CN109133237A - A kind of thermal power plant end high-salinity wastewater zero-emission processing system and its working method - Google Patents

A kind of thermal power plant end high-salinity wastewater zero-emission processing system and its working method Download PDF

Info

Publication number
CN109133237A
CN109133237A CN201810863682.7A CN201810863682A CN109133237A CN 109133237 A CN109133237 A CN 109133237A CN 201810863682 A CN201810863682 A CN 201810863682A CN 109133237 A CN109133237 A CN 109133237A
Authority
CN
China
Prior art keywords
flue gas
pipeline
concentrated water
water
low
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810863682.7A
Other languages
Chinese (zh)
Inventor
唐郭安
朱跃
张杨
王丰吉
唐树芳
段浩然
刘沛奇
刘晓萌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huadian Electric Power Research Institute Co Ltd
Original Assignee
Huadian Electric Power Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huadian Electric Power Research Institute Co Ltd filed Critical Huadian Electric Power Research Institute Co Ltd
Priority to CN201810863682.7A priority Critical patent/CN109133237A/en
Publication of CN109133237A publication Critical patent/CN109133237A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/02Treatment of water, waste water, or sewage by heating
    • C02F1/04Treatment of water, waste water, or sewage by heating by distillation or evaporation
    • C02F1/16Treatment of water, waste water, or sewage by heating by distillation or evaporation using waste heat from other processes
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/02Treatment of water, waste water, or sewage by heating
    • C02F1/04Treatment of water, waste water, or sewage by heating by distillation or evaporation
    • C02F1/06Flash evaporation
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2103/00Nature of the water, waste water, sewage or sludge to be treated
    • C02F2103/18Nature of the water, waste water, sewage or sludge to be treated from the purification of gaseous effluents
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2303/00Specific treatment goals
    • C02F2303/10Energy recovery

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Water Supply & Treatment (AREA)
  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Treating Waste Gases (AREA)
  • Heat Treatment Of Water, Waste Water Or Sewage (AREA)

Abstract

The present invention relates to a kind of thermal power plant end high-salinity wastewater zero-emission processing system and its working methods, are used for large-scale power station end high-salinity wastewater zero-emission.The present invention includes low-temperature flue gas pipeline, high-temperature flue gas pipeline, air preheater, gas cooler, deduster, desulfurizing tower and air-introduced machine;Vacuum pump extracts the vapor in cryogenic vaporizer and forms vacuum, the heat of flue gas heat-exchange unit supply is absorbed into the end high-salt wastewater of cryogenic vaporizer at this time, and it is concentrated by evaporation under the conditions of low-temp low-pressure, the vapor of generation passes through steam-water separation, gas after separation enters desulfurizing tower, and the water after separation weighs as desulphurization system moisturizing maintenance level;Waste water after concentration sprays into air preheater import flue again or exhaust pass is flashed, and is finally reached the purpose of end high-salinity wastewater zero-emission.The present invention is able to achieve the end thermal power plant Quan Chang high-salinity wastewater zero-emission, and can not influence air preheater inlet flue gas temperature and boiler efficiency, without the risk of air preheater blocking.

Description

A kind of thermal power plant end high-salinity wastewater zero-emission processing system and its working method
Technical field
The present invention relates to a kind of thermal power plant end high-salinity wastewater zero-emission processing system and its working methods, are used for thermal power plant The processing of end high-salinity wastewater zero-emission.
Background technique
China's national situation is still based on thermal power generation at present, and sewerage, the stone that thermal power plant has recirculated water to generate Desulfurization wastewater, the reverse osmosis sewage etc. that lime stone-gypsum wet desulphurization system generates, containing many poisonous and hazardous in these sewage Substance, carrying out processing can be only achieved emission request.Since waste water quality is many kinds of, water is of different sizes, is handling this It is relatively difficult when a little waste water, and the generally existing system complex of these methods, take up a large area, the problems such as operating cost is high.
High-salt wastewater processing technique in end used at present mainly include the following types:
The first is that chemical agent-feeding treatment is carried out to end high-salt wastewater, is precipitated, filtered, neutralized, flocculate, seeped to waste water Thoroughly, it evaporates, crystallize or using treatment process such as three header devices.Such as the patent of invention of CN201711106836.X, disclose A kind of desulfurization wastewater Zero discharging system, in this system desulfurization wastewater by chemicals addition control, plate compression, softening, precipitating, filtering, It permeates, evaporate a series of processing, finally obtain clear water and high-purity sodium salt.This process is complete to wastewater treatment, can be with Clean recycled water and high-purity salt is obtained, but is taken up a large area, investment cost and operating cost are all very high.
Second of processing at the beginning of for end high-salt wastewater is carried out dosing is introduced directly into boiler height without chemical treatment In warm flue, waste water is evaporated using high-temperature flue gas.Such as the patent of invention of CN201710942060.9, one is disclosed Desulfurization wastewater is re-introduced into air after dosing pre-processes by kind Desulphurization for Coal-fired Power Plant wastewater zero discharge system and method, the method It is evaporated before preheater, since the position that desulfurization wastewater sprays into is air preheater gas approach, sky can be lowered into this way The smoke temperature of air preheater eventually reduced boiler efficiency, and moreover, the crystal salt for evaporating generation also adds air preheat The risk of device blocking.The for another example patent of invention of CN201710058803.6 discloses a kind of FGD wastewater zero discharge system, this is System preheats desulfurization wastewater using low-temperature flue gas, is concentrated, and is then evaporated using high-temperature flue gas to the waste water after concentration. Although the method also achieves wastewater zero discharge, but the cigarette before water reuse after the concentration of this system air preheater entrance Gas is evaporated, and finally can also reduce boiler efficiency, increases the risk of air preheater blocking, and in operation by low temperature cigarette The limitation of temperature degree, when low-temperature flue gas temperature is lower than 100 DEG C, it may be difficult to which desulfurization wastewater is concentrated.
Summary of the invention
It is an object of the invention to overcome the above deficiencies in the existing technologies, and provide a kind of reasonable thermoelectricity of design Factory's end high-salinity wastewater zero-emission processing system and its working method.
Technical solution used by the present invention solves the above problems is: a kind of processing of thermal power plant end high-salinity wastewater zero-emission System, including low-temperature flue gas pipeline, high-temperature flue gas pipeline, air preheater, gas cooler, deduster, desulfurizing tower and air inducing Machine;It is characterized in that, the air preheater, gas cooler and deduster are sequentially arranged in height along the flow direction of flue gas On warm flue, one end of deduster is connected to high-temperature flue gas pipeline, the other end and low-temperature flue gas pipeline of the deduster Connection, the deduster, air-introduced machine and desulfurizing tower are sequentially arranged on low-temperature flue gas pipeline along the flow direction of flue gas;It is described Desulfurizing tower is connected to by desulfurization wastewater pipeline with cryogenic vaporizer, and waste water pump and waste water spray are equipped on the desulfurization wastewater pipeline Head is drenched, the waste water spray head is located at the inside of cryogenic vaporizer;High-salt wastewater introduces pipe and is connected to desulfurization wastewater pipeline;It is described Cryogenic vaporizer is connected to by concentrated water pipeline with high-temperature flue gas pipeline, and concentrated water pump, the concentrated water are equipped on the concentrated water pipeline Pipe arrangement has No.1 concentrated water branch pipe and No. two concentrated water branch pipes, installs respectively on the No.1 concentrated water branch pipe and No. two concentrated water branch pipes There are No.1 valve and No. two valves, No.1 concentrated water spray is also separately installed on the No.1 concentrated water branch pipe and No. two concentrated water branch pipes Head and No. two concentrated water spray heads, the No.1 concentrated water spray head and No. two concentrated water spray heads are respectively positioned in high-temperature flue gas pipeline;Pressure Contracting air pipeline is connected to concentrated water pipeline;The low-temperature flue gas pipeline is connected to by No.1 bypass flue with flue gas heat-exchange unit, institute It states and low-temperature flue gas bypass pump is installed on No.1 bypass flue, the low-temperature flue gas bypass pump has the function of adjusting flow;Institute The inside that cryogenic vaporizer is arranged in flue gas heat-exchange unit is stated, the flue gas heat-exchange unit is located at the lower section of waste water spray head, the cigarette Gas heat exchanger also passes through No. two bypass flues and is connected to low-temperature flue gas pipeline;The cryogenic vaporizer passes through steam-water pipe and carbonated drink Separator is connected to, and is equipped with vacuum pump on the steam-water pipe, and vacuum pump can control the hydrone pressure in cryogenic vaporizer, So that high-salt wastewater can gasify at a lower temperature;The steam-water separator is connected by exhaust piping and low-temperature flue gas pipeline Logical, separation waterpipe is connected to steam-water separator.
Furthermore, the steam-water pipe is mounted on the top of cryogenic vaporizer.
Furthermore, the exhaust piping is mounted on the top of steam-water separator, and the separation waterpipe is mounted on vapour The junction of the lower part of separator, the exhaust piping and low-temperature flue gas pipeline is located on the gas approach of air-introduced machine.
Furthermore, the No.1 concentrated water branch pipe and No. two concentrated water branch pipes are connected to air with high-temperature flue gas pipeline respectively On the inlet flue duct and exhaust pass of preheater, the interface of the concentrated water pipeline and compressed air pipe is located at the outlet of concentrated water pump On pipeline.
Furthermore, the interface of the No.1 bypass flue and low-temperature flue gas pipeline is located at the exhaust pass of deduster On, the interface of No. two bypass flues and low-temperature flue gas pipeline is located on the gas approach of air-introduced machine.
A kind of working method of thermal power plant end high-salinity wastewater zero-emission processing system as described above, which is characterized in that The working method is as follows: it is with high salt useless that the desulfurization wastewater and high-salt wastewater that desulfurizing tower generates introduce each equipment end that pipe introduces Water is squeezed into waste water spray head by desulfurization wastewater pipeline by waste water pump jointly and is sprayed into cryogenic vaporizer, and cryogenic vaporizer is sprayed into In waste water absorb the heat of flue gas heat-exchange unit release, temperature rises to 65 DEG C or more;Vacuum pump controls the interior of cryogenic vaporizer Pressure is at low-pressure state, and the high-salt wastewater sprayed at this time evaporates in a low pressure environment generates vapor and condensed water;Its In, condensed water flows into concentrated water pump by concentrated water pipeline, and the compressed air being then sent into compressed air pipe mixes;Work as condensed water Amount it is larger when, open No. two valves, be passed through condensed water in No. two concentrated water spray heads by No. two concentrated water branch pipes and spray into sky The gas approach of air preheater is flashed, and the crystal salt of generation is removed when passing through deduster with flue gas;When the amount of condensed water When smaller, No.1 valve is opened, be passed through condensed water in No.1 concentrated water spray head by No.1 concentrated water branch pipe and sprays into air is pre- The exhaust pass of hot device is flashed, and the crystal salt of generation is removed when passing through deduster with flue gas;It in this way can be according to concentration Water inventory selection sprays into the flue of suitable smoke temperature, it is ensured that condensed water flashes completely;High-salt wastewater evaporates production in cryogenic vaporizer Raw vapor then passes through steam-water pipe and is sent into steam-water separator by vacuum pump, and vapor is separated into useless in steam-water separator Gas and cleaner water, exhaust gas enter the inlet flue gas pipeline of air-introduced machine by exhaust piping, and cleaner water is introduced into desulfurization Tower is recycled as moisturizing;Low-temperature flue gas in low-temperature flue gas pipeline is pumped into No.1 bypass flue by low-temperature flue gas bypass Flue gas heat-exchange unit discharges heat to cryogenic vaporizer, the gas approach of air-introduced machine is then entered by No. two bypass flues;According to The temperature requirements of cryogenic vaporizer adjust the control of low-temperature flue gas bypass pump and flow into the flue gas flow of cryogenic vaporizer, and adjust useless Water pump controls high-salt wastewater flow, guarantees suitable waste strength, avoids the high-salt wastewater in cryogenic vaporizer from crystallizing, together When flue gas heat-exchange unit using heat pipe plate enamel technology, not only ensure that heat exchange efficiency but also met requirement for anticorrosion.
More specifically, the interior pressure of vacuum pump control cryogenic vaporizer is in 0.025MPa.
Compared with prior art, the present invention having the following advantages that and effect: the present invention can be realized the end thermal power plant Quan Chang High-salinity wastewater zero-emission, and the inlet flue gas temperature of air preheater is not influenced, boiler efficiency is not influenced, without Blocking in Air Preheater The risk of plug;Meanwhile by providing environment under low pressure, realizes and evaporate high-salt wastewater under cryogenic conditions, not by low-temperature flue gas temperature Limitation not less than 100 DEG C, or even high-salt wastewater can be evaporated without using flue gas.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the embodiment of the present invention.
In figure: desulfurization wastewater pipeline 1, steam-water pipe 2, exhaust piping 3, separation waterpipe 4, No.1 bypass flue 5, two Bypass flue 6, concentrated water pipeline 7, compressed air pipe 8, low-temperature flue gas pipeline 9, high-temperature flue gas pipeline 10, high-salt wastewater introduce pipe 11, air preheater 21, gas cooler 22, deduster 23, desulfurizing tower 24, cryogenic vaporizer 25, steam-water separator 26, waste water Spray head 27, No.1 concentrated water spray head 28, flue gas heat-exchange unit 29, waste water pump 31, vacuum pump 32, concentrated water pump by 33, low-temperature flue gas Road pumps 34, air-introduced machine 35,71, No. two concentrated water branch pipes 72 of No.1 concentrated water branch pipe, the concentrated water of valve 74, two of No.1 valve 73, two Spray head 281.
Specific embodiment
The present invention is described in further detail with reference to the accompanying drawing and by embodiment, and following embodiment is to this hair Bright explanation and the invention is not limited to following embodiments.
Embodiment.
Referring to Fig. 1, a kind of thermal power plant end high-salinity wastewater zero-emission processing system, including low-temperature flue gas pipeline 9, high temperature cigarette Feed channel 10, air preheater 21, gas cooler 22, deduster 23, desulfurizing tower 24 and air-introduced machine 35;Air preheater 21, Gas cooler 22 and deduster 23 are sequentially arranged on high-temperature flue gas pipeline 10 along the flow direction of flue gas, deduster 23 One end is connected to high-temperature flue gas pipeline 10, and the other end of deduster 23 is connected to low-temperature flue gas pipeline 9, deduster 23, air-introduced machine 35 and desulfurizing tower 24 be sequentially arranged on low-temperature flue gas pipeline 9 along the flow direction of flue gas;Desulfurizing tower 24 passes through desulfurization wastewater Pipeline 1 is connected to cryogenic vaporizer 25, and waste water pump 31 and waste water spray head 27, waste water spray are equipped on desulfurization wastewater pipeline 1 First 27 are located at the inside of cryogenic vaporizer 25;High-salt wastewater introduces pipe 11 and is connected to desulfurization wastewater pipeline 1;Cryogenic vaporizer 25 is logical Overrich waterpipe 7 is connected to high-temperature flue gas pipeline 10, concentrated water pump 33 is equipped on concentrated water pipeline 7, concentrated water pipeline 7 is disposed with No.1 No.1 valve is separately installed on concentrated water branch pipe 71 and No. two concentrated water branch pipes 72, No.1 concentrated water branch pipe 71 and No. two concentrated water branch pipes 72 73 and No. two valves 74,28 He of No.1 concentrated water spray head is also separately installed on No.1 concentrated water branch pipe 71 and No. two concentrated water branch pipes 72 No. two concentrated water spray heads 281, No.1 concentrated water spray head 28 and No. two concentrated water spray heads 281 are respectively positioned in high-temperature flue gas pipeline 10; Compressed air pipe 8 is connected to concentrated water pipeline 7;Low-temperature flue gas pipeline 9 is connected by No.1 bypass flue 5 and flue gas heat-exchange unit 29 It is logical, low-temperature flue gas bypass pump 34 is installed, flue gas heat-exchange unit 29 is arranged in cryogenic vaporizer 25 on No.1 bypass flue 5 Portion, flue gas heat-exchange unit 29 are located at the lower section of waste water spray head 27, and flue gas heat-exchange unit 29 also passes through No. two bypass flues 6 and low temperature cigarette Feed channel 9 is connected to;Cryogenic vaporizer 25 is connected to by steam-water pipe 2 with steam-water separator 26, is equipped with vacuum on steam-water pipe 2 Pump 32;Steam-water separator 26 is connected to by exhaust piping 3 with low-temperature flue gas pipeline 9, and separation waterpipe 4 and steam-water separator 26 connect It is logical.
In the present embodiment, steam-water pipe 2 is mounted on the top of cryogenic vaporizer 25.
In the present embodiment, exhaust piping 3 is mounted on the top of steam-water separator 26, and separation waterpipe 4 is mounted on carbonated drink point The junction of lower part from device 26, exhaust piping 3 and low-temperature flue gas pipeline 9 is located on the gas approach of air-introduced machine 35.
In the present embodiment, No.1 concentrated water branch pipe 71 and No. two concentrated water branch pipes 72 are connected to sky with high-temperature flue gas pipeline 10 respectively On the inlet flue duct and exhaust pass of air preheater 21, the interface of concentrated water pipeline 7 and compressed air pipe 8 is located at concentrated water pump 33 On outlet conduit.
In the present embodiment, the interface of No.1 bypass flue 5 and low-temperature flue gas pipeline 9 is located at the exhaust pass of deduster 23 On, the interface of No. two bypass flues 6 and low-temperature flue gas pipeline 9 is located on the gas approach of air-introduced machine 35.
The working method of above-mentioned thermal power plant's end high-salinity wastewater zero-emission processing system is as follows: desulfurizing tower 24 generates de- Sulphur waste water and high-salt wastewater introduce each equipment end high-salt wastewater that pipe 11 introduces and pass through desulfurization wastewater by waste water pump 31 jointly Pipeline 1 is squeezed into waste water spray head 27 and is sprayed into cryogenic vaporizer 25, and the waste water sprayed into cryogenic vaporizer 25 absorbs flue gas and changes The heat that hot device 29 discharges, temperature rise to 65 DEG C or more;The interior pressure that vacuum pump 32 controls cryogenic vaporizer 25 exists 0.025MPa, the high-salt wastewater sprayed at this time evaporates in a low pressure environment generates vapor and condensed water;Wherein, condensed water is passed through Concentrated water pipeline 7 flows into concentrated water pump 33, and the compressed air being then sent into compressed air pipe 8 mixes;When the amount of condensed water is larger When, No. two valves 74 are opened, condensed water is made to be passed through in No. two concentrated water spray heads 281 by No. two concentrated water branch pipes 72 and spray into air The gas approach of preheater 21 is flashed, and the crystal salt of generation is removed when passing through deduster 23 with flue gas;When condensed water When measuring smaller, No.1 valve 73 is opened, condensed water is made to be passed through in No.1 concentrated water spray head 28 and spray by No.1 concentrated water branch pipe 71 The exhaust pass for entering air preheater 21 is flashed, and the crystal salt of generation is removed when passing through deduster 23 with flue gas;It is with high salt The vapor that waste water evaporates generation in cryogenic vaporizer 25 then passes through steam-water pipe 2 and is sent into steam-water separator by vacuum pump 32 26, vapor is separated into exhaust gas and cleaner water in steam-water separator 26, and exhaust gas enters air-introduced machine by exhaust piping 3 35 inlet flue gas pipeline, cleaner water are introduced into desulfurizing tower 24 and recycle as moisturizing;Low temperature in low-temperature flue gas pipeline 9 Flue gas is sent into flue gas heat-exchange unit 29 by low-temperature flue gas bypass pump 34 in No.1 bypass flue 5, discharges heat to cryogenic vaporizer 25, the gas approach of air-introduced machine 35 is then entered by No. two bypass flues 6;According to the temperature requirements of cryogenic vaporizer 25, adjust It saves the control of low-temperature flue gas bypass pump 34 and flows into the flue gas flow of cryogenic vaporizer 25, and adjust waste water pump 31 and control high-salt wastewater stream Amount, guarantees suitable waste strength, the high-salt wastewater in cryogenic vaporizer 25 is avoided to crystallize, while flue gas heat-exchange unit 29 is adopted Enamel technology is plated with heat pipe, heat exchange efficiency had not only been ensure that but also had met requirement for anticorrosion.
It is any to be familiar with although the present invention is disclosed as above with embodiment, its protection scope being not intended to limit the invention The technical staff of this technology changes and retouches made without departing from the spirit and scope of the invention, should belong to this hair Bright protection scope.

Claims (7)

1. a kind of thermal power plant end high-salinity wastewater zero-emission processing system, including low-temperature flue gas pipeline (9), high-temperature flue gas pipeline (10), air preheater (21), gas cooler (22), deduster (23), desulfurizing tower (24) and air-introduced machine (35);Its feature exists In the air preheater (21), gas cooler (22) and deduster (23) are sequentially arranged in along the flow direction of flue gas On high-temperature flue gas pipeline (10), one end of deduster (23) is connected to high-temperature flue gas pipeline (10), the deduster (23) it is another One end is connected to low-temperature flue gas pipeline (9), the deduster (23), air-introduced machine (35) and desulfurizing tower (24) along flue gas flowing Direction is sequentially arranged on low-temperature flue gas pipeline (9);The desulfurizing tower (24) passes through desulfurization wastewater pipeline (1) and cryogenic vaporizer (25) it is connected to, waste water pump (31) and waste water spray head (27), the waste water spray head is installed on the desulfurization wastewater pipeline (1) (27) it is located at the inside of cryogenic vaporizer (25);High-salt wastewater introduces pipe (11) and is connected to desulfurization wastewater pipeline (1);The low temperature Evaporator (25) is connected to by concentrated water pipeline (7) with high-temperature flue gas pipeline (10), and concentrated water pump is equipped on the concentrated water pipeline (7) (33), the concentrated water pipeline (7) is disposed with No.1 concentrated water branch pipe (71) and No. two concentrated water branch pipes (72), the No.1 concentrated water branch pipe (71) and on No. two concentrated water branch pipes (72) No.1 valve (73) and No. two valves (74), the No.1 concentrated water branch pipe are separately installed with (71) and on No. two concentrated water branch pipes (72) it is also separately installed with No.1 concentrated water spray head (28) and No. two concentrated water spray heads (281), The No.1 concentrated water spray head (28) and No. two concentrated water spray heads (281) are respectively positioned in high-temperature flue gas pipeline (10);Compressed air Pipeline (8) is connected to concentrated water pipeline (7);The low-temperature flue gas pipeline (9) passes through No.1 bypass flue (5) and flue gas heat-exchange unit (29) it is connected to, is equipped with low-temperature flue gas bypass pump (34) on the No.1 bypass flue (5), flue gas heat-exchange unit (29) setting In the inside of cryogenic vaporizer (25), the flue gas heat-exchange unit (29) is located at the lower section of waste water spray head (27), and the flue gas changes Hot device (29) is also connected to by No. two bypass flues (6) with low-temperature flue gas pipeline (9);The cryogenic vaporizer (25) passes through carbonated drink Pipeline (2) is connected to steam-water separator (26), is equipped with vacuum pump (32) on the steam-water pipe (2);The steam-water separator (26) it is connected to by exhaust piping (3) with low-temperature flue gas pipeline (9), separation waterpipe (4) is connected to steam-water separator (26).
2. thermal power plant end high-salinity wastewater zero-emission processing system according to claim 1, which is characterized in that the carbonated drink Pipeline (2) is mounted on the top of cryogenic vaporizer (25).
3. thermal power plant end high-salinity wastewater zero-emission processing system according to claim 1, which is characterized in that the exhaust gas Pipeline (3) is mounted on the top of steam-water separator (26), and the separation waterpipe (4) is mounted under steam-water separator (26) Portion, the exhaust piping (3) and the junction of low-temperature flue gas pipeline (9) are located on the gas approach of air-introduced machine (35).
4. thermal power plant end high-salinity wastewater zero-emission processing system according to claim 1, which is characterized in that the No.1 Concentrated water branch pipe (71) and No. two concentrated water branch pipes (72) be connected to respectively with high-temperature flue gas pipeline (10) air preheater (21) into On mouth flue and exhaust pass, the interface of the concentrated water pipeline (7) and compressed air pipe (8) is located at the outlet of concentrated water pump (33) On pipeline.
5. thermal power plant end high-salinity wastewater zero-emission processing system according to claim 1, which is characterized in that the No.1 Bypass flue (5) and the interface of low-temperature flue gas pipeline (9) are located on the exhaust pass of deduster (23), No. two bypass flues (6) it is located on the gas approach of air-introduced machine (35) with the interface of low-temperature flue gas pipeline (9).
6. a kind of thermal power plant's end high-salinity wastewater zero-emission processing system as described in any one of claim 1-5 claim Working method, which is characterized in that the working method is as follows: desulfurizing tower (24) generate desulfurization wastewater and high-salt wastewater draw Each equipment end high-salt wastewater for entering pipe (11) introducing squeezes into waste water spray by desulfurization wastewater pipeline (1) by waste water pump (31) jointly Leaching head (27) simultaneously sprays into cryogenic vaporizer (25), and the waste water sprayed into cryogenic vaporizer (25), which absorbs flue gas heat-exchange unit (29), to be released The heat put, temperature rise to 65 DEG C or more;The interior pressure of vacuum pump (32) control cryogenic vaporizer (25) is at low pressure State, the high-salt wastewater sprayed at this time evaporates in a low pressure environment generates vapor and condensed water;Wherein, condensed water passes through concentrated water Pipeline (7) flows into concentrated water pump (33), and the compressed air being then sent into compressed air pipe (8) mixes;When condensed water amount compared with When big, No. two valves (74) are opened, are passed through condensed water in No. two concentrated water spray heads (281) simultaneously by No. two concentrated water branch pipes (72) The gas approach for spraying into air preheater (21) is flashed, and the crystal salt of generation is removed when passing through deduster (23) with flue gas It goes;It when the amount of condensed water is smaller, opens No.1 valve (73), making condensed water by No.1 concentrated water branch pipe (71), to be passed through No.1 dense It in water spray head (28) and sprays into the exhaust pass of air preheater (21) and is flashed, the crystal salt of generation is with flue gas by removing It is removed when dirt device (23);The high-salt wastewater vapor that evaporation generates in cryogenic vaporizer (25) then passes through steam-water pipe (2) Steam-water separator (26) are sent by vacuum pump (32), vapor is separated into exhaust gas and cleaner in steam-water separator (26) Water, exhaust gas enter the inlet flue gas pipeline of air-introduced machine (35) by exhaust piping (3), and cleaner water is introduced into desulfurizing tower (24) It is recycled as moisturizing;Low-temperature flue gas in low-temperature flue gas pipeline (9) is in No.1 bypass flue (5) by low-temperature flue gas bypass pump (34) flue gas heat-exchange unit (29) are sent into, release heat gives cryogenic vaporizer (25), then enters by No. two bypass flues (6) and draws The gas approach of blower (35);According to the temperature requirements of cryogenic vaporizer (25), low-temperature flue gas bypass pump (34) control stream is adjusted Enter the flue gas flow of cryogenic vaporizer (25), and adjust waste water pump (31) control high-salt wastewater flow, guarantees that suitable waste water is dense Degree, avoids the high-salt wastewater in cryogenic vaporizer (25) from crystallizing, while flue gas heat-exchange unit (29) plates enamel skill using heat pipe Art not only ensure that heat exchange efficiency but also meet requirement for anticorrosion.
7. the working method of thermal power plant end high-salinity wastewater zero-emission processing system according to claim 6, feature exist In vacuum pump (32) controls the interior pressure of cryogenic vaporizer (25) in 0.025MPa.
CN201810863682.7A 2018-08-01 2018-08-01 A kind of thermal power plant end high-salinity wastewater zero-emission processing system and its working method Pending CN109133237A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810863682.7A CN109133237A (en) 2018-08-01 2018-08-01 A kind of thermal power plant end high-salinity wastewater zero-emission processing system and its working method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810863682.7A CN109133237A (en) 2018-08-01 2018-08-01 A kind of thermal power plant end high-salinity wastewater zero-emission processing system and its working method

Publications (1)

Publication Number Publication Date
CN109133237A true CN109133237A (en) 2019-01-04

Family

ID=64799411

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810863682.7A Pending CN109133237A (en) 2018-08-01 2018-08-01 A kind of thermal power plant end high-salinity wastewater zero-emission processing system and its working method

Country Status (1)

Country Link
CN (1) CN109133237A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110064286A (en) * 2019-04-12 2019-07-30 华电电力科学研究院有限公司 A kind of cooling joint reducing agent of SNCR spray gun evaporates pyrolysis system and its working method
CN111410351A (en) * 2019-01-07 2020-07-14 湖南军信环保股份有限公司 Method for treating high-salinity wastewater
CN111410350A (en) * 2019-01-07 2020-07-14 湖南军信环保股份有限公司 Method for cooperatively treating high-salinity wastewater by using low-calorific-value combustible gas
CN111453803A (en) * 2020-04-30 2020-07-28 成都市蜀科科技有限责任公司 High-salinity wastewater low-temperature bypass thermal method concentration reduction and flue evaporation zero-discharge system
CN112607810A (en) * 2020-12-14 2021-04-06 武汉天空蓝环保科技有限公司 Air type desulfurization waste water enrichment facility and zero discharge system
CN112794539A (en) * 2020-12-23 2021-05-14 华电水务工程有限公司 System for treating high-salinity wastewater by using flue gas and treatment method thereof
CN113979502A (en) * 2021-11-26 2022-01-28 南京诺克斯环保科技有限公司 Zero-emission treatment system for evaporating waste water by utilizing flue hot gas of thermal power plant
CN114620791A (en) * 2022-03-31 2022-06-14 西安交通大学 System for concentrating desulfurization wastewater by utilizing flue gas waste heat in stepped manner

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205473143U (en) * 2016-01-18 2016-08-17 李艳萍 High salinity wastewater treatment system
CN106115829A (en) * 2016-08-31 2016-11-16 厦门龙净环保技术有限公司 Desulfurization wastewater spray evaporation processing means with bypath system
CN107162084A (en) * 2017-06-16 2017-09-15 浙江大学 A kind of salt water treating system and its method with preposition heat exchanger and rear end deduster
CN107857321A (en) * 2017-11-07 2018-03-30 西安协力动力科技有限公司 A kind of technique for Waste Water From Fire Power Plant zero discharge treatment
CN108285188A (en) * 2018-03-13 2018-07-17 南京常荣声学股份有限公司 A kind of UTILIZATION OF VESIDUAL HEAT IN coordinated desulfurization wastewater zero discharge and the device and method for removing plume
CN108328683A (en) * 2017-01-19 2018-07-27 四川苏源环保工程有限公司 Waste water of heat-engine plant condensing crystallizing Zero discharging system
CN209537028U (en) * 2018-08-01 2019-10-25 华电电力科学研究院有限公司 A kind of thermal power plant end high-salinity wastewater zero-emission processing system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205473143U (en) * 2016-01-18 2016-08-17 李艳萍 High salinity wastewater treatment system
CN106115829A (en) * 2016-08-31 2016-11-16 厦门龙净环保技术有限公司 Desulfurization wastewater spray evaporation processing means with bypath system
CN108328683A (en) * 2017-01-19 2018-07-27 四川苏源环保工程有限公司 Waste water of heat-engine plant condensing crystallizing Zero discharging system
CN107162084A (en) * 2017-06-16 2017-09-15 浙江大学 A kind of salt water treating system and its method with preposition heat exchanger and rear end deduster
CN107857321A (en) * 2017-11-07 2018-03-30 西安协力动力科技有限公司 A kind of technique for Waste Water From Fire Power Plant zero discharge treatment
CN108285188A (en) * 2018-03-13 2018-07-17 南京常荣声学股份有限公司 A kind of UTILIZATION OF VESIDUAL HEAT IN coordinated desulfurization wastewater zero discharge and the device and method for removing plume
CN209537028U (en) * 2018-08-01 2019-10-25 华电电力科学研究院有限公司 A kind of thermal power plant end high-salinity wastewater zero-emission processing system

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111410351A (en) * 2019-01-07 2020-07-14 湖南军信环保股份有限公司 Method for treating high-salinity wastewater
CN111410350A (en) * 2019-01-07 2020-07-14 湖南军信环保股份有限公司 Method for cooperatively treating high-salinity wastewater by using low-calorific-value combustible gas
CN111410350B (en) * 2019-01-07 2022-05-27 湖南军信环保股份有限公司 Method for cooperatively treating high-salinity wastewater by using low-calorific-value combustible gas
CN111410351B (en) * 2019-01-07 2022-05-31 湖南军信环保股份有限公司 Method for treating high-salinity wastewater
CN110064286A (en) * 2019-04-12 2019-07-30 华电电力科学研究院有限公司 A kind of cooling joint reducing agent of SNCR spray gun evaporates pyrolysis system and its working method
CN110064286B (en) * 2019-04-12 2023-07-11 华电电力科学研究院有限公司 SNCR spray gun cooling combined reducing agent evaporation pyrolysis system and working method thereof
CN111453803A (en) * 2020-04-30 2020-07-28 成都市蜀科科技有限责任公司 High-salinity wastewater low-temperature bypass thermal method concentration reduction and flue evaporation zero-discharge system
CN112607810A (en) * 2020-12-14 2021-04-06 武汉天空蓝环保科技有限公司 Air type desulfurization waste water enrichment facility and zero discharge system
CN112794539A (en) * 2020-12-23 2021-05-14 华电水务工程有限公司 System for treating high-salinity wastewater by using flue gas and treatment method thereof
CN113979502A (en) * 2021-11-26 2022-01-28 南京诺克斯环保科技有限公司 Zero-emission treatment system for evaporating waste water by utilizing flue hot gas of thermal power plant
CN114620791A (en) * 2022-03-31 2022-06-14 西安交通大学 System for concentrating desulfurization wastewater by utilizing flue gas waste heat in stepped manner

Similar Documents

Publication Publication Date Title
CN109133237A (en) A kind of thermal power plant end high-salinity wastewater zero-emission processing system and its working method
CN109607907A (en) A kind of desulfurization wastewater multi-heat source coupled processing system and processing method
CN107954560A (en) The technique that vapor recompression is concentrated by evaporation joint flue spray technique processing waste water
CN105776706B (en) A kind of device and method of flue multistage evaporation processing desulfurization wastewater
CN107739119A (en) - kind of cascade utilization power-plant flue gas waste heat realizes the device of desulfurization wastewater zero-emission
CN211226744U (en) High salt, high COD waste water low temperature evaporation enrichment facility
CN107337245A (en) A kind of spraying system that desulfurization wastewater is concentrated using fume afterheat
CN106629946A (en) Desulfurization wastewater treatment integrated facility and desulfurization wastewater treatment method applicable to indirect air-cooling towers
CN110272082A (en) Desulfurization wastewater evaporative crystallization couples flue gas reheat integral system
CN113501612A (en) Energy-concerving and environment-protective type desulfurization waste water zero release processing system
CN209537028U (en) A kind of thermal power plant end high-salinity wastewater zero-emission processing system
CN204550302U (en) Desulfurization wastewater preheating spray evaporation system
CN207797091U (en) A kind of device for realizing desulfurization wastewater zero-emission using full flue gas
CN106698564A (en) Sea water desalinization method by waste heat recovery
CN109432969A (en) A kind of three-circulation desulphurization disappears white integrated apparatus
CN205590492U (en) Device of multistage evaporating treatment desulfurization waste water of flue
CN209226762U (en) A kind of waste-water treatment tower used when wet desulphurization
CN209383589U (en) A kind of desulfurization wastewater multi-heat source coupled processing system
CN206751452U (en) A kind of spraying system that desulfurization wastewater is concentrated using fume afterheat
CN207933199U (en) - kind of cascade utilization power-plant flue gas waste heat realizes the device of desulfurization wastewater zero-emission
CN207877490U (en) A kind of thermal power plant desulfurization wastewater zero-discharge treatment system
CN206828125U (en) Desulfurizing waste water processing device is evaporated in wet type cooling unit exhaust steam
CN206814422U (en) A kind of desulfurization fume evaporates Zero discharging system
CN205500825U (en) Novel heat pump evaporation heat recovery combination device
CN204873907U (en) Hot pressing formula distilled water machine system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190104