CN109136477A - A kind of train connecting hook heat treatment process - Google Patents

A kind of train connecting hook heat treatment process Download PDF

Info

Publication number
CN109136477A
CN109136477A CN201811097013.XA CN201811097013A CN109136477A CN 109136477 A CN109136477 A CN 109136477A CN 201811097013 A CN201811097013 A CN 201811097013A CN 109136477 A CN109136477 A CN 109136477A
Authority
CN
China
Prior art keywords
connecting hook
heat treatment
temperature
treatment process
heating furnace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811097013.XA
Other languages
Chinese (zh)
Inventor
叶振羽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wenling Dashan Heat Treatment Plant (general Partnership)
Original Assignee
Wenling Dashan Heat Treatment Plant (general Partnership)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenling Dashan Heat Treatment Plant (general Partnership) filed Critical Wenling Dashan Heat Treatment Plant (general Partnership)
Priority to CN201811097013.XA priority Critical patent/CN109136477A/en
Publication of CN109136477A publication Critical patent/CN109136477A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C8/00Solid state diffusion of only non-metal elements into metallic material surfaces; Chemical surface treatment of metallic material by reaction of the surface with a reactive gas, leaving reaction products of surface material in the coating, e.g. conversion coatings, passivation of metals
    • C23C8/06Solid state diffusion of only non-metal elements into metallic material surfaces; Chemical surface treatment of metallic material by reaction of the surface with a reactive gas, leaving reaction products of surface material in the coating, e.g. conversion coatings, passivation of metals using gases
    • C23C8/08Solid state diffusion of only non-metal elements into metallic material surfaces; Chemical surface treatment of metallic material by reaction of the surface with a reactive gas, leaving reaction products of surface material in the coating, e.g. conversion coatings, passivation of metals using gases only one element being applied
    • C23C8/20Carburising
    • C23C8/22Carburising of ferrous surfaces
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D1/00General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
    • C21D1/18Hardening; Quenching with or without subsequent tempering
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/0068Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for particular articles not mentioned below

Abstract

The invention discloses a kind of train connecting hook heat treatment process, are related to heat treatment process field.The technique mainly includes heating period, 900-920 DEG C of carbon impregnation stage, 60-80 DEG C of fast oily cooling stage and 180-200 DEG C of lonneal stage, and wherein carbon impregnation stage includes strong infiltration, diffusion and heat preservation.The present invention has the following advantages and effects: by the way that the prolonged strong diffusion phase for seeping stage and high temperature is arranged, improve the harden ability of connecting hook, the surface and centre hardness for guaranteeing connecting hook reach requirement, improve it treated tension resistance ability, achieved the effect that high service life;Holding stage and the rapid oil type of cooling are added again, are avoided connecting hook that decarburization phenomenon occurs and are improved the harden ability of connecting hook, have further achieved the effect that high service life.

Description

A kind of train connecting hook heat treatment process
Technical field
The present invention relates to heat treatment process field, in particular to a kind of train connecting hook heat treatment process.
Background technique
In material processing and equipment manufacture field, heat treatment, which is that one kind is common, carries out at reinforcing material surface and equipment Reason, is allowed to a kind of technique for having various superperformances, wherein can increase substantially the rigidity, hard of workpiece by heat treatment Degree, wearability, fatigue strength and toughness etc., to meet the different requirements of various machine components and tool.
Fixation is usually attached using connecting hook between two section compartments of train, is buffered when connecting hook is Train brake Component, when work, will bear great impact force, therefore be easy to cause its harden ability poor using traditional heat treatment method, into And the service life of connecting hook is considerably reduced, have much room for improvement.
Summary of the invention
The object of the present invention is to provide a kind of train connecting hook heat treatment process, have the effect of high service life.
At above-mentioned technical purpose of the invention has the technical scheme that a kind of train connecting hook is hot Science and engineering skill, characterized by the following steps:
S1: connecting hook is placed in heating furnace by heating by heating furnace continuous heating to after 900-920 DEG C, keeps the temperature 30- 40min;
S2: carburizing includes the following steps:
S21: it is strong to seep, it remains temperature-resistant, continues to be passed through methanol and propane into heating furnace, keep the temperature 390-410min;
S22: diffusion remains temperature-resistant, continues to be passed through methanol and propane into heating furnace, keeps the temperature 190-210min;
S3: it is cooling, connecting hook is taken out out of heating furnace, it is cold to carry out oil to connecting hook, cooling time 25-35min;
S4: connecting hook after heating furnace is cooled to 180-200 DEG C, is put into heating furnace, keeps the temperature 170-190min by tempering.
By using above-mentioned technical proposal, by 900-920 DEG C and the long-time of 390-410min is kept to seep by force the stage, it is right Connecting hook is seeped by force, and the carburizing effect on connecting hook surface is improved.Connecting hook is made to start to expand by 900-920 DEG C of high temperature again It dissipates, improves the carburizing effect of connecting hook heart, and then ensure that the surface hardness of connecting hook and centre hardness reach hardness and want It asks, improves the harden ability of connecting hook, improve it treated toughness and tension resistance ability, and then connection is greatly improved The service life of hook has achieved the effect that high service life.
The further setting of the present invention are as follows: step S2 further includes following steps:
S23: heat preservation, continued down remain temperature-resistant, keep the temperature 25-35min to 830-850 DEG C.
By using above-mentioned technical proposal, by the way that holding stage is arranged, so that the carbon penetrated into connecting hook is fixed, improve The stability of carburizing, and then avoid it that decarburization phenomenon occurs and influence the service life of connecting hook, further reach high use The effect in service life.
The further setting of the present invention are as follows: in step S3, be quickly cooled down using 60-80 DEG C of quenching oil.
By using above-mentioned technical proposal, replaces the slow oil of traditional classification cooling by the way that rapid oil is cooling, improve connecting hook Harden ability, and keep its layer depth more uniform, and the color on surface is more uniform full, and then increase connecting hook heat treatment Service life afterwards.
The further setting of the present invention are as follows: the carbon potential CP in step S21 is 1.1 ± 0.05, and the carbon potential CP in step S22 is Carbon potential CP in 0.8 ± 0.05, step S23 is 0.8 ± 0.05.
By using above-mentioned technical proposal, because the excessively high phosphorus content that will lead to connecting hook of carbon potential increases, phosphorus content increases There is carbon black in the surface that will lead to connecting hook, so that connecting hook is more crisp, i.e., connecting hook is easy to happen fracture or damage.Carbon potential is too low The phosphorus content that will lead to connecting hook reduces, and then reduces the bearing capacity on connecting hook surface, reduces the service life of connecting hook.Cause This makes the carbon potential CP of the carbon impregnation stage of connecting hook be 1.1 ± 0.05,0.8 ± 0.05 and 0.8 by 900-920 DEG C of high temperature ± 0.05, so that the phosphorus content of connecting hook reaches requirement just, the longevity is used after further increasing connecting hook heat treatment Life.
The further setting of the present invention are as follows: the heating temperature in step S21 is 910 DEG C, soaking time 400min.
By using above-mentioned technical proposal, because the temperature and soaking time in infiltration stage are the main of influence carbon potential by force Factor, the excessively high phosphorus content that will lead to connecting hook of temperature and time increase, so that connecting hook is more crisp, and then reduce making for connecting hook Use the service life.The too low phosphorus content that will will lead to connecting hook of temperature and time is not up to standard, while the carburizing that will lead to connecting hook is uneven It is even, the hardness on connecting hook surface is thereby reduced, the service life of connecting hook can be equally reduced.Therefore the heating of 910 DEG C of setting The soaking time of temperature and 400min, so that the phosphorus content on connecting hook surface reaches hardness standard, and then avoids under the state Connecting hook after heat treatment is excessively crisp or excessively soft, the effective service life for increasing connecting hook.
The further setting of the present invention are as follows: the heating temperature in step S22 is 910 DEG C, soaking time 200min.
By using above-mentioned technical proposal, diffusion phase refers to that carbon penetrates into the center portion of connecting hook, because of the center portion of connecting hook The phosphorus content of position will be lower than the phosphorus content on connecting hook surface, but the phosphorus content of connecting hook center portion again cannot be too low.Because even Connect hook center portion phosphorus content it is too low to will lead to connecting hook center portion softer, and then cause to be easy to happen shape in connecting hook use process Become;The phosphorus content of connecting hook center portion is excessively high and to will lead to connecting hook center portion more crisp, and then causes to be easy in connecting hook use process It is broken.Therefore the heating temperature of 910 DEG C of setting and the soaking time of 200min, so that under the state, connecting hook center portion Phosphorus content reach hardness standard, and then avoid the connecting hook after heat treatment deformation occurs or fracture, it is further effective to increase The service life of connecting hook.
The further setting of the present invention are as follows: the heating temperature in step S23 is 840 DEG C, soaking time 30min.
By using above-mentioned technical proposal, because the heating temperature of connecting hook is excessively high or the residence time is too long at high temperature When, it is easy to happen decarburization phenomenon, therefore heating temperature and soaking time are to influence the principal element of connecting hook decarburization, connecting hook Decarburization is easy to make the phosphorus content on its surface layer to reduce, and martensite transfor mation cannot occur inside it, or transformation is not exclusively, is easy to lead It cannot get required hardness after cause processing.Therefore the heating temperature of 8400 DEG C of setting and the soaking time of 30min, so that should Under state, the generation of connecting hook decarburization phenomenon is reduced or prevents, and then increase the service life of connecting hook.
The further setting of the present invention are as follows: the material of connecting hook is 40Cr.
By using above-mentioned technical proposal, the tensile strength of 40Cr material, yield strength and harden ability are higher, and it has There are higher fatigue strength and good toughness.And the machinability after being heat-treated is good, therefore using 40Cr material processing system Connecting hook is made, the tensile strength, yield strength and harden ability of connecting hook are effectively raised, and then its use is greatly improved Service life.
In conclusion the invention has the following advantages:
1. improving the harden ability of connecting hook by the prolonged strong diffusion phase for seeping stage and high temperature of setting, guaranteeing The surface of connecting hook and centre hardness reach requirement, improve it treated tension resistance ability, reached high service life Effect;
2. avoiding connecting hook that decarburization phenomenon, the company of further improving occurs by adding holding stage after diffusion phase Connect the service life of hook;
3. replacing the slow oil of traditional classification cooling by the way that rapid oil is cooling, the harden ability of connecting hook is further increased, and Keep its layer depth more uniform, further achievees the effect that high service life;
4. being increased substantially by selecting tensile strength, yield strength and the connecting hook of the higher 40Cr material of harden ability Its tension and anti-pressure ability, and then it is greatly improved its service life.
Specific embodiment
A kind of train connecting hook heat treatment process, characterized by the following steps:
S1: the connecting hook of 40Cr material is placed in heating furnace by heating furnace continuous heating to after 900-920 DEG C by heating It is interior, keep the temperature 30-40min;
Because the tensile strength of 40Cr material, yield strength and harden ability are higher, and its fatigue strength with higher With good toughness, therefore the present embodiment is heat-treated using the connecting hook of 40Cr material, effectively raises connecting hook Its service life is greatly improved in tensile strength.
S2: carburizing includes the following steps:
S21: it is strong to seep, it remains temperature-resistant, continues to be passed through methanol and propane into heating furnace, keep the temperature 390-410min, Middle heating temperature is preferably 910 DEG C, and soaking time is preferably 400min;
S22: diffusion remains temperature-resistant, continues to be passed through methanol and propane into heating furnace, keeps the temperature 190-210min, Middle heating temperature is preferably 910 DEG C, and soaking time is preferably 200min;
S23: heat preservation, continued down remain temperature-resistant, keep the temperature 25-35min, wherein heating temperature is excellent to 830-850 DEG C 840 DEG C are selected as, soaking time is preferably 30min;
Connecting hook is seeped by force by the long-time of 910 DEG C of high temperature and 400min, improves the infiltration on connecting hook surface Carbon effect.Make connecting hook start to spread by 900-920 DEG C of high temperature again, improves the carburizing effect of connecting hook heart.Lead to again Holding stage is crossed, so that the carbon penetrated into connecting hook is fixed, avoids it that decarburization phenomenon occurs, and then effectively raise connection The harden ability of hook improves it treated toughness and tension resistance ability, improves the service life of connecting hook, reached height The effect of service life;
Wherein, the carbon potential CP in step S21 is 1.1 ± 0.05, and the carbon potential CP in step S22 is 0.8 ± 0.05, step Carbon potential CP in S23 is 0.8 ± 0.05;
Because the excessively high phosphorus content that will lead to connecting hook of carbon potential increases, the surface that phosphorus content increase will lead to connecting hook occurs Carbon black, so that connecting hook is more crisp, i.e., connecting hook is easy to happen fracture or damage.The too low phosphorus content drop that will lead to connecting hook of carbon potential It is low, and then the bearing capacity on connecting hook surface is reduced, reduce the service life of connecting hook.Therefore pass through 900-920 DEG C of high temperature So that the carbon potential CP of the carbon impregnation stage of connecting hook is 1.1 ± 0.05,0.8 ± 0.05 and 0.8 ± 0.05, so that connecting hook Phosphorus content reach requirement just, further increase connecting hook heat treatment after service life;
S3: it is cooling, connecting hook is taken out out of heating furnace, fast quickly cooling is carried out to connecting hook using 60-80 DEG C of quenching oil But, 25-35min cooling time;
It replaces the slow oil of traditional classification cooling by the way that rapid oil is cooling, improves the harden ability of connecting hook, and make its layer depth It is more uniform, and the color on surface is more uniform full, and then increases the service life after connecting hook heat treatment.
S4: connecting hook after heating furnace is cooled to 180-200 DEG C, is put into heating furnace, keeps the temperature 170-190min by tempering;
By a lonneal, the brittleness of connecting hook is further decreased, further eliminates or reduces the interior of connecting hook and answer Power improves the toughness and plasticity of connecting hook, further increases the quality of connecting hook, makes after improving connecting hook heat treatment Use the service life.
Project The present embodiment
Surface hardness 56-62HRC
Case depth More than 1.02mm
Tensile strength 1000MPa or more
Testing inspection service life 10000 times or more
Specific embodiment is only explanation of the invention, is not limitation of the present invention, those skilled in the art It can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but as long as in this hair All by the protection of Patent Law in bright scope of the claims.

Claims (8)

1. a kind of train connecting hook heat treatment process, characterized by the following steps:
S1: connecting hook is placed in heating furnace by heating by heating furnace continuous heating to after 900-920 DEG C, keeps the temperature 30- 40min;
S2: carburizing includes the following steps:
S21: it is strong to seep, it remains temperature-resistant, continues to be passed through methanol and propane into heating furnace, keep the temperature 390-410min;
S22: diffusion remains temperature-resistant, continues to be passed through methanol and propane into heating furnace, keeps the temperature 190-210min;
S3: it is cooling, connecting hook is taken out out of heating furnace, it is cold to carry out oil to connecting hook, cooling time 25-35min;
S4: connecting hook after heating furnace is cooled to 180-200 DEG C, is put into heating furnace, keeps the temperature 170-190min by tempering.
2. a kind of train connecting hook heat treatment process according to claim 1, it is characterised in that: step S2 further include as Lower step:
S23: heat preservation, continued down remain temperature-resistant, keep the temperature 25-35min to 830-850 DEG C.
3. a kind of train connecting hook heat treatment process according to claim 2, it is characterised in that: in step S3, use 60-80 DEG C of quenching oil is quickly cooled down.
4. a kind of train connecting hook heat treatment process according to claim 3, it is characterised in that: the carbon in step S21 Gesture CP is 1.1 ± 0.05, and the carbon potential CP in step S22 is 0.8 ± 0.05, and the carbon potential CP in step S23 is 0.8 ± 0.05.
5. a kind of train connecting hook heat treatment process according to claim 4, it is characterised in that: adding in step S21 Hot temperature is 910 DEG C, soaking time 400min.
6. a kind of train connecting hook heat treatment process according to claim 4, it is characterised in that: adding in step S22 Hot temperature is 910 DEG C, soaking time 200min.
7. a kind of train connecting hook heat treatment process according to claim 4, it is characterised in that: adding in step S23 Hot temperature is 840 DEG C, soaking time 30min.
8. a kind of train connecting hook heat treatment process according to claim 1, it is characterised in that: the material of connecting hook is 40Cr。
CN201811097013.XA 2018-09-19 2018-09-19 A kind of train connecting hook heat treatment process Pending CN109136477A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811097013.XA CN109136477A (en) 2018-09-19 2018-09-19 A kind of train connecting hook heat treatment process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811097013.XA CN109136477A (en) 2018-09-19 2018-09-19 A kind of train connecting hook heat treatment process

Publications (1)

Publication Number Publication Date
CN109136477A true CN109136477A (en) 2019-01-04

Family

ID=64815015

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811097013.XA Pending CN109136477A (en) 2018-09-19 2018-09-19 A kind of train connecting hook heat treatment process

Country Status (1)

Country Link
CN (1) CN109136477A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103710714A (en) * 2012-12-07 2014-04-09 厦门真冈热处理有限公司 Automobile gearbox gear carburizing and quenching heat treatment method
CN104711401A (en) * 2015-02-09 2015-06-17 南车戚墅堰机车车辆工艺研究所有限公司 Carburizing and quenching method for large heavy-duty gear
CN105239033A (en) * 2015-11-10 2016-01-13 南车戚墅堰机车车辆工艺研究所有限公司 Composite carburizing and quenching heat treatment method of gear
CN105586599A (en) * 2014-11-14 2016-05-18 重庆春顾机械制造有限公司 Thermal treatment method for carburizing and quenching of gearbox gears
CN105689969A (en) * 2014-11-26 2016-06-22 重庆市巴南区永兴机械厂 Guide post processing technology
CN105986220A (en) * 2015-01-30 2016-10-05 重庆文力机械有限公司 Heat processing method for carburizing and quenching
CN107805776A (en) * 2017-10-23 2018-03-16 金川集团股份有限公司 A kind of carburizing carbon potential DISTRIBUTION CONTROL PROCESS of 23CrNi3MoA drilling tools material

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103710714A (en) * 2012-12-07 2014-04-09 厦门真冈热处理有限公司 Automobile gearbox gear carburizing and quenching heat treatment method
CN105586599A (en) * 2014-11-14 2016-05-18 重庆春顾机械制造有限公司 Thermal treatment method for carburizing and quenching of gearbox gears
CN105689969A (en) * 2014-11-26 2016-06-22 重庆市巴南区永兴机械厂 Guide post processing technology
CN105986220A (en) * 2015-01-30 2016-10-05 重庆文力机械有限公司 Heat processing method for carburizing and quenching
CN104711401A (en) * 2015-02-09 2015-06-17 南车戚墅堰机车车辆工艺研究所有限公司 Carburizing and quenching method for large heavy-duty gear
CN105239033A (en) * 2015-11-10 2016-01-13 南车戚墅堰机车车辆工艺研究所有限公司 Composite carburizing and quenching heat treatment method of gear
CN107805776A (en) * 2017-10-23 2018-03-16 金川集团股份有限公司 A kind of carburizing carbon potential DISTRIBUTION CONTROL PROCESS of 23CrNi3MoA drilling tools material

Similar Documents

Publication Publication Date Title
CN108118283A (en) A kind of surface peening heat treatment method for improving hardness gradient
CN101006189B (en) Method of manufacturing a hardened forged steel component
CN105239033B (en) A kind of Composite carburization quenching heat treatment method of gear
CN101597680B (en) Process for quenching-distribution heat treatment on 60Si2CrVA steel spring for trains
CN109183045B (en) Heat treatment process for automobile spindle
CN105349940B (en) Hot forging identifies the carburizing carbo-nitriding composite heat treating method of mould steel
CN102230062A (en) Heat treatment process for improving strength and toughness of 9SiCr die steel
CN101134995A (en) Alloy spring steel ultra-fine martensite heat treatment quenching strengthening process
CN103233101A (en) GCr15 bearing steel heat treatment method
CN105200201A (en) Method for carbonitriding heat treatment of screws
CN103849737A (en) Heat treatment method of spheroidal graphite cast iron
CN104213070B (en) Sewing machine gear wheel carburization layer control technique
JP5622138B2 (en) Heat treatment method for steel workpieces
CN105886739A (en) Processing technology for hinge shaft for low temperature environment
CN105506647A (en) Heat treatment production technology of super-malleable mild steel screw
US9834837B2 (en) Method and steel component
CN109136477A (en) A kind of train connecting hook heat treatment process
CN105648448A (en) Bevel gear heat-treatment technology
CN102864299A (en) Isothermal transformation thermal treatment method for superhigh-intensity steel
CN105112634A (en) Heat treatment process for hot-working die
CN105648173A (en) Heat treatment method of GCr15SiMn
CN109112469A (en) A kind of connector heat treatment process of 42CrMo material
CN1077141C (en) Method for producing steel parts
CN107130093B (en) A kind of preparation method of high-strength vermicular cast iron plate
CN101629228A (en) Heat treatment method for elastic part

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190104

RJ01 Rejection of invention patent application after publication