CN109179809A - One kind being mounted on processing coal slime water installations in coal mine roadway - Google Patents
One kind being mounted on processing coal slime water installations in coal mine roadway Download PDFInfo
- Publication number
- CN109179809A CN109179809A CN201811169989.3A CN201811169989A CN109179809A CN 109179809 A CN109179809 A CN 109179809A CN 201811169989 A CN201811169989 A CN 201811169989A CN 109179809 A CN109179809 A CN 109179809A
- Authority
- CN
- China
- Prior art keywords
- water
- pipe
- electrolytic cell
- sedimentation basin
- control panel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F9/00—Multistage treatment of water, waste water or sewage
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F1/00—Treatment of water, waste water, or sewage
- C02F1/46—Treatment of water, waste water, or sewage by electrochemical methods
- C02F1/461—Treatment of water, waste water, or sewage by electrochemical methods by electrolysis
- C02F1/46104—Devices therefor; Their operating or servicing
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F1/00—Treatment of water, waste water, or sewage
- C02F1/66—Treatment of water, waste water, or sewage by neutralisation; pH adjustment
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F1/00—Treatment of water, waste water, or sewage
- C02F2001/007—Processes including a sedimentation step
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F2201/00—Apparatus for treatment of water, waste water or sewage
- C02F2201/002—Construction details of the apparatus
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F2301/00—General aspects of water treatment
- C02F2301/08—Multistage treatments, e.g. repetition of the same process step under different conditions
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Hydrology & Water Resources (AREA)
- Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Water Supply & Treatment (AREA)
- Chemical & Material Sciences (AREA)
- Organic Chemistry (AREA)
- Water Treatment By Electricity Or Magnetism (AREA)
Abstract
The invention discloses one kind to be mounted on processing coal slime water installations in coal mine roadway, and Anodic includes: into water processing path, anode ring, suction hole, suction line, sucking surge chamber, anode treatment fluid drainpipe, waterproof penetration pipe and anode sliding groove;The anode sliding groove is in I-shaped structure, and the quantity of anode sliding groove is two, and sucking surge chamber is equipped between adjacent anode sliding groove;The top of the sucking surge chamber is connected with waterproof penetration pipe and anode treatment fluid drainpipe, and the lower part for sucking surge chamber is connected with suction line and anode ring;The suction line is penetrated through by sucking surge chamber and anode treatment fluid drainpipe.One kind of the present invention is mounted on processing coal slime water installations in coal mine roadway, and the apparatus structure is compact to design, and processing cost is lower, efficiency is higher, and occupied area is small, and maintenance management is convenient;The device can efficiently remove coal slime water pollutant, realize that sewage recycling utilizes, greatly reduce pollution of the sewage to environment.
Description
Technical field
The invention belongs to field of sewage treatment equipment, and in particular to one kind, which is mounted in coal mine roadway, handles black water dress
It sets.
Background technique
Slurry circulating system is that the important link of wet coal preparation factory is whether jumped in existing coal preparation process
Coal preparation technique or dense medium coal cleaning process are eliminated, water is the important process medium of wet coal preparation process, is wanted in coal separation production process
Consume a large amount of water, while inevitably generating a large amount of black water, in order to reduce water consume, realize closed water circuit and
The complete utilization of resource, it is necessary to black water be handled, coal slime is recycled.Sludge concentration device and coal slime dewatering processing
Equipment is the important component of slurry circulating system, both gives full play to that work efficiency is most important, and slime water treatment is improper, will
Environmental pollution is caused, coal preparation plant's economic benefit etc. is reduced.
Coal slime aqueous nature is complicated, contained slime size, concentration, anisotropic increasing of poor quality, part slime size in black water
Superfine, viscosity is very big, and is easy argillization, can steadily be suspended in concentrating and precipitating pond, or a large amount of aggregations, it is difficult to precipitating recycling
And it is handled using dehydration equipment.Above-mentioned property increases the processing difficulty of black water, such as deals with improperly, the flocculation in concentrating and precipitating pond
Effect is bad, causes underflow density not high, and mud extraction effect is poor, costs and poor dehydration results;Coal slime concentration is excessive in overflow, causes overflow water
Clarity it is inadequate, adverse effect will be will cause to subsequent process, such as can not achieve closed water circuit, it is difficult to meet sewage
The requirement of zero-emission.Therefore, it is necessary to a kind of Water treatment device for coal slime to solve the above problems.
Summary of the invention
In order to solve the above technical problem, the present invention provides one kind to be mounted on processing coal slime water installations in coal mine roadway, packet
Include: control panel 1, support base 2, toppling over motor 3, electrolytic cell 4 add alkali pipe 5, sedimentation basin level sensor 6, the inspection of sedimentation basin pH value
Survey device 7, sedimentation basin 8, sedimentation basin outlet pipe 9, sedimentation basin water inlet pipe 10, acid adding pipe 11, intake pump 12;It is characterized in that, described
8 inner wall of sedimentation basin is equipped with sedimentation basin level sensor 6 and sedimentation basin pH value detector 7;It is heavy that 8 bottom side of sedimentation basin is equipped with
Shallow lake pond water inlet pipe 10, sedimentation basin water inlet pipe 10 and sedimentation basin 8 penetrate through, and wherein 10 other end of sedimentation basin water inlet pipe is equipped with electrolytic cell 4,
Sedimentation basin water inlet pipe 10 and electrolytic cell 4 penetrate through;Described plus alkali pipe 5 and sedimentation basin outlet pipe 9 are respectively positioned on 8 outer wall of sedimentation basin, are added
Alkali pipe 5 and sedimentation basin outlet pipe 9 are penetrated through with sedimentation basin 8;4 bottom side of electrolytic cell is equipped with intake pump 12, and electrolytic cell 4 is logical
It crosses intake pump 12 and sedimentation basin 8 penetrates through;The acid adding pipe 11 is located at 4 top side of electrolytic cell, and acid adding pipe 11 is passed through with electrolytic cell 4
It is logical, acid adding pipe 11 on electrolytic cell 4 eaves between 15cm~20cm;4 two sides of electrolytic cell are equipped with support base 2, support base 2
Cross-sectional structure be it is trapezoidal, support base 2 and electrolytic cell 4 are rotatablely connected by axis, and wherein support base 2 is equipped with 1 He of control panel
Toppling over motor 3;The toppling over motor 3, sedimentation basin level sensor 6, sedimentation basin pH value detector 7 and intake pump 12 are by leading
Line is connected with the control of control panel 1.
Further, this section is the explanation to heretofore described 2 structure of support base.The support base 2 includes: connection branch
Frame slideway base 2-1, connecting bracket pulley 2-2, connecting bracket motor 2-3, bracket transmission system 2-4, bracket transmission system connect
Extension bar 2-5, support base panel connecting bracket 2-6, connecting bracket slideway 2-7, support base panel 2-8;The connecting bracket slideway
Pedestal 2-1 is set to below connecting bracket slideway 2-7, and the two is vertical and is fixedly connected, and the quantity of connecting bracket slideway base 2-1 is
2, the 2 connecting bracket slideway 2-7 in left and right are equipped on each connecting bracket slideway base 2-1;The support base panel connection
Left side connecting bracket slideway 2-7 on bracket 2-6 and connecting bracket slideway base 2-1 is slidably connected, support base panel connection branch
The end of frame 2-6 is fixedly connected with support base panel 2-8, and the quantity of support base panel connecting bracket 2-6 is two;The connection
Bracket pulley 2-2 is connected to the side support base panel connecting bracket 2-6, connecting bracket pulley 2-2 and connecting bracket slideway base
Right side connecting bracket slideway 2-7 on 2-1 rolls connection, and the quantity of every side connecting bracket pulley 2-2 is 2;The bracket passes
Dynamic system 2-4 is located at the other side each support base panel connecting bracket 2-6, and bracket transmission system 2-4 upper and lower ends are propped up with connecting
Frame pulley 2-2 transmission connection;The connecting bracket motor 2-3 is arranged in mono- side lower part of bracket transmission system 2-4, connecting bracket electricity
Machine 2-3 is connected by conducting wire with the control of control panel 1;The bracket transmission system connecting rod 2-5 is two side stand transmission systems
Attachment device between 2-4, the quantity of bracket transmission system connecting rod 2-5 are 2.
Further, this section is the explanation to heretofore described 4 structure of electrolytic cell.The electrolytic cell 4 includes: intake pump
Mounting base 4-1, electrolytic cell outlet pipe 4-2, bucket wall 4-3, blender 4-4, anode 4-5, stirring motor 4-6, pour spout 4-7, yin
Pole 4-8, rotation axis 4-9, acid adding hole 4-10;The bucket wall 4-3 top side is equipped with pour spout 4-7, and bucket wall 4-3 bottom side is set
There are intake pump mounting base 4-1 and electrolytic cell outlet pipe 4-2, wherein electrolytic cell outlet pipe 4-2 and bucket wall 4-3 is penetrated through;The water inlet
The top mounting base 4-1 is pumped to penetrate through equipped with acid adding hole 4-10, acid adding hole 4-10 and bucket wall 4-3;The rotation axis 4-9 is located at bucket wall 4-
3 two sides center, rotation axis 4-9 quantity are 2, and two rotation axis 4-9 are rotated coaxially;The bucket wall 4-3 top center is equipped with and stirs
Device 4-4 is mixed, the center blender 4-4 is equipped with stirring motor 4-6, and stirring motor 4-6 is threadedly coupled with blender 4-4;The stirring
The two sides device 4-4 are respectively equipped with anode 4-5 and cathode 4-8, and anode 4-5 and cathode 4-8 are slidably connected with blender 4-4;It is described
Anode 4-5, stirring motor 4-6 and cathode 4-8 pass through conducting wire and are connected with the control of control panel 1;The anode 4-5 is iron material
Matter, cathode 4-8 are carbon materials matter.
Further, this section is the explanation to heretofore described intake pump mounting base 4-1 structure.The intake pump installation
Seat 4-1 includes: mounting base panel 4-1-1, mounting base fixed block 4-1-2, fixed block connecting rod 4-1-3, water pump stabilizer blade 4-1-4,
Hold-down bolt 4-1-5, bolt sleeve 4-1-6, bolt adjusting knob 4-1-7, stabilizer blade fixed ring 4-1-8;The mounting base is fixed
Block 4-1-2 is located at the lower right mounting base panel 4-1-1, and the two is fixedly connected, and the quantity of mounting base fixed block 4-1-2 is 3, phase
Adjacent mounting base fixed block 4-1-2 is angularly distributed centered on water pump stabilizer blade 4-1-4;The stabilizer blade fixed ring 4-1-8 is located at peace
It fills on the inside of seat fixed block 4-1-2, stabilizer blade fixed ring 4-1-8 is solid by fixed block connecting rod 4-1-3 and mounting base fixed block 4-1-2
Fixed connection, stabilizer blade fixed ring 4-1-8 are equipped with bolt sleeve 4-1-6;The top of the bolt sleeve 4-1-6 is adjusted equipped with bolt
The bottom of knob 4-1-7, bolt sleeve 4-1-6 are equipped with hold-down bolt 4-1-5, and the quantity of bolt sleeve 4-1-6 is 3;It is described
Water pump stabilizer blade 4-1-4 is located inside stabilizer blade fixed ring 4-1-8, and the diameter of water pump stabilizer blade 4-1-4 is less than stabilizer blade fixed ring 4-1-8's
Diameter, water pump stabilizer blade 4-1-4 are fixed on mounting base panel 4-1-1 by the effect of hold-down bolt 4-1-5.
Further, this section is the explanation to heretofore described blender 4-4 structure.The blender 4-4 includes: to hold
Support plate 4-4-1, electrolytic cell pH value detector 4-4-2, electrolytic cell level sensor 4-4-3, agitating device 4-4-4;The carrying
Plate 4-4-1 is equipped with electrolytic cell pH value detector 4-4-2 and electrolytic cell level sensor 4-4-3, electrolytic cell pH value detector 4-
4-2 and electrolytic cell level sensor 4-4-3 passes through conducting wire and is connected with the control of control panel 1;The agitating device 4-4-4 is located at
The lower part loading plate 4-4-1, stirring motor 4-6 are fixedly connected by axis with agitating device 4-4-4.
Further, this section is the explanation to heretofore described agitating device 4-4-4 structure.The agitating device 4-4-
4 include: aerofoil profile paddle 4-4-4-1, agitating device connector 4-4-4-2, stirs axis 4-4-4-3, fixed impeller 4-4-4-
4, paddle support frame 4-4-4-5;It is equipped with fixed impeller 4-4-4-4 in the middle part of the stirring axis 4-4-4-3, stirs axis 4-4-
The bottom 4-3 is equipped with agitating device connector 4-4-4-2;The agitating device connector 4-4-4-2 and stirring axis 4-4-4-3 are solid
Fixed connection, the agitating device bottom connector 4-4-4-2 is fixedly connected with aerofoil profile paddle 4-4-4-1;The paddle support frame
The both ends of 4-4-4-5 are fixedly connected with agitating device connector 4-4-4-2 and aerofoil profile paddle 4-4-4-1 respectively, paddle branch
The quantity of support 4-4-4-5 is 2.
Further, this section is the explanation to heretofore described anode 4-5 structure.The anode 4-5 includes: into Shui Chu
Path 4-5-1, anode ring 4-5-2, suction hole 4-5-3, suction line 4-5-4 are managed, surge chamber 4-5-5, anode treatment fluid row are sucked
Water pipe 4-5-6, waterproof penetration pipe 4-5-7, anode sliding groove 4-5-8;The anode sliding groove 4-5-8 is in I-shaped structure, anode
The quantity of sliding groove 4-5-8 is two, and sucking surge chamber 4-5-5 is equipped between adjacent anode sliding groove 4-5-8;The sucking is slow
The top for rushing room 4-5-5 is connected with waterproof penetration pipe 4-5-7 and anode treatment fluid drainpipe 4-5-6, sucking surge chamber 4-5-5's
Lower part is connected with suction line 4-5-4 and anode ring 4-5-2;The suction line 4-5-4 is by sucking at surge chamber 4-5-5 and anode
Liquid drainpipe 4-5-6 perforation is managed, the lower end of suction line 4-5-4 is equipped with suction hole 4-5-3;The anode ring 4-5-2 is located at sucking
On the outside of pipe 4-5-4, the diameter of anode ring 4-5-2 is greater than the diameter of suction line 4-5-4, is equipped at water inlet inside anode ring 4-5-2
Manage path 4-5-1;The water inlet processing path 4-5-1 and suction hole 4-5-3 is penetrated through.
Further, this section is the explanation to heretofore described rotation axis 4-9 structure.The rotation axis 4-9 includes: pressure
Block fixed plate 4-9-1, rate of tension regulation cock 4-9-2, gear assembly 4-9-3, axis briquetting 4-9-4, holddown spring 4-9-
5, shaft housing 4-9-6, axis drive gear 4-9-7, rotating middle shaft 4-9-8 are rotated, shaft brake 4-9-9 is rotated;The rotation
Axis 4-9-8 is set at rotation shaft housing 4-9-6 inside center, and rotating middle shaft 4-9-8 outer wall is helicitic texture;The axis
Briquetting 4-9-4 is arranged in rotating middle shaft 4-9-8 upper and lower ends, and axis briquetting 4-9-4 concave side is equipped with briquetting fixed plate 4-9-
1;The quantity of the briquetting fixed plate 4-9-1 is 2;The rate of tension regulation cock 4-9-2 perpendicular to briquetting fixed plate 4-9-1 it
Between, and rate of tension regulation cock 4-9-2 passes through briquetting fixed plate 4-9-1 and is fixedly connected with axis briquetting 4-9-4, rate of tension regulation cock
The quantity of 4-9-2 is 4;The axis drive gear 4-9-7 is arranged in inside axis briquetting 4-9-4, axis drive gear 4-
9-7 engages connection with rotating middle shaft 4-9-8, is equipped with gear assembly 4-9-3 on the outside of axis drive gear 4-9-7;The tooth
Wheel transmission device 4-9-3 is connected by conducting wire with the control of control panel 1;The holddown spring 4-9-5 is fixedly connected on axis
At the center of the side briquetting 4-9-4;The rotation shaft brake 4-9-9 is located at the other side rotating middle shaft 4-9-8, rotating middle shaft 4-9-
8 pass through in the middle part of rotation shaft brake 4-9-9.
Further, this section is the explanation to heretofore described rotation shaft brake 4-9-9 structure.The rotation axis system
Dynamic device 4-9-9 includes: brake cooling water tank 4-9-9-1, belt controller 4-9-9-2, deceleration belt 4-9-9-3, and braking turns
Disk 4-9-9-4, belt tightening regulating device 4-9-9-5;The brake rotor 4-9-9-4 is centered on rotating middle shaft 4-9-8
And the two is fixed by the bracket connection, the periphery brake rotor 4-9-9-4 is wound with deceleration belt 4-9-9-3;The deceleration belt
The port of 4-9-9-3 is connect with belt controller 4-9-9-2, and the upside of deceleration belt 4-9-9-3 and belt tightening are adjusted and filled
Set one end connection of 4-9-9-5;The belt controller 4-9-9-2 is located on the downside of belt tightening regulating device 4-9-9-5, skin
Tape controller 4-9-9-2 is connect with the other end of belt tightening regulating device 4-9-9-5, and belt controller 4-9-9-2 passes through
Conducting wire is connected with the control of control panel 1;The brake cooling water tank 4-9-9-1 is connected on rotating middle shaft 4-9-8, and position
In the side brake rotor 4-9-9-4.
Further, this section is the explanation to heretofore described brake cooling water tank 4-9-9-1 structure.The braking
Device cooling water tank 4-9-9-1 includes: cooling water return pipe 4-9-9-1-1, rectangle buffer board 4-9-9-1-2, cooling water buffer net
4-9-9-1-3, water temperature sensor 4-9-9-1-4, water tank upper chamber 4-9-9-1-5, cooling water settles plate 4-9-9-1-6, cooling
Water removes flow tube 4-9-9-1-7, cooling water reflux pump 4-9-9-1-8, water tank lower chambers 4-9-9-1-9;The water tank upper chamber 4-
9-9-1-5 and water tank lower chambers 4-9-9-1-9 is respectively provided at two sides, and the two up and down inside brake cooling water tank 4-9-9-1
Perforation connection;The cooling water sedimentation plate 4-9-9-1-6 is fixedly connected on water tank upper chamber 4-9-9-1-5 and water tank lower chambers 4-
Inside 9-9-1-9, the quantity of cooling water sedimentation plate 4-9-9-1-6 is 3 in each chamber, and adjacent cooling water settles plate 4-9-9-
It is equidistantly distributed between 1-6;It is heavy that the rectangle buffer board 4-9-9-1-2 is located at the cooling water in water tank lower chambers 4-9-9-1-9
It drops on the downside of plate 4-9-9-1-6, the quantity of rectangle buffer board 4-9-9-1-2 is 4, between adjacent rectangle buffer board 4-9-9-1-2
It equidistantly distributes, the lower part of rectangle buffer board 4-9-9-1-2 is equipped with cooling water buffer net 4-9-9-1-3;The water temperature sensor
4-9-9-1-4 is fixedly connected on the downside of water tank lower chambers 4-9-9-1-9 inner wall, water temperature sensor 4-9-9-1-4 and control panel 1
It is connected by polygon control survey;The cooling water goes flow tube 4-9-9-1-7 to be located on the outside of water tank upper chamber 4-9-9-1-5, cooling water
One end of flow tube 4-9-9-1-7 is gone to be inserted into inside water tank upper chamber 4-9-9-1-5, cooling water goes that flow tube 4-9-9-1-7's is another
End is penetrated through by one end of cooling water reflux pump 4-9-9-1-8 and cooling water return pipe 4-9-9-1-1 and is connected;The cooling water returns
Flow tube 4-9-9-1-1 is located on the outside of water tank lower chambers 4-9-9-1-9, and the other end of cooling water return pipe 4-9-9-1-1 is inserted into water
Inside case lower chambers 4-9-9-1-9;The cooling water reflux pump 4-9-9-1-8 is arranged in entire brake cooling water tank 4-9-9-
1 side, cooling water reflux pump 4-9-9-1-8 are connected by conducting wire with control.
Further, this section is the explanation to heretofore described plus 5 structure of alkali pipe.Described plus alkali pipe 5 includes: that lye stirs
Leaf 5-1 is mixed, interior motor 5-2 is managed, adds alkali pipe fixed ring 5-3, lye outflux 5-4, lye buffer unit 5-5, lye inlet port
5-6;The lye inlet port 5-6, lye outflux 5-4 are respectively arranged on plus 5 left and right ends of alkali pipe;Described plus alkali pipe fixed ring 5-
3 are fixedly attached to plus the middle part of alkali pipe 5, and adding the quantity of alkali pipe fixed ring 5-3 is 3, and adjacent plus alkali pipe fixed ring 5-3 is in equidistant point
Cloth;Motor 5-2, which is located at, in the pipe adds inside alkali pipe 5, and the both ends for managing interior motor 5-2 are equipped with lye paddle 5-1, manages interior motor
The waist of 5-2 is equipped with lye buffer unit 5-5, manages interior motor 5-2 and is connected by conducting wire and the control of control panel 1;The lye
Paddle 5-1 and lye buffer unit 5-5 are fixedly connected with motor 5-2 in pipe.
Further, this section is the explanation to heretofore described 7 structure of sedimentation basin pH value detector.The sedimentation basin pH
Value detector 7 includes: sealed detector base 7-1, electrion capacitor 7-2, mercury isotope ring 7-3, mercury isotope transmitting
Head 7-4, integrated circuit board 7-5, test fluid water inlet path 7-6, electromagnetic shock coil 7-7, sealed waterproof glass shell 7-8 are surveyed
Test solution water inlet 7-9, test fluid water outlet 7-10;The test fluid water inlet 7-9 and test fluid water outlet 7-10 are respectively provided at
The upper/lower terminal of entire 7 device of sedimentation basin pH value detector, and both penetrated through with test fluid water inlet path 7-6;The test
Hollow folder of the liquid water inlet path 7-6 between entire 7 device outer wall of sedimentation basin pH value detector and sealed waterproof glass shell 7-8
Layer;The sealed waterproof glass shell 7-8 is located at the inside of entire 7 device of sedimentation basin pH value detector;The sealed waterproof
The inside of glass shell 7-8 is equipped with electromagnetic shock coil 7-7, and the bottom of sealed waterproof glass shell 7-8 is equipped with sealed detector
Base 7-1;The sealed detector base 7-1 is fixedly connected with sealed waterproof glass shell 7-8, sealed detector base
Integrated circuit board 7-5, mercury isotope ring 7-3 and electrion capacitor 7-2 are equipped with inside 7-1;The upper end mercury isotope ring 7-3
Equipped with mercury isotope emitting head 7-4, the quantity of mercury isotope emitting head 7-4 is no less than 8;The electromagnetic shock coil 7-7, collection
It is connected with control panel 1 by polygon control survey at circuit board 7-5, mercury isotope ring 7-3, electrion capacitor 7-2.
Further, this section is the explanation to heretofore described 9 structure of sedimentation basin outlet pipe.The sedimentation basin outlet pipe
9 include: dredger pushing tow controller 9-1, secondary sediment pot 9-2, U-tube water outlet 9-3, U-tube 9-4, sediment discharge
Mouth 9-5, dredger 9-6, sewage inlet pipe 9-7;The both ends of the dredger 9-6 are respectively equipped with the control of dredger pushing tow
The upside of device 9-1 and sediment outlet 9-5, dredger 9-6 are equipped with sewage inlet pipe 9-7;The sediment outlet 9-5
It penetrates through and connects with dredger 9-6 with sewage inlet pipe 9-7;The U-tube 9-4 is located on the downside of dredger 9-6, U-tube
One end of 9-4 and dredger 9-6 perforation connect, and the other end of U-tube 9-4 is equipped with U-tube water outlet 9-3;It is described secondary heavy
Slag ladle 9-2 is set to the bottom U-tube 9-4, the two perforation connection;The dredger pusher 9-1 passes through conducting wire and control panel 1
Control is connected.
Further, this section is the explanation to heretofore described dredger pushing tow controller 9-1 structure.The dredging
Device pushing tow controller 9-1 includes: controller housing 9-1-1, spill fixture block 9-1-2, fixture block spacing regulation cock 9-1-3, built-in
Gear 9-1-4, gearing shaft 9-1-5, side pressure spring 9-1-6;The concave fixture block 9-1-2 is located at controller housing 9-1-1
Inside, the quantity of concave fixture block 9-1-2 are 2, pass through fixture block spacing regulation cock 9-1-3 connection between adjacent fixture block;The folder
The quantity of block spacing regulation cock 9-1-3 is 4;The built-in gear 9-1-4 is set on the inside of spill fixture block 9-1-2, built-in gear
9-1-4 is connect with gearing shaft 9-1-5 coaxial transmission, and the quantity of built-in gear 9-1-4 is 2, adjacent built-in gear 9-1-4
Connection is engaged with sediment propulsion arm 9-6-4;The side pressure spring 9-1-6 is fixedly connected on the side spill fixture block 9-1-2, side
The quantity of pressing spring 9-1-6 is 2;The gearing shaft 9-1-5 and external motor are drivingly connected, external motor and control plane
The connection of 1 conducting wire of plate.
Further, this section is the explanation to heretofore described dredger 9-6 structure.The dredger 9-6 packet
It includes: dredge outlet pipe 9-6-1, dredge cavity 9-6-2, ejector piston 9-6-3, sediment propulsion arm 9-6-4;The precipitating
Object propulsion arm 9-6-4 is located inside dredge cavity 9-6-2, one end of sediment propulsion arm 9-6-4 and the control of dredger pushing tow
Device 9-1 transmission connection processed, the other end of sediment propulsion arm 9-6-4 are fixedly connected with ejector piston 9-6-3;The dredge goes out
Water pipe 9-6-1 is located at the side dredger 9-6 lower end, and dredge outlet pipe 9-6-1 and dredge cavity 9-6-2 perforation connect.
Further, this section is the explanation to heretofore described ejector piston 9-6-3 structure.The ejector piston 9-6-
3 include: piston end 9-6-3-1, piston air outlet 9-6-3-2, piston reinforcing ring 9-6-3-3, piston air inlet 9-6-3-4,
Fan leaf 9-6-3-5, blower motor 9-6-3-6;The piston air inlet 9-6-3-4 and piston end 9-6-3-1 are located at
The both ends of entire ejector piston 9-6-3 device;The blower motor 9-6-3-6 is located inside entire ejector piston 9-6-3 device,
The both ends of blower motor 9-6-3-6 are fixedly connected with fan leaf 9-6-3-5, and blower motor 9-6-3-6 passes through conducting wire and control plane
The control of plate 1 is connected;The piston reinforcing ring 9-6-3-3 and piston air outlet 9-6-3-2 are fixedly connected on entire ejector piston 9-
Outside 6-3 device, the quantity of piston reinforcing ring 9-6-3-3 is 2;The piston air outlet 9-6-3-2 is located at adjacent pistons and adds
Gu between ring 9-6-3-3, piston air outlet 9-6-3-2 and piston air inlet 9-6-3-4 are penetrated through, piston air outlet 9-6-3-2's
Quantity is no less than 4.
One kind disclosed by the invention is mounted on processing coal slime water installations in coal mine roadway, the advantage is that: the apparatus structure
Compact to design, processing cost is lower, efficiency is higher, and occupied area is small, and maintenance management is convenient;The device can efficiently remove black water
Pollutant purifies water, and can be realized sewage recycling utilization, greatly reduces pollution of the sewage to environment.
Detailed description of the invention
Fig. 1 is that heretofore described one kind is mounted on processing black water apparatus structure schematic diagram in coal mine roadway.
Fig. 2 is heretofore described 2 structural schematic diagram of support base.
Fig. 3 is heretofore described 4 structural schematic diagram of electrolytic cell.
Fig. 4 is heretofore described intake pump mounting base 4-1 structural schematic diagram.
Fig. 5 is heretofore described blender 4-4 structural schematic diagram.
Fig. 6 is heretofore described agitating device 4-4-4 structural schematic diagram.
Fig. 7 is heretofore described anode 4-5 structural schematic diagram.
Fig. 8 is heretofore described rotation axis 4-9 structural schematic diagram.
Fig. 9 is heretofore described rotation shaft brake 4-9-9 structural schematic diagram.
Figure 10 is heretofore described brake cooling water tank 4-9-9-1 structural schematic diagram.
Figure 11 is heretofore described plus 5 structural schematic diagram of alkali pipe.
Figure 12 is heretofore described 7 structural schematic diagram of sedimentation basin pH value detector.
Figure 13 is heretofore described 9 structural schematic diagram of sedimentation basin outlet pipe.
Figure 14 is heretofore described dredger pushing tow controller 9-1 structural schematic diagram.
Figure 15 is heretofore described dredger 9-6 structural schematic diagram.
Figure 16 is heretofore described ejector piston 9-6-3 structural schematic diagram.
Figure 17 is that (5,5,6- trimethyl is bicyclic with 3- for heretofore described loading plate 4-4-1 fatigue resistance gaining rate
(2.2.1) hept- 2- yl) hexamethylene -1- alcohol volume relationship.
Specific embodiment
Processing coal slime water installations in coal mine roadway are mounted on to one kind provided by the invention with reference to the accompanying drawing to carry out into one
Walk explanation.
As shown in Figure 1, being that heretofore described one kind is mounted on processing black water apparatus structure signal in coal mine roadway
Figure.As seen from Figure 1, comprising: control panel 1, support base 2, toppling over motor 3, electrolytic cell 4 add alkali pipe 5, precipitate pit level sense
Answer device 6, sedimentation basin pH value detector 7, sedimentation basin 8, sedimentation basin outlet pipe 9, sedimentation basin water inlet pipe 10, acid adding pipe 11, intake pump
12;8 inner wall of sedimentation basin is equipped with sedimentation basin level sensor 6 and sedimentation basin pH value detector 7;8 bottom one of sedimentation basin
Side has sedimentation basin water inlet pipe 10, and sedimentation basin water inlet pipe 10 and sedimentation basin 8 penetrate through, and wherein 10 other end of sedimentation basin water inlet pipe is equipped with
Electrolytic cell 4, sedimentation basin water inlet pipe 10 and electrolytic cell 4 penetrate through;Described plus alkali pipe 5 and sedimentation basin outlet pipe 9 are respectively positioned on outside sedimentation basin 8
On wall, alkali pipe 5 and sedimentation basin outlet pipe 9 is added to penetrate through with sedimentation basin 8;4 bottom side of electrolytic cell is equipped with intake pump 12, into
Water pump 12 is fixedly connected with electrolytic cell 4;The acid adding pipe 11 is located at 4 top side of electrolytic cell, and acid adding pipe 11 is passed through with electrolytic cell 4
It is logical, acid adding pipe 11 on electrolytic cell 4 eaves between 15cm~20cm;4 two sides of electrolytic cell are equipped with support base 2, support base 2
Cross-sectional structure be it is trapezoidal, support base 2 and electrolytic cell 4, which roll, to be connected, and wherein support base 2 is equipped with control panel 1 and topples over electricity
Machine 3;The toppling over motor 3, sedimentation basin level sensor 6, sedimentation basin pH value detector 7 and intake pump 12 pass through conducting wire and control
The control of panel 1 processed is connected.
As shown in Fig. 2, being heretofore described 2 structural schematic diagram of support base.As seen from the figure, support base 2 includes: to connect
Connect bracket slideway base 2-1, connecting bracket pulley 2-2, connecting bracket motor 2-3, bracket transmission system 2-4, bracket power train
Unite connecting rod 2-5, support base panel connecting bracket 2-6, connecting bracket slideway 2-7, support base panel 2-8;The connecting bracket
Slideway base 2-1 is set to below connecting bracket slideway 2-7, and the two is vertical and is fixedly connected, the number of connecting bracket slideway base 2-1
Amount is 2, and the 2 connecting bracket slideway 2-7 in left and right are equipped on each connecting bracket slideway base 2-1;The support base panel
Left side connecting bracket slideway 2-7 on connecting bracket 2-6 and connecting bracket slideway base 2-1 is slidably connected, and support base panel connects
The end for meeting bracket 2-6 is fixedly connected with support base panel 2-8, and the quantity of support base panel connecting bracket 2-6 is two;It is described
Connecting bracket pulley 2-2 is connected to the side support base panel connecting bracket 2-6, connecting bracket pulley 2-2 and connecting bracket slideway
Right side connecting bracket slideway 2-7 on pedestal 2-1 rolls connection, and the quantity of every side connecting bracket pulley 2-2 is 2;The branch
Frame transmission system 2-4 is located at the other side each support base panel connecting bracket 2-6, bracket transmission system 2-4 upper and lower ends and company
Connect bracket pulley 2-2 transmission connection;The connecting bracket motor 2-3 is arranged in mono- side lower part of bracket transmission system 2-4, connection branch
Frame motor 2-3 is connected by conducting wire with the control of control panel 1;The bracket transmission system connecting rod 2-5 is the transmission of two side stands
Attachment device between system 2-4, the quantity of bracket transmission system connecting rod 2-5 are 2.
As shown in figure 3, being heretofore described 4 structural schematic diagram of electrolytic cell.As seen from the figure, electrolytic cell 4 include: into
Water pump mounting base 4-1, electrolytic cell outlet pipe 4-2, bucket wall 4-3, blender 4-4, anode 4-5, stirring motor 4-6, pour spout 4-
7, cathode 4-8, rotation axis 4-9, acid adding hole 4-10;The bucket wall 4-3 top side is equipped with pour spout 4-7, the bottom bucket wall 4-3 one
Side is equipped with intake pump mounting base 4-1 and electrolytic cell outlet pipe 4-2, and wherein electrolytic cell outlet pipe 4-2 and bucket wall 4-3 is penetrated through;It is described
The intake pump top mounting base 4-1 is penetrated through equipped with acid adding hole 4-10, acid adding hole 4-10 and bucket wall 4-3;The rotation axis 4-9 is located at bucket
The two sides wall 4-3 center, rotation axis 4-9 quantity are 2, and two rotation axis 4-9 are rotated coaxially;The bucket wall 4-3 top center is set
There is blender 4-4, the center blender 4-4 is equipped with stirring motor 4-6, and stirring motor 4-6 is threadedly coupled with blender 4-4;It is described
The two sides blender 4-4 are respectively equipped with anode 4-5 and cathode 4-8, and anode 4-5 and cathode 4-8 are slidably connected with blender 4-4;
The anode 4-5, stirring motor 4-6 and cathode 4-8 pass through conducting wire and are connected with the control of control panel 1;The anode 4-5 is iron
Material, cathode 4-8 are carbon materials matter.
As shown in figure 4, being heretofore described intake pump mounting base 4-1 structural schematic diagram.As seen from the figure, intake pump
Mounting base 4-1 includes: mounting base panel 4-1-1, mounting base fixed block 4-1-2, fixed block connecting rod 4-1-3, water pump stabilizer blade 4-
1-4, hold-down bolt 4-1-5, bolt sleeve 4-1-6, bolt adjusting knob 4-1-7, stabilizer blade fixed ring 4-1-8;The mounting base
Fixed block 4-1-2 is located at the lower right mounting base panel 4-1-1, and the two is fixedly connected, and the quantity of mounting base fixed block 4-1-2 is 3
A, adjacent mounting base fixed block 4-1-2 is angularly distributed centered on water pump stabilizer blade 4-1-4;Stabilizer blade fixed ring 4-1-8
On the inside of mounting base fixed block 4-1-2, stabilizer blade fixed ring 4-1-8 passes through fixed block connecting rod 4-1-3 and mounting base fixed block 4-
1-2 is fixedly connected, and stabilizer blade fixed ring 4-1-8 is equipped with bolt sleeve 4-1-6;The top of the bolt sleeve 4-1-6 is equipped with spiral shell
The bottom of bolt adjusting knob 4-1-7, bolt sleeve 4-1-6 are equipped with hold-down bolt 4-1-5, and the quantity of bolt sleeve 4-1-6 is 3
It is a;The water pump stabilizer blade 4-1-4 is located inside stabilizer blade fixed ring 4-1-8, and the diameter of water pump stabilizer blade 4-1-4 is less than stabilizer blade fixed ring
The diameter of 4-1-8, water pump stabilizer blade 4-1-4 are fixed on mounting base panel 4-1-1 by the effect of hold-down bolt 4-1-5.
As shown in figure 5, being heretofore described blender 4-4 structural schematic diagram.As seen from the figure, blender 4-4 packet
It includes: loading plate 4-4-1, electrolytic cell pH value detector 4-4-2, electrolytic cell level sensor 4-4-3, agitating device 4-4-4, stirring
Axis 4-4-5;The loading plate 4-4-1 is equipped with electrolytic cell pH value detector 4-4-2 and electrolytic cell level sensor 4-4-3, electricity
Solution pond pH value detector 4-4-2 and electrolytic cell level sensor 4-4-3 passes through conducting wire and is connected with the control of control panel 1;It is described
Agitating shaft 4-4-5 is located at the center loading plate 4-4-1, and agitating shaft 4-4-5 and loading plate 4-4-1 are penetrated through, wherein the bottom agitating shaft 4-4-5
End is equipped with agitating device 4-4-4, and agitating device 4-4-4 is fixedly connected with agitating shaft 4-4-5.
As shown in fig. 6, being heretofore described agitating device 4-4-4 structural schematic diagram.As seen from the figure, agitating device
4-4-4 includes: aerofoil profile paddle 4-4-4-1, agitating device connector 4-4-4-2, stirs axis 4-4-4-3, fixed impeller 4-
4-4-4, paddle support frame 4-4-4-5;It is equipped with fixed impeller 4-4-4-4 in the middle part of the stirring axis 4-4-4-3, stirs axis
The bottom 4-4-4-3 is equipped with agitating device connector 4-4-4-2;The agitating device connector 4-4-4-2 and stirring axis 4-4-
4-3 is fixedly connected, and the agitating device bottom connector 4-4-4-2 is fixedly connected with aerofoil profile paddle 4-4-4-1;The paddle branch
The both ends of support 4-4-4-5 are fixedly connected with agitating device connector 4-4-4-2 and aerofoil profile paddle 4-4-4-1 respectively, stirring
The quantity of leaf support frame 4-4-4-5 is 2.
As shown in fig. 7, being heretofore described anode 4-5 structural schematic diagram.As seen from the figure, anode 4-5 include: into
Water process path 4-5-1, anode ring 4-5-2, suction hole 4-5-3, suction line 4-5-4 suck surge chamber 4-5-5, anode processing
Liquid drainpipe 4-5-6, waterproof penetration pipe 4-5-7, anode sliding groove 4-5-8;The anode sliding groove 4-5-8 is in I-shaped structure,
The quantity of anode sliding groove 4-5-8 is two, and sucking surge chamber 4-5-5 is equipped between adjacent anode sliding groove 4-5-8;The suction
The top for entering surge chamber 4-5-5 is connected with waterproof penetration pipe 4-5-7 and anode treatment fluid drainpipe 4-5-6, sucks surge chamber 4-
The lower part of 5-5 is connected with suction line 4-5-4 and anode ring 4-5-2;The suction line 4-5-4 by sucking surge chamber 4-5-5 with
The lower end of anode treatment fluid drainpipe 4-5-6 perforation, suction line 4-5-4 is equipped with suction hole 4-5-3;The anode ring 4-5-2 is set
On the outside of suction line 4-5-4, the diameter of anode ring 4-5-2 is greater than the diameter of suction line 4-5-4, is equipped with inside anode ring 4-5-2
Water inlet processing path 4-5-1;The water inlet processing path 4-5-1 and suction hole 4-5-3 is penetrated through.
As shown in figure 8, being heretofore described rotation axis 4-9 structural schematic diagram.As seen from the figure, rotation axis 4-9 packet
It includes: briquetting fixed plate 4-9-1, rate of tension regulation cock 4-9-2, gear assembly 4-9-3, axis briquetting 4-9-4, holddown spring
4-9-5 rotates shaft housing 4-9-6, axis drive gear 4-9-7, rotating middle shaft 4-9-8, rotates shaft brake 4-9-9;It is described
Rotating middle shaft 4-9-8 is set at rotation shaft housing 4-9-6 inside center, and rotating middle shaft 4-9-8 outer wall is helicitic texture;It is described
Axis briquetting 4-9-4 is arranged in rotating middle shaft 4-9-8 upper and lower ends, and axis briquetting 4-9-4 concave side is equipped with briquetting fixed plate
4-9-1;The quantity of the briquetting fixed plate 4-9-1 is 2;The rate of tension regulation cock 4-9-2 is perpendicular to briquetting fixed plate 4-
Between 9-1, and rate of tension regulation cock 4-9-2 passes through briquetting fixed plate 4-9-1 and is fixedly connected with axis briquetting 4-9-4, rate of tension
The quantity of regulation cock 4-9-2 is 4;The axis drive gear 4-9-7 is arranged in inside axis briquetting 4-9-4, axis drive
Gear 4-9-7 engages connection with rotating middle shaft 4-9-8, is equipped with gear assembly 4-9-3 on the outside of axis drive gear 4-9-7;
The gear assembly 4-9-3 is connected by conducting wire with the control of control panel 1;The holddown spring 4-9-5 is fixedly connected
At the center of the axis side briquetting 4-9-4;The rotation shaft brake 4-9-9 is located at the other side rotating middle shaft 4-9-8, in rotation
Axis 4-9-8 is passed through in the middle part of rotation shaft brake 4-9-9.
As shown in figure 9, being heretofore described rotation shaft brake 4-9-9 structural schematic diagram.As seen from the figure, it rotates
Shaft brake 4-9-9 includes: brake cooling water tank 4-9-9-1, belt controller 4-9-9-2, deceleration belt 4-9-9-3, system
Turn disk 4-9-9-4, belt tightening regulating device 4-9-9-5;The brake rotor 4-9-9-4 is with rotating middle shaft 4-9-8
Center and the two are fixed by the bracket connection, and the periphery brake rotor 4-9-9-4 is wound with deceleration belt 4-9-9-3;The deceleration
The port of belt 4-9-9-3 is connect with belt controller 4-9-9-2, the upside of deceleration belt 4-9-9-3 and belt tightening tune
One end of regulating device 4-9-9-5 connects;The belt controller 4-9-9-2 is located under belt tightening regulating device 4-9-9-5
Side, belt controller 4-9-9-2 are connect with the other end of belt tightening regulating device 4-9-9-5, belt controller 4-9-9-2
It is connected by conducting wire with the control of control panel 1;The brake cooling water tank 4-9-9-1 is connected on rotating middle shaft 4-9-8,
And it is located at the side brake rotor 4-9-9-4.
It as shown in Figure 10, is heretofore described brake cooling water tank 4-9-9-1 structural schematic diagram.From figure
Out, brake cooling water tank 4-9-9-1 includes: cooling water return pipe 4-9-9-1-1, rectangle buffer board 4-9-9-1-2, cooling water
Buffer subsystem 4-9-9-1-3, water temperature sensor 4-9-9-1-4, water tank upper chamber 4-9-9-1-5, cooling water settle plate 4-9-9-1-
6, cooling water removes flow tube 4-9-9-1-7, cooling water reflux pump 4-9-9-1-8, water tank lower chambers 4-9-9-1-9;On the water tank
Chamber 4-9-9-1-5 and water tank lower chambers 4-9-9-1-9 is respectively provided inside brake cooling water tank 4-9-9-1 two sides up and down,
And the two perforation connection;The cooling water sedimentation plate 4-9-9-1-6 is fixedly connected under water tank upper chamber 4-9-9-1-5 and water tank
Inside chamber 4-9-9-1-9, the quantity of cooling water sedimentation plate 4-9-9-1-6 is 3 in each chamber, and adjacent cooling water settles plate
It is equidistantly distributed between 4-9-9-1-6;The rectangle buffer board 4-9-9-1-2 is located at cold in water tank lower chambers 4-9-9-1-9
But on the downside of water sedimentation plate 4-9-9-1-6, the quantity of rectangle buffer board 4-9-9-1-2 is 4, adjacent rectangle buffer board 4-9-9-1-
It is equidistantly distributed between 2, the lower part of rectangle buffer board 4-9-9-1-2 is equipped with cooling water buffer net 4-9-9-1-3;The water temperature passes
Sensor 4-9-9-1-4 is fixedly connected on the downside of water tank lower chambers 4-9-9-1-9 inner wall, water temperature sensor 4-9-9-1-4 and control
Panel 1 is connected by polygon control survey;The cooling water goes flow tube 4-9-9-1-7 to be located on the outside of water tank upper chamber 4-9-9-1-5, cold
But water goes to one end of flow tube 4-9-9-1-7 to be inserted into inside water tank upper chamber 4-9-9-1-5, and cooling water goes flow tube 4-9-9-1-7's
The other end is penetrated through by one end of cooling water reflux pump 4-9-9-1-8 and cooling water return pipe 4-9-9-1-1 and is connected;The cooling
Water return pipe 4-9-9-1-1 is located on the outside of water tank lower chambers 4-9-9-1-9, and the other end of cooling water return pipe 4-9-9-1-1 is inserted
Enter inside water tank lower chambers 4-9-9-1-9;The cooling water reflux pump 4-9-9-1-8 is arranged in entire brake cooling water tank 4-
The side 9-9-1, cooling water reflux pump 4-9-9-1-8 are connected by conducting wire with control.
It as shown in figure 11, is heretofore described plus 5 structural schematic diagram of alkali pipe.As seen from the figure, the alkali pipe 5 is added to include:
Lye paddle 5-1 manages interior motor 5-2, adds alkali pipe fixed ring 5-3, lye outflux 5-4, lye buffer unit 5-5, lye
Inlet port 5-6;The lye inlet port 5-6, lye outflux 5-4 are respectively arranged on plus 5 left and right ends of alkali pipe;Described plus alkali Guan Gu
Determine ring 5-3 to be fixedly attached to plus the middle part of alkali pipe 5, adding the quantity of alkali pipe fixed ring 5-3 is 3, and adjacent plus alkali pipe fixed ring 5-3 is in
It is equally spaced;Motor 5-2, which is located at, in the pipe adds inside alkali pipe 5, and the both ends for managing interior motor 5-2 are equipped with lye paddle 5-1, pipe
The waist of interior motor 5-2 is equipped with lye buffer unit 5-5, manages interior motor 5-2 and is connected by conducting wire and the control of control panel 1;Institute
It states lye paddle 5-1 and lye buffer unit 5-5 is fixedly connected with motor 5-2 in pipe.
It as shown in figure 12, is heretofore described 7 structural schematic diagram of sedimentation basin pH value detector.As seen from the figure, it sinks
Shallow lake pond pH value detector 7 includes: sealed detector base 7-1, electrion capacitor 7-2, mercury isotope ring 7-3, the same position of mercury
Plain emitting head 7-4, integrated circuit board 7-5, test fluid intake path 7-6, electromagnetic shock coil 7-7, sealed waterproof glass shell
7-8, test fluid water inlet 7-9, test fluid water outlet 7-10;The test fluid water inlet 7-9 and test fluid water outlet 7-10 points
It is not located at the upper/lower terminal of entire 7 device of sedimentation basin pH value detector, and is both penetrated through with test fluid water inlet path 7-6;Institute
Test fluid water inlet path 7-6 is stated between entire 7 device outer wall of sedimentation basin pH value detector and sealed waterproof glass shell 7-8
Hollow sandwich;The sealed waterproof glass shell 7-8 is located at the inside of entire 7 device of sedimentation basin pH value detector;The sealing
The inside of formula waterproof glass shell 7-8 is equipped with electromagnetic shock coil 7-7, and the bottom of sealed waterproof glass shell 7-8 is equipped with sealed
Detector base 7-1;The sealed detector base 7-1 is fixedly connected with sealed waterproof glass shell 7-8, sealed detection
Integrated circuit board 7-5, mercury isotope ring 7-3 and electrion capacitor 7-2 are equipped with inside device base 7-1;The mercury isotope ring
The upper end 7-3 is equipped with mercury isotope emitting head 7-4, and the quantity of mercury isotope emitting head 7-4 is no less than 8;The electromagnetic shock line
It encloses 7-7, integrated circuit board 7-5, mercury isotope ring 7-3, electrion capacitor 7-2 and passes through polygon control survey phase with control panel 1
Even.
It as shown in figure 13, is heretofore described 9 structural schematic diagram of sedimentation basin outlet pipe.As seen from the figure, sedimentation basin
Outlet pipe 9 includes: dredger pushing tow controller 9-1, secondary sediment pot 9-2, U-tube water outlet 9-3, U-tube 9-4, precipitating
Object outlet 9-5, dredger 9-6, sewage inlet pipe 9-7;The both ends of the dredger 9-6 are respectively equipped with dredger top
The upside of push controller 9-1 and sediment outlet 9-5, dredger 9-6 are equipped with sewage inlet pipe 9-7;The sediment row
It exports 9-5 and sewage inlet pipe 9-7 and penetrates through connection with dredger 9-6;The U-tube 9-4 is located under dredger 9-6
Side, one end of U-tube 9-4 and dredger 9-6 perforation connect, and the other end of U-tube 9-4 is equipped with U-tube water outlet 9-3;Institute
Secondary sediment pot 9-2 is stated set on the bottom U-tube 9-4, the two perforation connection;The dredger pusher 9-1 by conducting wire with
The control of control panel 1 is connected.
It as shown in figure 14, is heretofore described dredger pushing tow controller 9-1 structural schematic diagram.From figure
Out, dredger pushing tow controller 9-1 includes: controller housing 9-1-1, spill fixture block 9-1-2, fixture block spacing regulation cock 9-1-
3, built-in gear 9-1-4, gearing shaft 9-1-5, side pressure spring 9-1-6;The concave fixture block 9-1-2 is located at controller housing
Inside 9-1-1, the quantity of concave fixture block 9-1-2 is 2, passes through fixture block spacing regulation cock 9-1-3 connection between adjacent fixture block;Institute
The quantity for stating fixture block spacing regulation cock 9-1-3 is 4;The built-in gear 9-1-4 is set on the inside of spill fixture block 9-1-2, built-in
Gear 9-1-4 is connect with gearing shaft 9-1-5 coaxial transmission, and the quantity of built-in gear 9-1-4 is 2, adjacent built-in gear
9-1-4 engages connection with sediment propulsion arm 9-6-4;The side pressure spring 9-1-6 is fixedly connected on spill fixture block 9-1-2 mono-
Side, the quantity of side pressure spring 9-1-6 are 2;The gearing shaft 9-1-5 and external motor are drivingly connected, external motor with
The connection of 1 conducting wire of control panel.
It as shown in figure 15, is heretofore described dredger 9-6 structural schematic diagram.As seen from the figure, dredger
9-6 includes: dredge outlet pipe 9-6-1, dredge cavity 9-6-2, ejector piston 9-6-3, sediment propulsion arm 9-6-4;Institute
It states sediment propulsion arm 9-6-4 to be located inside dredge cavity 9-6-2, one end of sediment propulsion arm 9-6-4 and dredger
Pushing tow controller 9-1 transmission connection, the other end of sediment propulsion arm 9-6-4 are fixedly connected with ejector piston 9-6-3;It is described to dredge
Logical device outlet pipe 9-6-1 is located at the side dredger 9-6 lower end, and dredge outlet pipe 9-6-1 and dredge cavity 9-6-2 are penetrated through
Connection.
It as shown in figure 16, is heretofore described ejector piston 9-6-3 structural schematic diagram.As seen from the figure, pushing tow is living
Filling in 9-6-3 includes: piston end 9-6-3-1, piston air outlet 9-6-3-2, piston reinforcing ring 9-6-3-3, piston air inlet 9-
6-3-4, fan leaf 9-6-3-5, blower motor 9-6-3-6;The piston air inlet 9-6-3-4 and piston end 9-6-3-1 points
Not Wei Yu entire ejector piston 9-6-3 device both ends;The blower motor 9-6-3-6 is located at entire ejector piston 9-6-3 dress
Set inside, the both ends of blower motor 9-6-3-6 are fixedly connected with fan leaf 9-6-3-5, blower motor 9-6-3-6 by conducting wire with
The control of control panel 1 is connected;The piston reinforcing ring 9-6-3-3 and piston air outlet 9-6-3-2 are fixedly connected on entire pushing tow
Outside piston 9-6-3 device, the quantity of piston reinforcing ring 9-6-3-3 is 2;The piston air outlet 9-6-3-2 is located at adjacent
Between piston reinforcing ring 9-6-3-3, piston air outlet 9-6-3-2 and piston air inlet 9-6-3-4 are penetrated through, piston air outlet 9-6-
The quantity of 3-2 is no less than 4.
Following embodiment further illustrates the contents of the present invention, and as loading plate 4-4-1, it is important set of the invention
Part increases the service life of integral device due to its presence, it plays pass for the safety of integral device, even running
Key effect.For this purpose, by it is following be embodiment, further verify loading plate 4-4-1 of the present invention, what is shown is higher than
The physical characteristic of other related patents.
Embodiment 1
Loading plate 4-4-1 of the present invention is manufactured according to the following steps, and by mass percentage:
Step 1: 3- (bicyclic (2.2.1) the hept- 2- yl of 5,5,6- trimethyl) hexamethylene-in component will be matched according to mass percent
1- alcohol 3% is added in band stirring heated type reactor tank, while ultrasonic purification water 1% is added, starting band stirring heated type reaction
Blender in tank, setting speed 3rpm;
Step 2: after band stirring heated type reactor tank operates 1 minute, CS set-accelerating admixture 3% and α-hydrogen-ω-[(1- oxygen is added
Generation -2- acrylic) oxygroup]-poly- [oxygroup (methyl-1,2- ethylidene)] 6%, the vapour biography in starting band stirring heated type reactor tank
Heater is led, temperature is made to rise to 3 DEG C, CSA is added and promotees solidifying promotor 8% and Tin Nanoparticle 4%, in band stirring heated type reaction
It is stirred evenly in tank, obtains the homogenate of J component;
Step 3: weighing the promotion catalyst DPG4% in proportion component according to mass percent, be homogenized and be mixed with J component,
It is again started up with the vapour conduction heaters in stirring heated type reactor tank, controlled at 6 DEG C, keeps the temperature 8 minutes, discharge into pressing mold
Machine to get arrive loading plate 4-4-1.
Embodiment 2
Loading plate 4-4-1 of the present invention is manufactured according to the following steps, and by mass percentage:
Step 1: 3- (bicyclic (2.2.1) the hept- 2- yl of 5,5,6- trimethyl) hexamethylene-in component will be matched according to mass percent
1- alcohol 13% is added in band stirring heated type reactor tank, while ultrasonic purification water 85% is added, and starting band stirring heated type is anti-
Answer the blender in tank, setting speed 13rpm;
Step 2: after band stirring heated type reactor tank operates 85 minutes, CS set-accelerating admixture 95% and α-hydrogen-ω-[(1- oxygen is added
Generation -2- acrylic) oxygroup]-poly- [oxygroup (methyl-1,2- ethylidene)] 39%, starting band stirs the vapour in heated type reactor tank
Conduction heaters make temperature rise to 95 DEG C, and CSA is added and promotees solidifying promotor 19% and Tin Nanoparticle 68%, heated in band stirring
It is stirred evenly in formula reactor tank, obtains the homogenate of J component;
Step 3: the promotion catalyst DPG44% in proportion component is weighed according to mass percent, mixes and stirs with the homogenate of J component
It mixes, is again started up with the vapour conduction heaters in stirring heated type reactor tank, controlled at 39 DEG C, keeps the temperature 19 minutes, discharging
Enter molding press to get loading plate 4-4-1 is arrived.
Reference examples
Reference examples are certain commercially available brand component same as the application loading plate 4-4-1, to be tested for the property test.
Embodiment 3
The loading plate 4-4-1 and reference examples that Examples 1 to 2 is prepared same component obtained carry out using effect pair
Than.The two heat distortion temperature, compression strength, impact strength, corrosion rate are counted, the results are shown in Table 1.
As seen from Table 1, loading plate 4-4-1 of the present invention, above-mentioned performance indicator are superior to prior art production
Product.
Embodiment 4
3- (bicyclic (2.2.1) the hept- 2- yl of 5,5,6- trimethyl) hexamethylene -1- alcohol component accounting is studied to loading plate 4-4-1 performance
Influence.Change 3- (bicyclic (2.2.1) the hept- 2- yl of 5,5,6- trimethyl) hexamethylene -1- alcohol volume be total amount 10%, 20%,
30%, 40%, using loading plate 4-4-1 fatigue resistance gaining rate as evaluation index.Resist from heretofore described loading plate 4-4-1 tired
Find out in labor intensity gaining rate and 3- (bicyclic (2.2.1) the hept- 2- yl of 5,5,6- trimethyls) hexamethylene -1- alcohol volume relational graph, 3- (5,
Bicyclic (2.2.1) the hept- 2- yl of 5,6- trimethyls) hexamethylene -1- alcohol content, have to its material fatigue resistance gaining rate important
It influences, the variation of content directly affects properties of product.
Claims (10)
1. one kind is mounted on processing coal slime water installations in coal mine roadway, comprising: control panel (1), support base (2), toppling over motor
(3), electrolytic cell (4) add alkali pipe (5), sedimentation basin level sensor (6), sedimentation basin pH value detector (7), sedimentation basin (8), sink
Shallow lake pond outlet pipe (9), sedimentation basin water inlet pipe (10), acid adding pipe (11), intake pump (12);It is characterized in that, the sedimentation basin (8)
Inner wall is equipped with sedimentation basin level sensor (6) and sedimentation basin pH value detector (7);It is heavy that sedimentation basin (8) bottom side is equipped with
Shallow lake pond water inlet pipe (10), sedimentation basin water inlet pipe (10) and sedimentation basin (8) penetrate through, and wherein sedimentation basin water inlet pipe (10) other end is equipped with
Electrolytic cell (4), sedimentation basin water inlet pipe (10) and electrolytic cell (4) penetrate through;Described plus alkali pipe (5) and sedimentation basin outlet pipe (9) equal position
In on sedimentation basin (8) outer wall, add alkali pipe (5) and sedimentation basin outlet pipe (9) with sedimentation basin (8) penetrate through;Electrolytic cell (4) bottom
Portion side is equipped with intake pump (12), and electrolytic cell (4) is penetrated through by intake pump (12) and sedimentation basin (8);Acid adding pipe (11) position
In electrolytic cell (4) top side, acid adding pipe (11) and electrolytic cell (4) are penetrated through, and acid adding pipe (11) eaves on electrolytic cell (4) exists
Between 15cm~20cm;Electrolytic cell (4) two sides are equipped with support base (2), and support base (2) cross-sectional structure is trapezoidal, support
Seat (2) and electrolytic cell (4) are rotatablely connected by axis, and wherein support base (2) is equipped with control panel (1) and toppling over motor (3);Institute
State toppling over motor (3), sedimentation basin level sensor (6), sedimentation basin pH value detector (7) and intake pump (12) by conducting wire with
Control panel (1) control is connected.
2. one kind according to claim 1 is mounted on processing coal slime water installations in coal mine roadway, which is characterized in that the branch
Support seat (2) includes: connecting bracket slideway base (2-1), connecting bracket pulley (2-2), connecting bracket motor (2-3), bracket biography
Dynamic system (2-4), bracket transmission system connecting rod (2-5), support base panel connecting bracket (2-6), connecting bracket slideway (2-
7), support base panel (2-8);The connecting bracket slideway base (2-1) is set to below connecting bracket slideway (2-7), and the two is hung down
It directly and is fixedly connected, the quantity of connecting bracket slideway base (2-1) is 2, is all provided on each connecting bracket slideway base (2-1)
There are the 2 connecting bracket slideways (2-7) in left and right;The support base panel connecting bracket (2-6) and connecting bracket slideway base (2-1)
On left side connecting bracket slideway (2-7) be slidably connected, the end of support base panel connecting bracket (2-6) and support base panel
(2-8) is fixedly connected, and the quantity of support base panel connecting bracket (2-6) is two;The connecting bracket pulley (2-2) is connected to
The side support base panel connecting bracket (2-6), connecting bracket pulley (2-2) and the right side on connecting bracket slideway base (2-1)
Connecting bracket slideway (2-7) rolls connection, and the quantity of every side connecting bracket pulley (2-2) is 2;The bracket transmission system
(2-4) is located at each support base panel connecting bracket (2-6) other side, bracket transmission system (2-4) upper and lower ends with connect branch
Frame pulley (2-2) transmission connection;The connecting bracket motor (2-3) is arranged in bracket transmission system (2-4) side lower part, connection
Carriage motor (2-3) is connected by conducting wire with control panel (1) control;The bracket transmission system connecting rod (2-5) is two sides
Attachment device between bracket transmission system (2-4), the quantity of bracket transmission system connecting rod (2-5) are 2.
3. one kind according to claim 2 is mounted on processing coal slime water installations in coal mine roadway, which is characterized in that the electricity
Xie Chi (4) includes: intake pump mounting base (4-1), electrolytic cell outlet pipe (4-2), bucket wall (4-3), blender (4-4), anode (4-
5), stirring motor (4-6), pour spout (4-7), cathode (4-8), rotation axis (4-9), acid adding hole (4-10);The bucket wall (4-3)
Top side is equipped with pour spout (4-7), and bucket wall (4-3) bottom side is equipped with intake pump mounting base (4-1) and electrolytic cell outlet pipe
(4-2), wherein electrolytic cell outlet pipe (4-2) and bucket wall (4-3) are penetrated through;The intake pump mounting base top (4-1) is equipped with acid adding
Hole (4-10), acid adding hole (4-10) and bucket wall (4-3) are penetrated through;The rotation axis (4-9) is located at the two sides center bucket wall (4-3), turns
Moving axis (4-9) quantity is 2, and two rotation axis (4-9) rotate coaxially;Bucket wall (4-3) top center is equipped with blender (4-
4), the center blender (4-4) is equipped with stirring motor (4-6), and stirring motor (4-6) is threadedly coupled with blender (4-4);It is described to stir
Mix the two sides device (4-4) and be respectively equipped with anode (4-5) and cathode (4-8), anode (4-5) and cathode (4-8) with blender (4-4)
It is slidably connected;The anode (4-5), stirring motor (4-6) and cathode (4-8) control phase by conducting wire and control panel (1)
Even;The anode (4-5) is iron material matter, and cathode (4-8) is carbon materials matter.
4. one kind according to claim 3 is mounted in coal mine roadway processing coal slime water installations, which is characterized in that it is described into
Water pump mounting base (4-1) includes: mounting base panel (4-1-1), mounting base fixed block (4-1-2), fixed block connecting rod (4-1-
3), water pump stabilizer blade (4-1-4), hold-down bolt (4-1-5), bolt sleeve (4-1-6), bolt adjusting knob (4-1-7), stabilizer blade is solid
Determine ring (4-1-8);The mounting base fixed block (4-1-2) is located at the lower right mounting base panel (4-1-1), and the two is fixedly connected,
The quantity of mounting base fixed block (4-1-2) is 3, and adjacent mounting base fixed block (4-1-2) is centered on water pump stabilizer blade (4-1-4)
Angularly it is distributed;The stabilizer blade fixed ring (4-1-8) is located on the inside of mounting base fixed block (4-1-2), stabilizer blade fixed ring (4-1-8)
It is fixedly connected by fixed block connecting rod (4-1-3) with mounting base fixed block (4-1-2), stabilizer blade fixed ring (4-1-8) is equipped with
Bolt sleeve (4-1-6);The top of the bolt sleeve (4-1-6) is equipped with bolt adjusting knob (4-1-7), bolt sleeve (4-
Bottom 1-6) is equipped with hold-down bolt (4-1-5), and the quantity of bolt sleeve (4-1-6) is 3;The water pump stabilizer blade (4-1-4)
Internal positioned at stabilizer blade fixed ring (4-1-8), the diameter of water pump stabilizer blade (4-1-4) is less than the diameter of stabilizer blade fixed ring (4-1-8), water
Pump stabilizer blade (4-1-4) is fixed on mounting base panel (4-1-1) by the effect of hold-down bolt (4-1-5).
5. one kind according to claim 4 is mounted on processing coal slime water installations in coal mine roadway, which is characterized in that described to stir
Mixing device (4-4) includes: loading plate (4-4-1), electrolytic cell pH value detector (4-4-2), electrolytic cell level sensor (4-4-3),
Agitating device (4-4-4);The loading plate (4-4-1) is equipped with electrolytic cell pH value detector (4-4-2) and electrolysis pit level sense
It answers device (4-4-3), electrolytic cell pH value detector (4-4-2) and electrolytic cell level sensor (4-4-3) pass through conducting wire and control
Panel (1) control is connected;The agitating device (4-4-4) is located at the lower part loading plate (4-4-1), and stirring motor (4-6) passes through axis
It is fixedly connected with agitating device (4-4-4).
6. one kind according to claim 5 is mounted on processing coal slime water installations in coal mine roadway, which is characterized in that described to stir
Mixing device (4-4-4) includes: aerofoil profile paddle (4-4-4-1), and agitating device connector (4-4-4-2) stirs axis (4-4-4-
3), fixed impeller (4-4-4-4), paddle support frame (4-4-4-5);It is equipped with and fixes in the middle part of the stirring axis (4-4-4-3)
Impeller (4-4-4-4), the stirring axis bottom (4-4-4-3) are equipped with agitating device connector (4-4-4-2);The agitating device connects
It connects device (4-4-4-2) to be fixedly connected with stirring axis (4-4-4-3), the agitating device connector bottom (4-4-4-2) is stirred with aerofoil profile
Leaf (4-4-4-1) is mixed to be fixedly connected;The both ends of the paddle support frame (4-4-4-5) respectively with agitating device connector (4-
It 4-4-2) is fixedly connected with aerofoil profile paddle (4-4-4-1), the quantity of paddle support frame (4-4-4-5) is 2.
7. one kind according to claim 6 is mounted on processing coal slime water installations in coal mine roadway, which is characterized in that the sun
Pole (4-5) includes: to handle path (4-5-1) into water, anode ring (4-5-2), suction hole (4-5-3), and suction line (4-5-4) is inhaled
Enter surge chamber (4-5-5), anode treatment fluid drainpipe (4-5-6), waterproof penetration pipe (4-5-7), anode sliding groove (4-5-8);
The anode sliding groove (4-5-8) is in I-shaped structure, and the quantity of anode sliding groove (4-5-8) is two, adjacent anode sliding groove
Sucking surge chamber (4-5-5) is equipped between (4-5-8);The top of sucking surge chamber (4-5-5) is connected with waterproof penetration pipe
(4-5-7) and anode treatment fluid drainpipe (4-5-6), sucking surge chamber (4-5-5) lower part be connected with suction line (4-5-4) and
Anode ring (4-5-2);The suction line (4-5-4) passes through sucking surge chamber (4-5-5) and anode treatment fluid drainpipe (4-5-6)
The lower end of perforation, suction line (4-5-4) is equipped with suction hole (4-5-3);The anode ring (4-5-2) is located at suction line (4-5-4)
Outside, the diameter of anode ring (4-5-2) are greater than the diameter of suction line (4-5-4), are equipped with water inlet inside anode ring (4-5-2) and handle
Path (4-5-1);Water inlet processing path (4-5-1) and suction hole (4-5-3) penetrates through.
8. one kind according to claim 7 is mounted on processing coal slime water installations in coal mine roadway, which is characterized in that described turn
Moving axis (4-9) includes: briquetting fixed plate (4-9-1), rate of tension regulation cock (4-9-2), gear assembly (4-9-3), axis
Briquetting (4-9-4), holddown spring (4-9-5) rotate shaft housing (4-9-6), axis drive gear (4-9-7), rotating middle shaft (4-
9-8), shaft brake (4-9-9) is rotated;The rotating middle shaft (4-9-8) is set at rotation shaft housing (4-9-6) inside center,
Rotating middle shaft (4-9-8) outer wall is helicitic texture;The axis briquetting (4-9-4) is arranged in rotating middle shaft (4-9-8) up and down two
End, axis briquetting (4-9-4) concave side are equipped with briquetting fixed plate (4-9-1);The quantity of the briquetting fixed plate (4-9-1) is
2;The rate of tension regulation cock (4-9-2) is perpendicular between briquetting fixed plate (4-9-1), and rate of tension regulation cock (4-9-2)
It is fixedly connected across briquetting fixed plate (4-9-1) with axis briquetting (4-9-4), the quantity of rate of tension regulation cock (4-9-2) is 4
It is a;The axis drive gear (4-9-7) is arranged in axis briquetting (4-9-4) inside, axis drive gear (4-9-7) and rotation
Axis (4-9-8) engagement connection, axis drive gear (4-9-7) outside are equipped with gear assembly (4-9-3);The gear passes
Dynamic device (4-9-3) is connected by conducting wire with control panel (1) control;During the holddown spring (4-9-5) is fixedly connected on
At the side center axis briquetting (4-9-4);The rotation shaft brake (4-9-9) is located at the other side rotating middle shaft (4-9-8), rotation
Axis (4-9-8) passes through in the middle part of rotation shaft brake (4-9-9).
9. one kind according to claim 8 is mounted on processing coal slime water installations in coal mine roadway, which is characterized in that described turn
Moving axis brake (4-9-9) includes: brake cooling water tank (4-9-9-1), belt controller (4-9-9-2), deceleration belt (4-
9-9-3), brake rotor (4-9-9-4), belt tightening regulating device (4-9-9-5);The brake rotor (4-9-9-4) with
Centered on rotating middle shaft (4-9-8) and the two is fixed by the bracket connection, and the periphery brake rotor (4-9-9-4) is wound with deceleration skin
Band (4-9-9-3);The port of the deceleration belt (4-9-9-3) is connect with belt controller (4-9-9-2), deceleration belt (4-
Upside 9-9-3) is connect with the one end of belt tightening regulating device (4-9-9-5);Belt controller (4-9-9-2) position
On the downside of belt tightening regulating device (4-9-9-5), belt controller (4-9-9-2) and belt tightening regulating device (4-
Other end connection 9-9-5), belt controller (4-9-9-2) are connected by conducting wire with control panel (1) control;The system
Dynamic device cooling water tank (4-9-9-1) is connected on rotating middle shaft (4-9-8), and is located at the side brake rotor (4-9-9-4);
The brake cooling water tank (4-9-9-1) includes: cooling water return pipe (4-9-9-1-1), rectangle buffer board (4-9-9-
1-2), cooling water buffer net (4-9-9-1-3), water temperature sensor (4-9-9-1-4), water tank upper chamber (4-9-9-1-5) are cooling
Water settles plate (4-9-9-1-6), and cooling water is gone flow tube (4-9-9-1-7), cooling water reflux pump (4-9-9-1-8), water tank cavity of resorption
Room (4-9-9-1-9);The water tank upper chamber (4-9-9-1-5) and water tank lower chambers (4-9-9-1-9) are respectively provided at brake
The internal two sides up and down of cooling water tank (4-9-9-1), and the two perforation connection;Cooling water sedimentation plate (4-9-9-1-6) is fixed
It is connected to water tank upper chamber (4-9-9-1-5) and water tank lower chambers (4-9-9-1-9) is internal, cooling water settles plate in each chamber
The quantity of (4-9-9-1-6) is 3, is equidistantly distributed between adjacent cooling water sedimentation plate (4-9-9-1-6);The rectangle is slow
Punching (4-9-9-1-2) is located on the downside of the sedimentation of the cooling water in water tank lower chambers (4-9-9-1-9) plate (4-9-9-1-6), rectangle
The quantity of buffer board (4-9-9-1-2) is 4, is equidistantly distributed between adjacent rectangle buffer board (4-9-9-1-2), rectangle buffering
The lower part of plate (4-9-9-1-2) is equipped with cooling water buffer net (4-9-9-1-3);The water temperature sensor (4-9-9-1-4) is fixed
It is connected on the downside of water tank lower chambers (4-9-9-1-9) inner wall, water temperature sensor (4-9-9-1-4) is with control panel (1) by leading
Line traffic control connection;The cooling water goes flow tube (4-9-9-1-7) to be located on the outside of water tank upper chamber (4-9-9-1-5), and cooling water is gone
One end insertion water tank upper chamber (4-9-9-1-5) of flow tube (4-9-9-1-7) is internal, and cooling water goes flow tube (4-9-9-1-7)
The other end is penetrated through by the one end of cooling water reflux pump (4-9-9-1-8) and cooling water return pipe (4-9-9-1-1) and is connected;It is described
Cooling water return pipe (4-9-9-1-1) is located on the outside of water tank lower chambers (4-9-9-1-9), cooling water return pipe (4-9-9-1-1)
Other end insertion water tank lower chambers (4-9-9-1-9) it is internal;The cooling water reflux pump (4-9-9-1-8) is arranged in entire system
Dynamic side device cooling water tank (4-9-9-1), cooling water reflux pump (4-9-9-1-8) are connected by conducting wire with control;
Described plus alkali pipe (5) include: lye paddle (5-1), manage interior motor (5-2), add alkali pipe fixed ring (5-3), alkaline stream
It exports (5-4), lye buffer unit (5-5), lye inlet port (5-6);The lye inlet port (5-6), lye outflux (5-
4) it is respectively arranged on and adds alkali pipe (5) left and right ends;Described plus alkali pipe fixed ring (5-3) is fixedly attached to plus alkali pipe (5) middle part, adds alkali
The quantity of pipe fixed ring (5-3) is 3, and adjacent plus alkali pipe fixed ring (5-3) is in be equally spaced;The position motor (5-2) in the pipe
The both ends of motor (5-2) are equipped with lye paddle (5-1) within adding alkali pipe (5) internal, managing, and the waist of motor (5-2) is set in pipe
Have lye buffer unit (5-5), manages interior motor (5-2) and connected by conducting wire and control panel (1) control;The lye paddle
(5-1) and lye buffer unit (5-5) are fixedly connected with motor in pipe (5-2);
The sedimentation basin pH value detector (7) includes: sealed detector base (7-1), and electrion capacitor (7-2), mercury is same
Position prime ring (7-3), mercury isotope emitting head (7-4), integrated circuit board (7-5), test fluid are intake path (7-6), electromagnetic shock
Coil (7-7), sealed waterproof glass shell (7-8), test fluid water inlet (7-9), test fluid water outlet (7-10);The test
Liquid water inlet (7-9) and test fluid water outlet (7-10) are respectively provided at upper and lower the two of entire sedimentation basin pH value detector (7) device
End, and both penetrated through with test fluid water inlet path (7-6);Test fluid water inlet path (7-6) is entire sedimentation basin pH value
Hollow sandwich between detector (7) device outer wall and sealed waterproof glass shell (7-8);The sealed waterproof glass shell
(7-8) is located at the inside of entire sedimentation basin pH value detector (7) device;The inside of the sealed waterproof glass shell (7-8) is set
Have electromagnetic shock coil (7-7), the bottom of sealed waterproof glass shell (7-8) is equipped with sealed detector base (7-1);It is described
Sealed detector base (7-1) is fixedly connected with sealed waterproof glass shell (7-8), in sealed detector base (7-1)
Portion is equipped with integrated circuit board (7-5), mercury isotope ring (7-3) and electrion capacitor (7-2);The mercury isotope ring (7-3)
Upper end is equipped with mercury isotope emitting head (7-4), and the quantity of mercury isotope emitting head (7-4) is no less than 8;The electromagnetic shock line
Circle (7-7), integrated circuit board (7-5), mercury isotope ring (7-3), electrion capacitor (7-2) pass through with control panel (1)
Polygon control survey is connected;
The sedimentation basin outlet pipe (9) includes: dredger pushing tow controller (9-1), secondary sediment pot (9-2), U-tube water outlet
Mouth (9-3), U-tube (9-4), sediment outlet (9-5), dredger (9-6), sewage inlet pipe (9-7);The dredging dress
The both ends for setting (9-6) are respectively equipped with dredger pushing tow controller (9-1) and sediment outlet (9-5), dredger (9-6)
Upside be equipped with sewage inlet pipe (9-7);The sediment outlet (9-5) and sewage inlet pipe (9-7) are and dredger
(9-6) perforation connection;The U-tube (9-4) is located on the downside of dredger (9-6), one end of U-tube (9-4) and dredger
(9-6) perforation connection, the other end of U-tube (9-4) are equipped with U-tube water outlet (9-3);The secondary sediment pot (9-2) is set to U
The bottom type pipe (9-4), the two perforation connection;The dredger pusher (9-1) controls phase by conducting wire and control panel (1)
Even;
The dredger pushing tow controller (9-1) includes: controller housing (9-1-1), spill fixture block (9-1-2), between fixture block
Away from regulation cock (9-1-3), built-in gear (9-1-4), gearing shaft (9-1-5), side pressure spring (9-1-6);The concave folder
Block (9-1-2) is located at controller housing (9-1-1) inside, and the quantity of concave fixture block (9-1-2) is 2, leads between adjacent fixture block
Cross fixture block spacing regulation cock (9-1-3) connection;The quantity of the fixture block spacing regulation cock (9-1-3) is 4;The built-in gear
(9-1-4) is set on the inside of spill fixture block (9-1-2), and built-in gear (9-1-4) and gearing shaft (9-1-5) coaxial transmission connect
It connects, the quantity of built-in gear (9-1-4) is 2, and adjacent built-in gear (9-1-4) is engaged with sediment propulsion arm (9-6-4)
Connection;The side pressure spring (9-1-6) is fixedly connected on the side spill fixture block (9-1-2), and the quantity of side pressure spring (9-1-6) is
2;The gearing shaft (9-1-5) and external motor are drivingly connected, and external motor is connect with control panel (1) conducting wire;
The dredger (9-6) includes: dredge outlet pipe (9-6-1), dredge cavity (9-6-2), ejector piston (9-6-
3), sediment propulsion arm (9-6-4);The sediment propulsion arm (9-6-4) is located at dredge cavity (9-6-2) inside, precipitating
One end of object propulsion arm (9-6-4) and dredger pushing tow controller (9-1) are sequentially connected, sediment propulsion arm (9-6-4)
The other end is fixedly connected with ejector piston (9-6-3);The dredge outlet pipe (9-6-1) is located at the side dredger (9-6)
Lower end, dredge outlet pipe (9-6-1) and dredge cavity (9-6-2) perforation connect;
The ejector piston (9-6-3) includes: piston end (9-6-3-1), piston air outlet (9-6-3-2), piston reinforcing ring
(9-6-3-3), piston air inlet (9-6-3-4), fan leaf (9-6-3-5), blower motor (9-6-3-6);The piston air inlet
Mouth (9-6-3-4) and piston end (9-6-3-1) is located at the both ends of entire ejector piston (9-6-3) device;The air blast
Motor (9-6-3-6) is located inside entire ejector piston (9-6-3) device, and the both ends of blower motor (9-6-3-6) are fixedly connected
Have fan leaf (9-6-3-5), blower motor (9-6-3-6) is connected by conducting wire with control panel (1) control;The piston is reinforced
Ring (9-6-3-3) and piston air outlet (9-6-3-2) are fixedly connected on outside entire ejector piston (9-6-3) device, and piston adds
Gu the quantity of ring (9-6-3-3) is 2;The piston air outlet (9-6-3-2) be located at adjacent pistons reinforcing ring (9-6-3-3) it
Between, piston air outlet (9-6-3-2) and piston air inlet (9-6-3-4) are penetrated through, and the quantity of piston air outlet (9-6-3-2) is many
In 4;
One kind being mounted on processing coal slime water installations, the working method of the device in coal mine roadway including the following steps:
Step 1: in a kind of whole device for being mounted on and handling coal slime water installations in coal mine roadway, staff connects control first
Panel (1) power supply processed, it is secondly that tape handling sewage injection electrolytic cell (4) is internal, at the same time, it is located on blender (4-4)
Electrolytic cell level sensor (4-4-3) real-time monitoring electrolytic cell (4) water level inside height, as electrolytic cell level sensor (4-4-
3) when monitor value reaches its setting value, electrolytic cell level sensor (4-4-3) generates electric signal transmission to control panel (1), control
Panel (1) processed generates warning information, and staff is reminded to stop filling treatment sewage;
Step 2: in support base (2) operation process, connecting bracket motor (2-3) is transported under the control of control panel (1)
Turn, and drives the running of bracket transmission system (2-4), and then promote connecting bracket pulley (2-2) at connecting bracket slideway (2-7)
On scroll up and down;Connecting bracket pulley (2-2) scrolls up and down and promotes support base panel connecting bracket (2-6) in connecting bracket
It is slided up and down on slideway (2-7), to realize the rising and decline of support base panel (2-8);Since bracket transmission system connects
The presence of bar (2-5) promotes the two sets of upgrade-systems in left and right to synchronize and moves down under the driving effect of connecting bracket motor (2-3)
It is dynamic;
Step 3: in electrolytic cell (4) operation, when electrolytic cell (4) complete treatment sewage filling work, staff passes through
Control panel (1) controls stirring motor (4-6) starting, while being powered to anode (4-5) and cathode (4-8), carries out wait locate
Manage electrolytic sewage work;Electrolytic cell pH value detector during treatment sewage electrolysis, on blender (4-4)
The internal pH value of sewage water of (4-4-2) real-time monitoring electrolytic cell (4), when electrolytic cell pH value detector (4-4-2) monitor value is set beyond it
When determining value range, electrolytic cell pH value detector (4-4-2) generates electric signal transmission to control panel (1), control panel (1) control
Electrically-controlled valve on acid adding pipe (11) is opened, and internal acidic materials injection electrolytic cell (4) of acid adding pipe (11) is internal;As electrolytic cell pH
It is worth detector (4-4-2) monitor value in its setting range value, electrolytic cell pH value detector (4-4-2) generates electric signal transmission extremely
Control panel (1), control panel (1) control the electrically-controlled valve on acid adding pipe (11) and close;
Step 4: in intake pump mounting base (4-1) course of work, compression is realized by tightening bolt adjusting knob (4-1-7)
Fixation of the bolt (4-1-5) to water pump stabilizer blade (4-1-4);
Step 5: in blender (4-4) operation, electrolytic cell pH value detector (4-4-2) carries out the sewage in electrolytic cell (4)
Real-time pH value detection;The position that electrolytic cell level sensor (4-4-3) reaches the interior sewage of electrolytic cell (4) is monitored, with
Prevent sewage overflows;Meanwhile agitating device (4-4-4) is stirred sewage in pond;
Step 6: in agitating device (4-4-4) operation process, the operating of stirring axis (4-4-4-3) drives fixed impeller (4-
Rotation 4-4-4) promotes sludge to be pressed into bottom;Meanwhile the rotation of aerofoil profile paddle (4-4-4-1) is realized to electrolytic cell (4)
The stirring of interior sewage;
Step 7: in anode (4-5) course of work, after external water enters water inlet processing path (4-5-1), suction hole (4-5-
3) water in water inlet processing path (4-5-1) is drawn into suction line (4-5-4);Water in suction line (4-5-4) is by inhaling
After entering surge chamber (4-5-5), it is discharged from anode treatment fluid drainpipe (4-5-6);Meanwhile electric wire is from waterproof penetration pipe (4-5-7)
It inside penetrates, is connect with anode ring (4-5-2), so that the anode ring periphery (4-5-2) forms electric field, complete electrolysis work;
Step 8: in rotation axis (4-9) operation process, gear assembly (4-9-3) under the control of control panel (1) into
Row running, and the operating of axis drive gear (4-9-7) is driven, and then promote rotating middle shaft (4-9-8) left or right rotation, it drives
Electrolytic cell (4) overturning resets;Meanwhile axis briquetting is realized using rate of tension regulation cock (4-9-2) and holddown spring (4-9-5)
(4-9-4) is tightly engaged with rotating middle shaft (4-9-8's);
Step 9: in rotation shaft brake (4-9-9) operation process, belt controller (4-9-9-2) is in control panel (1)
Deceleration belt (4-9-9-3) is pulled down under control, promotes deceleration belt (4-9-9-3) to the brake rotor (4-9- of operating
Tight 9-4) is carried out, to realize deceleration;
Step 10: in brake cooling water tank (4-9-9-1) operation process, cooling water removes flow tube (4-9-9-1- from cooling water
7) enter water tank upper chamber (4-9-9-1-5), and flow into water tank lower chambers (4- after supercooled water settles plate (4-9-9-1-6)
9-9-1-9);Water in water tank lower chambers (4-9-9-1-9) is settling plate (4-9-9-1-6), rectangle buffer board through supercooled water
After (4-9-9-1-2) and cooling water buffer net (4-9-9-1-3), flow into cooling water return pipe (4-9-9-1-1);At the same time,
Water temperature sensor (4-9-9-1-4) carries out real time temperature detection to the water in water tank lower chambers (4-9-9-1-9), and will test
Information be sent to control panel (1);Cooling water reflux pump (4-9-9-1-8) is operated under the control of control panel (1),
Water in cooling water return pipe (4-9-9-1-1) is delivered to cooling water to go flow tube (4-9-9-1-7), is completed to rotating middle shaft
The circulation cooling of (4-9-8);
Step 11: in adding alkali pipe (5) operation process, lye is flowed into from lye inlet port (5-6) plus alkali pipe (5) are interior;Meanwhile it managing
Interior motor (5-2) drives lye paddle (5-1) to be rotated under the control of control panel (1), realizes interior to alkali pipe (5) is added
The stirring of lye;Then, liquid outflow from lye outflux (5-4);
Step 12: in sedimentation basin pH value detector (7) operation, sewage to be detected is flowed from test fluid water inlet (7-9)
Enter test fluid water inlet path (7-6);At the same time, electromagnetic shock coil (7-7), integrated circuit board (7-5), mercury isotope ring
(7-3), electrion capacitor (7-2) are cooperated to complete pH value detection work under the control of control panel (1);The sewage detected
It is flowed out from test fluid water outlet (7-10);
Step 13: in sedimentation basin outlet pipe (9) operation, sewage flows into dredger (9- from sewage inlet pipe (9-7)
6);Under the control of control panel (1), dredger pushing tow controller (9-1) promotes dredger (9-6) to be operated, into
And the sediment in sewage is pushed into sediment outlet (9-5) and is discharged afterwards, remaining sewage then flows into U-tube (9-4);Through
The precipitation of U-tube (9-4) is crossed, the sediment in sewage enters secondary sediment pot (9-2);Meanwhile the water of sediment is removed from U-shaped
Pipe water outlet (9-3) discharge;
Step 14: in dredger pushing tow controller (9-1) operation, external motor is under the control of control panel (1)
It is operated, and drives gearing shaft (9-1-5) and built-in gear (9-1-4) to rotate, and then pass through built-in gear (9-1-4)
The sediment propulsion arm (9-6-4) realized with the engagement of sediment propulsion arm (9-6-4) is flexible;
Step 15: in dredger (9-6) operation, sewage enters dredge cavity (9-6- from sewage inlet pipe (9-7)
2) in;Sediment propulsion arm (9-6-4) and ejector piston (9-6-3), will under the action of dredger pushing tow controller (9-1)
Sediment in sewage is squeezed to sediment outlet (9-5) and is discharged afterwards, remaining water is then flowed from dredge outlet pipe (9-6-1)
Out;
Step 16: in ejector piston (9-6-3) operation process, wind enters ejector piston (9- from piston air inlet (9-6-3-4)
6-3) inside device;Meanwhile blower motor (9-6-3-6) is operated under the control of control panel (1), and then drives fan
Heat dissipation is realized in the rotation of leaf (9-6-3-5);The hot wind generated in radiation processes is discharged from piston air outlet (9-6-3-2);
Step 17: in sedimentation basin (8) operation, after the completion for the treatment of sewage electrolysis, control panel (1) controls stirring motor
(4-6) shuts down, while powering off to anode (4-5) and cathode (4-8), and subsequent control panel (1) controls intake pump
(12) start, internal sewage injection sedimentation basin (8) of electrolytic cell (4) is internal;It is located at sedimentation basin (8) internal precipitating at the same time
Pit level inductor (6) real-time monitoring sedimentation basin (8) water level inside height, when sedimentation basin level sensor (6), monitor value reaches
When its setting value, sedimentation basin level sensor (6) generates electric signal transmission to control panel (1), control panel (1) intake pump
(12) it shuts down;After treatment sewage injects sedimentation basin (8) inside, it is located at sedimentation basin (8) internal sedimentation basin pH value detection
The internal pH value of sewage water of device (7) real-time monitoring sedimentation basin (8), when sedimentation basin pH value detector (7) monitor value is lower than its setting range
When value, sedimentation basin pH value detector (7) generates electric signal transmission to control panel (1), and control panel (1) control adds alkali pipe (5)
On electrically-controlled valve open, internal alkaline matter injection electrolytic cell (4) of alkali pipe (5) will be added internal, when sedimentation basin pH value detector (7)
For monitor value in its setting range value, sedimentation basin pH value detector (7) generates electric signal transmission to control panel (1), control plane
Electrically-controlled valve in plate (1) control plus alkali pipe (5) is closed;When staff needs to clean electrolytic cell (4) residues inside
When with toppling over work, staff is carried out by control panel (1) control stirring motor (4-6) starting to inside electrolytic cell (4)
Cleaning, after the completion of cleaning, staff is driven by control panel (1) control toppling over motor (3) starting, toppling over motor (3)
Electrolytic cell (4) overturning, residue is discharged by pour spout (4-7).
10. one kind according to claim 9 is mounted on processing coal slime water installations in coal mine roadway, which is characterized in that described
Loading plate (4-4-1) is formed by high molecular material pressing mold, and loading plate (4-4-1) by mass percentage, is grouped as by following group:
3- (bicyclic (2.2.1) the hept- 2- yl of 5,5,6- trimethyl) hexamethylene -1- alcohol 3~13%;
Ultrasonic purification water 1~85%;
CS set-accelerating admixture 3~95%;
α-hydrogen-ω-[(1- oxo -2- acrylic) oxygroup]-poly- [oxygroup (methyl-1,2- ethylidene)] 6~39%;
CSA promotees solidifying promotor 8~19%;
Tin Nanoparticle 4~68%;
Promote catalyst DPG4~44%;
The CS set-accelerating admixture is 2- [3- (2H- benzotriazole -2- base) -4- hydroxy phenyl] ethyl 2- methacrylate
Derivative, molecular characterization are as follows:
Wherein, R is alkyl, is 7~10 carbon atoms;
The CSA promotees the derivative that solidifying promotor is gamma decalactone, molecular structural formula are as follows:
Wherein, the molecular structural formula of X group are as follows:
The water-oil separating coefficient of the group are as follows: 2.8809;
The promotion catalyst DPG is -7 α of 17 Alpha-hydroxy -3- oxygen-(acetylthio) -17 α-pregnant steroid -4- alkene -21- carboxylic acid-γ -
The derivative of lactone, molecular structural formula are as follows:
Wherein, B group is macromolecule group;
The molecular structural formula of the B group are as follows:
Its molecular formula are as follows: C12H16ClNO3;Molecular weight: 257.71;
The manufacturing method of loading plate (4-4-1) is:
Step 1: 3- (bicyclic (2.2.1) the hept- 2- yl of 5,5,6- trimethyl) hexamethylene-in component will be matched according to mass percent
1- alcohol is added in band stirring heated type reactor tank, while ultrasonic purification water is added, and starting is in stirring heated type reactor tank
Blender, setting speed are 3rpm~13rpm;
Step 2: after band stirring heated type reactor tank operates 1~85 minute, CS set-accelerating admixture and α-hydrogen-ω-[(1- oxygen is added
Generation -2- acrylic) oxygroup]-poly- [oxygroup (methyl-1,2- ethylidene)], start with the vapour conduction in stirring heated type reactor tank
Heater makes temperature rise to 3 DEG C~95 DEG C, and CSA is added and promotees solidifying promotor and Tin Nanoparticle, stirs heated type reactor tank in band
In stir evenly, obtain J component homogenate;
Step 3: weighing the promotion catalyst DPG in proportion component according to mass percent, be homogenized and be mixed with J component, then
Secondary starting is with the vapour conduction heaters in stirring heated type reactor tank, controlled at 6 DEG C~39 DEG C, keeps the temperature 8~19 minutes, out
Expect into molding press to get to loading plate (4-4-1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811169989.3A CN109179809A (en) | 2018-10-09 | 2018-10-09 | One kind being mounted on processing coal slime water installations in coal mine roadway |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811169989.3A CN109179809A (en) | 2018-10-09 | 2018-10-09 | One kind being mounted on processing coal slime water installations in coal mine roadway |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109179809A true CN109179809A (en) | 2019-01-11 |
Family
ID=64946938
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811169989.3A Withdrawn CN109179809A (en) | 2018-10-09 | 2018-10-09 | One kind being mounted on processing coal slime water installations in coal mine roadway |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109179809A (en) |
-
2018
- 2018-10-09 CN CN201811169989.3A patent/CN109179809A/en not_active Withdrawn
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206927730U (en) | A kind of efficient sedimentation tank | |
CN207016590U (en) | A kind of sewage purification coagulation treatment device | |
CN114314791B (en) | Coal slime water concentration treatment system | |
CN113603266B (en) | Urban industrial sewage treatment system | |
CN109289260A (en) | A kind of abjection water treatment system after residents in rural community fermentation | |
CN109052759A (en) | A kind of coal mine sewage treatment process and reclamation set | |
CN109179809A (en) | One kind being mounted on processing coal slime water installations in coal mine roadway | |
CN109107231A (en) | Nutrient solution recycling processing system is discarded in a kind of camplotheca acuminata seedling cultivating process | |
CN109110987A (en) | One kind being used for high concentrated organic wastewater dephosphorization denitrogenation processing system | |
CN111018064A (en) | Industrial sewage regeneration treatment equipment | |
CN109052760A (en) | One kind being used for slaughterhouse modified form sewage disposal device | |
CN109052757A (en) | A kind of kitchen sewage emergency treatment device and working method | |
CN215712407U (en) | Novel magnetic medium coagulating sedimentation system | |
CN109052758A (en) | A kind of combined type urban sewage treating device being easily installed | |
CN109052582A (en) | It is a kind of that sewage of farm device is handled using electrolysis method | |
CN109110986A (en) | A kind of related device of integrated printing and dyeing waste water treatment process | |
CN109179807A (en) | It is a kind of to use electrolysis-aerobic process Treating Municipal Sewage device | |
CN110204104A (en) | Suspension media layer filtration system based on mechanical stirring stratification | |
CN109133444A (en) | A kind of printing industry printing ink wastewater treatment system and processing method | |
CN109045772A (en) | A kind of separate type countryside sewage treatment equipment | |
CN109052761A (en) | It is a kind of that electroplating sewerage equipment is handled by DC electric field | |
CN109179808A (en) | One kind being used for dyeing iron-carbon micro-electrolysis sewage-treatment plant | |
CN220300492U (en) | Inverted U-shaped flocculation precipitation equipment | |
CN211328641U (en) | Metal powder recovery device | |
CN109107236A (en) | A kind of ferric manganese ore well water advanced treatment apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20190111 |