CN109141049B - Arrangement structure of electric control chamber under copper alloy casting furnace table - Google Patents

Arrangement structure of electric control chamber under copper alloy casting furnace table Download PDF

Info

Publication number
CN109141049B
CN109141049B CN201811154491.XA CN201811154491A CN109141049B CN 109141049 B CN109141049 B CN 109141049B CN 201811154491 A CN201811154491 A CN 201811154491A CN 109141049 B CN109141049 B CN 109141049B
Authority
CN
China
Prior art keywords
room
transformer
power supply
supply control
furnace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201811154491.XA
Other languages
Chinese (zh)
Other versions
CN109141049A (en
Inventor
白华
何淼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Nonferrous Metals Processing Technology Co Ltd
Original Assignee
China Nonferrous Metals Processing Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nonferrous Metals Processing Technology Co Ltd filed Critical China Nonferrous Metals Processing Technology Co Ltd
Priority to CN201811154491.XA priority Critical patent/CN109141049B/en
Publication of CN109141049A publication Critical patent/CN109141049A/en
Application granted granted Critical
Publication of CN109141049B publication Critical patent/CN109141049B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D19/00Arrangements of controlling devices

Abstract

The utility model provides a copper alloy founds electric control room arrangement structure under stove table, relate to an electric control room arrangement structure, including the transformer room and the power control room that are arranged adjacently around the lower part of equipment stove table, the transformer room sets up in the lower part rear of equipment stove table, be equipped with smelting furnace transformer and holding furnace transformer respectively in the transformer room, smelting furnace power control cabinet and holding furnace power control cabinet have been placed respectively in the power control room, install the air pipe on the upper roof of power control room, be equipped with the underground wind channel of intercommunication in the underground of power control room and the underground outside of power control room, the forced draught blower outside of power control room is connected with the outer end of underground wind channel and sets up, be provided with the underground wind channel export in the wall position of power control room, the other end of underground wind channel and the lower extreme intercommunication setting of underground wind channel export, the upper end and the one end intercommunication setting of air pipe of underground wind channel export; the invention effectively ensures the safe and reliable operation of the transformer and the power supply control equipment.

Description

Arrangement structure of electric control chamber under copper alloy casting furnace table
Technical Field
The invention relates to an electric control chamber arrangement structure, in particular to an electric control chamber arrangement structure under a copper alloy casting furnace table.
Background
The known copper alloy casting production line is arranged in the middle of a workshop and consists of a smelting furnace, a heat preservation furnace and a casting machine, and mainly uses electric loads to concentrate on high-power electric heating equipment matched with the smelting furnace and the heat preservation furnace; the induction heating furnace adopts a special rectifying device, and comprises electric equipment such as a rectifying transformer, a power supply cabinet, a rectifying cabinet, a compensation cabinet, a control cabinet and the like; according to the technical requirements of equipment and the manufacturing capacity of transformers, the factors such as equipment cost and the like are comprehensively considered, the current rectifying or voltage regulating transformers of the high-power induction heating furnace are oil immersed transformers, the conventional design is that the rectifying or voltage regulating transformers of a smelting furnace and a heat preservation furnace are arranged on a workshop bias, the power supply control equipment of the furnace is arranged in a control room under a furnace table, the distance between the transformer and the power supply control equipment is long, and the line loss and the long-term operation loss are large; the oil immersed transformer is arranged in a workshop close to a smelting furnace and a heat preservation furnace, so that the problem of line loss can be solved, but the ventilation and fire prevention of the transformer are greatly solved, the oil immersed transformer has insulation and cooling effects due to the adoption of mineral oil, a transformer room belongs to a class-C fire hazard environment, and the transformer and a power supply control cabinet belong to heating equipment, so that the arrangement structure of the copper alloy casting furnace under the electric control room, which ensures that the transformer room and the electric control room are normally ventilated in the workshop environment and accords with the fire prevention design specification, is a basic requirement of a person in the field.
Disclosure of Invention
In order to overcome the defects in the background art, the invention discloses an arrangement structure of an electric control chamber under a copper alloy casting furnace table.
In order to achieve the aim of the invention, the invention adopts the following technical scheme:
the utility model provides a copper alloy founds under stove table automatically controlled room arrangement structure, including transformer room and the power control room that the adjacent arrangement around equipment stove table lower part, be equipped with the partition wall between transformer room and power control room, upper portion interval at the partition wall is equipped with a plurality of air inlet fire prevention shutter, the transformer room sets up in the lower part rear of equipment stove table, the door of transformer room ware all adopts the first grade fire door, and set up towards workshop direction, be equipped with smelting furnace transformer and holding furnace transformer in the transformer room respectively, the upper portion of fire door at the first grade of transformer room all is equipped with air-out fire prevention shutter, a plurality of air inlet fire prevention shutter that partition wall upper portion set up respectively with the air-out fire prevention shutter of transformer room first grade fire door upper portion set up, smelting furnace power control cabinet and holding furnace power control cabinet have been placed respectively in the power control room, install the air pipe on the upper roof of power control room, the interval is equipped with a plurality of supply air outlets on the air pipe, the underground of power control room and the underground of power control room outside is equipped with the wind channel of intercommunication, the forced draught blower of the outside is connected with the outer end of wind channel of underground wind channel and is connected with the setting up, the other end that the air channel of underground wind channel is set up with the air channel of underground wind channel of the underground wind channel, the other end that is connected with the underground wind channel of the underground wind channel.
The number of the smelting furnace transformers arranged in the transformer room is equal to the number of the smelting furnace power supply control cabinets arranged in the power supply control room, and the number of the heat preservation furnace transformers arranged in the transformer room is equal to the number of the heat preservation furnace power supply control cabinets arranged in the power supply control room.
The copper alloy casting furnace is characterized in that the arrangement structure of the electric control chamber under the copper alloy casting furnace is characterized in that the air inlet fireproof shutter and the air outlet fireproof shutter are made of stainless steel and are composed of an electric fireproof valve and a ventilation shutter, and the electric fireproof valve is arranged on the ventilation shutter.
The electric control chamber arrangement structure under the copper alloy casting furnace table is characterized in that the electric fire valves, the air feeder and the fire alarm on the air inlet fire shutter and the air outlet fire shutter are connected with the PLC control cabinet through signals.
The copper alloy casting furnace is characterized in that the arrangement structure of the electric control chamber below the copper alloy casting furnace is characterized in that the height of the power control chamber meets the installation height of a smelting furnace power control cabinet, a heat preservation furnace power control cabinet, an inlet cable, an outlet water cooling busbar and an underground air duct, the height of the terrace of the power control chamber is lower than that of a workshop, and the air feeder is arranged on the bias span of the workshop.
The copper alloy casting furnace is characterized in that the arrangement structure of the electric control chamber below the copper alloy casting furnace table is that the ventilation pipeline is a steel pipeline.
The copper alloy smelting and casting furnace comprises a copper alloy smelting and casting furnace table, wherein an electric control chamber arrangement structure under the copper alloy smelting and casting furnace table is characterized in that a heat preservation furnace transformer is arranged on one side of a smelting furnace transformer, a water pump room is arranged on the other side of the smelting furnace transformer, and a cooling system is arranged in the water pump room.
The copper alloy casting furnace is characterized in that the arrangement structure of the electric control chamber below the copper alloy casting furnace is characterized in that a stair leading to the transformer chamber from the power control chamber is arranged at the partition wall of the water pump room 8, and a stair is arranged at the rear part of the power control chamber.
Due to the adoption of the technical scheme, the invention has the following beneficial effects:
1. the arrangement structure of the electric control chamber under the copper alloy casting furnace table fully utilizes the space under the equipment furnace table, so that the equipment layout of the copper alloy casting production line is more compact and reasonable, and has important significance for production organization management; the plurality of air inlet fireproof shutters 7 arranged on the upper part of the partition wall are respectively arranged corresponding to the air outlet fireproof shutters on the upper part of the fire door A of the transformer room to form convection, so that air flow can be formed in the transformer room, and heat can be conveniently discharged outdoors;
2. the arrangement structure of the electric control chamber under the copper alloy casting furnace platform greatly shortens the power supply distance between the transformer and the power supply control equipment, has minimum line and operation loss, saves engineering investment and reduces production and operation cost; and the blower is adopted, so that the fireproof design requirement is met, and the safe and reliable operation of the transformer and the power supply control equipment is effectively ensured.
Drawings
FIG. 1 is a plan view of the arrangement of a transformer room and an electric control room under a furnace platform of the invention;
in the figure: 1. a smelting furnace transformer; 2. a holding furnace transformer; 3. a smelting furnace power supply control cabinet; 4. a power supply control cabinet of the heat preservation furnace; 5. a ventilation duct; 6. fire door class a; 7. air inlet fireproof shutter; 8. the water pump room; 9. an underground air duct; 10. and an outlet of the underground air duct.
Detailed Description
The invention will be explained in more detail by the following examples, the purpose of which is to protect all technical improvements within the scope of the invention.
The utility model provides a combine copper alloy casting stove platform lower automatically controlled room arrangement structure, including transformer room and the power control room that the adjacent arrangement around equipment stove platform lower part, be equipped with the partition wall between transformer room and power control room, upper portion interval at the partition wall is equipped with a plurality of air inlet fire prevention shutter 7, the transformer room sets up in the lower part rear of equipment stove platform, the door of transformer room ware all adopts first fire door 6, and set up towards the workshop direction, be equipped with smelting furnace transformer and holding furnace transformer in the transformer room respectively, upper portion that prevents fire door 6 in the transformer room first grade all is equipped with out the air fire prevention shutter, a plurality of air inlet fire prevention shutter 7 that partition wall upper portion set up respectively with the air out fire prevention shutter of transformer room first grade upper portion set up, place smelting furnace power control cabinet 3 and holding furnace power control cabinet 4 respectively in the power control room, install ventilation duct 5 on the roof of power control room, the interval is equipped with a plurality of supply air inlets on ventilation duct 5, the underground of power control room and the underground of power control room outside is equipped with the wind channel 9 of intercommunication, the wind channel 9 of the air feeder outside the power control room outside is equipped with, the wind channel 10 is connected with the outer end of wind channel 9 in the underground wind channel, the wind channel 10 is connected with the other end setting up in the underground wind channel 10, the other end setting up the other end of the wind channel is connected with the wind channel 10 down the wind channel, the other end is set up.
The arrangement structure of the electric control chamber under the copper alloy casting furnace table is characterized in that the number of smelting furnace transformers 1 arranged in the transformer chamber is equal to the number of smelting furnace power supply control cabinets 3 arranged in the power supply control chamber, and the number of heat preservation furnace transformers 2 arranged in the transformer chamber is equal to the number of heat preservation furnace power supply control cabinets 4 arranged in the power supply control chamber.
The copper alloy casting furnace is characterized in that the arrangement structure of the electric control chamber under the copper alloy casting furnace is characterized in that the air inlet fireproof shutter 7 and the air outlet fireproof shutter are made of stainless steel and are composed of an electric fireproof valve and a ventilation shutter, and the electric fireproof valve is arranged on the ventilation shutter.
The electric control chamber arrangement structure under the copper alloy casting furnace table is characterized in that an air inlet fireproof shutter 7, an electric fireproof valve on an air outlet fireproof shutter, an air feeder and a fire alarm are all connected with a PLC control cabinet through signals.
The copper alloy casting furnace is characterized in that the arrangement structure of the electric control chamber under the copper alloy casting furnace is characterized in that the height of the power supply control chamber meets the installation height of the smelting furnace power supply control cabinet 3, the heat preservation furnace power supply control cabinet 4, the inlet wire cable, the outlet wire water cooling busbar and the underground air duct 9, the floor of the power supply control chamber is lower than the floor of a workshop, and the air feeder is arranged on the bias span of the workshop.
The ventilation pipeline 5 is a steel pipeline.
The copper alloy smelting and casting furnace comprises a copper alloy smelting and casting furnace table, wherein an electric control chamber arrangement structure under the copper alloy smelting and casting furnace table is characterized in that a heat preservation furnace transformer is arranged on one side of a smelting furnace transformer, a water pump room is arranged on the other side of the smelting furnace transformer, and a cooling system is arranged in the water pump room.
The copper alloy casting furnace table lower electric control chamber arrangement structure is characterized in that a stair leading to a transformer chamber from a power supply control chamber is arranged at a partition wall of a water pump room 8, and a stair is arranged at the rear part of the power supply control chamber, as shown by an arrow in fig. 1.
The arrangement structure of the electric control chamber under the copper alloy casting furnace table comprises two smelting furnaces and a heat preservation furnace, wherein the capacities of a smelting furnace transformer 1 and a heat preservation furnace transformer 2 are 2500kVA and 630kVA respectively, a group of power control cabinets are matched with the three furnaces respectively, the elevation of the top surface of the equipment table is +3.8m, the elevation of a terrace of the transformer chamber is +/-0.0 m, the elevation of the terrace of the power control chamber is-1.2 m, and a fire door 6 of the first grade of the transformer chamber is 2.5 m high and is opened towards the workshop direction.
The heat dissipation capacity of the power supply control cabinet is 10 kW/group, two sets of smelting furnaces do not work at the same time, the indoor environment temperature of the power supply control cabinet is required to be not higher than 36 ℃, the heat dissipation capacity of the three transformers is respectively 40kW, 40kW and 10kW, the temperature of the air outlet of the transformer chamber is required to be not higher than 45 ℃, and the temperature difference between the air inlet and the air outlet is required to be not higher than 15 ℃; the machine room of the blower is arranged on the offset span of the workshop, outdoor fresh air is sent into the electric control room through coarse filtration, the blower, the underground air duct 9 and the ventilating duct 5, air in the power supply control room is sent into the transformer room through the air inlet fireproof shutter 7 on the partition wall, and hot air is discharged through the air outlet fireproof shutter on the upper part of the first fireproof door 6 of the transformer room after the waste heat of the transformer room is taken away; and according to the ventilation temperature in the season, the air quantity of the ventilation system is calculated by the total heat dissipation capacity of the transformer room and the power supply control room, and a motor of a proper blower is selected, the design of each ventilation pipeline and the wind speed of the wind opening are in accordance with national standard 'industrial building heating ventilation and air conditioning design Specification' GB50019-2015, in practical application, the configuration mode of the invention can be adopted when the height of the equipment stove table meets the condition that the transformer enters the house from the workshop direction, and proper air supply devices are selected according to the heat dissipation capacity of the transformer and the control cabinet, the process layout and the environmental conditions of the workshop, the air pipes of the underground air duct and the control room are reasonably arranged, the size of the fireproof shutter is adjusted, and the safe and reliable operation of the transformer and the power supply control equipment is ensured.
The invention is not described in detail in the prior art.
The embodiments selected herein for the purposes of disclosing the present invention are presently considered to be suitable, however, it is to be understood that the present invention is intended to include all such variations and modifications as fall within the spirit and scope of the present invention.

Claims (8)

1. An arrangement structure of an electric control chamber under a copper alloy casting furnace table comprises a transformer chamber and a power supply control chamber which are adjacently arranged at the front and back of the lower part of an equipment furnace table, and is characterized in that: a partition wall is arranged between a transformer room and a power supply control room, a plurality of air inlet fireproof shutters are arranged at the upper part of the partition wall at intervals, the transformer room is arranged at the rear of the lower part of an equipment stove table, a first-class fireproof door is adopted by a door of a transformer room and is arranged towards a workshop direction, a smelting furnace transformer and a heat preservation furnace transformer are respectively arranged in the transformer room, air outlet fireproof shutters are respectively arranged at the upper part of the first-class fireproof door of the transformer room, the plurality of air inlet fireproof shutters arranged at the upper part of the partition wall are respectively arranged corresponding to the air outlet fireproof shutters at the upper part of the first-class fireproof door of the transformer room, a smelting furnace power supply control cabinet and a heat preservation furnace power supply control cabinet are respectively arranged in the power supply control room, a ventilating duct is arranged on an upper top plate of the power supply control room, a plurality of air supply inlets are arranged at intervals on the ventilating duct, a communicating underground air duct is arranged underground outside the power supply control room and underground outside the power supply control room, an underground air duct is connected with the outer end of the underground air duct, an underground air duct outlet is arranged at the position of the power supply control room, the other end of the underground air duct is communicated with the lower end of the underground air duct, and the upper end of the underground air duct outlet is arranged.
2. The arrangement structure of an electric control chamber under a copper alloy casting furnace table as claimed in claim 1, wherein: the number of the smelting furnace transformers arranged in the transformer room is equal to the number of the smelting furnace power supply control cabinets arranged in the power supply control room, and the number of the heat preservation furnace transformers arranged in the transformer room is equal to the number of the heat preservation furnace power supply control cabinets arranged in the power supply control room.
3. The arrangement structure of an electric control chamber under a copper alloy casting furnace table as claimed in claim 1, wherein: the air inlet fireproof shutter and the air outlet fireproof shutter are made of stainless steel materials and are composed of an electric fireproof valve and a ventilation shutter, and the electric fireproof valve is arranged on the ventilation shutter.
4. The arrangement structure of an electric control chamber under a copper alloy casting furnace table as claimed in claim 1, wherein: the air inlet fireproof shutter, the electric fireproof valve on the air outlet fireproof shutter, the blower and the fire alarm are all connected with the PLC control cabinet through signals.
5. The arrangement structure of an electric control chamber under a copper alloy casting furnace table as claimed in claim 1, wherein: the height of the power supply control room meets the installation height of the smelting furnace power supply control cabinet, the heat preservation furnace power supply control cabinet, the incoming cable, the outgoing water cooling busbar and the underground air duct, the floor of the power supply control room is lower than the floor of a workshop, and the air feeder is arranged on the bias span of the workshop.
6. The arrangement structure of an electric control chamber under a copper alloy casting furnace table as claimed in claim 1, wherein: the ventilation pipeline is a steel pipeline.
7. The arrangement structure of an electric control chamber under a copper alloy casting furnace table as claimed in claim 1, wherein: one side of the smelting furnace transformer is provided with a heat preservation furnace transformer, the other side of the smelting furnace transformer is provided with a water pump room, and a cooling system is arranged in the water pump room.
8. The arrangement structure of an electric control chamber under a copper alloy casting furnace table as claimed in claim 1, wherein: the partition wall of the water pump room is provided with stairs leading to the transformer room from the power supply control room, and the rear part of the power supply control room is provided with stairs.
CN201811154491.XA 2018-09-30 2018-09-30 Arrangement structure of electric control chamber under copper alloy casting furnace table Active CN109141049B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811154491.XA CN109141049B (en) 2018-09-30 2018-09-30 Arrangement structure of electric control chamber under copper alloy casting furnace table

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811154491.XA CN109141049B (en) 2018-09-30 2018-09-30 Arrangement structure of electric control chamber under copper alloy casting furnace table

Publications (2)

Publication Number Publication Date
CN109141049A CN109141049A (en) 2019-01-04
CN109141049B true CN109141049B (en) 2024-01-30

Family

ID=64813780

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811154491.XA Active CN109141049B (en) 2018-09-30 2018-09-30 Arrangement structure of electric control chamber under copper alloy casting furnace table

Country Status (1)

Country Link
CN (1) CN109141049B (en)

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE903462A (en) * 1984-10-17 1986-02-17 Ruhrkohle Ag OPERATING MEANS PROTECTED AGAINST EXPLOSIONS FOR MOBILE UNDERGROUND OPERATING MACHINES, ESPECIALLY FOR A TRAILER OF A GALLERY DIGGING MACHINE.
JP2008245430A (en) * 2007-03-27 2008-10-09 Kandenko Co Ltd Power transmission structure of facility having long distance from electric room to load apparatus
CN101611158A (en) * 2007-04-20 2009-12-23 株式会社日立产机系统 Iron core annealing furnace
CN202121219U (en) * 2010-08-19 2012-01-18 天津德赛机电设备有限公司 Container type electrical device
CN102477568A (en) * 2010-11-30 2012-05-30 沈阳铝镁设计研究院有限公司 Configuration structure for power distribution control equipment of rectifier unit in rectifying station of aluminum electrolysis plant
EP2584278A1 (en) * 2011-10-19 2013-04-24 Renson Ventilation NV Ventilation system for ventilating a fire compartment in a building
CN203278056U (en) * 2013-04-01 2013-11-06 泰州腾威电器有限公司 Nonmetal prepackage-type box-type transformer station
CN203374022U (en) * 2013-06-26 2014-01-01 杭州福斯达实业集团有限公司 Container type space division control chamber
CA2789642A1 (en) * 2012-09-14 2014-03-14 Nova Chemicals Corporation Improved industrial furnace
CN204864624U (en) * 2015-07-20 2015-12-16 国网上海市电力公司 Fire prevention ventilation system of discharging fume of underground substation
CN205070441U (en) * 2015-10-12 2016-03-02 鞍山荣泰电力电子有限公司 Dry -type becomes SVG container of built -in lower air inlet multicapacity configuration
CN106451166A (en) * 2016-11-01 2017-02-22 上海金友金弘智能电气股份有限公司 Environment-friendly energy-saving type intelligent prefabricated transformer substation
CN209054963U (en) * 2018-09-30 2019-07-02 中色科技股份有限公司 Electric control chamber arragement construction under one Albatra metal casting furnace platform

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE903462A (en) * 1984-10-17 1986-02-17 Ruhrkohle Ag OPERATING MEANS PROTECTED AGAINST EXPLOSIONS FOR MOBILE UNDERGROUND OPERATING MACHINES, ESPECIALLY FOR A TRAILER OF A GALLERY DIGGING MACHINE.
JP2008245430A (en) * 2007-03-27 2008-10-09 Kandenko Co Ltd Power transmission structure of facility having long distance from electric room to load apparatus
CN101611158A (en) * 2007-04-20 2009-12-23 株式会社日立产机系统 Iron core annealing furnace
CN202121219U (en) * 2010-08-19 2012-01-18 天津德赛机电设备有限公司 Container type electrical device
CN102477568A (en) * 2010-11-30 2012-05-30 沈阳铝镁设计研究院有限公司 Configuration structure for power distribution control equipment of rectifier unit in rectifying station of aluminum electrolysis plant
EP2584278A1 (en) * 2011-10-19 2013-04-24 Renson Ventilation NV Ventilation system for ventilating a fire compartment in a building
CA2789642A1 (en) * 2012-09-14 2014-03-14 Nova Chemicals Corporation Improved industrial furnace
CN203278056U (en) * 2013-04-01 2013-11-06 泰州腾威电器有限公司 Nonmetal prepackage-type box-type transformer station
CN203374022U (en) * 2013-06-26 2014-01-01 杭州福斯达实业集团有限公司 Container type space division control chamber
CN204864624U (en) * 2015-07-20 2015-12-16 国网上海市电力公司 Fire prevention ventilation system of discharging fume of underground substation
CN205070441U (en) * 2015-10-12 2016-03-02 鞍山荣泰电力电子有限公司 Dry -type becomes SVG container of built -in lower air inlet multicapacity configuration
CN106451166A (en) * 2016-11-01 2017-02-22 上海金友金弘智能电气股份有限公司 Environment-friendly energy-saving type intelligent prefabricated transformer substation
CN209054963U (en) * 2018-09-30 2019-07-02 中色科技股份有限公司 Electric control chamber arragement construction under one Albatra metal casting furnace platform

Also Published As

Publication number Publication date
CN109141049A (en) 2019-01-04

Similar Documents

Publication Publication Date Title
CN102088167A (en) Control system for improving operation environment of substation equipment
CN106642603A (en) Temperature control humidity control anti-condensation method for electrical room with cable trench
CN109141049B (en) Arrangement structure of electric control chamber under copper alloy casting furnace table
CN204361532U (en) A kind of indoor main transformer sheet falls apart the textural association that room bottom air inlet is arranged
CN212176127U (en) Building outer wall energy-saving and heat-insulating structure
CN206908158U (en) A kind of ring main unit of high efficiency and heat radiation
CN203145514U (en) Outdoor electrical equipment installing house
CN204880454U (en) Can be applied to two kinds of different work condition's central air -conditioning system simultaneously
CN209054963U (en) Electric control chamber arragement construction under one Albatra metal casting furnace platform
CN210035757U (en) Cooling system suitable for frequency conversion room, factory building
EP2722463B1 (en) Building engineering module
CN202059181U (en) Reactive power compensation box body
CN205070270U (en) Two kinds of grade voltage prepackage type transformer substations
CN210946995U (en) Special pressurization water supply equipment of integration water supply transformation
CN204230700U (en) box-type substation
CN112503636A (en) Double-fan dynamic balance air conditioning system for room of subway station equipment personnel
CN202274757U (en) Waste heat utilization and hot air heating device for float glass production line annealing kiln
CN112524711A (en) Unattended intelligent ring control machine room
CN112228958A (en) Central air-conditioning process system suitable for tall and large space
CN109346954B (en) Automatic heat dissipation circulation system of transformer room control by temperature change
CN213027129U (en) Ventilation and waste heat utilization system of full underground substation
CN205688883U (en) A kind of for disposing the energy-saving outdoor generator rooms of base station equipment
CN204755962U (en) Electronic airtight valve of formula heat preservation that cut straightly
CN108923306A (en) A kind of JXF distribution box that indoor and outdoor is multi-purpose
CN220605266U (en) Waterproof power distribution cabinet

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant