CN109162271A - Drain bar, hardened system and reinforcement means for reinforcing soft ground - Google Patents
Drain bar, hardened system and reinforcement means for reinforcing soft ground Download PDFInfo
- Publication number
- CN109162271A CN109162271A CN201811155907.XA CN201811155907A CN109162271A CN 109162271 A CN109162271 A CN 109162271A CN 201811155907 A CN201811155907 A CN 201811155907A CN 109162271 A CN109162271 A CN 109162271A
- Authority
- CN
- China
- Prior art keywords
- draining
- drain bar
- aperture
- soft ground
- reinforcing soft
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/02—Improving by compacting
- E02D3/10—Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
Abstract
For the drain bar, hardened system and reinforcement means of reinforcing soft ground, belong to reinforcement of soft soil technical field.The drain bar includes thickening substrate and multiple partitions, it thickeies in substrate and is provided with multiple draining cylindrical holes, two sides for thickening substrate are respectively first side and second side, first side is equipped with multiple row first side and drains aperture, each column first side drains each one draining cylindrical hole of correspondence of aperture, and each column first side draining aperture with its corresponding to draining cylindrical hole be connected to, second side is equipped with multiple row second side and drains aperture, each column second side drains each one draining cylindrical hole of correspondence of aperture, and each column second side draining aperture with its corresponding to draining cylindrical hole be connected to;In the first side for thickening substrate, the two sides of each column first side draining aperture are equipped with partition, and in the second side for thickening substrate, the two sides of each column second side draining aperture are equipped with partition;It thickeies substrate and has been embedded in copper wire.
Description
Technical field
The present invention relates to reinforcement of soft soil technical field, in particular to a kind of drain bar for reinforcing soft ground, reinforcing
System and reinforcement means.
Background technique
With the economic sustained and rapid development in China, population is constantly dense, and land demand is growing.It is nervous to alleviate land used
Problem, reclaiming land around sea are increasingly being applied in engineering practice (the large area such as Dong Zhiliang, Liu Jia reclamation engineering key
Technical research and utilization [J] marine traffic engineering, 2015, (2): 9-17.).At present frequently with direct hydraulic reclamation in reclamation engineering
Method, and consolidation process is carried out to large area deep soft soil foundation, it is to ensure that the key of reclaiming land around sea.Reinforcing soft ground in engineering
Conventional treatment method generally have vacuum method, electro-osmosis method and vacuum preloading combined with electroosmosis etc..
The technical solution of the prior art one
Firstly, setting vertical drain (bag after being laid with horizontal drainage bed course (such as sand bedding course) on the ground to need reinforcement
Sand loading well or plastic draining board etc.).Then, it is laid with plastic seal film on sand bedding course and its surrounding is made to be embedded in airtight layer top
At least 50cm below face, is allowed to be isolated with atmospheric pressure.Ground inner hole is finally reinforced using vacuum evacuation device (jet pump) reduction
Gap water pressure increases effective stress in its ground, and the soil body is reinforced.(Xia Yubin, Chen Yun are into directly discharging type vacuum prepressing method
The test of reinforcing soft ground and research [J] engineering geology journal, 2010,18(3): 376-383.)
The shortcomings that prior art one
The reinforcement means soil body processing time high for sticky content is longer;When reinforcing, vacuum degree can along soil body depth by
Degradation subtracts, and causes soil body lower part drainage effect poor, secondary treatment is generally required before construction;The reinforcement means processing cost is opposite
It is higher.
The technical solution of the prior art two
Firstly, being inserted into metal electrode on to consolidated subsoil, then pass to direct current.Under electric field action, water body in the soil body from
Anode moves to cathode, and is moved out in cathode, so that reaching reduces high viscosity soil's water content, improves foundation soil strength
Purpose.
The shortcomings that prior art two
The reinforcement means there are metal electrodes it is perishable, interface resistance is excessive, electricity and consumption of electrode are larger the problems such as;Electric osmose mistake
The cell reaction occurred in journey can generate a certain amount of gas, and the spilling of gas will affect consolidation effect;Under independent electroosmosis,
Soil strength non-uniform phenomenon after reinforcing is obvious, and the neighbouring foundation soil strength of anode is significantly larger than the strong of the neighbouring foundation soil of cathode
Degree, the engineering application value that this allows for reinforcing groundwork soil are relatively low.
The technical solution of the prior art three
The reinforcement means is usually using conductive plastics drain bar or conductive plastics drainpipe as the test material of the consolidated subsoil soil body
Material, the draining concretion method that vacuum method is combined with electro-osmosis method, in the collective effect of vacuum preloading draining and drainage by electroosmosis
Lower carry out discharging consolidation, the double effects with vacuum preloading and drainage by electroosmosis.(Fang Yingguang, the vacuum-of xuwei caustic sludge soil
Electric osmose united drainage consolidation characteristics experimental study [J] South China Science & Engineering University's journal (natural science edition), 2006,34(11): 70-
75)
The shortcomings that prior art three
Conductive plastics drain bar used in the reinforcement means is easily bent in vacuum preloading combined with electroosmosis reinforcing process,
And then it will lead to the bad especially later period drainability of drainage effect and be decreased obviously, and plastic draining board is to pass through substrate surface
Groove drained, cannot effectively play the effect of vacuum method draining;In addition, this method is according to conductive plastics
Drainpipe can make the effective electromotive force for acting on the soil body be far smaller than the effective electricity for acting on the soil body when using conductive plastics drain bar
Gesture cannot effectively play the effect of electro-osmosis method draining when using conductive plastics drainpipe, and drainage efficiency is lower.
Summary of the invention
In order to solve the problems, such as that existing vacuum preloading combined with electroosmosis drainage efficiency is lower, the present invention provides a kind of use
In the drain bar of reinforcing soft ground, the drain bar includes thickening substrate and multiple partitions, thickeies and is arranged at intervals in substrate
The height of multiple draining cylindrical holes, each draining cylindrical hole is identical as the height of substrate is thickeied,
Two sides for thickening substrate are respectively first side and second side, and multiple row first side is equipped at intervals in first side
Aperture is drained, each column first side drains each one draining cylindrical hole of correspondence of aperture, and each column first side draining aperture is equal
It is connected to the draining cylindrical hole corresponding to it, multiple row second side draining aperture, each column second is equipped at intervals in second side
One draining cylindrical hole of each correspondence of side discharge aperture, and each column second side draining aperture with its corresponding to draining circle
The connection of column through-hole;
In the first side for thickening substrate, the two sides of each column first side draining aperture are equipped with partition, are thickening substrate
In second side, the two sides of each column second side draining aperture are equipped with partition;
It thickeies substrate and has been embedded in copper wire, and copper wire is stretched out out of thickening substrate, the extension end of copper wire can be with the anode of power supply
Or cathode electrical connection.
The substrate and the material of the partition of thickening is conductive plastics.
All draining apertures that the draining aperture of first side described in multiple row includes are in the first side for thickening substrate
It is uniformly distributed, has the partition between adjacent two column first sides draining aperture;
All draining apertures that the draining aperture of second side described in multiple row includes are uniform in the second side for thickening substrate
Distribution, two adjacent column second sides, which drain between aperture, the partition.
The thickening substrate has been embedded in two copper wire, and the extension end of two copper wire is electrically connected with the positive or negative pole of power supply
It connects.
A kind of hardened system for reinforcing soft ground, the drainage system include woven cloth, power supply, geotextiles, pumping
Vacuum plant, horizontal direction chimney filter, sand bedding course, sealing film, moisture content monitoring device and two pieces of drain bars;
Two pieces of drain bars in parallel opposite insertion in reinforcing soft ground, the copper wire of one of drain bar with it is described
The anode electrical connection of power supply, the copper wire of another piece of drain bar are electrically connected with the cathode of the power supply;
Woven cloth is laid on described on reinforcing soft ground, sand bedding course is laid in woven cloth, and geotextile laying is in sand bedding course
On, the edge that sealing film is covered on sand bedding course, and seals film is placed in sealing ditch, and sealing in ditch has sealing liquid, horizontal direction
Chimney filter is inserted into sand bedding course across film is sealed, and the junction of horizontal direction chimney filter and sealing film seals, horizontal direction chimney filter and pumping
Vacuum plant connection, the draining cylindrical hole of every piece of drain bar are aqueous with the horizontal direction chimney filter by piping connection
Rate monitoring device is embedded in described in reinforcing soft ground.
Two pieces of drain bars are described identical to the insertion depth in reinforcing soft ground.
A method of soft soil foundation is reinforced using the drain bar, which comprises
S1, by two pieces of drain bars, opposite insertion is in reinforcing soft ground in parallel, the insertion depth of two pieces of drain bars
It is identical, wherein the copper wire of two pieces of drain bars respectively connects a conducting wire, moisture content monitoring device is embedded in described wait reinforce
In soft soil foundation;
S2, it is laid with sand bedding course in woven cloth to be laid with one layer of woven cloth on reinforcing soft ground described, is being laid with sand bedding course
Period, located level are connected with horizontal direction chimney filter by pipeline to chimney filter, and by the draining cylindrical hole of every piece of drain bar
It connects;
S3, it is successively laid with geotextiles and sealing film on sand bedding course, sealing film is placed in certain depth in sealing ditch, in sealing ditch
Interior injection seals liquid, so that Horizontal filter pipe is passed through sealing film when being laid with sealing film and connect with vacuum evacuation device, will with it is one of
The conducting wire of the drain bar connection is connect with positive pole, and the conducting wire connecting with another piece of drain bar and power cathode are connected
It connects, carries out sealing in the junction of horizontal direction chimney filter and sealing film, guarantee that sealing film is air tight;
S4, starting vacuum evacuation device carry out vacuum preloading processing to reinforcing soft ground to described, in reinforcing soft ground
Water drains aperture by the multiple row first side on two pieces of drain bars and multiple row second side drains aperture, into two pieces of institutes
It states in the draining cylindrical hole of drain bar, and enters in horizontal direction chimney filter and then be discharged, the moisture content monitoring device is supervised in real time
Survey the moisture content to reinforcing soft ground;
S5, when be reduced to when the moisture content of reinforcing soft ground initial aqueous rate 70% ~ 75%, power supply is opened, with electricity
The drain bar of the anode electrical connection in source is as anode, and the drain bar being electrically connected with the cathode of power supply is as cathode, to described to be added
Gu soft soil foundation carries out vacuum preloading combined with electroosmosis processing, part water passes through two pieces of drain bar rows under vacuum
Out, part water passes through the drain bar discharge as cathode gradually to the drain bar migration as cathode under the action of electric field;
S6, closing vacuum evacuation device and power supply described when the intensity of reinforcing soft ground reaches engine request when monitoring.
When be reduced to when the moisture content of reinforcing soft ground initial aqueous rate 70%, power supply is opened, with power supply
The drain bar of anode electrical connection is as anode, and the drain bar being electrically connected with the cathode of power supply is as cathode, to described soft wait reinforce
Soil base carries out vacuum preloading combined with electroosmosis processing.
By above technical scheme, compared with the existing technology, the invention has the following advantages:
(1) for drain bar in the present invention using substrate is thickeied, intensity is higher, and drain bar can effectively be avoided to generate bending;
(2) the deeper drain groove of multiple depth is formed by partition on two surfaces for thickening substrate, thickeies and is opened up in substrate
There is draining cylindrical hole, and be connected to the draining aperture for thickening substrate surface, so increases drainage channel, more conducively reinforced
The discharge of water body in journey, the further intensity for improving foundation soil body, and the design of multiple draining apertures can make to reinforce groundwork
The intensity of soil is more uniform;
(3) reinforcing early period can using the draining aperture and draining cylindrical hole opened up on two pieces of drain bars using vacuum method
Most of Free water is discharged, vacuum preloading combined with electroosmosis is used in stage, since the structure of drain bar is further advantageous
It is discharged in by the water body in the soil body, vacuum method and electric osmose can be played to the greatest extent by carrying out distinct methods treatment by stages
The respective advantage of method, so that drain bar had not only been used for vacuum preloading draining for drainage by electroosmosis, drainage efficiency is high, drainage effect
It is good, the integral strength to reinforcing soft ground is improved to a greater extent, and can effectively reduce engineering cost, more engineering is answered
With value.
(4) as cylindrical hole and draining aperture is opened up on the drain bar of cathode, so that reinforcing the later period, to can use vacuum pre-
The water body that electroosmosis migrates to cathode is discharged to the greatest extent for pressure effect, and soft subgrade soil intensity is uneven after reinforcing has been effectively relieved
Even problem.
(5) entire reinforcing soft foundation process is all made of drain bar and is drained, smaller to the disturbance of soft soil foundation, and green,
It is environmentally friendly, pollution-free.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples.
Fig. 1 is a kind of structural schematic diagram of drain bar for reinforcing soft ground provided by the invention;
Fig. 2 is the structural schematic diagram of another drain bar for reinforcing soft ground provided by the invention;
Fig. 3 is the main view of drain bar of the invention;
Fig. 4 is the top view of drain bar of the invention;
Fig. 5 is a kind of structural schematic diagram of hardened system for reinforcing soft ground provided by the invention.
In figure:
1 thickening substrate, the first side of 1A thickening substrate, the second side of 1B thickening substrate, 2 partitions, 3 draining cylindrical holes, 4
Draining aperture, 5 drain grooves, 6 copper wire, 7 woven cloths, 8 power supplys, 9 geotextiles, 10 vacuum evacuation devices, 11 horizontal direction chimney filters, 12
Sand bedding course, 13 sealing films, 14 to reinforcing soft ground, 15 anodes, 16 cathodes, 17 sealing ditches.
Specific embodiment
In conjunction with the accompanying drawings, the present invention is further explained in detail.These attached drawings are simplified schematic diagram, only with
Illustration illustrates basic structure of the invention, therefore it only shows the composition relevant to the invention.
In order to solve the problems, such as that existing vacuum preloading combined with electroosmosis drainage efficiency is lower, as shown in Figures 1 to 4, this hair
Bright to provide a kind of drain bar for reinforcing soft ground, which includes thickening substrate 1 and multiple partitions 2, thickeies base
Multiple draining cylindrical holes 3, height phase of the height of each draining cylindrical hole 3 with thickening substrate 1 are arranged at intervals in plate 1
Together,
Two sides for thickening substrate 1 are respectively first side 1A and second side 1B, are equipped at intervals with multiple row on first side 1A
First side drains aperture, and each column first side draining aperture includes multiple draining apertures 4, and each column first side drains aperture
One draining cylindrical hole 3 of each correspondence, and each column first side draining aperture with its corresponding to draining cylindrical hole 3 connect
It is logical, i.e., each column first side draining aperture include all draining apertures 4 with its corresponding to draining cylindrical hole 3 be connected to,
Multiple row second side draining aperture is equipped at intervals on second side 1B, each column second side draining aperture also includes that multiple drainings are small
Hole, each column second side drain each one draining cylindrical hole 3 of correspondence of aperture, and each column second side drain aperture with its institute
Corresponding draining cylindrical hole 3 is connected to, i.e., each column second side draining aperture include all draining apertures with its corresponding to
Draining cylindrical hole 3 be connected to;
On the first side 1A for thickening substrate 1, the two sides of each column first side draining aperture are equipped with partition 2, that is, are thickening
Multiple drain grooves 5 are formed on the first side 1A of substrate 1, on the second side 1B for thickening substrate 1, each column second side 1B
The two sides of draining aperture 4 are equipped with partition 2, i.e., also form multiple drain grooves 5 on the second side 1B for thickening substrate 1,
In multiple partitions 2 with thicken substrate 1 be integrally formed;
It thickeies substrate 1 and has been embedded in copper wire 6, and copper wire 6 is stretched out out of thickening substrate 1, the extension end of copper wire 6 can be with power supply
Positive or negative pole electrical connection.
In the present invention, thickening substrate 1 and the material of partition 2 can be conductive plastics.
In the present invention, two copper wire 6 can be embedded in by thickening in substrate 1, the extension end of two copper wire 6 with power supply just
Pole or cathode electrical connection, it is preferable that the distance between two copper wire 6 are thicken 1 length of substrate 1/2.
In the present invention, as shown in Figure 1, all draining apertures 4 that multiple row first side draining aperture includes are thickening base
It is uniformly distributed on the first side 1A of plate 1, has a partition 2 between adjacent two column first sides draining aperture;Multiple row second
All draining apertures that side discharge aperture includes are uniformly distributed on the second side 1B for thickening substrate 1, and adjacent two arrange the
There is a partition 2 between two side faces draining aperture;The copper wire 6 that insertion thickeies in substrate 1 at this time avoids draining cylindrical hole 3, such as
This arrangement can increase the quantity of draining aperture 4, improve water efficiency;
In the present invention, as shown in Fig. 2, on thickening substrate 1, it is logical that the part of insertion copper wire 6 can also be not provided with draining cylinder
Hole 3 and draining aperture.
The present invention also provides a kind of hardened systems for reinforcing soft ground, as shown in figure 5, the drainage system includes compiling
Woven fabric 7, power supply 8, geotextiles 9, vacuum evacuation device 10, horizontal direction chimney filter 11, sand bedding course 12, sealing film 13, moisture content monitoring dress
It sets and the drain bar;
Two pieces of drain bars are opposite in parallel to be inserted into which in reinforcing soft ground 14, the copper wire 6 and power supply 8 of one of drain bar are just
Pole electrical connection, the copper wire 6 of another piece of drain bar are electrically connected with the cathode of power supply 8;
Woven cloth 7 is laid on on reinforcing soft ground 14, sand bedding course 12 is laid in woven cloth 7, and geotextiles 9 are laid on sand pad
On layer 12, the edge that sealing film 13 is covered on sand bedding course 12, and seals film 13 is placed in sealing ditch, and sealing in ditch has sealing fluid
Body, horizontal direction chimney filter 11 pass through sealing film 13 and are inserted into sand bedding course 12, and the junction of horizontal direction chimney filter 11 and sealing film 13
Sealing, horizontal direction chimney filter 11 connect with vacuum evacuation device 10, the draining cylindrical hole 3 of every piece of drain bar with horizontal direction chimney filter 11
By piping connection, moisture content monitoring device is embedded in in reinforcing soft ground 14.Preferably, two pieces of drain bars are wait reinforce
Insertion depth in soft soil foundation 14 is identical.
Include: using the method that the system reinforces soft soil foundation
S1, by two pieces of drain bars in parallel opposite insertion in reinforcing soft ground 14, the insertion depth of two pieces of drain bars is identical,
In two pieces of drain bars copper wire 6 respectively connection a piece conducting wire, moisture content monitoring device is embedded in in reinforcing soft ground 14;
After connecting conducting wire, the conducting wire of one piece of drain bar can be connect with 8 anode of power supply, the conducting wire and electricity of another piece of drain bar
The connection of 8 cathode of source, powers on 8 in advance, checks connection situation;The insertion depth of two pieces of drain bars is identical, can
Increase electric field strength;Detecting device for moisture content is used to monitor the moisture content to reinforcing soft ground 14, and moisture content monitoring device can
Using the existing device for being used to monitor moisture content;
S2, on reinforcing soft ground 14 be laid with one layer of woven cloth 7, in woven cloth 7 be laid with sand bedding course 12, be laid with sand pad
During layer 12, located level passes through pipe with horizontal direction chimney filter 11 to chimney filter 11, and by the draining cylindrical hole 3 of every piece of drain bar
Road connection;
S3, it is successively laid with geotextiles 9 and sealing film 13 on sand bedding course 12, sealing film 13 is placed in a depthkeeping in sealing ditch 17
Degree, the injection sealing liquid in sealing ditch 17, makes Horizontal filter pipe pass through sealing film 13 and vacuum evacuation device when being laid with sealing film 13
The conducting wire connecting with one of drain bar is connect, the conducting wire that will be connect with another piece of drain bar by 10 connections with 8 anode of power supply
It is connect with 8 cathode of power supply, carries out sealing in the junction of horizontal direction chimney filter 11 and sealing film 13, guarantee that sealing film 13 is air tight;
Wherein, sealing film 13 can be laid with two layers, and sealing liquid can use sticky oil body, existing to mostly use soil body progress close
Envelope, but often there is gap between the soil body, sealing effect is bad;
S4, starting vacuum evacuation device 10, treat reinforcing soft ground 14 and carry out vacuum preloading processing, make to reinforcing soft ground 14
In air pressure reduce, form unbalanced soil water potential, promote to pass through on two pieces of drain bars to the water in reinforcing soft ground 14
Multiple row first side drains aperture and multiple row second side drains aperture, into the draining cylindrical hole 3 of two pieces of drain bars, and
Into being discharged in turn in horizontal direction chimney filter 11, moisture content monitoring device real-time monitoring waits for the moisture content of reinforcing soft ground 14,
In, horizontal direction chimney filter 11 can be connect with gas-liquid separator, the gas-liquid in horizontal direction chimney filter 11 is separated;Vacuum means
Setting 10 can be vacuum pump;
S5, when the moisture content of reinforcing soft ground 14 is reduced to the 70% ~ 75% of initial aqueous rate, open power supply 8, with power supply
The drain bar of 8 anode electrical connection is as anode 15, and the drain bar being electrically connected with the cathode of power supply 8 is as cathode 16, to be added
Gu soft soil foundation 14 carries out vacuum preloading combined with electroosmosis processing, part water passes through two pieces of drain bar discharges under vacuum,
Part water, gradually to the drain bar migration as cathode 16, is discharged under the action of electric field by the drain bar as cathode 16,
Specifically, aperture is drained by the multiple row first side on the drain bar as cathode 16 and multiple row second side drains aperture,
Into in the draining cylindrical hole 3 of the block drain bar, and enter in horizontal direction chimney filter 11;Preferably, when to reinforcing soft ground
When 14 moisture content is reduced to the 70% of initial aqueous rate, power supply 8 is opened, the drain bar being electrically connected with the anode of power supply 8 is as sun
Pole 15, the drain bar being electrically connected with the cathode of power supply 8 treat reinforcing soft ground 14 and carry out vacuum pre-pressed joint as cathode 16
Electro-osmosis method processing, it is in the present invention, electric when being intervened when the moisture content of reinforcing soft ground 14 is reduced to the 70% of initial aqueous rate
Infiltration method, drainage efficiency are higher.During electric osmose, soil temperature can be risen and mutually the meeting and get along well of the zwitterion in the soil body
Reaction is learned, the variation of temperature field and ionic reaction field can promote the discharge of water body, so that the soil body is effectively reinforced.
S6, when monitoring when the intensity of reinforcing soft ground 14 reaches engine request, close vacuum evacuation device 10 and electricity
Source 8.
There are following by the present invention the utility model has the advantages that the drain bar of (1) in the present invention is using substrate 1 is thickeied, and intensity is higher, energy
It is enough that drain bar is effectively avoided to generate bending;
(2) the deeper drain groove 5 of multiple depth is formed by partition 2 on two surfaces for thickening substrate 1, thickeied in substrate 1
Draining cylindrical hole 3 is offered, and is connected to the draining aperture 4 for thickening 1 surface of substrate, drainage channel is so increased, it is more sharp
The discharge of water body in reinforcing process, the further intensity for improving foundation soil body, and the design of multiple draining apertures 4 can make to add
Gu the intensity of groundwork soil is more uniform;
(3) it reinforces and the draining aperture 4 opened up on two pieces of drain bars is utilized using vacuum method and drains 3 energy of cylindrical hole early period
It is enough that most of Free water is discharged, vacuum preloading combined with electroosmosis is used in stage, since the structure of drain bar further has
It is discharged conducive to by the water body in the soil body, vacuum method and electricity can be played to the greatest extent by carrying out distinct methods treatment by stages
The respective advantage of infiltration method, so that drain bar had not only been used for vacuum preloading draining for drainage by electroosmosis, drainage efficiency is high, drainage effect
It is good, the integral strength to reinforcing soft ground 14 is improved to a greater extent, and can effectively reduce engineering cost, more engineering
Application value.
(4) cylindrical hole and draining aperture 4 are opened up on the drain bar as cathode 16, so that reinforcing the later period can use vacuum
The water body that electroosmosis migrates to cathode 16 is discharged to the greatest extent for precompressed effect, and soft subgrade soil intensity after reinforcing has been effectively relieved
Non-uniform problem.
(5) entire reinforcing soft foundation process is all made of drain bar and is drained, smaller to the disturbance of soft soil foundation, and green,
It is environmentally friendly, pollution-free.
Those skilled in the art of the present technique are appreciated that unless otherwise defined, all terms used herein (including technology art
Language and scientific term) there is meaning identical with the general understanding of those of ordinary skill in the application fields.Should also
Understand, those terms such as defined in the general dictionary, which should be understood that, to be had and the meaning in the context of the prior art
The consistent meaning of justice, and unless defined as here, it will not be explained in an idealized or overly formal meaning.
The meaning of " connection " described herein can be between component be directly connected to be also possible to pass through between component
Other components are indirectly connected with.
Taking the above-mentioned ideal embodiment according to the present invention as inspiration, through the above description, relevant staff is complete
Various changes and amendments can be carried out without departing from the scope of the technological thought of the present invention' entirely.The technology of this invention
Property range is not limited to the contents of the specification, it is necessary to which the technical scope thereof is determined according to the scope of the claim.
Claims (8)
1. a kind of drain bar for reinforcing soft ground, it is characterised in that: the drain bar include thicken substrate and it is multiple every
Plate thickeies in substrate and is arranged at intervals with multiple draining cylindrical holes, the height of each draining cylindrical hole with thicken substrate
It is highly identical,
Two sides for thickening substrate are respectively first side and second side, and multiple row first side is equipped at intervals in first side
Aperture is drained, each column first side drains each one draining cylindrical hole of correspondence of aperture, and each column first side draining aperture is equal
It is connected to the draining cylindrical hole corresponding to it, multiple row second side draining aperture, each column second is equipped at intervals in second side
One draining cylindrical hole of each correspondence of side discharge aperture, and each column second side draining aperture with its corresponding to draining circle
The connection of column through-hole;
In the first side for thickening substrate, the two sides of each column first side draining aperture are equipped with partition, are thickening substrate
In second side, the two sides of each column second side draining aperture are equipped with partition;
It thickeies substrate and has been embedded in copper wire, and copper wire is stretched out out of thickening substrate, the extension end of copper wire can be with the anode of power supply
Or cathode electrical connection.
2. the drain bar according to claim 1 for reinforcing soft ground, it is characterised in that: the thickening substrate and institute
The material for stating partition is conductive plastics.
3. the drain bar according to claim 1 for reinforcing soft ground, it is characterised in that: first side described in multiple row
All draining apertures that draining aperture includes are uniformly distributed in the first side for thickening substrate, two adjacent the first sides of column
There is the partition between face draining aperture;
All draining apertures that the draining aperture of second side described in multiple row includes are uniform in the second side for thickening substrate
Distribution, two adjacent column second sides, which drain between aperture, the partition.
4. the drain bar according to claim 1 for reinforcing soft ground, it is characterised in that: the thickening substrate is embedded
Enter to have two copper wire, the extension end of two copper wire is electrically connected with the positive or negative pole of power supply.
5. a kind of hardened system for reinforcing soft ground, it is characterised in that: the drainage system include woven cloth, power supply,
Described in geotextiles, vacuum evacuation device, horizontal direction chimney filter, sand bedding course, sealing film, moisture content monitoring device and two pieces of claims 1
Drain bar;
Two pieces of drain bars in parallel opposite insertion in reinforcing soft ground, the copper wire of one of drain bar with it is described
The anode electrical connection of power supply, the copper wire of another piece of drain bar are electrically connected with the cathode of the power supply;
Woven cloth is laid on described on reinforcing soft ground, sand bedding course is laid in woven cloth, and geotextile laying is in sand bedding course
On, the edge that sealing film is covered on sand bedding course, and seals film is placed in sealing ditch, and sealing in ditch has sealing liquid, horizontal direction
Chimney filter is inserted into sand bedding course across film is sealed, and the junction of horizontal direction chimney filter and sealing film seals, horizontal direction chimney filter and pumping
Vacuum plant connection, the draining cylindrical hole of every piece of drain bar are aqueous with the horizontal direction chimney filter by piping connection
Rate monitoring device is embedded in described in reinforcing soft ground.
6. the hardened system according to claim 5 for reinforcing soft ground, it is characterised in that: two pieces of drain bars
Described identical to the insertion depth in reinforcing soft ground.
7. a kind of method reinforced using drain bar described in claim 1 to soft soil foundation, which is characterized in that the side
Method includes:
S1, by two pieces of drain bars, opposite insertion is in reinforcing soft ground in parallel, the insertion depth of two pieces of drain bars
It is identical, wherein the copper wire of two pieces of drain bars respectively connects a conducting wire, moisture content monitoring device is embedded in described wait reinforce
In soft soil foundation;
S2, it is laid with sand bedding course in woven cloth to be laid with one layer of woven cloth on reinforcing soft ground described, is being laid with sand bedding course
Period, located level are connected with horizontal direction chimney filter by pipeline to chimney filter, and by the draining cylindrical hole of every piece of drain bar
It connects;
S3, it is successively laid with geotextiles and sealing film on sand bedding course, sealing film is placed in certain depth in sealing ditch, in sealing ditch
Interior injection seals liquid, so that Horizontal filter pipe is passed through sealing film when being laid with sealing film and connect with vacuum evacuation device, will with it is one of
The conducting wire of the drain bar connection is connect with positive pole, and the conducting wire connecting with another piece of drain bar and power cathode are connected
It connects, carries out sealing in the junction of horizontal direction chimney filter and sealing film, guarantee that sealing film is air tight;
S4, starting vacuum evacuation device carry out vacuum preloading processing to reinforcing soft ground to described, in reinforcing soft ground
Water drains aperture by the multiple row first side on two pieces of drain bars and multiple row second side drains aperture, into two pieces of institutes
It states in the draining cylindrical hole of drain bar, and enters in horizontal direction chimney filter and then be discharged, the moisture content monitoring device is supervised in real time
Survey the moisture content to reinforcing soft ground;
S5, when be reduced to when the moisture content of reinforcing soft ground initial aqueous rate 70% ~ 75%, power supply is opened, with electricity
The drain bar of the anode electrical connection in source is as anode, and the drain bar being electrically connected with the cathode of power supply is as cathode, to described to be added
Gu soft soil foundation carries out vacuum preloading combined with electroosmosis processing, part water passes through two pieces of drain bar rows under vacuum
Out, part water passes through the drain bar discharge as cathode gradually to the drain bar migration as cathode under the action of electric field;
S6, closing vacuum evacuation device and power supply described when the intensity of reinforcing soft ground reaches engine request when monitoring.
8. the method according to claim 7 reinforced to soft soil foundation, it is characterised in that: when described to reinforcing soft soil
When the moisture content of ground is reduced to the 70% of initial aqueous rate, power supply is opened, the drain bar being electrically connected with the anode of power supply is as sun
Pole, the drain bar being electrically connected with the cathode of power supply carry out vacuum pre-pressed joint electricity to reinforcing soft ground as cathode, to described
The processing of infiltration method.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811155907.XA CN109162271A (en) | 2018-09-30 | 2018-09-30 | Drain bar, hardened system and reinforcement means for reinforcing soft ground |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811155907.XA CN109162271A (en) | 2018-09-30 | 2018-09-30 | Drain bar, hardened system and reinforcement means for reinforcing soft ground |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109162271A true CN109162271A (en) | 2019-01-08 |
Family
ID=64877263
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811155907.XA Pending CN109162271A (en) | 2018-09-30 | 2018-09-30 | Drain bar, hardened system and reinforcement means for reinforcing soft ground |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109162271A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110029656A (en) * | 2019-05-06 | 2019-07-19 | 广东水电二局股份有限公司 | Soft base drain consolidation system and soft base discharging consolidation method |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102535432A (en) * | 2011-12-26 | 2012-07-04 | 河海大学 | Vacuumizing-electroosmosis-stacking combined soft-foundation consolidating system and method |
CN105442526A (en) * | 2015-12-24 | 2016-03-30 | 王有成 | Plate and pipe combined electro-endosmosis electrode |
JP2018119348A (en) * | 2017-01-26 | 2018-08-02 | キャドテック株式会社 | Improvement device of weak ground and improvement method of weak ground |
-
2018
- 2018-09-30 CN CN201811155907.XA patent/CN109162271A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102535432A (en) * | 2011-12-26 | 2012-07-04 | 河海大学 | Vacuumizing-electroosmosis-stacking combined soft-foundation consolidating system and method |
CN105442526A (en) * | 2015-12-24 | 2016-03-30 | 王有成 | Plate and pipe combined electro-endosmosis electrode |
JP2018119348A (en) * | 2017-01-26 | 2018-08-02 | キャドテック株式会社 | Improvement device of weak ground and improvement method of weak ground |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110029656A (en) * | 2019-05-06 | 2019-07-19 | 广东水电二局股份有限公司 | Soft base drain consolidation system and soft base discharging consolidation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106192982B (en) | A method of the electric osmose soil stake based on tubulose ekg electrode handles soft base | |
CN103215946B (en) | Electroosmosis draining system based on sectional electroosmosis electrode | |
CN102995620B (en) | Vacuum/electroosmosis/magnetic field/stack joint preloading consolidation method of soft foundation | |
CN107905211B (en) | Electric osmosis electrode capable of quickly crusting by newly dredger fill and use method thereof | |
CN105256788A (en) | Saturated dredger soft soil foundation reinforcing treatment system and grid-type vacuum preloading and electroosmosis-method combined treatment method | |
CN103758110B (en) | Reinforce the method for Soft Clay Foundation | |
CN107724379B (en) | A kind of method of electrochemistry-vacuum prepressing reinforcement soft base | |
CN106284293A (en) | A kind of system and method for vacuum pre-pressed joint electric osmose reinforcing soft ground | |
CN102900067B (en) | Processing method for reinforcing soft clay ground through vacuum preloading in combination with electro-osmosis method | |
CN112921193B (en) | Method for controlling seepage direction of rare earth leaching solution by electrifying | |
CN103866760A (en) | Method and device for accelerating ultra-soft soil solidification through dual-passage variable-polarity vacuum electroosmosis | |
CN103015401B (en) | Method and device for vacuum electro-osmotic drainage for reinforcing dredged silt soil | |
CN100526563C (en) | Method for reinforcing composite vacuum prepressing soft soil foundation | |
CN111636405A (en) | Device and method for reinforcing foundation by combining vacuum preloading, electroosmosis and heating with biological enzyme | |
CN111074878A (en) | Silt long type mud flat foundation reinforcing device and construction method thereof | |
CN109162271A (en) | Drain bar, hardened system and reinforcement means for reinforcing soft ground | |
CN108385654A (en) | A method of with electrosol combination vacuum-electric osmose reinforcing flexible foundation | |
CN110670574B (en) | Enhanced electroosmosis method and system for reinforcing soft clay foundation | |
CN106436686B (en) | Device and Soft Clay Foundation processing unit for collecting drainage by electroosmosis and method | |
CN104150740A (en) | Two-pool sludge dehydration technology through vacuum pre-compression combined electroosmosis | |
CN108118684B (en) | Beach reclamation dredger fill silt sand inclusion layer foundation reinforcing structure and construction method | |
CN106093348A (en) | Tubulose EKG layer enters formula electrochemistry slip casting reinforcing soft foundation test method and device | |
CN217840065U (en) | Deep and large foundation pit dewatering device | |
CN209760220U (en) | Be used for newly dredger fill to add system of consolidating again | |
CN207749509U (en) | It is pressurized compound vacuum pre-pressed soft soil foundation processing constructing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190108 |
|
RJ01 | Rejection of invention patent application after publication |