CN109146139A - A kind of event time prediction technique and device - Google Patents
A kind of event time prediction technique and device Download PDFInfo
- Publication number
- CN109146139A CN109146139A CN201810823503.7A CN201810823503A CN109146139A CN 109146139 A CN109146139 A CN 109146139A CN 201810823503 A CN201810823503 A CN 201810823503A CN 109146139 A CN109146139 A CN 109146139A
- Authority
- CN
- China
- Prior art keywords
- node
- duration
- event
- prediction
- module
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0633—Workflow analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Data Mining & Analysis (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
This application involves a kind of event time prediction technique and devices, which comprises the event that receives initiates request, and the event is initiated to carry solicited message in request;It initiates to extract the solicited message in request from the event;Corresponding object event is generated based on the solicited message;The object event includes: the trend between at least two nodes and node;The history for obtaining each node completes duration;Duration is completed based on the respective history of node, calculates the prediction duration of each node;Show the event and in the event each node of mark prediction duration.The event obtained using this method, it can show prediction duration automatically to user when showing, and then for event initiator, the case where node executes can be checked at any time, and the estimated time-consuming of each node can be accomplished to know very well in one's heart, it can be convenient and process executive condition is grasped, in order to carry out related work arrangement according to the process executive condition.
Description
Technical field
This application involves technical field of data processing more particularly to a kind of event time prediction technique and devices.
Background technique
BPM, i.e. Business Process Management, centered on being a kind of brilliant operation flow by the forming end-to-end of standardization, with
The lasting Systematization method improved for the purpose of organization business performance.
In existing BPM system, the processes such as examination & approval or audit can all be provided each in detailed process trend and process
Node, but each node is uncertain by the time audited or examined, and causes the applicant for auditing or examining to overall flow
Time-consuming can not determine, and then influence to need to carry out the arrangements of other work according to the result of the process, so that surrounding
The working efficiency of the process reduces.
Summary of the invention
In order to solve the above-mentioned technical problem or it at least is partially solved above-mentioned technical problem, this application provides when event
Between prediction technique and device.
In view of this, in a first aspect, this application provides a kind of event time prediction techniques, which comprises
Reception event initiates request, and the event is initiated to carry solicited message in request;
It initiates to extract the solicited message in request from the event;
Corresponding object event is generated based on the solicited message;The object event include: at least two nodes and
Trend between node;
The history for obtaining each node completes duration;
Duration is completed based on the respective history of node, calculates the prediction duration of each node;
Show the event and in the event each node of mark prediction duration.
Optionally, described that duration is completed based on the respective history of node, calculate the prediction duration of each node, comprising:
All history of calculate node complete the average duration of duration;
The average duration is determined as preset duration.
Optionally, described that duration is completed based on the respective history of node, calculate the prediction duration of each node, comprising:
Duration is completed based on all history of node, determines duration trend curve;
According to the duration trend curve, the preset duration is predicted.
Optionally, it is described show the event and in the event each node of mark prediction duration, comprising:
The event is shown with the directional arrow between node and node;
The corresponding position of arrow marks the prediction duration of next node in the form of text between node.
Optionally, it is described show the event and in the event each node of mark prediction duration, comprising:
Obtain the corresponding relationship of duration and arrow length;
Determine the target length for being directed toward the directional arrow of each node;
Directional arrow between node and node is shown according to the target length.
Optionally, the solicited message includes: the mark of promoter;
It is described that corresponding object event is generated based on the event information, comprising:
According to the mark of the promoter, the job information of the promoter is determined;
Search predeterminable event corresponding with the job information;
Judge whether predeterminable event corresponding with the job information of the promoter is unique;
If unique, the predeterminable event is determined as the object event.
Optionally, the solicited message includes: historical event information;
It is described that corresponding object event is generated based on the event information, comprising:
The last event initiated is searched from the historical event information;
The last event initiated is prompted, and judges whether receive event change operation in the process in prompt;
When not receiving event change operation, the last event initiated is determined as object event;
When receiving event change operation, event change is operated into corresponding event and is determined as object event.
Optionally, the solicited message includes: historical event information;
It is described that corresponding object event is generated based on the event information, comprising:
Statistics number is searched from the historical event information to sort most events;
The statistics number is prompted to sort most events;And judge whether receive event change behaviour in the process in prompt
Make;
When not receiving event change operation, the statistics number most event that sorts is determined into object event;
When receiving event change operation, event change is operated into corresponding event and is determined as object event.
Second aspect, present invention also provides a kind of event time prediction meanss, described device includes:
Request receiving module initiates request for receiving event, and the event is initiated to carry solicited message in request;
Information extraction modules extract the solicited message in request for initiating from the event;
Object event determining module, for generating corresponding object event based on the solicited message;The object event
It include: the trend between at least two nodes and node;
Duration obtains module, and the history for obtaining each node completes duration;
Duration calculation module calculates the prediction duration of each node for completing duration based on the respective history of node;
Display module, for show the event and in the event each node of mark prediction duration.
Optionally, the duration calculation module, comprising:
Average duration computing module completes the average duration of duration for all history of calculate node;Determining module is used for
The average duration is determined as preset duration;
Optionally, curve determining module determines duration trend curve for completing duration based on all history of node;In advance
Module is surveyed, for predicting the preset duration according to the duration trend curve.
Optionally, the display module, comprising:
Drafting module, for drawing node flow table or node flow chart;
Mark module, in the node flow table or node flow chart predeterminated position mark in the form of text it is next
The prediction duration of node.
Optionally, the display module, comprising:
Corresponding relationship obtains module, for obtaining the corresponding relationship of duration and arrow length;
Length determination modul, for determining the target length for being directed toward the directional arrow of each node;
Drafting module, for drawing the directional arrow between node and node according to the target length.
Optionally, the solicited message includes: the mark of promoter;
The object event determining module, comprising:
Job information determining module determines the job information of the promoter for the mark according to the promoter;
Predeterminable event searching module, for searching predeterminable event corresponding with the job information;
Predeterminable event judgment module, for whether only to judge predeterminable event corresponding with the job information of the promoter
One;
First determining module, for when the predeterminable event is unique, the predeterminable event to be determined as the target thing
Part.
Optionally, the solicited message includes: historical event information;
The object event determining module, comprising:
Recent events searching module, for searching the last event initiated from the historical event information;
Cue module, for prompting the last event initiated;
Operation receives judgment module, for judging whether receive event change operation in the process in prompt;
Second determining module, for when not receiving event change operation, the event that described the last time is initiated to be true
It is set to object event;When receiving event change operation, event change is operated into corresponding event and is determined as target thing
Part.
Optionally, the solicited message includes: historical event information;
The object event determining module, comprising:
Sequence event searching module sorts most events for searching statistics number from the historical event information;
Cue module, for prompting the statistics number to sort most events;
Operation receives judgment module, for judging whether receive event change operation in the process in prompt;
Third determining module, for when not receiving event change operation, the statistics number to be sorted most things
Part determines object event;When receiving event change operation, event change is operated into corresponding event and is determined as target
Event.
Above-mentioned technical proposal provided by the embodiments of the present application has the advantages that compared with prior art
This method provided in the embodiment of the present application can initiate the solicited message in request, Auto-matching according to event
Corresponding object event is generated, and for each node in object event, duration is completed according to respective history, to node
Time-consuming is predicted, prediction duration is obtained, and finally shows the prediction duration that each node is shown while event.
Therefore, the event obtained using this method can give user show automatically and predict duration when showing, and then for
Event initiator can check the case where node executes at any time, and can accomplish have at heart for the estimated time-consuming of each node
Number, can be convenient and grasp to process executive condition, in order to carry out related work arrangement according to the process executive condition.
Detailed description of the invention
The drawings herein are incorporated into the specification and forms part of this specification, and shows and meets implementation of the invention
Example, and be used to explain the principle of the present invention together with specification.
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, for those of ordinary skill in the art
Speech, without any creative labor, is also possible to obtain other drawings based on these drawings.
Fig. 1 provides a kind of flow diagram of event time prediction technique for the embodiment of the present application;
Fig. 2 is that a kind of event provided by the embodiments of the present application shows example;
Fig. 3 provides a kind of structural schematic diagram of event time prediction meanss for the embodiment of the present application.
Specific embodiment
To keep the purposes, technical schemes and advantages of the embodiment of the present application clearer, below in conjunction with the embodiment of the present application
In attached drawing, the technical scheme in the embodiment of the application is clearly and completely described, it is clear that described embodiment is
A part of the embodiment of the application, instead of all the embodiments.Based on the embodiment in the application, ordinary skill people
Member's every other embodiment obtained without making creative work, shall fall in the protection scope of this application.
Fig. 1 provides a kind of flow diagram of event time prediction technique for the embodiment of the present application.
As shown in Figure 1, described method includes following steps:
S101 receives event and initiates request.
The event is initiated to carry solicited message in request.In the embodiment of the present application, it includes a variety of that event, which initiates request,
Type, such as: financial approval request, occurrences in human life approval request etc. carry solicited message in each request, and solicited message is
Refer to the main contents of this request, such as: money is asked to finance, alternatively, New Hire Onboarding's application etc..
In addition, solicited message can also include: the name of promoter, position etc..
S102 initiates to extract the solicited message in request from the event.
S103 generates corresponding object event based on the solicited message.
The object event includes: the trend between at least two nodes and node.
For the application, event typically refers to the workflow examination and approval between several nodes, so in object event, packet
At least two nodes are included, and the trend between node is also specific.
When determining object event, event corresponding with solicited message can be pre-created, such as: to finance request or newly
Employee's enrollment application, the event for waiting process CIMSs unified can be determined directly according to solicited message.In addition, determining target thing
When part, it can be also determined according to the information of promoter, such as: a people is common department employee or line manager,
When initiating the same request, corresponding process is different, for this purpose, mesh can also be determined according to the information of promoter
Mark event.
S104, the history for obtaining each node complete duration.
History completes duration, is obtained according to historical statistical data.Due to the different people's examination & approval of identical node, spend
Time how much be different or even the same person examines the affairs of same node in different time sections, the time is also different
Sample.For this reason, it may be necessary to which the history for obtaining each node completes duration.
S105 completes duration based on the respective history of node, calculates the prediction duration of each node.
In the application one embodiment, which can be in the following ways:
S11, all history of calculate node complete the average duration of duration.
The average duration is determined as preset duration by S12.
In the embodiment of the present application, in the state of more stable, the time-consuming variation of each node be it is little, thus
All history of node are completed duration to be averaged, take mean value as one with reference to duration.
In another embodiment of the application, which can be in the following ways:
S21 completes duration based on all history of node, determines duration trend curve;
S22 predicts the preset duration according to the duration trend curve.
In having some embodiments, the processing time-consuming of node can be changed, such as: with the increasing of associate and affairs
More, the processing time-consuming of single node can increase therewith, for this purpose, in this embodiment, can also complete duration according to history, when drafting
Long trend curve predicts preset duration then according to duration trend curve.
It, can be according to the time point to be predicted, to predict preset duration when obtaining duration trend curve.Time point gets over
Far, the preset duration accuracy of prediction is lower, and time point is closer, and the preset duration accuracy of prediction is higher.
S106, show the event and in the event each node of mark prediction duration.
In the application one embodiment, which can be in the following ways:
S31 draws node flow table or node flow chart.
In the embodiment of the present application, flow table and flow chart are only a concrete implementation modes, in other embodiments,
As long as the form of expression of the flow direction of egress can be embodied, one kind of exhibition method all can serve as.
S32, predeterminated position marks the pre- of next node in the form of text in the node flow table or node flow chart
Survey duration.
Referring to following table:
Link serial number or title | Link executor | Predict duration |
1 (starting) | Zhang San | 13 hours |
2 (department for review) | Li Si | 15 hours |
3 (financial audits) | King five | 20 hours |
4 (manager's audits) | Zhao six | 24 hours |
In upper table, prediction duration is shown in the form of the text in list.
In another embodiment of the application, which can be in the following ways:
S41 obtains the corresponding relationship of duration and arrow length;
S42 determines the target length for being directed toward the directional arrow of each node;
S43 draws the directional arrow between node and node according to the target length.
As shown in Fig. 2, having marked the arrow trend between node 1-4 in figure, and when the length expression prediction of arrow
Between length.
This method provided in the embodiment of the present application can initiate the solicited message in request, Auto-matching according to event
Corresponding object event is generated, and for each node in object event, duration is completed according to respective history, to node
Time-consuming is predicted, prediction duration is obtained, and finally shows the prediction duration that each node is shown while event.
Therefore, the event obtained using this method can give user show automatically and predict duration when showing, and then for
Event initiator can check the case where node executes at any time, and can accomplish have at heart for the estimated time-consuming of each node
Number, can be convenient and grasp to process executive condition, in order to carry out related work arrangement according to the process executive condition.
Fig. 3 is a kind of structural schematic diagram of event time prediction meanss provided by the embodiments of the present application.As shown in figure 3, should
Event time prediction meanss, comprising:
Request receiving module 11 initiates request for receiving event, and the event is initiated to carry solicited message in request;
Information extraction modules 12 extract the solicited message in request for initiating from the event;
Object event determining module 13, for generating corresponding object event based on the solicited message;The target thing
Part includes: the trend between at least two nodes and node;
Duration obtains module 14, and the history for obtaining each node completes duration;
Duration calculation module 15 calculates the prediction duration of each node for completing duration based on the respective history of node;
Display module 16, for show the event and in the event each node of mark prediction duration.
In the application one embodiment, the duration calculation module, comprising:
Average duration computing module completes the average duration of duration for all history of calculate node;
Determining module, for the average duration to be determined as preset duration.
In the application one embodiment, the duration calculation module, comprising:
Curve determining module determines duration trend curve for completing duration based on all history of node;
Prediction module, for predicting the preset duration according to the duration trend curve.
In the application one embodiment, the display module, comprising:
Drafting module, for drawing node flow table or node flow chart;
Mark module, in the node flow table or node flow chart predeterminated position mark in the form of text it is next
The prediction duration of node.
In the application one embodiment, the display module, comprising:
Corresponding relationship obtains module, for obtaining the corresponding relationship of duration and arrow length;
Length determination modul, for determining the target length for being directed toward the directional arrow of each node;
Drafting module, for drawing the directional arrow between node and node according to the target length
The device provided in the embodiment of the present application can initiate the solicited message in request, Auto-matching according to event
Corresponding object event is generated, and for each node in object event, duration is completed according to respective history, to node
Time-consuming is predicted, prediction duration is obtained, and finally shows the prediction duration that each node is shown while event.
Therefore, the event obtained using the device can give user show automatically and predict duration when showing, and then for
Event initiator can check the case where node executes at any time, and can accomplish have at heart for the estimated time-consuming of each node
Number, can be convenient and grasp to process executive condition, in order to carry out related work arrangement according to the process executive condition.
It should be noted that, in this document, the relational terms of such as " first " and " second " or the like are used merely to one
A entity or operation with another entity or operate distinguish, without necessarily requiring or implying these entities or operation it
Between there are any actual relationship or orders.Moreover, the terms "include", "comprise" or its any other variant are intended to
Cover non-exclusive inclusion, so that the process, method, article or equipment for including a series of elements not only includes those
Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or setting
Standby intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that
There is also other identical elements in the process, method, article or apparatus that includes the element.
The above is only a specific embodiment of the invention, is made skilled artisans appreciate that or realizing this hair
It is bright.Various modifications to these embodiments will be apparent to one skilled in the art, as defined herein
General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention
It is not intended to be limited to the embodiments shown herein, and is to fit to and applied principle and features of novelty phase one herein
The widest scope of cause.
Claims (10)
1. a kind of event time prediction technique, which is characterized in that the described method includes:
Reception event initiates request, and the event is initiated to carry solicited message in request;
It initiates to extract the solicited message in request from the event;
Corresponding object event is generated based on the solicited message;The object event includes: at least two nodes and node
Between trend;
The history for obtaining each node completes duration;
Duration is completed based on the respective history of node, calculates the prediction duration of each node;
Show the event and in the event each node of mark prediction duration.
2. being calculated the method according to claim 1, wherein described complete duration based on the respective history of node
The prediction duration of each node, comprising:
All history of calculate node complete the average duration of duration;
The average duration is determined as preset duration.
3. being calculated the method according to claim 1, wherein described complete duration based on the respective history of node
The prediction duration of each node, comprising:
Duration is completed based on all history of node, determines duration trend curve;
According to the duration trend curve, the preset duration is predicted.
4. according to the method in claim 2 or 3, which is characterized in that described to show the event and get the bid in the event
The prediction duration of each node at note, comprising:
Draw node flow table or node flow chart;
Predeterminated position marks the prediction duration of next node in the form of text in the node flow table or node flow chart.
5. according to the method in claim 2 or 3, which is characterized in that described to show the event and get the bid in the event
The prediction duration of each node at note, comprising:
Obtain the corresponding relationship of duration and arrow length;
Determine the target length for being directed toward the directional arrow of each node;
The directional arrow between node and node is drawn according to the target length.
6. a kind of event time prediction meanss, which is characterized in that described device includes:
Request receiving module initiates request for receiving event, and the event is initiated to carry solicited message in request;
Information extraction modules extract the solicited message in request for initiating from the event;
Object event determining module, for generating corresponding object event based on the solicited message;The object event includes:
Trend between at least two nodes and node;
Duration obtains module, and the history for obtaining each node completes duration;
Duration calculation module calculates the prediction duration of each node for completing duration based on the respective history of node;
Display module, for show the event and in the event each node of mark prediction duration.
7. device according to claim 6, which is characterized in that the duration calculation module, comprising:
Average duration computing module completes the average duration of duration for all history of calculate node;
Determining module, for the average duration to be determined as preset duration.
8. device according to claim 6, which is characterized in that the duration calculation module, comprising:
Curve determining module determines duration trend curve for completing duration based on all history of node;
Prediction module, for predicting the preset duration according to the duration trend curve.
9. device according to claim 7 or 8, which is characterized in that the display module, comprising:
Drafting module, for drawing node flow table or node flow chart;
Mark module, in the node flow table or node flow chart predeterminated position mark next node in the form of text
Prediction duration.
10. device according to claim 7 or 8, which is characterized in that the display module, comprising:
Corresponding relationship obtains module, for obtaining the corresponding relationship of duration and arrow length;
Length determination modul, for determining the target length for being directed toward the directional arrow of each node;
Drafting module, for drawing the directional arrow between node and node according to the target length.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810823503.7A CN109146139B (en) | 2018-07-25 | 2018-07-25 | Event time prediction method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810823503.7A CN109146139B (en) | 2018-07-25 | 2018-07-25 | Event time prediction method and device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109146139A true CN109146139A (en) | 2019-01-04 |
CN109146139B CN109146139B (en) | 2021-06-04 |
Family
ID=64797807
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810823503.7A Active CN109146139B (en) | 2018-07-25 | 2018-07-25 | Event time prediction method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109146139B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111047150A (en) * | 2019-11-22 | 2020-04-21 | 浙江蓝卓工业互联网信息技术有限公司 | Method, device and system for calculating stability rate of process industrial device |
CN112308639A (en) * | 2019-07-25 | 2021-02-02 | 贝壳技术有限公司 | Target event aging prediction method and device |
CN112825169A (en) * | 2020-12-24 | 2021-05-21 | 苏州瑞畅信息技术有限公司 | Intelligent enterprise management system and management method |
CN112905224A (en) * | 2019-12-04 | 2021-06-04 | 阿里巴巴集团控股有限公司 | Time-consuming determination method, device and equipment for code review |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3104316A1 (en) * | 2015-06-11 | 2016-12-14 | Harman International Industries, Incorporated | Approaches to crowdsourced-based wait time estimates |
CN106779222A (en) * | 2016-12-20 | 2017-05-31 | 中国人民解放军空军装备研究院雷达与电子对抗研究所 | Airport ground stand-by period Forecasting Methodology and device |
CN106971545A (en) * | 2017-05-16 | 2017-07-21 | 青岛大学 | A kind of bus arrival time Forecasting Methodology |
CN107274141A (en) * | 2016-04-07 | 2017-10-20 | 中国移动通信有限公司研究院 | A kind of event-handling method and the network equipment |
US9836718B2 (en) * | 2013-06-19 | 2017-12-05 | United States Postal Service | System and method for providing real-time tracking of items in a distribution network |
CN108154252A (en) * | 2016-12-02 | 2018-06-12 | 百度在线网络技术(北京)有限公司 | Method and apparatus for estimating the flow deadline |
-
2018
- 2018-07-25 CN CN201810823503.7A patent/CN109146139B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9836718B2 (en) * | 2013-06-19 | 2017-12-05 | United States Postal Service | System and method for providing real-time tracking of items in a distribution network |
EP3104316A1 (en) * | 2015-06-11 | 2016-12-14 | Harman International Industries, Incorporated | Approaches to crowdsourced-based wait time estimates |
CN107274141A (en) * | 2016-04-07 | 2017-10-20 | 中国移动通信有限公司研究院 | A kind of event-handling method and the network equipment |
CN108154252A (en) * | 2016-12-02 | 2018-06-12 | 百度在线网络技术(北京)有限公司 | Method and apparatus for estimating the flow deadline |
CN106779222A (en) * | 2016-12-20 | 2017-05-31 | 中国人民解放军空军装备研究院雷达与电子对抗研究所 | Airport ground stand-by period Forecasting Methodology and device |
CN106971545A (en) * | 2017-05-16 | 2017-07-21 | 青岛大学 | A kind of bus arrival time Forecasting Methodology |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112308639A (en) * | 2019-07-25 | 2021-02-02 | 贝壳技术有限公司 | Target event aging prediction method and device |
CN112308639B (en) * | 2019-07-25 | 2023-07-04 | 贝壳技术有限公司 | Aging prediction method and device for target event |
CN111047150A (en) * | 2019-11-22 | 2020-04-21 | 浙江蓝卓工业互联网信息技术有限公司 | Method, device and system for calculating stability rate of process industrial device |
CN112905224A (en) * | 2019-12-04 | 2021-06-04 | 阿里巴巴集团控股有限公司 | Time-consuming determination method, device and equipment for code review |
CN112905224B (en) * | 2019-12-04 | 2024-04-30 | 阿里巴巴集团控股有限公司 | Time-consuming determination method, device and equipment for code review |
CN112825169A (en) * | 2020-12-24 | 2021-05-21 | 苏州瑞畅信息技术有限公司 | Intelligent enterprise management system and management method |
CN112825169B (en) * | 2020-12-24 | 2023-09-22 | 苏州瑞畅信息技术有限公司 | Intelligent enterprise management system and management method |
Also Published As
Publication number | Publication date |
---|---|
CN109146139B (en) | 2021-06-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109146139A (en) | A kind of event time prediction technique and device | |
US7472097B1 (en) | Employee selection via multiple neural networks | |
US7062449B1 (en) | Method and apparatus for planning and monitoring multiple tasks based on user defined criteria and predictive ability and for automatically detecting task related work | |
US7720822B1 (en) | Quality management in a data-processing environment | |
US20170061357A1 (en) | Crowdsourcing a task | |
EP1881427A1 (en) | Database analysis program, database analysis apparatus, and database analysis method | |
CN110782224A (en) | Method and system for self-adapting workflow establishment and approval node | |
US20150379453A1 (en) | System and method for evaluating employees and job seekers at an organization | |
JP2010507146A (en) | Method and apparatus for capacity planning and resource optimization of distributed systems | |
US20100198776A1 (en) | System and method for dependency and root cause discovery | |
US20070233532A1 (en) | Business process analysis apparatus | |
CN110570097A (en) | business personnel risk identification method and device based on big data and storage medium | |
US20150073852A1 (en) | Method and apparatus for predicting project outcomes | |
Suhm et al. | A data-driven methodology for evaluating and optimizing call center IVRs | |
CN101093445A (en) | Multistep prediction method and system based on automatic mining sequential data in software procedure | |
US8090609B2 (en) | Method for evaluating performance of internal network in an enterprise | |
JP2007034428A (en) | Document registration system and document registration program | |
Chen | The application of an improved C4. 5 decision tree | |
KR102262611B1 (en) | Intelligent bid analyzing system using UI development tool and method thereof | |
US10853317B2 (en) | Data normalizing system | |
JP5177792B2 (en) | Data aggregation method and data aggregation device | |
CN103778498A (en) | Method for improving college innovation and entrepreneurial ability PDCA based on benchmarking management | |
JP2009043188A (en) | Operation management support system, and program | |
JP4489340B2 (en) | Information management support device, information management support system, information management support method, storage medium, and program | |
JP2009122791A (en) | End-of-work prediction system in work flow |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Liu Jinzhu Inventor before: Liang Qianqian Inventor before: Ding Yuyang |
|
GR01 | Patent grant | ||
GR01 | Patent grant |