CN109162304A - 一种利用avr结合桩机模型计算实时桩深的方法 - Google Patents
一种利用avr结合桩机模型计算实时桩深的方法 Download PDFInfo
- Publication number
- CN109162304A CN109162304A CN201811213327.1A CN201811213327A CN109162304A CN 109162304 A CN109162304 A CN 109162304A CN 201811213327 A CN201811213327 A CN 201811213327A CN 109162304 A CN109162304 A CN 109162304A
- Authority
- CN
- China
- Prior art keywords
- avr
- depth
- stake
- stake machine
- machine model
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D33/00—Testing foundations or foundation structures
Abstract
本发明提供了一种利用AVR结合桩机模型计算实时桩深的方法,采用在在CFG桩机上面安装avr双天线,通过天线结算的结果计算出两个天线的绝度高程差值,进而结合桩机本身的各项尺寸计算出当前桩机锤头进入到地面以下的深度,其中,所述avr双天线连接有数据接收结算模块,所述数据接收结算模块连接有算法计算模块,所述算法计算模块连接有显示模块,本发明以用户为中心,提高监管方对于打桩深度的监管准确度,减少人为计算的误差,提升工程的施工质量,提高施工工艺水平。
Description
技术领域
本发明涉及数字化施工监测装置领域,具体涉及到一种利用AVR结合桩机模型计算实时桩深的方法。
背景技术
近年来,国家基础设施监测在各地如火如荼,更加科学的施工工艺监测手段是施工质量的保障,CFG桩机施工打桩深度监测系统而生。目前市场上流量监测系统主要是针对CFG桩机这种不存在桩管嵌套的施工桩管进行测量多数市面上的CFG在作业的时候,施工深度完全靠肉眼观测,精度较低,误差较大,无法满足监测要求,给工程质量带来较大隐患。
发明内容
为了解决上述不足的缺陷,本发明提供了一种利用AVR结合桩机模型计算实时桩深的方法,本发明以用户为中心,提高监管方对于打桩深度的监管准确度,减少人为计算的误差,提升工程的施工质量,提高施工工艺水平。
本发明提供了一种利用AVR结合桩机模型计算实时桩深的方法,采用在在CFG桩机上面安装avr双天线,通过天线结算的结果计算出两个天线的绝度高程差值,进而结合桩机本身的各项尺寸计算出当前桩机锤头进入到地面以下的深度,其中,所述avr双天线连接有数据接收结算模块,所述数据接收结算模块连接有算法计算模块,所述算法计算模块连接有显示模块。
上述的方法,其中,以用户为中心,提高监管方对于打桩深度的监管准确度,减少人为计算的误差,提升工程的施工质量,提高施工工艺水平。
上述的方法,其中,通过使用有线通信方式,并且实现设备的诊断功能。
上述的方法,其中,使用有线传输,确保双天线正常工作的情况下使用,以及解决深度难以精确实时测量的问题,安装简单方便,实用耐用。
本发明提供了一种利用AVR结合桩机模型计算实时桩深的方法具有以下有益效果:1、本发明以用户为中心,提高监管方对于打桩深度的监管准确度,减少人为计算的误差,提升工程的施工质量,提高施工工艺水平;2、采用在在CFG桩机上面安装avr双天线,通过天线结算的结果计算出两个天线的绝度高程差值,进而结合桩机本身的各项尺寸计算出当前桩机锤头进入到地面以下的深度;3、本发明解决了使用人工估算时,准确度难以把控的问题,以及使用有线通信方式,并且实现设备的诊断功能。
附图说明
通过阅读参照以下附图对非限制性实施例所作的详细描述,本发明及其特征、外形和优点将会变得更明显。在全部附图中相同的标记指示相同的部分。并未刻意按照比例绘制附图,重点在于示出本发明的主旨。
图1为本发明提供的一种利用AVR结合桩机模型计算实时桩深的方法工作流程示意图。
具体实施方式
在下文的描述中,给出了大量具体的细节以便提供对本发明更为彻底的理解。然而,对于本领域技术人员而言显而易见的是,本发明可以无需一个或多个这些细节而得以实施。在其他的例子中,为了避免与本发明发生混淆,对于本领域公知的一些技术特征未进行描述。
为了彻底理解本发明,将在下列的描述中提出详细的步骤以及详细的结构,以便阐释本发明的技术方案。本发明的较佳实施例详细描述如下,然而除了这些详细描述外,本发明还可以具有其他实施方式。
参照图1所示,本发明提供的一种利用AVR结合桩机模型计算实时桩深的方法,采用在在CFG桩机上面安装avr双天线,通过天线结算的结果计算出两个天线的绝度高程差值,进而结合桩机本身的各项尺寸计算出当前桩机锤头进入到地面以下的深度,其中,所述avr双天线连接有数据接收结算模块,所述数据接收结算模块连接有算法计算模块,所述算法计算模块连接有显示模块。
本发明一优选而非限制的实施例中,以用户为中心,提高监管方对于打桩深度的监管准确度,减少人为计算的误差,提升工程的施工质量,提高施工工艺水平。
本发明一优选而非限制的实施例中,通过使用有线通信方式,并且实现设备的诊断功能。
本发明一优选而非限制的实施例中,使用有线传输,确保双天线正常工作的情况下使用,以及解决深度难以精确实时测量的问题,安装简单方便,实用耐用。
本发明中,以用户为中心,提高监管方对于打桩深度的监管准确度,减少人为计算的误差,提升工程的施工质量,提高施工工艺水平;采用在在CFG桩机上面安装avr双天线,通过天线结算的结果计算出两个天线的绝度高程差值,进而结合桩机本身的各项尺寸计算出当前桩机锤头进入到地面以下的深度;本发明解决了使用人工估算时,准确度难以把控的问题,以及使用有线通信方式,并且实现设备的诊断功能。
以上对本发明的较佳实施例进行了描述。需要理解的是,本发明并不局限于上述特定实施方式,其中未尽详细描述的设备和结构应该理解为用本领域中的普通方式予以实施;任何熟悉本领域的技术人员,在不脱离本发明技术方案范围情况下,都可利用上述揭示的方法和技术内容对本发明技术方案做出许多可能的变动和修饰,或修改为等同变化的等效实施例,这并不影响本发明的实质内容。因此,凡是未脱离本发明技术方案的内容,依据本发明的技术实质对以上实施例所做的任何简单修改、等同变化及修饰,均仍属于本发明技术方案保护的范围内。
Claims (4)
1.一种利用AVR结合桩机模型计算实时桩深的方法,其特征在于,
采用在在CFG桩机上面安装avr双天线,通过天线结算的结果计算出两个天线的绝度高程差值,进而结合桩机本身的各项尺寸计算出当前桩机锤头进入到地面以下的深度,其中,所述avr双天线连接有数据接收结算模块,所述数据接收结算模块连接有算法计算模块,所述算法计算模块连接有显示模块。
2.如权利要求1所述的一种利用AVR结合桩机模型计算实时桩深的方法,其特征在于,以用户为中心,提高监管方对于打桩深度的监管准确度,减少人为计算的误差,提升工程的施工质量,提高施工工艺水平。
3.如权利要求1所述的一种利用AVR结合桩机模型计算实时桩深的方法,其特征在于,通过使用有线通信方式,并且实现设备的诊断功能。
4.如权利要求3所述的一种利用AVR结合桩机模型计算实时桩深的方法,其特征在于,使用有线传输,确保双天线正常工作的情况下使用,以及解决深度难以精确实时测量的问题,安装简单方便,实用耐用。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811213327.1A CN109162304A (zh) | 2018-10-18 | 2018-10-18 | 一种利用avr结合桩机模型计算实时桩深的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811213327.1A CN109162304A (zh) | 2018-10-18 | 2018-10-18 | 一种利用avr结合桩机模型计算实时桩深的方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109162304A true CN109162304A (zh) | 2019-01-08 |
Family
ID=64878631
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811213327.1A Pending CN109162304A (zh) | 2018-10-18 | 2018-10-18 | 一种利用avr结合桩机模型计算实时桩深的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109162304A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110016915A (zh) * | 2019-05-20 | 2019-07-16 | 南京天辰礼达电子科技有限公司 | Cfg桩机施工打桩深度监测系统 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20110066401A (ko) * | 2009-12-11 | 2011-06-17 | 함샘 | 무인 항공 자동 항법시스템 설계 |
CN107806118A (zh) * | 2017-12-12 | 2018-03-16 | 北京中企卓创科技发展有限公司 | 一种碎石桩机数字化施工系统 |
CN207636775U (zh) * | 2017-12-12 | 2018-07-20 | 北京中企卓创科技发展有限公司 | 一种打桩深度的计量装置 |
-
2018
- 2018-10-18 CN CN201811213327.1A patent/CN109162304A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20110066401A (ko) * | 2009-12-11 | 2011-06-17 | 함샘 | 무인 항공 자동 항법시스템 설계 |
CN107806118A (zh) * | 2017-12-12 | 2018-03-16 | 北京中企卓创科技发展有限公司 | 一种碎石桩机数字化施工系统 |
CN207636775U (zh) * | 2017-12-12 | 2018-07-20 | 北京中企卓创科技发展有限公司 | 一种打桩深度的计量装置 |
Non-Patent Citations (1)
Title |
---|
刘天一: "基于AVR单片机的GSM-R基站天线倾角测量系统", 《中国优秀硕士学位论文全文数据库信息科技辑》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110016915A (zh) * | 2019-05-20 | 2019-07-16 | 南京天辰礼达电子科技有限公司 | Cfg桩机施工打桩深度监测系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Lora et al. | Design and performance of a nozzle-type rainfall simulator for landslide triggering experiments | |
CN105066893B (zh) | 一种地下管道参数测量装置及其测量方法 | |
CN106067169A (zh) | 植物水分胁迫状态自动监控方法及系统 | |
CN205175360U (zh) | 一种利用激光位移传感器监测滑坡的装置 | |
CN109183865A (zh) | 利用倾角传感器结合桩机模型计算展示实时垂直度的方法 | |
CN109162304A (zh) | 一种利用avr结合桩机模型计算实时桩深的方法 | |
CN116757097A (zh) | 一种数字孪生水利工程运维监测系统和方法 | |
CN104897269A (zh) | 基于线扫描成像的架空电线振动频率测量系统 | |
CN105403250A (zh) | 一种电力防灾预警系统 | |
CN205102881U (zh) | 一种分布式水位测量装置 | |
CN116577788B (zh) | 输电线路异物侵限监测方法、装置和计算机设备 | |
CN103760544A (zh) | 雷达目标的散射中心提取方法及系统 | |
Munoz et al. | Watersheds are not static: Implications of climate variability and hydrologic dynamics in modeling | |
CN114991225A (zh) | 一种深基坑变形监测方法、装置和服务器 | |
CN109579688A (zh) | 一种桩机施工打桩实时超灌报警的方法 | |
Savic et al. | Intelligent urban water infrastructure management | |
CN110016915A (zh) | Cfg桩机施工打桩深度监测系统 | |
CN106445445A (zh) | 一种矢量数据的处理方法及装置 | |
CN104434273A (zh) | 一种穿刺针增强显示方法、装置及其系统 | |
CN116579214A (zh) | 一种基于数字孪生的三维可视化桥墩监测系统及方法 | |
CN103698823B (zh) | 沉管隧道管节海上浮运沉放施工气象窗口预报系统与方法 | |
CN107889058A (zh) | 监测方法、装置及电子设备 | |
CN113052499B (zh) | 一种电力基础设施哑资源管理方法、装置、终端及介质 | |
CN108020296B (zh) | 一种基于超声波技术的油感事件识别算法 | |
CN109403400A (zh) | 一种自动铲刀控制系统及控制方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190108 |
|
RJ01 | Rejection of invention patent application after publication |