CN109138449A - The lateral assembling method of large span inverted triangle tubular truss - Google Patents

The lateral assembling method of large span inverted triangle tubular truss Download PDF

Info

Publication number
CN109138449A
CN109138449A CN201811219337.6A CN201811219337A CN109138449A CN 109138449 A CN109138449 A CN 109138449A CN 201811219337 A CN201811219337 A CN 201811219337A CN 109138449 A CN109138449 A CN 109138449A
Authority
CN
China
Prior art keywords
truss
inverted triangle
assembly
pipe
triangle tubular
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811219337.6A
Other languages
Chinese (zh)
Inventor
赵保华
王连想
闫毫辉
张锐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FANGCHENGGANG ZHONGYI HEAVY INDUSTRY Co Ltd
Original Assignee
FANGCHENGGANG ZHONGYI HEAVY INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FANGCHENGGANG ZHONGYI HEAVY INDUSTRY Co Ltd filed Critical FANGCHENGGANG ZHONGYI HEAVY INDUSTRY Co Ltd
Priority to CN201811219337.6A priority Critical patent/CN109138449A/en
Publication of CN109138449A publication Critical patent/CN109138449A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Abstract

The invention discloses a kind of lateral assembling method of large span inverted triangle tubular truss, job steps are as follows: multiple groups assembly device 1. is arranged along assembled direction, each assembly device includes multiple assembly platforms at forward and backward interval;2. respectively setting a truss on forward and backward assembly platform to wind up pipe support frame, remaining stirrup formula assembly platform is equipped with to wind up the equidistant truss lower edge tube fixing device in pipe support frame side in forward and backward truss;3. being uniformly laterally located each inverted triangle tubular truss unit on corresponding group assembly platform and initial and end connects, one truss of each inverted triangle tubular truss unit pipe that winds up is supported on forward and backward truss and winds up on pipe support frame, another truss pipe that winds up is located on each assembly platform, and truss lower chord tube is higher than the assembly platform of each group and is fixed on each truss lower edge tube fixing device;4. by truss lower chord tube, the truss of alignment wind up pipe be welded to connect.The present invention both ensure that construction quality and construction safety, improve construction speed and installation accuracy, and reduce construction cost.

Description

The lateral assembling method of large span inverted triangle tubular truss
Technical field
The present invention relates to building construction technology, specially a kind of lateral assembling method of large span inverted triangle tubular truss.
Background technique
Currently, during the assembly of the large stadiums tubular truss such as stadiums, railway station, terminal, traditional way Often using the construction method just spelled, traditional method installation moulding bed needs auxiliary material more, and jig structure is complicated, and production amount is big, Construction cost is big.
Summary of the invention
In view of the deficiencies of the prior art, the technical problem to be solved by the present invention is to propose it is a kind of it is simple and easy it is big across Spend the lateral assembling method of inverted triangle tubular truss.
It is able to solve the lateral assembling method of large span inverted triangle tubular truss of above-mentioned technical problem, job step includes:
1, corresponding multiple groups assembly device is arranged along assembled direction in erecting bed according to inverted triangle tubular truss element number, Each assembly device includes the spaced multiple assembly platforms of forward and backward, and whole assembly platforms use level after setting completed It measures levelling.
2, in each assembly device, the consistent truss of height is respectively set up on forward and backward assembly platform and is winded up pipe support frame, It is equipped on remaining assembly platform and winds up the equidistant truss lower edge tube fixing device in pipe support frame side in forward and backward truss.
3, each inverted triangle tubular truss unit is uniformly laterally located on the assembly platform 1 of corresponding group and initial and end connects, respectively One truss of the inverted triangle tubular truss unit pipe that winds up is supported on the forward and backward truss of corresponding group and winds up on pipe support frame, another truss The pipe that winds up is located on each assembly platform 1 of corresponding group, and truss lower chord tube is higher than the assembly platform of each group and is fixed on corresponding group Each truss lower edge tube fixing device on.
4, the truss lower chord tube being aligned between each inverted triangle tubular truss unit is welded to connect, by each inverted triangle tubular truss unit Between the truss that is aligned wind up pipe welded connecting.
5, check whether the welding quality of each welding position is qualified.
Further, the wind up height of pipe support frame of the truss is computed and obtains, so that in each inverted triangle tubular truss unit The wind up angle of the upper plane and horizontal plane that constitute between pipe of two truss meets assembled require.
It is required to meet the assembled of different angle, the truss winds up pipe support frame with height-adjustable structure.
By design requirement, the horizontal gradient error between each assembly platform is within 2mm.
Beneficial effects of the present invention:
1, assembling method of the present invention is according to inverted triangle truss space geometry size, adjusts truss and winds up pipe support frame height, Inverted triangle truss is set to have a certain degree with ground level shape, adjustment lower boom meets plane chord member and lower boom geometric dimension Truss Design drawing requirement.
2, present invention setting lower boom limiting and fixing device, improves truss assembling precision, realizes the fast of inverted triangle truss Speed Pinyin dress, ensure that assembled quality.
3, using assembling method of the present invention, construction efficiency can be improved, reduce moulding bed auxiliary material consumption, save construction Cost guarantees construction safety.
Detailed description of the invention
Fig. 1 is the in-site installation schematic diagram of one embodiment of the present invention.
Fig. 2 is the A direction view in Fig. 1.
Fig. 3 is the sectional view of each inverted triangle tubular truss unit in Fig. 1.
Figure number mark: 1, assembly platform;2, truss winds up pipe support frame;3, truss lower edge tube fixing device;4, truss lower edge Pipe;5, inverted triangle tubular truss unit;6, truss upper left string pipe;7, truss upper right string pipe;8, batter brace;9, truss supports.
Specific embodiment
Illustrated embodiment is described further technical solution of the present invention with reference to the accompanying drawing.
Inverted triangle tubular truss unit 5 of the present invention includes truss lower boom 4, the truss upper left string pipe 6 being parallel to each other With truss upper right string pipe 7, by corresponding truss between the truss lower boom 4 and truss upper left string pipe 6 and truss upper right string pipe 7 Diagonal brace 8 connects, and supports 9 connections, 6 He of truss upper left string pipe by truss between the truss upper left string pipe 6 and truss upper right string pipe 7 Truss upper right string pipe 7 and truss support the upper plane of 9 composition inverted triangle tubular truss units 5, as shown in Figure 3.
The lateral assembling method of large span inverted triangle tubular truss of the present invention is to spell multiple inverted triangle tubular truss units 5 It is welded into as monolithic architecture component, referring to Fig. 1, Fig. 3, its job step are as follows:
1, according to the quantity of inverted triangle tubular truss unit 5, corresponding multiple groups assembly is set along assembled direction in erecting bed Device, each assembly device include multiple (stirrup formula) assembly platforms of forward and backward interval setting (every 3m~7m puts one) 1, all assembly platforms 1 of each group are horizontal with level measurement centering after setting completed, so that the levelness between each assembly platform 1 Error is within 2mm.
2, in each assembly device, pipe of respectively setting up that one placed in the middle and the consistent truss of height winds up on forward and backward assembly platform 1 Support frame 2 (height adjustable) is equipped on remaining each assembly platform 1 and winds up 2 left side of pipe support frame in forward and backward truss Truss lower edge tube fixing device 3, each truss lower edge tube fixing device 3 are equal in the wind up distance in the left side of pipe support frame 2 of truss.
3, simultaneously initial and end phase is placed on assembly platform 1 after each inverted triangle tubular truss unit 5 being turned an angle to the right It connects, side turns positioning method are as follows: 41 one distances of upward out assembly platform of truss lower chord tube of each inverted triangle tubular truss unit 5 are simultaneously It is fixed on each truss lower edge tube fixing device 3, truss upper left string pipe 6 is supported on corresponding truss and winds up on pipe support frame 2, truss Upper right string pipe 7 is located on assembly platform 1.
4, the truss lower chord tube 4 being aligned between each inverted triangle tubular truss unit 5 is welded to connect, by each inverted triangle tubular truss list Connection is respectively welded in the truss upper left string pipe 6 and truss upper right string pipe 7 being aligned between member 5.
5, check whether the welding quality of each welding position is qualified.
The wind up adjusting height of pipe support frame 2 of the truss is computed and obtains, so that two in each inverted triangle tubular truss unit 5 The wind up angle of the upper plane and horizontal plane that constitute between pipe of truss meets assembled require.

Claims (4)

1. the lateral assembling method of large span inverted triangle tubular truss, job step are as follows:
1., corresponding multiple groups assembly device is arranged along assembled direction in erecting bed according to inverted triangle tubular truss unit (5) quantity, Each assembly device includes the spaced multiple assembly platforms (1) of forward and backward, and whole assembly platforms (1) are used after setting completed Level measurement is levelling;
2., in each assembly device, the consistent truss of height is respectively set up on forward and backward assembly platform (1) and is winded up pipe support frame (2), it is equipped on remaining assembly platform (1) solid in the forward and backward truss equidistant truss lower chord tube in pipe support frame (2) side that winds up Determine frame (3);
3., each inverted triangle tubular truss unit (5) is uniformly laterally located on the assembly platform (1) of corresponding group and initial and end connects, One truss of each inverted triangle tubular truss unit (5) pipe that winds up is supported on the forward and backward truss of corresponding group and winds up on pipe support frame (2), Another truss pipe that winds up is located on each assembly platform (1) of corresponding group, and truss lower chord tube (4) is higher than the assembly platform of each group (1) it and is fixed on each truss lower edge tube fixing device (3) of corresponding group;
4., by the truss lower chord tube (4) being aligned between each inverted triangle tubular truss unit (5) be welded to connect, by each inverted triangle tubular truss The truss being aligned between unit (5) wind up pipe welded connecting;
5., check whether the welding quality of each welding position qualified.
2. the lateral assembling method of large span inverted triangle tubular truss according to claim 1, it is characterised in that: on the truss The height of string pipe support frame (2), which is computed, to be obtained, so that two truss wind up and constitute between pipe in each inverted triangle tubular truss unit (5) Upper plane and the angle of horizontal plane meet assembled require.
3. the lateral assembling method of large span inverted triangle tubular truss according to claim 2, it is characterised in that: on the truss String pipe support frame (2) has height-adjustable structure.
4. the lateral assembling method of large span inverted triangle tubular truss according to any one of claims 1 to 3, feature exist In: the horizontal gradient error between each assembly platform (1) is within 2mm.
CN201811219337.6A 2018-10-19 2018-10-19 The lateral assembling method of large span inverted triangle tubular truss Pending CN109138449A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811219337.6A CN109138449A (en) 2018-10-19 2018-10-19 The lateral assembling method of large span inverted triangle tubular truss

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811219337.6A CN109138449A (en) 2018-10-19 2018-10-19 The lateral assembling method of large span inverted triangle tubular truss

Publications (1)

Publication Number Publication Date
CN109138449A true CN109138449A (en) 2019-01-04

Family

ID=64808649

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811219337.6A Pending CN109138449A (en) 2018-10-19 2018-10-19 The lateral assembling method of large span inverted triangle tubular truss

Country Status (1)

Country Link
CN (1) CN109138449A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203034821U (en) * 2012-11-14 2013-07-03 中冶天工集团有限公司 Large-span arched inverted-triangular pipe truss assembly integral mould
CN203484844U (en) * 2013-10-02 2014-03-19 芜湖天航科技(集团)股份有限公司 Welding tool for assembling special-shaped steel pipe truss structure
CN204040494U (en) * 2014-09-03 2014-12-24 中国建筑第八工程局有限公司 The assembled moulding bed of easy unloading type triangular pipe truss
CN204663011U (en) * 2015-02-06 2015-09-23 中建一局钢结构工程有限公司 Long span variable cross-section triangle steel tubular truss adjustable moulding bed
CN206752670U (en) * 2017-03-21 2017-12-15 广西建工集团第四建筑工程有限责任公司 A kind of support jig of inverted triangle tubular truss
CN208686115U (en) * 2018-08-14 2019-04-02 湖南金海集团有限公司 A kind of lateral assembled ground assembling jig frame of triangular truss

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203034821U (en) * 2012-11-14 2013-07-03 中冶天工集团有限公司 Large-span arched inverted-triangular pipe truss assembly integral mould
CN203484844U (en) * 2013-10-02 2014-03-19 芜湖天航科技(集团)股份有限公司 Welding tool for assembling special-shaped steel pipe truss structure
CN204040494U (en) * 2014-09-03 2014-12-24 中国建筑第八工程局有限公司 The assembled moulding bed of easy unloading type triangular pipe truss
CN204663011U (en) * 2015-02-06 2015-09-23 中建一局钢结构工程有限公司 Long span variable cross-section triangle steel tubular truss adjustable moulding bed
CN206752670U (en) * 2017-03-21 2017-12-15 广西建工集团第四建筑工程有限责任公司 A kind of support jig of inverted triangle tubular truss
CN208686115U (en) * 2018-08-14 2019-04-02 湖南金海集团有限公司 A kind of lateral assembled ground assembling jig frame of triangular truss

Similar Documents

Publication Publication Date Title
CN102953552B (en) Method for positioning through hole of pipe truss
CN103437279B (en) Overhead cast-in-place box compression struts and construction technology thereof
CN103706670B (en) Super-large-diameter shield machine shield tail circular arc degree straightened up in place device
CN107339981A (en) A kind of electronic tripod of engineering survey and quick centring flatening method
CN202577380U (en) Steel member perpendicularity correcting device for construction of upright column piles
CN204000618U (en) A kind of truss-like 0# piece cast-in-place support
CN109137737B (en) Cable conduit positioning device
CN109457806B (en) Adjustable assembling structure and method for welding ball net rack
CN212452310U (en) First section steel anchor box positioning accuracy adjusting device of cable-stay bridge
CN109138449A (en) The lateral assembling method of large span inverted triangle tubular truss
CN105202265B (en) Multilayer bridge frame support arm mounting and positioning device and method
CN209211281U (en) A kind of overall package moulding bed of double-walled combination bridge tower steel shell segment
CN107881914B (en) Wire-dividing tube type cable saddle back field assembly type positioning device and assembly method
CN104563525B (en) A kind of box steel arch beam Integral horizontal type group is to method
CN115059308A (en) Large-span hyperbolic reducing inverted triangular pipe truss assembling method
CN211647444U (en) Steel structure assembling supporting jig frame capable of adjusting elevation
CN213654282U (en) Portable detachable cyclic utilization double-limb column type assembling jig frame
CN103572870B (en) A kind of overlength high obliquity curtain wall batter post and mounting method thereof
CN207395740U (en) Multifunctional measuring instrument pedestal
CN207568205U (en) The moulding bed quickly positioned for truss assembly rod piece
CN207794093U (en) The assembled device of internal support of foundation pit
CN212406169U (en) Prefabricated assembled reinforced concrete post butt joint positioner
CN212956135U (en) Adjusting lifting and supporting device for assembling super-large steel structure bridge sections
CN218715247U (en) Adjustable assembling jig frame of steel structure triangular truss
CN111173298A (en) Reinforcing steel bar correcting unit of prefabricated post of assembly type structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190104