CN109164295A - A method of power grid electric is calculated using power integral - Google Patents
A method of power grid electric is calculated using power integral Download PDFInfo
- Publication number
- CN109164295A CN109164295A CN201811101397.8A CN201811101397A CN109164295A CN 109164295 A CN109164295 A CN 109164295A CN 201811101397 A CN201811101397 A CN 201811101397A CN 109164295 A CN109164295 A CN 109164295A
- Authority
- CN
- China
- Prior art keywords
- power
- grid electric
- calculating
- integral
- power grid
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R22/00—Arrangements for measuring time integral of electric power or current, e.g. electricity meters
- G01R22/06—Arrangements for measuring time integral of electric power or current, e.g. electricity meters by electronic methods
Abstract
A kind of method calculating power grid electric using power integral of the present invention, is calculated using timing cycle and power integral method is used to calculate power grid electric.There are three advantages provided by the invention using with power integration method calculating power grid electric: the first, high-efficient due to being not necessarily to manual intervention using calculating automatically;The second, panoramic view data can be obtained, it can be to the electricity data for obtaining any moment in one day;Three, accuracy rate is high.
Description
Technical field
The present invention relates to power network schedule automation fields, calculate power grid electricity using power integral more particularly, to a kind of
The method of amount.
Background technique
It can not directly be collected in automation system for the power network dispatching at present in the market without measuring entire power grid electric number
According to, and power grid electric data are the data that dispatching of power netwoks mechanism is paid special attention to, these data used very in order to obtain in the past
Original method obtains electricity data from other departments by phone or mail first, will then be obtained by dispatching person on duty
The mode that is manually placed in of electricity data be injected into dispatch automated system, time-consuming and laborious, inefficiency.
Summary of the invention
It can not directly be collected in current automation system for the power network dispatching in the market to overcome without measuring entire power grid
The problem of electricity data, the present invention propose a kind of method for calculating power grid electric using power integral, the technology that the present invention uses
Scheme is:
A method of power grid electric is calculated using power integral, comprising the following steps:
S10. the current calculating time t2 in reading service device, current active power P and last computation time t1 in server;
S20. judge whether the time interval of t2 and t1 is greater than 24 hours, if then initializing total electricity is 0, otherwise continue to integrate
Cumulative electricity.
Preferably, it is described continue to integrate cumulative electricity it is as follows:
Q=Q+ΔQ;
Wherein Δ Q is to calculate time t1 to the electricity for calculating time t2 this period, Δ Q=p*(t2-t1);Q is cumulative electricity.
Preferably, the calculating cycle is consistent with the active-power P update cycle.
Preferably, the clock system of the server uses GPS clock.
There are three advantages provided by the invention using with power integration method calculating power grid electric: the first, due to using
It is automatic to calculate, it is not necessarily to manual intervention, it is high-efficient;The second, panoramic view data can be obtained, it can be to the electricity number for obtaining any moment in one day
According to;Three, accuracy rate is high.
Detailed description of the invention
Fig. 1 is the flow chart for the method that power grid electric is calculated using power integral that this method provides.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, only for illustration, Bu Nengli
Solution is the limitation to this patent.Based on the embodiments of the present invention, those of ordinary skill in the art are not making creative labor
Every other embodiment obtained under the premise of dynamic, shall fall within the protection scope of the present invention.
The following further describes the technical solution of the present invention with reference to the accompanying drawings and examples.
Embodiment 1, as shown in Figure 1, a kind of method for calculating power grid electric using power integral, comprising the following steps:
S10. the current calculating time t2 in reading service device, current active power P and last computation time t1 in server;
S20. judge whether the time interval of t2 and t1 is greater than 24 hours, if then initializing total electricity is 0, otherwise continue to integrate
Cumulative electricity.
Wherein, it is described continue to integrate cumulative electricity it is as follows:
Q=Q+ΔQ;
Wherein Δ Q is to calculate time t1 to the electricity for calculating time t2 this period, Δ Q=p*(t2-t1);Q is cumulative electricity.
Wherein, the calculating cycle is consistent with the active-power P update cycle.
Wherein, the clock system of the server uses GPS clock.
Obviously, the above embodiment of the present invention be only to clearly illustrate example of the present invention, and not be pair
The restriction of embodiments of the present invention.For those of ordinary skill in the art, may be used also on the basis of the above description
To make other variations or changes in different ways.There is no necessity and possibility to exhaust all the enbodiments.It is all this
Made any modifications, equivalent replacements, and improvements etc., should be included in the claims in the present invention within the spirit and principle of invention
Protection scope within.
Claims (4)
1. a kind of method for calculating power grid electric using power integral, which comprises the following steps:
S10. the current calculating time t2 in reading service device, current active power P and last computation time t1 in server;
S20. judge whether the time interval of t2 and t1 is greater than 24 hours, if then initializing total electricity is 0, otherwise continue to integrate
Cumulative electricity.
2. it is according to claim 1 it is a kind of using power integral calculate power grid electric method, which is characterized in that it is described after
The continuous cumulative electricity of integral is as follows:
Q=Q+ΔQ;
Wherein Δ Q is to calculate time t1 to the electricity for calculating time t2 this period, Δ Q=p*(t2-t1);Q is cumulative electricity.
3. a kind of method for calculating power grid electric using power integral according to claim 1, which is characterized in that described
Calculating cycle is consistent with the active-power P update cycle.
4. a kind of method for calculating power grid electric using power integral according to claim 1, which is characterized in that described
The clock system of server uses GPS clock.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811101397.8A CN109164295A (en) | 2018-09-20 | 2018-09-20 | A method of power grid electric is calculated using power integral |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811101397.8A CN109164295A (en) | 2018-09-20 | 2018-09-20 | A method of power grid electric is calculated using power integral |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109164295A true CN109164295A (en) | 2019-01-08 |
Family
ID=64879975
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811101397.8A Pending CN109164295A (en) | 2018-09-20 | 2018-09-20 | A method of power grid electric is calculated using power integral |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109164295A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109861344A (en) * | 2019-03-22 | 2019-06-07 | 威海优微科技有限公司 | A kind of USB PD electricity accurate calculation and display methods based on power integral method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2042598U (en) * | 1988-03-30 | 1989-08-09 | 宋寿椿 | Electronic digital watt-hour meter |
CN101540080A (en) * | 2009-04-28 | 2009-09-23 | 华南理工大学 | Three-phase prepayment electric energy meter system based on GPRS communication and control method thereof |
CN101871985A (en) * | 2010-07-13 | 2010-10-27 | 杭州华三通信技术有限公司 | Method and device for metering electric quantity of powered device in power over Ethernet system |
CN102290825A (en) * | 2011-08-05 | 2011-12-21 | 辽宁省电力有限公司 | Real-time measuring and evaluation-querying system for regulating performance of power generating set |
CN102955464A (en) * | 2011-08-26 | 2013-03-06 | 欧姆龙株式会社 | Power display device and system and method, control program and recording medium |
CN103344824A (en) * | 2013-07-08 | 2013-10-09 | 国家电网公司 | Electric energy integration method based on time mark measurement |
-
2018
- 2018-09-20 CN CN201811101397.8A patent/CN109164295A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2042598U (en) * | 1988-03-30 | 1989-08-09 | 宋寿椿 | Electronic digital watt-hour meter |
CN101540080A (en) * | 2009-04-28 | 2009-09-23 | 华南理工大学 | Three-phase prepayment electric energy meter system based on GPRS communication and control method thereof |
CN101871985A (en) * | 2010-07-13 | 2010-10-27 | 杭州华三通信技术有限公司 | Method and device for metering electric quantity of powered device in power over Ethernet system |
CN102290825A (en) * | 2011-08-05 | 2011-12-21 | 辽宁省电力有限公司 | Real-time measuring and evaluation-querying system for regulating performance of power generating set |
CN102955464A (en) * | 2011-08-26 | 2013-03-06 | 欧姆龙株式会社 | Power display device and system and method, control program and recording medium |
CN103344824A (en) * | 2013-07-08 | 2013-10-09 | 国家电网公司 | Electric energy integration method based on time mark measurement |
Non-Patent Citations (1)
Title |
---|
卢黎明等: "谈功率积分求电量", 《浙江电力》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109861344A (en) * | 2019-03-22 | 2019-06-07 | 威海优微科技有限公司 | A kind of USB PD electricity accurate calculation and display methods based on power integral method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Mahmood et al. | Design and implementation of AMR smart grid system | |
CN103197138A (en) | Intelligent electric meter with function of detecting power supply reliability and voltage qualified rate and detecting method thereof | |
CN103558453A (en) | System for collecting maximum demand of multi-power-source power supply direct power purchase customers | |
US20160341773A1 (en) | Method for clear delineation of wholesale and retail energy usage and activity involving energy storage devices | |
US20170271915A1 (en) | Energy Demand Monitoring System and Smart micro-Grid Controller | |
CN109444800A (en) | Platform area recognition methods based on wireless communication acquisition | |
CN106569028B (en) | Electric quantity synchronous processing method and system of double-core intelligent electric energy meter | |
JP5322716B2 (en) | Distributed power output estimation apparatus and method for distribution system | |
WO2019021438A1 (en) | Solar power generation amount prediction device, solar power generation amount prediction system, prediction method, and program | |
CN108490285B (en) | Low-voltage transformer area line loss rate calculation method based on voltage drop method | |
CN109164295A (en) | A method of power grid electric is calculated using power integral | |
Zabasta et al. | Automatic wireless meters reading for water distribution network in Talsi city | |
CN113381408B (en) | Power utilization abnormity distribution transformer positioning method and device based on distribution automation data | |
JP2016092930A (en) | Electric power saving system | |
CN105321331B (en) | The processing method of ammeter information, apparatus and system | |
CN110854845B (en) | Topology identification method and system for low-voltage distribution network | |
CN106600465A (en) | Processing apparatus, system and method for electricity fee exception | |
Meliones et al. | A web-based three-tier control and monitoring application for integrated facility management of photovoltaic systems | |
CN204131632U (en) | A kind of flood control rainwater feelings wireless monitor station | |
Bhavani et al. | Design and implementation of gsm based smart energy meter (sem) for home applications | |
CN115456668A (en) | Data processing method and device based on tiered pricing, equipment and storage medium | |
Patil et al. | Machine to machine communication based electricity monitoring and billing system | |
CN111596125B (en) | Method, device and equipment for determining power generation capacity and storage medium | |
CN109270360B (en) | Method for calculating online line loss with high precision | |
CN102711136A (en) | Energy saving amount calculation method and system for communication base station |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190108 |