CN109179837A - A kind of multi-filtering sewage distil(l) collection device - Google Patents

A kind of multi-filtering sewage distil(l) collection device Download PDF

Info

Publication number
CN109179837A
CN109179837A CN201811178190.0A CN201811178190A CN109179837A CN 109179837 A CN109179837 A CN 109179837A CN 201811178190 A CN201811178190 A CN 201811178190A CN 109179837 A CN109179837 A CN 109179837A
Authority
CN
China
Prior art keywords
upside
combination
filtering tank
plate
steam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811178190.0A
Other languages
Chinese (zh)
Other versions
CN109179837B (en
Inventor
张淑华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongling Jiye Water Purification Material Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811178190.0A priority Critical patent/CN109179837B/en
Publication of CN109179837A publication Critical patent/CN109179837A/en
Application granted granted Critical
Publication of CN109179837B publication Critical patent/CN109179837B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/001Processes for the treatment of water whereby the filtration technique is of importance
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/02Treatment of water, waste water, or sewage by heating
    • C02F1/04Treatment of water, waste water, or sewage by heating by distillation or evaporation
    • C02F1/043Details
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/02Treatment of water, waste water, or sewage by heating
    • C02F1/04Treatment of water, waste water, or sewage by heating by distillation or evaporation
    • C02F1/048Purification of waste water by evaporation
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2303/00Specific treatment goals
    • C02F2303/04Disinfection

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Water Supply & Treatment (AREA)
  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Filtration Of Liquid (AREA)
  • Vaporization, Distillation, Condensation, Sublimation, And Cold Traps (AREA)

Abstract

The present invention relates to a kind of filter sewage devices, are in particular a kind of multi-filtering sewage distil(l) collection devices.Sewage carries out primary filter by cartridge filter, filters out the impurity of the inside, is then entered in steam combination by centrifugal blower, high-temperature sterilization is carried out in steam combination, and generate water vapour, water vapour is condensed into distilled water afterwards to the cold, and is collected.Filtration combination is installed on the left of steam combination, filtration combination is connect with steam combination, filtration combination is installed on cooling combination left side, and filtration combination is installed on the inside of outer skeleton, and filtration combination is bolted with outer skeleton, steam combination is installed on cooling combination left side, steam combination is connect with cooling assembling bolt, and steam combination is installed on the inside of outer skeleton, and steam combination is bolted with outer skeleton, cooling combination is installed on the inside of outer skeleton, and cooling combination is connect with outer skeleton.

Description

A kind of multi-filtering sewage distil(l) collection device
Technical field
The present invention relates to a kind of filter sewage devices, are in particular a kind of multi-filtering sewage distil(l) collection dresses It sets.
Background technique
Sewage due to be doped in water contamination sources, pathogen, plant nutrient substance and result in the variation of water quality, thus It loses originally using function, and the yield of sewage rises year by year, and each drop sewage will pollute several times, decades of times Water body causes serious threat to biology, environment, plant or even the health of the mankind in water, so devising this multiple Filter sewage distil(l) collection device.
Summary of the invention
The present invention provides a kind of multi-filtering sewage distil(l) collection device, beneficial to benefit be sewage by cartridge filter into Row primary filter filters out the impurity of the inside, is then entered in steam combination by centrifugal blower, carried out in steam combination High-temperature sterilization, and water vapour is generated, water vapour is condensed into distilled water afterwards to the cold, and is collected.
In order to solve the above technical problems, being in particular a kind of multiple mistake the present invention relates to a kind of filter sewage device Filter sewage distil(l) collection device, including filtration combination, steam combination, cooling combination, outer skeleton, sewage by cartridge filter into Row primary filter filters out the impurity of the inside, is then entered in steam combination by centrifugal blower, carried out in steam combination High-temperature sterilization, and water vapour is generated, water vapour is condensed into distilled water afterwards to the cold, and is collected.
Filtration combination is made of combination of drawing water, cartridge filter, pond cover, reservoir, and combination of drawing water is installed on the left of cartridge filter, Combination of drawing water is bolted with cartridge filter, and combination of drawing water is installed on the left of pond cover, and combination of drawing water is installed on the left of reservoir, mistake Filter cylinder is installed on the upside of pond cover, and cartridge filter is bolted with pond cover, and cartridge filter is installed on the upside of reservoir, pond cover installation On the upside of reservoir, pond cover is bolted with reservoir;
Combination of drawing water is made of spiral case, blade wheel, pedestal, filtering suction nozzle, and spiral case is installed on the outside of blade wheel, spiral case and leaf Piece wheel axis connection, spiral case are mounted on the base side, spiral case and tube chamber welds with base, and spiral case is installed on the upside of filtering suction nozzle, spiral case and mistake It filters suction nozzle to be threadedly coupled, blade wheel is mounted on the base side, and blade wheel is installed on the upside of filtering suction nozzle, and pedestal is installed on filtering and inhales Mouth side;
Cartridge filter is by filtering tank water inlet pipe, filtering tank body, filter cotton bracket, filter cotton, draining plate, filtering tank supporting leg, mistake Filter tank outlet tube composition, filtering tank water inlet pipe are installed on the upside of filtering tank body, filtering tank water inlet pipe and filtering tank body welding, filtering Tank water inlet pipe is installed on the upside of filter cotton bracket, and filtering tank water inlet pipe is installed on the upside of filter cotton, and filtering tank water inlet pipe is installed on On the upside of draining plate, filtering tank water inlet pipe is installed on the upside of filtering tank supporting leg, and filtering tank water inlet pipe is installed on filtering tank outlet tube Side, filtering tank body are installed on filter cotton stent outer, and filtering tank body and filter cotton bracket weld, and filtering tank body is installed on filter cotton Outside, filtering tank body are connect with filter cotton, and filtering tank body is installed on the outside of draining plate, and filtering tank body and draining plate weld, filtering Tank body is installed on the upside of filtering tank supporting leg, and filtering tank body and filtering tank supporting leg weld, and filtering tank body is installed on filtering tank outlet tube Upside, filtering tank body and filtering tank outlet tube weld, and filter cotton bracket is installed on the downside of filter cotton, filter cotton bracket and filter cotton Connection, filter cotton bracket are installed on the upside of draining plate, and filter cotton bracket is installed on filtering tank supporting leg side, the installation of filter cotton bracket On the upside of filtering tank outlet tube, filter cotton is installed on the upside of draining plate, and filter cotton is installed on filtering tank supporting leg side, filter cotton peace On the upside of filtering tank outlet tube, draining plate is installed on filtering tank supporting leg side, and draining plate is installed on the upside of filtering tank outlet tube, Filtering tank supporting leg is installed on filtering tank outlet tube side;
Steam combination is by plate group, steam extraction machine, escape pipe, centrifugal blower, steam cover, evaporative cylinder, heater group At, plate group is installed on the left of steam extraction machine, and plate group is connect with steam extraction machine, and plate group is installed on the left of escape pipe, Plate group is installed on the upside of centrifugal blower, and plate group is installed on steam drum and covers side, and plate group is installed on the upside of evaporative cylinder, plate Group is installed on the upside of heater, and steam extraction machine is installed on the downside of escape pipe, and steam extraction machine and escape pipe weld, steam extraction Machine is installed on the upside of centrifugal blower, and steam extraction machine is installed on steam drum and covers side, and steam extraction machine and steam cover are welded, steamed Vapour extraction machine is installed on the upside of evaporative cylinder, and steam extraction machine is installed on the upside of heater, and escape pipe is installed on the upside of centrifugal blower, Escape pipe is installed on steam drum and covers side, and escape pipe is installed on the upside of evaporative cylinder, and escape pipe is installed on the upside of heater, is centrifuged wind Machine is installed on steam cover side, and centrifugal blower is installed on evaporative cylinder side, and centrifugal blower and evaporative cylinder weld, centrifugal blower peace Loaded on heater side, steam cover is installed on the upside of evaporative cylinder, and steam cover is bolted with evaporative cylinder, the installation of steam cover On the upside of heater, evaporative cylinder is installed on the upside of heater;
Plate group is by gate valve motor, gear, straight line plate valve housing one, plate, valve body, sealing framework, seal groove, tooth Item, sliding block, guide rail composition, gate valve motor are co-axially mounted with gear, and gate valve motor is installed in straight line plate valve housing one Side, gate valve motor are bolted with straight line plate valve housing one, and gate valve motor is installed on the left of plate, gate valve motor peace Loaded on the left of valve body, gate valve motor is installed on the left of sealing framework, and gate valve motor is installed on the left of seal groove, gate valve electricity Machine is installed on the upside of rack gear, and gate valve motor is installed on the upside of sliding block, and gate valve motor is installed on the upside of guide rail, and gear is installed on One inside of straight line plate valve housing, gear are installed on the left of plate, and gear is installed on the left of valve body, and gear is installed on sealing framework Left side, gear are installed on the left of seal groove, and gear is installed on the upside of rack gear, and wheel and rack engagement, gear is installed on sliding block Side, gear are installed on the upside of guide rail, and straight line plate valve housing one is installed on the left of plate, and straight line plate valve housing one is installed on valve On the left of body, straight line plate valve housing one is installed on the left of sealing framework, and straight line plate valve housing one is installed on the left of seal groove, directly Line plate valve housing one is installed on the outside of rack gear, and straight line plate valve housing one is installed on the outside of sliding block, straight line plate valve housing one It is installed on the outside of guide rail, straight line plate valve housing one is bolted with guide rail, and plate is installed on the left of valve body, and plate is installed on close It seals on the left of skeleton, plate is installed on the left of seal groove, and plate is connect with seal groove, and plate and seal groove are interference fitted, plate peace Loaded on the right side of rack gear, plate is bolted with rack gear, and plate is installed on the right side of sliding block, and plate is installed on the right side of guide rail, valve body peace Loaded on the inside of sealing framework, valve body is bolted with sealing framework, and valve body is installed on the inside of seal groove, and valve body is installed on a rack gear left side Side, valve body are installed on the left of sliding block, and valve body is installed on the left of guide rail, and sealing framework is installed on the outside of seal groove, sealing framework with Seal groove connection, sealing framework and seal groove are interference fitted, and sealing framework is installed on the left of rack gear, and sealing framework is installed on sliding block Left side, sealing framework are installed on the left of guide rail, and seal groove is installed on the left of rack gear, and seal groove is installed on the left of sliding block, seal groove It is installed on the left of guide rail, rack gear is installed on the upside of sliding block, and rack gear is bolted with sliding block, and rack gear is installed on the upside of guide rail, sliding block It is installed on the upside of guide rail, sliding block is connect with guide rail;
Steam extraction machine is made of suction blade, air duct, bleed motor, and suction blade is installed on the inside of air duct, is evacuated leaf Piece is installed on the upside of bleed motor, and suction blade and bleed motor axis connection, air duct are installed on the outside of bleed motor, air duct and pumping Pneumatic generator is bolted;
Cooling combination is made of air compression plant, coolant liquid liquefying plant, cooling tank, air inlet, cooling tube, air pressure Compression apparatus is installed on the downside of coolant liquid liquefying plant, and air compression plant is connect with coolant liquid liquefying plant, air compression plant It is installed on the right side of cooling tank, air compression plant is installed on the right side of air inlet, and air compression plant is installed on the right side of cooling tube, empty Air pressure compression apparatus is connect with cooling tube, and coolant liquid liquefying plant is installed on the upside of cooling tank, coolant liquid liquefying plant and cooling tank Connection, coolant liquid liquefying plant are installed on the upside of air inlet, and coolant liquid liquefying plant is installed on the upside of cooling tube, coolant liquid liquefaction Device is threadedly coupled with cooling tube, and cooling tank is installed on the right side of air inlet, and cooling tank and air inlet weld, and cooling tank is installed on cold But on the outside of pipe, cooling tank is connect with cooling tube, and air inlet is installed on the left of cooling tube;
Coolant liquid liquefying plant is made of liquefaction blower, air inlet, Air Filter, liquefaction cabinet, liquefaction pipe, liquefaction blower peace Loaded on the left of air inlet, liquefaction assembling on the left of Air Filter, liquefaction assembling on the upside of liquefaction cabinet, liquefaction blower with Liquefaction cabinet is bolted, and air inlet is installed on the outside of Air Filter, and air inlet is connect with Air Filter, and air inlet is installed on liquefied tank On the upside of body, air inlet is bolted with liquefaction cabinet, and air inlet is installed on the upside of liquefaction pipe, and Air Filter is installed on liquefaction cabinet Side, Air Filter are installed on the upside of liquefaction pipe, and liquefaction cabinet is installed on the inside of liquefaction pipe, and liquefaction cabinet is connect with liquefaction pipe;
Filtration combination is installed on the left of steam combination, and filtration combination is connect with steam combination, and filtration combination is installed on cooling Combination left side, filtration combination are installed on the inside of outer skeleton, and filtration combination is bolted with outer skeleton, and steam combination is installed on cooling Combination left side, steam combination are connect with cooling assembling bolt, and steam combination is installed on the inside of outer skeleton, steam combination and outer skeleton It is bolted, cooling combination is installed on the inside of outer skeleton, and cooling combination is connect with outer skeleton.
As advanced optimizing for the technical program, described in a kind of multi-filtering sewage distil(l) collection device of the present invention Filter cotton number of holders is four.
As advanced optimizing for the technical program, described in a kind of multi-filtering sewage distil(l) collection device of the present invention Filter cotton quantity is four.
As advanced optimizing for the technical program, described in a kind of multi-filtering sewage distil(l) collection device of the present invention Seal groove material is rubber.
Multi-filtering sewage distil(l) collection device of the present invention has the beneficial effect that
Sewage carries out primary filter by cartridge filter, filters out the impurity of the inside, then enters steaming by centrifugal blower In vapour combination, high-temperature sterilization being carried out in steam combination, and generate water vapour, water vapour is condensed into distilled water afterwards to the cold, and It is collected.
Detailed description of the invention
The present invention will be further described in detail with specific implementation method with reference to the accompanying drawing.
Fig. 1 is a kind of structural schematic diagram of multi-filtering sewage distil(l) collection device of the present invention.
Fig. 2 is a kind of 1 structural schematic diagram of filtration combination of multi-filtering sewage distil(l) collection device of the present invention.
Fig. 3 is that a kind of drawing water for multi-filtering sewage distil(l) collection device of the present invention combines 1-1 structural schematic diagram.
Fig. 4 is a kind of cartridge filter 1-2 structural schematic diagram of multi-filtering sewage distil(l) collection device of the present invention.
Fig. 5 is a kind of 2 structural schematic diagram of steam combination of multi-filtering sewage distil(l) collection device of the present invention.
Fig. 6 is a kind of plate group 2-1 structural schematic diagram of multi-filtering sewage distil(l) collection device of the present invention.
Fig. 7 is a kind of steam extraction machine 2-2 structural schematic diagram of multi-filtering sewage distil(l) collection device of the present invention.
Fig. 8 is a kind of 3 structural schematic diagrams of cooling combination of multi-filtering sewage distil(l) collection device of the present invention.
Fig. 9 is that a kind of 3 partial enlargement structures of cooling combination of multi-filtering sewage distil(l) collection device of the present invention are shown It is intended to.
Figure 10 is that a kind of coolant liquid liquefying plant 3-2 structure of multi-filtering sewage distil(l) collection device of the present invention is shown It is intended to.
In figure: filtration combination 1;It draws water and combines 1-1;Spiral case 1-1-1;Blade wheel 1-1-2;Pedestal 1-1-3;Filter suction nozzle 1- 1-4;Cartridge filter 1-2;Filtering tank water inlet pipe 1-2-1;Filter tank body 1-2-2;Filter cotton bracket 1-2-3;Filter cotton 1-2-4;It leads Liquid plate 1-2-5;Filtering tank supporting leg 1-2-6;Filtering tank outlet tube 1-2-7;Pond cover 1-3;Reservoir 1-4;Steam combination 2;It inserts Board group 2-1;Gate valve motor 2-1-1;Gear 2-1-2;One 2-1-3 of straight line plate valve housing;Plate 2-1-4;Valve body 2-1-5; Sealing framework 2-1-6;Seal groove 2-1-7;Rack gear 2-1-8;Sliding block 2-1-9;Guide rail 2-1-10;Steam extraction machine 2-2;It is evacuated leaf Piece 2-2-1;Air duct 2-2-2;Bleed motor 2-2-3;Escape pipe 2-3;Centrifugal blower 2-4;Steam cover 2-5;Evaporative cylinder 2-6; Heater 2-7;Cooling combination 3;Air compression plant 3-1;Coolant liquid liquefying plant 3-2;Liquefy blower 3-2-1;Air inlet 3- 2-2;Air Filter 3-2-3;Liquefy cabinet 3-2-4;Liquefy pipe 3-2-5;Cooling tank 3-3;Air inlet 3-4;Cooling tube 3-5;Dermoskeleton Frame 4.
Specific embodiment
Specific embodiment 1:
Illustrate present embodiment below with reference to Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6, Fig. 7, Fig. 8, Fig. 9, Figure 10, the present invention It is related to a kind of filter sewage device, is in particular a kind of multi-filtering sewage distil(l) collection device, including filtering group 1, steam combination 2, cooling combination 3, outer skeleton 4 are closed, sewage carries out primary filter by cartridge filter, filters out the miscellaneous of the inside Matter is then entered in steam combination by centrifugal blower, high-temperature sterilization is carried out in steam combination, and generate water vapour, water Steam is condensed into distilled water afterwards to the cold, and is collected.
Filtration combination 1 is combined 1-1, cartridge filter 1-2, pond cover 1-3, reservoir 1-4 and is formed by drawing water, and is drawn water and is combined 1-1 It is installed on the left of cartridge filter 1-2, draws water and combine 1-1 and cartridge filter 1-2 and be bolted, draw water and combine 1-1 and be installed on pond cover 1-3 Left side draws water and combines 1-1 and be installed on the left of reservoir 1-4, and cartridge filter 1-2 is installed on the upside of pond cover 1-3, cartridge filter 1-2 with Pond cover 1-3 is bolted, and cartridge filter 1-2 is installed on the upside of reservoir 1-4, and pond cover 1-3 is installed on the upside of reservoir 1-4, Pond cover 1-3 is bolted with reservoir 1-4;
Draw water combine 1-1 by spiral case 1-1-1, blade wheel 1-1-2, pedestal 1-1-3, filtering suction nozzle 1-1-4 form, spiral case 1- 1-1 is installed on the outside of blade wheel 1-1-2, and spiral case 1-1-1 and blade wheel 1-1-2 axis connection, spiral case 1-1-1 are installed on pedestal 1-1- 3 upsides, spiral case 1-1-1 and pedestal 1-1-3 are welded, and spiral case 1-1-1 is installed on the upside of filtering suction nozzle 1-1-4, spiral case 1-1-1 and mistake It filters suction nozzle 1-1-4 to be threadedly coupled, blade wheel 1-1-2 is installed on the upside of pedestal 1-1-3, and blade wheel 1-1-2 is installed on filtering suction nozzle On the upside of 1-1-4, pedestal 1-1-3 is installed on the filtering side suction nozzle 1-1-4, blade wheel 1-1-2 high speed rotation, blade wheel 1-1-2 band Dynamic sewage high speed rotation, when sewage high speed rotation, generate centrifugal force, and sewage produces very big kinetic energy at this time, and kinetic energy generates static pressure Can, sewage is sent into the filtering tank water inlet pipe 1-2-1 of eminence, after sewage is sent in pump, at filtering suction nozzle 1-1-4 Pressure is less than external atmosphere pressure, and under the action of pressure difference, sewage is entered in spiral case 1-1-1 by filtering suction nozzle 1-1-4, sewage Endlessly it is inhaled into;
Cartridge filter 1-2 is by filtering tank water inlet pipe 1-2-1, filtering tank body 1-2-2, filter cotton bracket 1-2-3, filter cotton 1-2- 4, draining plate 1-2-5, filtering tank supporting leg 1-2-6, filtering tank outlet tube 1-2-7 composition, filtering tank water inlet pipe 1-2-1 were installed on On the upside of filter tank body 1-2-2, filtering tank water inlet pipe 1-2-1 and filtering tank body 1-2-2 welding, filtering tank water inlet pipe 1-2-1 are installed on On the upside of filter cotton bracket 1-2-3, filtering tank water inlet pipe 1-2-1 is installed on the upside of filter cotton 1-2-4, filtering tank water inlet pipe 1-2-1 It is installed on the upside of draining plate 1-2-5, filtering tank water inlet pipe 1-2-1 is installed on the upside of filtering tank supporting leg 1-2-6, filtering tank water inlet pipe 1-2-1 is installed on the upside of filtering tank outlet tube 1-2-7, and filtering tank body 1-2-2 is installed on the outside of filter cotton bracket 1-2-3, filtering Tank body 1-2-2 and filter cotton bracket 1-2-3 is welded, and filtering tank body 1-2-2 is installed on the outside of filter cotton 1-2-4, filters tank body 1- 2-2 is connect with filter cotton 1-2-4, and filtering tank body 1-2-2 is installed on the outside of draining plate 1-2-5, filters tank body 1-2-2 and draining plate 1-2-5 welding, filtering tank body 1-2-2 are installed on the upside of filtering tank supporting leg 1-2-6, filtering tank body 1-2-2 and filtering tank supporting leg 1- 2-6 welding, filtering tank body 1-2-2 are installed on the upside of filtering tank outlet tube 1-2-7, filtering tank body 1-2-2 and filtering tank outlet tube 1-2-7 welding, filter cotton bracket 1-2-3 are installed on the downside of filter cotton 1-2-4, and filter cotton bracket 1-2-3 and filter cotton 1-2-4 connect It connects, filter cotton bracket 1-2-3 is installed on the upside of draining plate 1-2-5, and filter cotton bracket 1-2-3 is installed on filtering tank supporting leg 1-2-6 Side, filter cotton bracket 1-2-3 are installed on the upside of filtering tank outlet tube 1-2-7, and filter cotton 1-2-4 is installed on draining plate 1-2-5 Upside, filter cotton 1-2-4 are installed on the side filtering tank supporting leg 1-2-6, and filter cotton 1-2-4 is installed on filtering tank outlet tube 1-2-7 Upside, draining plate 1-2-5 are installed on the side filtering tank supporting leg 1-2-6, and draining plate 1-2-5 is installed on filtering tank outlet tube 1-2-7 Upside, filtering tank supporting leg 1-2-6 are installed on the side filtering tank outlet tube 1-2-7, and sewage is constantly sent into filtering tank water inlet pipe In 1-2-1, sewage is entered in filtering tank body 1-2-2 by filtering tank water inlet pipe 1-2-1, and sewage passes through filter cotton 1-2-4, part Sewage flows out from gap between filter cotton bracket 1-2-3 and filtering tank body 1-2-2, is blocked when flowing down by draining plate 1-2-5, dirty Water is pooled to next layer of filter cotton bracket 1-2-3 filtering, causes after being blocked with effective solution filter cotton 1-2-4 The problems such as filtering efficiency reduces, and filter effect is deteriorated, reduces the replacement cycle of filter cotton 1-2-4, and sewage passes through four layers of filter cotton 1- After 2-4 filtering, contaminant filter in sewage more thoroughly, the sewage of primary filter is sent by filtering tank outlet tube 1-2-7 Enter in reservoir 1-4;
Steam combination 2 by plate group 2-1, steam extraction machine 2-2, escape pipe 2-3, centrifugal blower 2-4, steam cover 2-5, Evaporative cylinder 2-6, heater 2-7 composition, plate group 2-1 are installed on the left of steam extraction machine 2-2, plate group 2-1 and steam extraction Machine 2-2 connection, plate group 2-1 are installed on the left of escape pipe 2-3, and plate group 2-1 is installed on the upside of centrifugal blower 2-4, plate group 2-1 is installed on the upside of steam cover 2-5, and plate group 2-1 is installed on the upside of evaporative cylinder 2-6, and plate group 2-1 is installed on heater 2- 7 upsides, steam extraction machine 2-2 are installed on the downside of escape pipe 2-3, and steam extraction machine 2-2 and escape pipe 2-3 are welded, steam extraction Machine 2-2 is installed on the upside of centrifugal blower 2-4, and steam extraction machine 2-2 is installed on the upside of steam cover 2-5, steam extraction machine 2-2 with Steam cover 2-5 welding, steam extraction machine 2-2 are installed on the upside of evaporative cylinder 2-6, and steam extraction machine 2-2 is installed on heater 2-7 Upside, escape pipe 2-3 are installed on the upside of centrifugal blower 2-4, and escape pipe 2-3 is installed on the upside of steam cover 2-5, escape pipe 2-3 It is installed on the upside of evaporative cylinder 2-6, escape pipe 2-3 is installed on the upside of heater 2-7, and centrifugal blower 2-4 is installed on steam cover 2-5 Side, centrifugal blower 2-4 are installed on the side evaporative cylinder 2-6, and centrifugal blower 2-4 and evaporative cylinder 2-6 are welded, centrifugal blower 2-4 peace Loaded on the side heater 2-7, steam cover 2-5 is installed on the upside of evaporative cylinder 2-6, and steam cover 2-5 and evaporative cylinder 2-6 bolt connect It connects, steam cover 2-5 is installed on the upside of heater 2-7, and evaporative cylinder 2-6 is installed on the upside of heater 2-7, starts centrifugal blower 2- The sewage of primary filter in reservoir 1-4 is sent in evaporative cylinder 2-6 by 4, centrifugal blower 2-4, and starting heater 2-7 heating is just The sewage of grade filtering, the sewage evaporation of primary filter become vapor, the rapid spatial expansion of vapor, 2 internal pressure of steam combination Power increases;
Plate group 2-1 by gate valve motor 2-1-1, gear 2-1-2, one 2-1-3 of straight line plate valve housing, plate 2-1-4, Valve body 2-1-5, sealing framework 2-1-6, seal groove 2-1-7, rack gear 2-1-8, sliding block 2-1-9, guide rail 2-1-10 composition, gate valve Motor 2-1-1 is co-axially mounted with gear 2-1-2, and gate valve motor 2-1-1 is installed on the inside of one 2-1-3 of straight line plate valve housing, Gate valve motor 2-1-1 is bolted with one 2-1-3 of straight line plate valve housing, and gate valve motor 2-1-1 is installed on plate 2-1-4 Left side, gate valve motor 2-1-1 are installed on the left of valve body 2-1-5, and it is left that gate valve motor 2-1-1 is installed on sealing framework 2-1-6 Side, gate valve motor 2-1-1 are installed on the left of seal groove 2-1-7, and gate valve motor 2-1-1 is installed on the upside of rack gear 2-1-8, are inserted Plate valve motor 2-1-1 is installed on the upside of sliding block 2-1-9, and gate valve motor 2-1-1 is installed on the upside of guide rail 2-1-10, gear 2-1- 2 are installed on the inside of one 2-1-3 of straight line plate valve housing, and gear 2-1-2 is installed on the left of plate 2-1-4, and gear 2-1-2 is installed on On the left of valve body 2-1-5, gear 2-1-2 is installed on the left of sealing framework 2-1-6, and it is left that gear 2-1-2 is installed on seal groove 2-1-7 Side, gear 2-1-2 are installed on the upside of rack gear 2-1-8, and gear 2-1-2 is engaged with rack gear 2-1-8, and gear 2-1-2 is installed on sliding block On the upside of 2-1-9, gear 2-1-2 is installed on the upside of guide rail 2-1-10, and one 2-1-3 of straight line plate valve housing is installed on plate 2-1-4 Left side, one 2-1-3 of straight line plate valve housing are installed on the left of valve body 2-1-5, and one 2-1-3 of straight line plate valve housing is installed on sealing On the left of skeleton 2-1-6, one 2-1-3 of straight line plate valve housing is installed on the left of seal groove 2-1-7, one 2-1- of straight line plate valve housing 3 are installed on the outside of rack gear 2-1-8, and one 2-1-3 of straight line plate valve housing is installed on the outside of sliding block 2-1-9, straight line plate valve housing One 2-1-3 is installed on the outside of guide rail 2-1-10, and straight line plate valve housing one 2-1-3 and guide rail 2-1-10 is bolted, plate 2- 1-4 is installed on the left of valve body 2-1-5, and plate 2-1-4 is installed on the left of sealing framework 2-1-6, and plate 2-1-4 is installed on seal groove On the left of 2-1-7, plate 2-1-4 is connect with seal groove 2-1-7, and plate 2-1-4 and seal groove 2-1-7 are interference fitted, plate 2-1-4 It is installed on the right side of rack gear 2-1-8, plate 2-1-4 is bolted with rack gear 2-1-8, and it is right that plate 2-1-4 is installed on sliding block 2-1-9 Side, plate 2-1-4 are installed on the right side of guide rail 2-1-10, and valve body 2-1-5 is installed on the inside of sealing framework 2-1-6, valve body 2-1-5 with Sealing framework 2-1-6 is bolted, and valve body 2-1-5 is installed on the inside of seal groove 2-1-7, and valve body 2-1-5 is installed on rack gear 2-1-8 Left side, valve body 2-1-5 are installed on the left of sliding block 2-1-9, and valve body 2-1-5 is installed on the left of guide rail 2-1-10, sealing framework 2-1-6 It is installed on the outside of seal groove 2-1-7, sealing framework 2-1-6 is connect with seal groove 2-1-7, sealing framework 2-1-6 and seal groove 2- 1-7 interference fit, sealing framework 2-1-6 are installed on the left of rack gear 2-1-8, and it is left that sealing framework 2-1-6 is installed on sliding block 2-1-9 Side, sealing framework 2-1-6 are installed on the left of guide rail 2-1-10, and seal groove 2-1-7 is installed on the left of rack gear 2-1-8, seal groove 2- 1-7 is installed on the left of sliding block 2-1-9, and seal groove 2-1-7 is installed on the left of guide rail 2-1-10, and rack gear 2-1-8 is installed on sliding block 2- On the upside of 1-9, rack gear 2-1-8 is bolted with sliding block 2-1-9, and rack gear 2-1-8 is installed on the upside of guide rail 2-1-10, sliding block 2-1-9 It is installed on the upside of guide rail 2-1-10, sliding block 2-1-9 is connect with guide rail 2-1-10, starts gate valve motor 2-1-1, gate valve motor 2-1-1 is rotated clockwise, and gate valve motor 2-1-1 band moving gear 2-1-2 is moved downward, and moving gear 2-1-2 is along guide rail 2-1-10 It moves downward, moving gear 2-1-2 drives plate 2-1-4 to move downward;
Steam extraction machine 2-2 is made of suction blade 2-2-1, air duct 2-2-2, bleed motor 2-2-3, suction blade 2-2- 1 is installed on the inside of air duct 2-2-2, and suction blade 2-2-1 is installed on the upside of bleed motor 2-2-3, suction blade 2-2-1 and pumping Motor 2-2-3 axis connection, air duct 2-2-2 are installed on the outside of bleed motor 2-2-3, air duct 2-2-2 and bleed motor 2-2-3 bolt Connection starts bleed motor 2-2-3, bleed motor 2-2-3 rotation, and bleed motor 2-2-3 band movable vane piece 2-2-1 rotates, drain Gas generates pressure difference by cutting in plate 1-2-5, and vapor is sent into cooling combination 3 by continuous;
It is cooling to combine 3 by air compression plant 3-1, coolant liquid liquefying plant 3-2, cooling tank 3-3, air inlet 3-4, cooling Pipe 3-5 composition, air compression plant 3-1 are installed on the downside of coolant liquid liquefying plant 3-2, air compression plant 3-1 and coolant liquid Liquefying plant 3-2 connection, air compression plant 3-1 are installed on the right side of cooling tank 3-3, and air compression plant 3-1 is installed on air inlet On the right side of mouth 3-4, air compression plant 3-1 is installed on the right side of cooling tube 3-5, and air compression plant 3-1 is connect with cooling tube 3-5, Coolant liquid liquefying plant 3-2 is installed on the upside of cooling tank 3-3, and coolant liquid liquefying plant 3-2 is connect with cooling tank 3-3, coolant liquid Liquefying plant 3-2 is installed on the upside of air inlet 3-4, and coolant liquid liquefying plant 3-2 is installed on the upside of cooling tube 3-5, coolant liquid liquid Makeup is set 3-2 and is threadedly coupled with cooling tube 3-5, and cooling tank 3-3 is installed on the right side of air inlet 3-4, cooling tank 3-3 and air inlet 3- 4 welding, cooling tank 3-3 are installed on the outside of cooling tube 3-5, and cooling tank 3-3 is connect with cooling tube 3-5, and air inlet 3-4 is installed on cold But on the left of pipe 3-5, the coolant liquid in liquefaction pipe 3-2-5 and cooling tube 3-5 is recycled, and hot coolant liquid is by band in cyclic process It walks, cold coolant liquid is admitted to, the Water vapor condensation in cooling tank 3-3, and the vapor after condensation is under gravity to cold But tank 3-3 congregate carries out the collection of distilled water by the collecting pipe of the bottom cooling tank 3-3 later;
Coolant liquid liquefying plant 3-2 is by liquefaction blower 3-2-1, air inlet 3-2-2, Air Filter 3-2-3, liquefaction cabinet 3-2- 4, liquefaction pipe 3-2-5 composition, liquefaction blower 3-2-1 are installed on the left of air inlet 3-2-2, and liquefaction blower 3-2-1 is installed on dust-proof It nets on the left of 3-2-3, liquefaction blower 3-2-1 is installed on the upside of liquefaction cabinet 3-2-4, liquefaction blower 3-2-1 and liquefaction cabinet 3-2-4 It is bolted, air inlet 3-2-2 is installed on the outside of Air Filter 3-2-3, and air inlet 3-2-2 is connect with Air Filter 3-2-3, air inlet 3-2-2 is installed on the upside of liquefaction cabinet 3-2-4, and air inlet 3-2-2 is bolted with liquefaction cabinet 3-2-4, air inlet 3-2-2 peace On the upside of liquefaction pipe 3-2-5, Air Filter 3-2-3 is installed on the upside of liquefaction cabinet 3-2-4, and Air Filter 3-2-3 is installed on liquefaction On the upside of pipe 3-2-5, liquefaction cabinet 3-2-4 is installed on the inside of liquefaction pipe 3-2-5, and liquefaction cabinet 3-2-4 and liquefaction pipe 3-2-5 connect Connect, starting liquefaction blower 3-2-1, liquefy cabinet 3-2-4 in gas be extracted, liquefy cabinet 3-2-4 bad student negative pressure, gas from Air inlet 3-2-2 enters, and gas constantly recycles in the cabinet 3-2-4 that liquefies, and takes away the heat in liquefaction pipe 3-2-5, air compression Device 3-1 drives the liquid motion in liquefaction pipe 3-2-5;
Filtration combination 1 is installed on 2 left side of steam combination, and filtration combination 1 is connect with steam combination 2, and filtration combination 1 is installed on Cooling 3 left side of combination, filtration combination 1 are installed on outer 4 inside of skeleton, and filtration combination 1 is bolted with outer skeleton 4, steam combination 2 It is installed on cooling 3 left side of combination, steam combination 2 combines 3 with cooling and is bolted, and steam combination 2 is installed on outer 4 inside of skeleton, Steam combination 2 is bolted with outer skeleton 4, and cooling combination 3 is installed on outer 4 inside of skeleton, and cooling combination 3 is connect with outer skeleton 4.
Specific embodiment 2:
Illustrate present embodiment, this implementation below with reference to Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6, Fig. 7, Fig. 8, Fig. 9, Figure 10 Mode is described further embodiment one, and the filter cotton bracket 1-2-3 quantity is four.
Specific embodiment 3:
Illustrate present embodiment, this implementation below with reference to Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6, Fig. 7, Fig. 8, Fig. 9, Figure 10 Mode is described further embodiment one, and the filter cotton 1-2-4 quantity is four.
Specific embodiment 4:
Illustrate present embodiment, this implementation below with reference to Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6, Fig. 7, Fig. 8, Fig. 9, Figure 10 Mode is described further embodiment one, and the seal groove 2-1-7 material is rubber.
Sewage carries out primary filter by cartridge filter, filters out the impurity of the inside, then enters steaming by centrifugal blower In vapour combination, high-temperature sterilization being carried out in steam combination, and generate water vapour, water vapour is condensed into distilled water afterwards to the cold, and It is collected.
The working principle of the present apparatus are as follows: the working principle of sewage sucking is to start to draw water to combine 1-1, blade wheel 1-1-2 high Speed rotation, blade wheel 1-1-2 drive sewage high speed rotation, and when sewage high speed rotation generates centrifugal force, and sewage produces very at this time Big kinetic energy, kinetic energy generate static energy, sewage are sent into the filtering tank water inlet pipe 1-2-1 of eminence, are sent when pumping interior sewage Afterwards, the pressure at filtering suction nozzle 1-1-4 is less than external atmosphere pressure, and under the action of pressure difference, sewage passes through filtering suction nozzle 1- 1-4 enters in spiral case 1-1-1, and sewage is endlessly inhaled into.The working principle of sewage primary filter is since sewage is not by In disconnected feeding filtering tank water inlet pipe 1-2-1, sewage is entered in filtering tank body 1-2-2 by filtering tank water inlet pipe 1-2-1, sewage By filter cotton 1-2-4, part of contaminated water flows out from gap between filter cotton bracket 1-2-3 and filtering tank body 1-2-2, when flowing down It is blocked by draining plate 1-2-5, sewage is pooled to next layer of filter cotton bracket 1-2-3 filtering, can be with effective solution filter cotton The problems such as 1-2-4 causes filter efficiency to reduce after blocking, and filter effect is deteriorated reduces the replacement cycle of filter cotton 1-2-4, Sewage after four layers of filter cotton 1-2-4 are filtered, contaminant filter in sewage more thoroughly, the sewage of primary filter passed through Filter tank outlet tube 1-2-7 is admitted in reservoir 1-4.The working principle of distillation is starting centrifugal blower 2-4, centrifugal blower 2-4 The sewage of primary filter in reservoir 1-4 is sent in evaporative cylinder 2-6, the sewage of starting heater 2-7 heating primary filtering, The sewage evaporation of primary filter becomes vapor, the rapid spatial expansion of vapor, and pressure increase in steam combination 2, starting is inserted Plate valve motor 2-1-1, gate valve motor 2-1-1 are rotated clockwise, and gate valve motor 2-1-1 band moving gear 2-1-2 is moved downward, Moving gear 2-1-2 is moved downward along guide rail 2-1-10, and moving gear 2-1-2 drives plate 2-1-4 to move downward, draining plate 1-2-5 It opens wide, starts bleed motor 2-2-3, bleed motor 2-2-3 rotation, bleed motor 2-2-3 band movable vane piece 2-2-1 rotates, drain Gas generates pressure difference by cutting in plate 1-2-5, and vapor is sent into cooling combination 3 by continuous.The working principle of condensation is Vapor is entered in cooling tank 3-3 by air inlet 3-4, starting liquefaction blower 3-2-1, the gas to liquefy in cabinet 3-2-4 It is extracted, liquefy cabinet 3-2-4 bad student negative pressure, and gas enters from air inlet 3-2-2, and gas constantly follows in the cabinet 3-2-4 that liquefies Ring, takes away the heat in liquefaction pipe 3-2-5, and air compression plant 3-1 drives the liquid motion in liquefaction pipe 3-2-5, liquefaction pipe Coolant liquid in 3-2-5 and cooling tube 3-5 recycles, and hot coolant liquid is pulled away in cyclic process, and cold coolant liquid is admitted to, Water vapor condensation in cooling tank 3-3, the vapor after condensation is under gravity to cooling tank 3-3 congregate, later The collection of distilled water is carried out by the collecting pipe of the bottom cooling tank 3-3.
Certainly, above description is not limitation of the present invention, and the present invention is also not limited to the example above, the art The variations, modifications, additions or substitutions that those of ordinary skill is made within the essential scope of the present invention also belong to guarantor of the invention Protect range.

Claims (4)

1. a kind of multi-filtering sewage distil(l) collection device, including filtration combination (1), steam combination (2), cooling combination (3), outer skeleton (4), it is characterised in that: filtration combination (1) by draw water combination (1-1), cartridge filter (1-2), pond cover (1-3), Reservoir (1-4) composition, combination (1-1) of drawing water are installed on the left of cartridge filter (1-2), and draw water combination (1-1) and cartridge filter (1-2) It is bolted, combination (1-1) of drawing water is installed on the left of pond cover (1-3), and combination (1-1) of drawing water is installed on reservoir (1-4) left side Side, cartridge filter (1-2) are installed on the upside of pond cover (1-3), and cartridge filter (1-2) is bolted with pond cover (1-3), cartridge filter (1-2) is installed on the upside of reservoir (1-4), and pond cover (1-3) is installed on the upside of reservoir (1-4), pond cover (1-3) and water storage (1-4) is bolted in pond;
Combination (1-1) of drawing water is made of spiral case (1-1-1), blade wheel (1-1-2), pedestal (1-1-3), filtering suction nozzle (1-1-4), Spiral case (1-1-1) is installed on the outside of blade wheel (1-1-2), spiral case (1-1-1) and blade wheel (1-1-2) axis connection, spiral case (1-1- 1) it is installed on the upside of pedestal (1-1-3), spiral case (1-1-1) and pedestal (1-1-3) are welded, and spiral case (1-1-1) is installed on filtering and inhales On the upside of mouth (1-1-4), spiral case (1-1-1) is threadedly coupled with filtering suction nozzle (1-1-4), and blade wheel (1-1-2) is installed on pedestal (1- 1-3) upside, blade wheel (1-1-2) are installed on the upside of filtering suction nozzle (1-1-4), and pedestal (1-1-3) is installed on filtering suction nozzle (1- 1-4) side;
Cartridge filter (1-2) is by filtering tank water inlet pipe (1-2-1), filtering tank body (1-2-2), filter cotton bracket (1-2-3), filter cotton (1-2-4), draining plate (1-2-5), filtering tank supporting leg (1-2-6), filtering tank outlet tube (1-2-7) composition, filtering tank water inlet pipe (1-2-1) is installed on the upside of filtering tank body (1-2-2), filtering tank water inlet pipe (1-2-1) and filtering tank body (1-2-2) welding, mistake Filter tank water inlet pipe (1-2-1) is installed on the upside of filter cotton bracket (1-2-3), and filtering tank water inlet pipe (1-2-1) is installed on filter cotton On the upside of (1-2-4), filtering tank water inlet pipe (1-2-1) is installed on the upside of draining plate (1-2-5), filtering tank water inlet pipe (1-2-1) peace Loaded on the upside of filtering tank supporting leg (1-2-6), filtering tank water inlet pipe (1-2-1) is installed on the upside of filtering tank outlet tube (1-2-7), mistake Filter tank body (1-2-2) is installed on the outside of filter cotton bracket (1-2-3), and filtering tank body (1-2-2) and filter cotton bracket (1-2-3) are welded It connecing, filtering tank body (1-2-2) is installed on the outside of filter cotton (1-2-4), and filtering tank body (1-2-2) is connect with filter cotton (1-2-4), Filtering tank body (1-2-2) is installed on the outside of draining plate (1-2-5), and filtering tank body (1-2-2) and draining plate (1-2-5) are welded, mistake Filter tank body (1-2-2) is installed on the upside of filtering tank supporting leg (1-2-6), and filtering tank body (1-2-2) and filtering tank supporting leg (1-2-6) are welded It connects, filtering tank body (1-2-2) is installed on the upside of filtering tank outlet tube (1-2-7), filtering tank body (1-2-2) and filtering tank outlet tube (1-2-7) welding, filter cotton bracket (1-2-3) are installed on the downside of filter cotton (1-2-4), filter cotton bracket (1-2-3) and filtering Cotton (1-2-4) connection, filter cotton bracket (1-2-3) are installed on the upside of draining plate (1-2-5), filter cotton bracket (1-2-3) installation In the side filtering tank supporting leg (1-2-6), filter cotton bracket (1-2-3) is installed on the upside of filtering tank outlet tube (1-2-7), filter cotton (1-2-4) is installed on the upside of draining plate (1-2-5), and filter cotton (1-2-4) is installed on the side filtering tank supporting leg (1-2-6), is filtered Cotton (1-2-4) is installed on the upside of filtering tank outlet tube (1-2-7), and draining plate (1-2-5) is installed on the side filtering tank supporting leg (1-2-6) Face, draining plate (1-2-5) are installed on the upside of filtering tank outlet tube (1-2-7), and filtering tank supporting leg (1-2-6) is installed on filtering tank and goes out The side liquid pipe (1-2-7);
Steam combination (2) is by plate group (2-1), steam extraction machine (2-2), escape pipe (2-3), centrifugal blower (2-4), steam drum (2-5), evaporative cylinder (2-6), heater (2-7) composition are covered, plate group (2-1) is installed on the left of steam extraction machine (2-2), plate Group (2-1) is connect with steam extraction machine (2-2), and plate group (2-1) is installed on the left of escape pipe (2-3), plate group (2-1) installation On the upside of centrifugal blower (2-4), plate group (2-1) is installed on the upside of steam cover (2-5), and plate group (2-1) is installed on evaporation On the upside of cylinder (2-6), plate group (2-1) is installed on the upside of heater (2-7), and steam extraction machine (2-2) is installed on escape pipe (2-3) Downside, steam extraction machine (2-2) and escape pipe (2-3) are welded, and steam extraction machine (2-2) is installed on the upside of centrifugal blower (2-4), Steam extraction machine (2-2) is installed on the upside of steam cover (2-5), and steam extraction machine (2-2) and steam cover (2-5) are welded, and is steamed Vapour extraction machine (2-2) is installed on the upside of evaporative cylinder (2-6), and steam extraction machine (2-2) is installed on the upside of heater (2-7), outlet Pipe (2-3) is installed on the upside of centrifugal blower (2-4), and escape pipe (2-3) is installed on the upside of steam cover (2-5), escape pipe (2-3) It is installed on the upside of evaporative cylinder (2-6), escape pipe (2-3) is installed on the upside of heater (2-7), and centrifugal blower (2-4) is installed on steaming The side vapour cover (2-5), centrifugal blower (2-4) are installed on the side evaporative cylinder (2-6), centrifugal blower (2-4) and evaporative cylinder (2-6) Welding, centrifugal blower (2-4) are installed on the side heater (2-7), and steam cover (2-5) is installed on the upside of evaporative cylinder (2-6), steam Vapour cover (2-5) is bolted with evaporative cylinder (2-6), and steam cover (2-5) is installed on the upside of heater (2-7), evaporative cylinder (2- 6) it is installed on the upside of heater (2-7);
Plate group (2-1) is by gate valve motor (2-1-1), gear (2-1-2), straight line plate valve housing one (2-1-3), plate (2-1-4), valve body (2-1-5), seal groove (2-1-7), rack gear (2-1-8), sliding block (2-1-9), are led at sealing framework (2-1-6) Rail (2-1-10) composition, gate valve motor (2-1-1) are co-axially mounted with gear (2-1-2), and gate valve motor (2-1-1) is installed on On the inside of straight line plate valve housing one (2-1-3), gate valve motor (2-1-1) and one (2-1-3) bolt of straight line plate valve housing connect It connects, gate valve motor (2-1-1) is installed on the left of plate (2-1-4), and gate valve motor (2-1-1) is installed on valve body (2-1-5) Left side, gate valve motor (2-1-1) are installed on the left of sealing framework (2-1-6), and gate valve motor (2-1-1) is installed on seal groove On the left of (2-1-7), gate valve motor (2-1-1) is installed on the upside of rack gear (2-1-8), and gate valve motor (2-1-1) is installed on cunning On the upside of block (2-1-9), gate valve motor (2-1-1) is installed on the upside of guide rail (2-1-10), and gear (2-1-2) is installed on straight line and inserts On the inside of plate valve cabinet one (2-1-3), gear (2-1-2) is installed on the left of plate (2-1-4), and gear (2-1-2) is installed on valve body On the left of (2-1-5), gear (2-1-2) is installed on the left of sealing framework (2-1-6), and gear (2-1-2) is installed on seal groove (2-1- 7) left side, gear (2-1-2) are installed on the upside of rack gear (2-1-8), and gear (2-1-2) is engaged with rack gear (2-1-8), gear (2- It 1-2) is installed on the upside of sliding block (2-1-9), gear (2-1-2) is installed on the upside of guide rail (2-1-10), straight line plate valve housing one (2-1-3) is installed on the left of plate (2-1-4), and straight line plate valve housing one (2-1-3) is installed on the left of valve body (2-1-5), directly Line plate valve housing one (2-1-3) is installed on the left of sealing framework (2-1-6), and straight line plate valve housing one (2-1-3) is installed on On the left of seal groove (2-1-7), straight line plate valve housing one (2-1-3) is installed on the outside of rack gear (2-1-8), straight line plate valve housing One (2-1-3) is installed on the outside of sliding block (2-1-9), and straight line plate valve housing one (2-1-3) is installed on the outside of guide rail (2-1-10), Straight line plate valve housing one (2-1-3) is bolted with guide rail (2-1-10), and plate (2-1-4) is installed on valve body (2-1-5) left side Side, plate (2-1-4) are installed on the left of sealing framework (2-1-6), and plate (2-1-4) is installed on the left of seal groove (2-1-7), are inserted Plate (2-1-4) is connect with seal groove (2-1-7), and plate (2-1-4) and seal groove (2-1-7) are interference fitted, plate (2-1-4) peace Loaded on the right side of rack gear (2-1-8), plate (2-1-4) is bolted with rack gear (2-1-8), and plate (2-1-4) is installed on sliding block (2- 1-9) right side, plate (2-1-4) are installed on the right side of guide rail (2-1-10), and valve body (2-1-5) is installed in sealing framework (2-1-6) Side, valve body (2-1-5) are bolted with sealing framework (2-1-6), and valve body (2-1-5) is installed on the inside of seal groove (2-1-7), valve Body (2-1-5) is installed on the left of rack gear (2-1-8), and valve body (2-1-5) is installed on the left of sliding block (2-1-9), valve body (2-1-5) peace Loaded on the left of guide rail (2-1-10), sealing framework (2-1-6) is installed on the outside of seal groove (2-1-7), sealing framework (2-1-6) with Seal groove (2-1-7) connection, sealing framework (2-1-6) and seal groove (2-1-7) are interference fitted, sealing framework (2-1-6) installation On the left of rack gear (2-1-8), sealing framework (2-1-6) is installed on the left of sliding block (2-1-9), and sealing framework (2-1-6) is installed on On the left of guide rail (2-1-10), seal groove (2-1-7) is installed on the left of rack gear (2-1-8), and seal groove (2-1-7) is installed on sliding block On the left of (2-1-9), seal groove (2-1-7) is installed on the left of guide rail (2-1-10), and rack gear (2-1-8) is installed on sliding block (2-1-9) Upside, rack gear (2-1-8) are bolted with sliding block (2-1-9), and rack gear (2-1-8) is installed on the upside of guide rail (2-1-10), sliding block (2-1-9) is installed on the upside of guide rail (2-1-10), and sliding block (2-1-9) is connect with guide rail (2-1-10);
Steam extraction machine (2-2) is made of suction blade (2-2-1), air duct (2-2-2), bleed motor (2-2-3), suction blade (2-2-1) is installed on the inside of air duct (2-2-2), and suction blade (2-2-1) is installed on the upside of bleed motor (2-2-3), is evacuated leaf Piece (2-2-1) and bleed motor (2-2-3) axis connection, air duct (2-2-2) are installed on the outside of bleed motor (2-2-3), air duct (2- 2-2) it is bolted with bleed motor (2-2-3);
Cooling combination (3) is by air compression plant (3-1), coolant liquid liquefying plant (3-2), cooling tank (3-3), air inlet (3- 4), cooling tube (3-5) forms, and air compression plant (3-1) is installed on the downside of coolant liquid liquefying plant (3-2), air compression dress It sets (3-1) to connect with coolant liquid liquefying plant (3-2), air compression plant (3-1) is installed on the right side of cooling tank (3-3), air Compression set (3-1) is installed on the right side of air inlet (3-4), and air compression plant (3-1) is installed on the right side of cooling tube (3-5), empty Air pressure compression apparatus (3-1) is connect with cooling tube (3-5), and coolant liquid liquefying plant (3-2) is installed on the upside of cooling tank (3-3), cold But liquid liquefying plant (3-2) is connect with cooling tank (3-3), and coolant liquid liquefying plant (3-2) is installed on the upside of air inlet (3-4), Coolant liquid liquefying plant (3-2) is installed on the upside of cooling tube (3-5), coolant liquid liquefying plant (3-2) and cooling tube (3-5) screw thread Connection, cooling tank (3-3) are installed on the right side of air inlet (3-4), and cooling tank (3-3) and air inlet (3-4) are welded, cooling tank (3- 3) it is installed on the outside of cooling tube (3-5), cooling tank (3-3) is connect with cooling tube (3-5), and air inlet (3-4) is installed on cooling tube On the left of (3-5);
Coolant liquid liquefying plant (3-2) is by liquefaction blower (3-2-1), air inlet (3-2-2), Air Filter (3-2-3), liquefaction cabinet (3-2-4), liquefaction pipe (3-2-5) composition, liquefaction blower (3-2-1) are installed on the left of air inlet (3-2-2), and liquefy blower (3- It 2-1) is installed on the left of Air Filter (3-2-3), liquefaction blower (3-2-1) is installed on the upside of liquefaction cabinet (3-2-4), and liquefy blower (3-2-1) is bolted with liquefaction cabinet (3-2-4), and air inlet (3-2-2) is installed on the outside of Air Filter (3-2-3), air inlet (3-2-2) is connect with Air Filter (3-2-3), and air inlet (3-2-2) is installed on the upside of liquefaction cabinet (3-2-4), air inlet (3-2- 2) it is bolted with liquefaction cabinet (3-2-4), air inlet (3-2-2) is installed on the upside of liquefaction pipe (3-2-5), Air Filter (3-2- 3) it is installed on the upside of liquefaction cabinet (3-2-4), Air Filter (3-2-3) is installed on the upside of liquefaction pipe (3-2-5), and liquefy cabinet (3- It 2-4) is installed on the inside of liquefaction pipe (3-2-5), liquefaction cabinet (3-2-4) is connect with liquefaction pipe (3-2-5);
Filtration combination (1) is installed on the left of steam combination (2), and filtration combination (1) is connect with steam combination (2), filtration combination (1) It is installed on the left of cooling combination (3), filtration combination (1) is installed on the inside of outer skeleton (4), filtration combination (1) and outer skeleton (4) spiral shell It tethers and connects, steam combination (2) is installed on the left of cooling combination (3), and steam combination (2) combines (3) with cooling and is bolted, steam Combination (2) is installed on the inside of outer skeleton (4), and steam combination (2) is bolted with outer skeleton (4), and cooling combination (3) is installed on outer On the inside of skeleton (4), cooling combination (3) connect with outer skeleton (4).
2. a kind of multi-filtering sewage distil(l) collection device according to claim 1, it is characterised in that: the filtering Cotton bracket (1-2-3) quantity is four.
3. a kind of multi-filtering sewage distil(l) collection device according to claim 1, it is characterised in that: the filtering Cotton (1-2-4) quantity is four.
4. a kind of multi-filtering sewage distil(l) collection device according to claim 1, it is characterised in that: the sealing Slot (2-1-7) material is rubber.
CN201811178190.0A 2018-10-10 2018-10-10 Multiple filtration sewage distillation purification collection device Active CN109179837B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811178190.0A CN109179837B (en) 2018-10-10 2018-10-10 Multiple filtration sewage distillation purification collection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811178190.0A CN109179837B (en) 2018-10-10 2018-10-10 Multiple filtration sewage distillation purification collection device

Publications (2)

Publication Number Publication Date
CN109179837A true CN109179837A (en) 2019-01-11
CN109179837B CN109179837B (en) 2021-07-16

Family

ID=64947721

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811178190.0A Active CN109179837B (en) 2018-10-10 2018-10-10 Multiple filtration sewage distillation purification collection device

Country Status (1)

Country Link
CN (1) CN109179837B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110054240A (en) * 2019-05-20 2019-07-26 江阴新雨生物科技有限公司 Processing unit for Bioexperiment desktop waste liquid

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020051377A1 (en) * 2000-10-30 2002-05-02 Samsung Electronics Co., Ltd. Ferroelectric random access memory device
DE102016208571A1 (en) * 2015-06-08 2016-12-08 Robert Bosch Gmbh Arrangement for the provision of germ-free water for injections
CN108178215A (en) * 2018-01-30 2018-06-19 泰州市乐律金属制品有限公司 The distilling apparatus that a kind of rainwater recycles

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020051377A1 (en) * 2000-10-30 2002-05-02 Samsung Electronics Co., Ltd. Ferroelectric random access memory device
DE102016208571A1 (en) * 2015-06-08 2016-12-08 Robert Bosch Gmbh Arrangement for the provision of germ-free water for injections
CN108178215A (en) * 2018-01-30 2018-06-19 泰州市乐律金属制品有限公司 The distilling apparatus that a kind of rainwater recycles

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
吴俊等: "《化工原理课程设计》", 31 August 2011, 华东理工大学出版社 *
周前等: "《冷库技术》", 30 September 2018, 中国矿业大学出版社 *
郭仁惠等: "《固-液分离 滤布性能测定及选用》", 31 March 1997, 机械工业出版社 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110054240A (en) * 2019-05-20 2019-07-26 江阴新雨生物科技有限公司 Processing unit for Bioexperiment desktop waste liquid

Also Published As

Publication number Publication date
CN109179837B (en) 2021-07-16

Similar Documents

Publication Publication Date Title
CN208136442U (en) A kind of textile machines have heat dissipation and dedusting function device
CN109179837A (en) A kind of multi-filtering sewage distil(l) collection device
CN111349520A (en) Distillation preparation method of plant essential oil
CN211246043U (en) Gas dehumidifying device for chemical dust removal
CN208406524U (en) A kind of waste material waste gas recovery utilizes system
US7610780B2 (en) Fabric articles dry cleaning machine by solvent nebulization
CN208104352U (en) Rosa Damascana, which is produced, uses cleaning and filtrating equipment
CN113668215A (en) Knitting steam wrinkle-removing treatment equipment capable of effectively removing condensed water
CN211133067U (en) Percolation extraction system
CN107655938A (en) High-temperature-resistant detection equipment for automobile parts
CN116092717B (en) Radioactive waste liquid treatment method and system
CN116153551B (en) Radioactive waste liquid treatment method and system
CN116013570B (en) Radioactive waste liquid treatment method and system
CN208388535U (en) A kind of textile manufacturing floor cleaning device
CN207545900U (en) A kind of vacuum oil-filter and its filter vat
CN208620766U (en) A kind of non-woven fabrics drying unit
CN208678690U (en) A kind of dust filter unit being installed in semiconductor waste gas processing equipment
CN116031008A (en) Radioactive waste liquid treatment method and system
CN111649600A (en) Condensation mechanism that uses in spices production process
CN108619845A (en) A kind of dust filter unit being installed in semiconductor waste gas processing equipment
CN114645127A (en) Heat treatment processing equipment
CN208952709U (en) A kind of waste hot steam processing unit in material disinfecting process
CN208541971U (en) A kind of modified flour station-service dust treatment device
CN209302320U (en) A kind of recyclable device of mining ionic liquid retardant
CN207324160U (en) A kind of vacuum oil-filter

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20210701

Address after: 244199 No.399 Dongchong Road, Tongling Development Zone, Anhui Province

Applicant after: TONGLING JIYE WATER PURIFICATION MATERIAL Co.,Ltd.

Address before: 361005 Xiamen University, 422 Siming South Road, Siming District, Xiamen City, Fujian Province

Applicant before: Zhang Shuhua

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant