, be additionally provided with sliding sleeve 7 in shaft 5,6 lateral surface of left and right sides fixed plate all it is evenly spaced be hinged with it is multiple
Connecting rod 8, sliding sleeve 7 medial surface in the left and right sides is also evenly spaced to be hinged with multiple connecting rods 8, consolidates between 8 inner end of left and right sides connecting rod
Be connected to connecting plate 9 that can be fixed by dustcloth, between 9 medial surface of connecting plate and shaft 5 uniformly by be connected with the first spring 10, can make
The mobile bull stick 12 of connecting plate 9 is two, and bull stick 12 is respectively arranged among 11 top and bottom of nut.
Rubbing device 13 includes casing 131, motion bar 132, second spring 133, arc panel 134 and friction pulley 135, a left side
5 left part of side shaft and 5 right part of right side shaft are fitted with friction pulley 135, and friction pulley 135 is located in N-shaped frame 3, top in N-shaped frame 3
The casing 131 playing the guiding role is installed, motion bar 132 is located in casing 131 and cooperates with it, 132 top of motion bar among portion
It is connected with second spring 133 between 3 inner top of N-shaped frame, the arc panel 134 for increasing resistance is installed on 132 bottom end of motion bar, arc
Shape plate 134 is contacted with friction pulley 135.
Embodiment 3
A kind of bridge floor road construction dustcloth bedding equipment, as shown in Figure 1-3, include bottom plate 1, wheel 2, N-shaped frame 3, axis
Hold seat 4, shaft 5, fixed plate 6, sliding sleeve 7, connecting rod 8, connecting plate 9, the first spring 10, nut 11, bull stick 12, rubbing device 13 and branch
Fagging 14,1 bottom of bottom plate left and right sides symmetrical expression are equipped with support plate 14,14 lateral surface lower rotational of left and right sides support plate
The connection wheel 2 of formula, N-shaped frame 3 are two, and one of N-shaped frame 3 is installed on 1 top left side of left-side bottom, another N-shaped frame 3
It is installed on right side 1 top right side of bottom plate, 3 left and right sides middle part of N-shaped frame is all Embedded to be equipped with bearing block 4, shaft 5 and left and right
Bearing connection in two side shaft holders 4, is equipped with rubbing device 13 between 3 inner top of shaft 5 and N-shaped frame, in left and right sides shaft 5
End is all connected with fixed plate 6, and 5 right part of left side shaft and 5 left part of right side shaft are all provided with screw thread, and shaft 5 is equipped with nut 11, spiral shell
Mother 11 be threadedly engaged, be additionally provided with sliding sleeve 7 in shaft 5,6 lateral surface of left and right sides fixed plate all it is evenly spaced be hinged with it is multiple
Connecting rod 8, sliding sleeve 7 medial surface in the left and right sides is also evenly spaced to be hinged with multiple connecting rods 8, consolidates between 8 inner end of left and right sides connecting rod
Be connected to connecting plate 9 that can be fixed by dustcloth, between 9 medial surface of connecting plate and shaft 5 uniformly by be connected with the first spring 10, can make
The mobile bull stick 12 of connecting plate 9 is two, and bull stick 12 is respectively arranged among 11 top and bottom of nut.
Rubbing device 13 includes casing 131, motion bar 132, second spring 133, arc panel 134 and friction pulley 135, a left side
5 left part of side shaft and 5 right part of right side shaft are fitted with friction pulley 135, and friction pulley 135 is located in N-shaped frame 3, top in N-shaped frame 3
The casing 131 playing the guiding role is installed, motion bar 132 is located in casing 131 and cooperates with it, 132 top of motion bar among portion
It is connected with second spring 133 between 3 inner top of N-shaped frame, the arc panel 134 for increasing resistance is installed on 132 bottom end of motion bar, arc
Shape plate 134 is contacted with friction pulley 135.
It further include having water injector 15, water injector 15 includes water tank 151, plug 152, handle 153, cross bar 154, leads
Set 155, guide rod 156, antipriming pipe 157, outlet pipe 158, valve 159 and limited block 1510, the outer top center of N-shaped frame 3 bolt have
Water tank 151,151 top center of water tank are equipped with the plug 152 that water can be made to be added, 151 lower right side of left side water tank and right side water tank
151 left lowers are all connected with outlet pipe 158, are connected in outlet pipe 158 and water tank 151, and outlet pipe 158 is equipped with valve 159,
The antipriming pipe 157 that water sprays can be connect with 158 tail end of outlet pipe, be connected in antipriming pipe 157 and outlet pipe 158, antipriming pipe 157
Above connecting plate 9,151 external right side face lower part of left side water tank and the outer left side lower part of right side water tank 151 are fitted with cross bar
154, cross bar 154 inner end in the left and right sides is connected with guide sleeve 155, and guide rod 156 is located in guide sleeve 155 and cooperates with it, 156 bottom end of guide rod
It is connect with 157 top center of antipriming pipe, more convenient handle 153 two for pushing the present apparatus of operator can be made, handle 153 divides
It is not installed on the left side outer left side top of water tank 151 and 151 external right side face top of right side water tank, limited block 1510 is installed on guide rod
156 tops.
Embodiment 4
A kind of bridge floor road construction dustcloth bedding equipment, as shown in Figure 1-3, include bottom plate 1, wheel 2, N-shaped frame 3, axis
Hold seat 4, shaft 5, fixed plate 6, sliding sleeve 7, connecting rod 8, connecting plate 9, the first spring 10, nut 11, bull stick 12, rubbing device 13 and branch
Fagging 14,1 bottom of bottom plate left and right sides symmetrical expression are equipped with support plate 14,14 lateral surface lower rotational of left and right sides support plate
The connection wheel 2 of formula, N-shaped frame 3 are two, and one of N-shaped frame 3 is installed on 1 top left side of left-side bottom, another N-shaped frame 3
It is installed on right side 1 top right side of bottom plate, 3 left and right sides middle part of N-shaped frame is all Embedded to be equipped with bearing block 4, shaft 5 and left and right
Bearing connection in two side shaft holders 4, is equipped with rubbing device 13 between 3 inner top of shaft 5 and N-shaped frame, in left and right sides shaft 5
End is all connected with fixed plate 6, and 5 right part of left side shaft and 5 left part of right side shaft are all provided with screw thread, and shaft 5 is equipped with nut 11, spiral shell
Mother 11 be threadedly engaged, be additionally provided with sliding sleeve 7 in shaft 5,6 lateral surface of left and right sides fixed plate all it is evenly spaced be hinged with it is multiple
Connecting rod 8, sliding sleeve 7 medial surface in the left and right sides is also evenly spaced to be hinged with multiple connecting rods 8, consolidates between 8 inner end of left and right sides connecting rod
Be connected to connecting plate 9 that can be fixed by dustcloth, between 9 medial surface of connecting plate and shaft 5 uniformly by be connected with the first spring 10, can make
The mobile bull stick 12 of connecting plate 9 is two, and bull stick 12 is respectively arranged among 11 top and bottom of nut.
Rubbing device 13 includes casing 131, motion bar 132, second spring 133, arc panel 134 and friction pulley 135, a left side
5 left part of side shaft and 5 right part of right side shaft are fitted with friction pulley 135, and friction pulley 135 is located in N-shaped frame 3, top in N-shaped frame 3
The casing 131 playing the guiding role is installed, motion bar 132 is located in casing 131 and cooperates with it, 132 top of motion bar among portion
It is connected with second spring 133 between 3 inner top of N-shaped frame, the arc panel 134 for increasing resistance is installed on 132 bottom end of motion bar, arc
Shape plate 134 is contacted with friction pulley 135.
It further include having water injector 15, water injector 15 includes water tank 151, plug 152, handle 153, cross bar 154, leads
Set 155, guide rod 156, antipriming pipe 157, outlet pipe 158, valve 159 and limited block 1510, the outer top center of N-shaped frame 3 bolt have
Water tank 151,151 top center of water tank are equipped with the plug 152 that water can be made to be added, 151 lower right side of left side water tank and right side water tank
151 left lowers are all connected with outlet pipe 158, are connected in outlet pipe 158 and water tank 151, and outlet pipe 158 is equipped with valve 159,
The antipriming pipe 157 that water sprays can be connect with 158 tail end of outlet pipe, be connected in antipriming pipe 157 and outlet pipe 158, antipriming pipe 157
Above connecting plate 9,151 external right side face lower part of left side water tank and the outer left side lower part of right side water tank 151 are fitted with cross bar
154, cross bar 154 inner end in the left and right sides is connected with guide sleeve 155, and guide rod 156 is located in guide sleeve 155 and cooperates with it, 156 bottom end of guide rod
It is connect with 157 top center of antipriming pipe, more convenient handle 153 two for pushing the present apparatus of operator can be made, handle 153 divides
It is not installed on the left side outer left side top of water tank 151 and 151 external right side face top of right side water tank, limited block 1510 is installed on guide rod
156 tops.
It further include having bracing wire 16, cutting ferrule 17, kelly 18 and reel 19, reel 19 is installed on 1 right side of left-side bottom
Middle part is wound with bracing wire 16 on reel 19, and 16 tail end of bracing wire is equipped with kelly 18, and bottom plate 1 left side top in right side is connected with card
Set 17, kelly 18 is located in cutting ferrule 17.
Embodiment 5
A kind of bridge floor road construction dustcloth bedding equipment, as shown in Figure 1-3, include bottom plate 1, wheel 2, N-shaped frame 3, axis
Hold seat 4, shaft 5, fixed plate 6, sliding sleeve 7, connecting rod 8, connecting plate 9, the first spring 10, nut 11, bull stick 12, rubbing device 13 and branch
Fagging 14,1 bottom of bottom plate left and right sides symmetrical expression are equipped with support plate 14,14 lateral surface lower rotational of left and right sides support plate
The connection wheel 2 of formula, N-shaped frame 3 are two, and one of N-shaped frame 3 is installed on 1 top left side of left-side bottom, another N-shaped frame 3
It is installed on right side 1 top right side of bottom plate, 3 left and right sides middle part of N-shaped frame is all Embedded to be equipped with bearing block 4, shaft 5 and left and right
Bearing connection in two side shaft holders 4, is equipped with rubbing device 13 between 3 inner top of shaft 5 and N-shaped frame, in left and right sides shaft 5
End is all connected with fixed plate 6, and 5 right part of left side shaft and 5 left part of right side shaft are all provided with screw thread, and shaft 5 is equipped with nut 11, spiral shell
Mother 11 be threadedly engaged, be additionally provided with sliding sleeve 7 in shaft 5,6 lateral surface of left and right sides fixed plate all it is evenly spaced be hinged with it is multiple
Connecting rod 8, sliding sleeve 7 medial surface in the left and right sides is also evenly spaced to be hinged with multiple connecting rods 8, consolidates between 8 inner end of left and right sides connecting rod
Be connected to connecting plate 9 that can be fixed by dustcloth, between 9 medial surface of connecting plate and shaft 5 uniformly by be connected with the first spring 10, can make
The mobile bull stick 12 of connecting plate 9 is two, and bull stick 12 is respectively arranged among 11 top and bottom of nut.
Rubbing device 13 includes casing 131, motion bar 132, second spring 133, arc panel 134 and friction pulley 135, a left side
5 left part of side shaft and 5 right part of right side shaft are fitted with friction pulley 135, and friction pulley 135 is located in N-shaped frame 3, top in N-shaped frame 3
The casing 131 playing the guiding role is installed, motion bar 132 is located in casing 131 and cooperates with it, 132 top of motion bar among portion
It is connected with second spring 133 between 3 inner top of N-shaped frame, the arc panel 134 for increasing resistance is installed on 132 bottom end of motion bar, arc
Shape plate 134 is contacted with friction pulley 135.
It further include having water injector 15, water injector 15 includes water tank 151, plug 152, handle 153, cross bar 154, leads
Set 155, guide rod 156, antipriming pipe 157, outlet pipe 158, valve 159 and limited block 1510, the outer top center of N-shaped frame 3 bolt have
Water tank 151,151 top center of water tank are equipped with the plug 152 that water can be made to be added, 151 lower right side of left side water tank and right side water tank
151 left lowers are all connected with outlet pipe 158, are connected in outlet pipe 158 and water tank 151, and outlet pipe 158 is equipped with valve 159,
The antipriming pipe 157 that water sprays can be connect with 158 tail end of outlet pipe, be connected in antipriming pipe 157 and outlet pipe 158, antipriming pipe 157
Above connecting plate 9,151 external right side face lower part of left side water tank and the outer left side lower part of right side water tank 151 are fitted with cross bar
154, cross bar 154 inner end in the left and right sides is connected with guide sleeve 155, and guide rod 156 is located in guide sleeve 155 and cooperates with it, 156 bottom end of guide rod
It is connect with 157 top center of antipriming pipe, more convenient handle 153 two for pushing the present apparatus of operator can be made, handle 153 divides
It is not installed on the left side outer left side top of water tank 151 and 151 external right side face top of right side water tank, limited block 1510 is installed on guide rod
156 tops.
It further include having bracing wire 16, cutting ferrule 17, kelly 18 and reel 19, reel 19 is installed on 1 right side of left-side bottom
Middle part is wound with bracing wire 16 on reel 19, and 16 tail end of bracing wire is equipped with kelly 18, and bottom plate 1 left side top in right side is connected with card
Set 17, kelly 18 is located in cutting ferrule 17.
It further include having magnet 20 and iron block 21,157 top left side of left side antipriming pipe and 157 top right side of right side antipriming pipe are all
Magnet 20 is installed, 154 bottom right of left side cross bar and 154 bottom left of right side cross bar are fitted with iron block 21, iron block 21 with
Magnet 20 cooperates.
It is operated first personnel the present apparatus is moved on bridge floor, further according to the mobile left and right sides connecting plate 9 of width of dustcloth
To suitable distance, then by a roll of dust jacket between left and right sides connecting plate 9, twisting right side bull stick 12 is rotated forward and left side bull stick
12 reversions, right side bull stick 12, which rotates forward, drives right side nut 11 to rotate forward, and the rotating forward of right side nut 11 is moved inward by screw thread, right side spiral shell
Mother 11 moves inward drive right side sliding sleeve 7 and moves inward, and right side sliding sleeve 7 travels inward through right side connecting rod 8 and drives right side connecting plate 9
It being displaced outwardly, the first spring 10 stretches, and right side connecting plate 9, which is displaced outwardly, fixes dustcloth right end, stop twisting right side bull stick 12,
Meanwhile the reversion of left side bull stick 12 drives left side nut 11 to invert, left side nut 11 is moved right by left side screw thread, left side nut
11 move inward drive left side sliding sleeve 7 moves inward, left side sliding sleeve 7 travel inward through left side connecting rod 8 drive left side connecting plate 9 to
Outer movement, left side connecting plate 9, which is displaced outwardly, fixes dustcloth left end, stops twisting left side bull stick 12, and operator can pull
Dustcloth head end bedding is fixed on bridge floor, water is poured on dustcloth both ends, then push the present apparatus in bridge floor by wheel 2
Upper movement, the present apparatus is mobile to drive dustcloth rotation bedding on bridge floor, meanwhile, dustcloth rotation drives connecting plate 9 to rotate, connecting plate
9 rotations drive shaft 5 to rotate, and the power that rubbing device 13 then rotates shaft 5 buffers.Similarly, when bridge floor upper berth cover it is anti-
When dirt cloth, the mobile present apparatus can be stopped, twisting left side bull stick 12 is rotated forward to be inverted with right side bull stick 12, and then because of the first spring 10
Effect, connecting plate 9, which moves inward, unclamps dustcloth, stop twisting bull stick 12, remaining dustcloth can be removed.
When operator pushes the present apparatus by dustcloth bedding on bridge floor, the rotation of shaft 5 drives 135 turns of friction pulley
Dynamic, arc panel 134 increases resistance when then rotating to friction pulley 135, because of the effect of second spring 133, arc panel 134 always with rub
Wipe 135 contact of wheel.In this way, too fast when can prevent dustcloth from rotating cause to loosen influence bedding effect.
It is operated first personnel and pulls up plug 152 from water tank 151, then water is poured into water tank 151, have in water tank 151
When suitable water, plug 152 is got back into water tank 151, then antipriming pipe 157 is pulled to be moved upward to suitable position, it is porous
Pipe 157, which moves up, drives guide rod 156 to move up, when can be fixed on dustcloth on connecting plate 9, when dustcloth fixes
Afterwards, antipriming pipe 157 is unclamped, because of the influence of gravity, antipriming pipe 157 moves down recovery to original position, and limited block 1510 can then prevent
Antipriming pipe 157 moves down excessive, opening valve 159, and the water in water tank 151 is discharged into outlet pipe 158, in outlet pipe 158
Water is sprayed by antipriming pipe 157, and water is sprayed on dustcloth both ends and is drenched.When there is suitable water on dustcloth, valve is closed
159, water stops spraying, and can hold the dustcloth bedding after handle 153 pushes the present apparatus is mobile will to drench on bridge floor.Such as
This, can be such that dustcloth is tightly attached on bridge floor, and bedding effect is more preferable.
When the present apparatus is moved on bridge floor, operator can extract kelly 18 out of cutting ferrule 17, further according to dust-proof
The mobile left and right sides connecting plate 9 of the width of cloth when dustcloth is fixed on the connecting plate 9 of the left and right sides, then is pulled to suitable distance
Kelly 18 moves in insertion cutting ferrule 17, and then the present apparatus is moved by dustcloth bedding when on bridge floor, and bracing wire 16 plays position-limiting action,
In this way, the bedding of the left and right sides outside bias effect dustcloth of connecting plate 9 can be prevented.
When operator pulls antipriming pipe 157 to move up, antipriming pipe 157 is also moved up with moving magnet 20, magnet
20 move up when contacting with iron block 21, and magnet 20 and iron block 21 cooperate antipriming pipe 157 is fixed, can unclamp antipriming pipe 157.
When dustcloth is fixed on the connecting plate 9 of the left and right sides, antipriming pipe 157 can be pulled to move down recovery to original position, magnet 20 with
Iron block 21 is detached from.In this way, antipriming pipe 157 is pulled always without operator, it is convenient and efficient.
It is sub that the above description is only an embodiment of the present invention, is not intended to restrict the invention.It is all in principle of the invention
Within, made equivalent replacement should all be included in the protection scope of the present invention.The content category that the present invention is not elaborated
The prior art well known to this professional domain technical staff.
Claims (5)
1. a kind of bridge floor road construction dustcloth bedding equipment includes bottom plate (1), wheel (2), N-shaped frame (3), bearing block
(4), shaft (5), fixed plate (6) and support plate (14), bottom plate (1) bottom left and right sides symmetrical expression are equipped with support plate
(14), the connection wheel (2) of left and right sides support plate (14) lateral surface lower rotational formula, N-shaped frame (3) are two, one of n
Type frame (3) is installed on left-side bottom (1) top left side, another N-shaped frame (3) is installed on right side bottom plate (1) top right side, N-shaped
Middle part is all Embedded at left and right sides of frame (3) is equipped with bearing block (4), the bearing in shaft (5) and left and right sides bearing block (4)
Connection, left and right sides shaft (5) inner end is all connected with fixed plate (6), it is characterised in that: further include have sliding sleeve (7), connecting rod (8),
Connecting plate (9), the first spring (10), nut (11), bull stick (12) and rubbing device (13), shaft (5) and N-shaped frame (3) inner top
Between be equipped with rubbing device (13), left side shaft (5) right part and right side shaft (5) left part are all provided with screw thread, and shaft (5) is equipped with
Nut (11), nut (11) be threadedly engaged, be additionally provided in shaft (5) sliding sleeve (7), left and right sides fixed plate (6) lateral surface is all
Evenly spaced to be hinged with multiple connecting rods (8), left and right sides sliding sleeve (7) medial surface is also evenly spaced to be hinged with multiple connecting rods
(8), connecting plate (9) that can be fixed by dustcloth, connecting plate (9) medial surface and shaft are connected between left and right sides connecting rod (8) inner end
(5) between uniformly by be connected with the first spring (10), the bull stick (12) that connecting plate (9) can be made mobile is two, bull stick (12) point
It is not installed among nut (11) top and bottom.
2. a kind of bridge floor road construction dustcloth bedding equipment as described in claim 1, it is characterised in that: rubbing device
It (13) include casing (131), motion bar (132), second spring (133), arc panel (134) and friction pulley (135), left side turns
Axis (5) left part and right side shaft (5) right part are fitted with friction pulley (135), and friction pulley (135) is located in N-shaped frame (3), N-shaped frame
(3) casing (131) playing the guiding role is installed among inner top, motion bar (132) is located in casing (131) and cooperates with it,
Second spring (133) are connected between motion bar (132) top and N-shaped frame (3) inner top, increase the arc panel (134) of resistance
It is installed on motion bar (132) bottom end, arc panel (134) is contacted with friction pulley (135).
3. a kind of bridge floor road construction dustcloth bedding equipment as claimed in claim 2, it is characterised in that: further include having spray
Water installations (15), water injector (15) include water tank (151), plug (152), handle (153), cross bar (154), guide sleeve
(155), guide rod (156), antipriming pipe (157), outlet pipe (158), valve (159) and limited block (1510), N-shaped frame (3) push up outside
Portion's middle pin is connected to water tank (151), and water tank (151) top center is equipped with the plug (152) that water can be made to be added, left side water tank
(151) lower right side and right side water tank (151) left lower are all connected with outlet pipe (158), outlet pipe (158) and water tank
(151) connection in, outlet pipe (158) are equipped with valve (159), the antipriming pipe (157) and outlet pipe (158) tail that can spray water
It is connected in end connection, antipriming pipe (157) and outlet pipe (158), antipriming pipe (157) is located above connecting plate (9), left side water tank
(151) external right side face lower part and right side water tank (151) outer left side lower part are fitted with cross bar (154), left and right sides cross bar
(154) inner end is connected with guide sleeve (155), and guide rod (156) is located in guide sleeve (155) and cooperates with it, guide rod (156) bottom end with it is porous
The connection of (157) top center is managed, can make the more convenient handle (153) for pushing the present apparatus of operator is two, handle (153) point
It is not installed on left side water tank (151) outer left side top and right side water tank (151) external right side face top, limited block (1510) installation
In guide rod (156) top.
4. a kind of bridge floor road construction dustcloth bedding equipment as claimed in claim 3, it is characterised in that: further include having drawing
Line (16), cutting ferrule (17), kelly (18) and reel (19), reel (19) are installed on left-side bottom (1) right flank middle part, around
It is wound in line wheel (19) bracing wire (16), bracing wire (16) tail end is equipped with kelly (18), and right side bottom plate (1) left side top is connected with
Cutting ferrule (17), kelly (18) are located in cutting ferrule (17).
5. a kind of bridge floor road construction dustcloth bedding equipment as claimed in claim 4, it is characterised in that: further include having magnetic
Iron (20) and iron block (21), left side antipriming pipe (157) top left side and right side antipriming pipe (157) top right side are fitted with magnet
(20), left side cross bar (154) bottom right and right side cross bar (154) bottom left are fitted with iron block (21), iron block (21) with
Magnet (20) cooperation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811233488.7A CN109183581B (en) | 2018-10-23 | 2018-10-23 | Bridge floor is dustproof cloth equipment of laying down for road construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811233488.7A CN109183581B (en) | 2018-10-23 | 2018-10-23 | Bridge floor is dustproof cloth equipment of laying down for road construction |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109183581A true CN109183581A (en) | 2019-01-11 |
CN109183581B CN109183581B (en) | 2020-12-01 |
Family
ID=64942677
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811233488.7A Active CN109183581B (en) | 2018-10-23 | 2018-10-23 | Bridge floor is dustproof cloth equipment of laying down for road construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109183581B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111893850A (en) * | 2020-08-11 | 2020-11-06 | 王海燕 | Road maintenance device that nearly desert area used |
CN112227156A (en) * | 2020-10-23 | 2021-01-15 | 怀化都市麦田园林景观工程有限公司 | Pebble arrangement laying device for garden construction |
CN112921768A (en) * | 2021-03-25 | 2021-06-08 | 蚌埠市思创沥青路面工程有限公司 | Asphalt pavement full-section one-time paving forming construction equipment and method thereof |
CN113047136A (en) * | 2021-04-15 | 2021-06-29 | 湖南发通路桥集团有限公司 | Multifunctional environment-friendly semi-flexible asphalt pavement construction method |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2003066331A1 (en) * | 2002-02-04 | 2003-08-14 | Leroy Payne | Structure forming method and apparatus |
CN201416131Y (en) * | 2009-06-11 | 2010-03-03 | 中铁十七局集团有限公司 | Geotextile coiling and uncoiling trolley for maintenance purpose |
CN204356812U (en) * | 2014-12-23 | 2015-05-27 | 林清辉 | A kind of compressing structure of the automatic installation apparatus of waterproof roll of ground |
WO2016166758A1 (en) * | 2015-04-15 | 2016-10-20 | Prime Innovative Machinery Ltd. | Geotextile deployment apparatus and method |
CN205857730U (en) * | 2016-06-21 | 2017-01-04 | 中建七局第一建筑有限公司 | Construction Air Filter laying apparatus |
CN206438377U (en) * | 2017-01-09 | 2017-08-25 | 田艳秋 | A kind of highway engineering construction Machine for spread geotext ile |
CN108360348A (en) * | 2018-01-22 | 2018-08-03 | 毕金鹤 | A kind of concrete road geotextile laying machine |
CN108425307A (en) * | 2018-04-26 | 2018-08-21 | 曾庆发 | A kind of road construction concrete curing device |
CN108557566A (en) * | 2018-04-20 | 2018-09-21 | 张吉超 | A kind of weaving cotton wound device |
CN207905489U (en) * | 2017-12-25 | 2018-09-25 | 新昌县博杰机械有限公司 | A kind of Air Filter laying apparatus for building |
-
2018
- 2018-10-23 CN CN201811233488.7A patent/CN109183581B/en active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2003066331A1 (en) * | 2002-02-04 | 2003-08-14 | Leroy Payne | Structure forming method and apparatus |
CN201416131Y (en) * | 2009-06-11 | 2010-03-03 | 中铁十七局集团有限公司 | Geotextile coiling and uncoiling trolley for maintenance purpose |
CN204356812U (en) * | 2014-12-23 | 2015-05-27 | 林清辉 | A kind of compressing structure of the automatic installation apparatus of waterproof roll of ground |
WO2016166758A1 (en) * | 2015-04-15 | 2016-10-20 | Prime Innovative Machinery Ltd. | Geotextile deployment apparatus and method |
CN205857730U (en) * | 2016-06-21 | 2017-01-04 | 中建七局第一建筑有限公司 | Construction Air Filter laying apparatus |
CN206438377U (en) * | 2017-01-09 | 2017-08-25 | 田艳秋 | A kind of highway engineering construction Machine for spread geotext ile |
CN207905489U (en) * | 2017-12-25 | 2018-09-25 | 新昌县博杰机械有限公司 | A kind of Air Filter laying apparatus for building |
CN108360348A (en) * | 2018-01-22 | 2018-08-03 | 毕金鹤 | A kind of concrete road geotextile laying machine |
CN108557566A (en) * | 2018-04-20 | 2018-09-21 | 张吉超 | A kind of weaving cotton wound device |
CN108425307A (en) * | 2018-04-26 | 2018-08-21 | 曾庆发 | A kind of road construction concrete curing device |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111893850A (en) * | 2020-08-11 | 2020-11-06 | 王海燕 | Road maintenance device that nearly desert area used |
CN112227156A (en) * | 2020-10-23 | 2021-01-15 | 怀化都市麦田园林景观工程有限公司 | Pebble arrangement laying device for garden construction |
CN112921768A (en) * | 2021-03-25 | 2021-06-08 | 蚌埠市思创沥青路面工程有限公司 | Asphalt pavement full-section one-time paving forming construction equipment and method thereof |
CN113047136A (en) * | 2021-04-15 | 2021-06-29 | 湖南发通路桥集团有限公司 | Multifunctional environment-friendly semi-flexible asphalt pavement construction method |
Also Published As
Publication number | Publication date |
---|---|
CN109183581B (en) | 2020-12-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109183581A (en) | A kind of bridge floor road construction dustcloth bedding equipment | |
CN105290054B (en) | Steel pipe inside and outside wall combines cleaning plant | |
CN107282346A (en) | A kind of bearing mnanufacture spraying equipment | |
CN109737265B (en) | Detection method of resin detection device for CIPP (cleaning in place) repaired pipeline | |
CN205393050U (en) | Special dust remover of electric power system | |
CN109013435B (en) | Rubber toy ball cleaning equipment for infants | |
CN108499942A (en) | A kind of environmental protection machinery surface greasy-removing device | |
CN106859516A (en) | A kind of family removes grease and uses high pressure washer | |
CN109147484A (en) | A kind of multi-functional sand table of new-type Psychological Teaching | |
CN107824584A (en) | A kind of constructing tunnel barrel of cement cleaning device | |
CN206676776U (en) | The attached dirt clearing apparatus of poly (methyl methacrylate) plate | |
CN209829775U (en) | Fill standpipe clearance robot | |
CN210204630U (en) | Portable high-pressure water gun | |
CN220918564U (en) | Dustproof device for road bridge construction | |
CN220329528U (en) | Auxiliary use type cart | |
CN220346606U (en) | Hydrologic cableway cleaning equipment | |
CN109169979A (en) | A kind of fresh tea leaf spin-drier | |
CN208960563U (en) | Medicine bottle cleaning equipment | |
CN220225193U (en) | Trash device for water conservancy river operation | |
CN106623124A (en) | Single electric system dirt cleaning machine | |
CN106654975A (en) | Assistor for tour inspection and maintenance of power line | |
CN106623044A (en) | Portable insulator surface cleaning device | |
CN106623033A (en) | Electric power system insulation protection assist device for single person | |
CN106623035A (en) | Electric power maintenance cleaning assist tool for single person | |
CN107681970A (en) | A kind of solar panels cleaning equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20201113 Address after: Room 121 B, R & D building, science and Technology Park, Shanghai Jiaotong University (Jiaxing), No.321 Jiachuang Road, Gaozhao street, Xiuzhou District, Jiaxing City, Zhejiang Province Applicant after: Jiaxing Guantong Electromechanical Technology Co., Ltd Address before: 330009 Room 303, Unit 2, Building 145 Dongtan Lane, Xihu District, Nanchang City, Jiangxi Province Applicant before: Luo Jin |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |