CN109114417A - A kind of filling station and charging method of LNG ship - Google Patents
A kind of filling station and charging method of LNG ship Download PDFInfo
- Publication number
- CN109114417A CN109114417A CN201811284762.3A CN201811284762A CN109114417A CN 109114417 A CN109114417 A CN 109114417A CN 201811284762 A CN201811284762 A CN 201811284762A CN 109114417 A CN109114417 A CN 109114417A
- Authority
- CN
- China
- Prior art keywords
- liquid
- gaseous state
- branch pipe
- filling
- general pipeline
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C5/00—Methods or apparatus for filling containers with liquefied, solidified, or compressed gases under pressures
- F17C5/02—Methods or apparatus for filling containers with liquefied, solidified, or compressed gases under pressures for filling with liquefied gases
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C13/00—Details of vessels or of the filling or discharging of vessels
- F17C13/04—Arrangement or mounting of valves
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
The present invention provides a kind of LNG ship filling station and charging methods, open two-way branch pipe respectively in LNG liquid filling general pipeline, branch pipe is filled for connecting liquid pipeline to goods tank all the way, is filled all the way for connecting gaseous state pipeline to goods tank;Two-way branch pipe is opened respectively in LNG gaseous state filling general pipeline, it is filled all the way for connecting gaseous state pipeline to goods tank, it is filled all the way for connecting liquid line to goods tank, it can be using the on-off being shorted with blank flange realization pipeline on the pipeline of branch pipe, the on-off that valve realizes control piper can also be increased, the present invention effectively reduces pipeline quantity and floor space, reduces interface docking cost, and LNG ship filling docking flexibility improves.
Description
Technical field
The present invention relates to a kind of harbour LNG filling station more particularly to the filling stations and charging method of a kind of LNG ship.
Background technique
Currently, filling interface used in each harbour LNG filling station and LNG filling ship is single integrated mode,
It is liquid line and the combination of gaseous state pipeline, i.e. the filling interface of L-V form;It is that gaseous state pipeline and liquid line combine,
That is the filling interface of V-L form, this requires LNG liquefied gas carriers filled when filling LNG interface will with the interface of filling station into
Row matching, the interfacing order of LNG liquefied gas carrier and filling station, filling ship interfacing order on the contrary, can not then be filled because
LNG liquefied gas carrier is global service course line at present, and the filling interfacing order in the area of country variant is not unified, so for
The filling interface of LNG liquefied gas carrier can be suitably used for it is different filling interfacing orders connections, particularly with Large LNG filling ship with
The docking filling of LNG liquefied gas carrier, since Large LNG filling ship ratio LNG liquefied gas carrier interface position is much higher, LNG
Liquefied gas carrier needs a setting high position to fill, and interface is used for and LNG fills ship progress interface docking.
The situation that can not dock such at present is generally there are three types of solution: 1, multiple gaseous states are established on LNG liquefied gas carrier
Pipeline and the alternate arrangement of liquid line interface such as liquid filling interface-gaseous state filling interface-liquid filling interface (L-V-L) pipe
Road arrangement, liquid filling interface-gaseous state filling interface-gaseous state filling interface-liquid filling interface (L-V-V-L) pipeline arrangement
Deng, pass through LNG liquefied gas carrier back-and-forth motion realize filling interface sequence docking;2, since the filling of LNG liquefied gas carrier connects
Mouth is arranged symmetrically for port and starboard, passes through hull and rotates 180 ° of sequence docking for realizing filling interfaces;3. fill ship detour 180 ° with
The docking of LNG liquefied gas carrier interface, high for the first scheme manufacturing cost, it is more to occupy main deck area, and second and the third side
Case is more time-consuming in actual operation, and cost is also relatively high.
Summary of the invention
The technical problem to be solved by the present invention is to realize that LNG ship filling interface and filling station, especially solution LNG fill ship
Problem is docked with LNG liquefied gas carrier filling interfacing order, it is desirable to provide a kind of filling station and charging method of LNG ship.
The technical scheme adopted by the invention is that: a kind of LNG ship filling station, including two high-order filling general pipeline and three are low
Position filling general pipeline, the high position filling general pipeline is used for and the LNG of different filling interfaces fills ship or high-order filing provision docking, institute
State docking of the low level filling general pipeline for LNGs different with harbour bank station filling interface;Described two high-order filling general pipeline include one
Root high position LNG liquid fills general pipeline and high position LNG gaseous state and fills general pipeline, connects on the high position LNG liquid filling general pipeline
Two branch pipes are liquid branch pipe one and gaseous state branch pipe one respectively;Two branch pipes are connected on the high position LNG gaseous state filling general pipeline,
It is liquid branch pipe two and gaseous state branch pipe two respectively;The filling station further includes a gaseous state bridge pipe and a liquid bridge pipe,
The gaseous state bridge pipe connects gaseous state gathering tube, and the liquid bridge pipe connects liquid gathering tube;Filling station by be shorted elbow,
The blank flange branch pipe different from described two high-order filling general pipeline connects, and the liquid in high-order LNG liquid filling general pipeline is logical
It crosses liquid branch pipe one and flows into short circuit elbow one into liquid gathering tube, the gas that high-order LNG gaseous state fills in general pipeline passes through gaseous state
Branch pipe two, which flows into, is shorted elbow two into gaseous state bridge pipe, realizes that the fluids in two high-order filling general pipeline flow into gaseous state gathering tubes
Or liquid gathering tube, to realize that high-order filling general pipeline is connected from different filling interfaces.
Preferably, the branch pipe of two high-order filling general pipeline of all filling interfaces, which passes through, is shorted bend pipe connection, and in liquid
Valve, liquid branch pipe one and liquid branch pipe are increased separately on state branch pipe one, gaseous state branch pipe one, liquid branch pipe two and gaseous state branch pipe two
Two are respectively arranged with liquid manifold valve to liquid gathering tube, and on liquid branch pipe one and liquid branch pipe two by piping connection respectively
Door;Gaseous state branch pipe one and gaseous state branch pipe two are respectively by piping connection to gaseous state gathering tube, and gaseous state branch pipe one and gaseous state branch pipe
It is respectively arranged with gaseous state branch pipe valve on two, by the opening and closing of valve, realizes that the fluid in two high-order filling general pipeline flows into gas
State gathering tube or liquid gathering tube, to realize that high-order filling general pipeline is connected from different filling interfaces.
A method of LNG filling is carried out using LNG ship filling station, comprising the following steps:
Liquid in step S1, high-order LNG liquid filling general pipeline is flowed by liquid branch pipe one is shorted elbow one into liquid remittance
Gas in general pipeline, high-order LNG gaseous state filling general pipeline is flowed by gaseous state branch pipe two is shorted elbow two into gaseous state bridge pipe;
Step S2 will be shorted elbow one and tear open when needing the filled function by high-order LNG liquid filling general pipeline to be converted to gaseous state
Under, liquid branch pipe one is shut with blind plate, elbow two will be shorted and be connected on gaseous state branch pipe one, the gas of filling will be from a high position
LNG liquid filling general pipeline flows through gaseous state branch pipe one and enters gaseous state bridge pipe;
Step S3 will be shorted elbow two and tear open when needing the filled function by high-order LNG gaseous state filling general pipeline to be converted to liquid
Under, gaseous state branch pipe two is shut with blind plate, elbow one will be shorted and be connected on liquid branch pipe two, the liquid of filling will be from a high position
LNG gaseous state filling general pipeline flows into liquid branch pipe two and enters liquid bridge pipe.
A method of LNG filling is carried out using LNG ship filling station, comprising the following steps:
Liquid in step S1, high-order LNG liquid filling general pipeline is entered by liquid branch pipe one and the liquid branch pipe valve opened
Liquid gathering tube, high-order LNG gaseous state fill the gas in general pipeline and are entered by gaseous state branch pipe two and the gaseous state branch pipe valve opened
Gaseous state bridge pipe;
Step S2 closes liquid branch pipe valve when needing the filled function by high-order LNG liquid filling general pipeline to be converted to gaseous state
It closes, opens gaseous state branch pipe valve, the gas of filling will fill general pipeline from high-order LNG liquid and flow through gaseous state branch pipe one into gaseous state remittance
General pipeline;
Step S3 closes gaseous state branch pipe valve when needing the filled function by gaseous state general pipeline to be converted to liquid, opens liquid
Branch pipe valve, the liquid of filling will fill general pipeline from high-order LNG gaseous state and flow into liquid branch pipe two into liquid gathering tube.
The beneficial effects of the present invention are: 1, effectively reduce pipeline quantity and floor space;2, interface is reduced to be butted into
This;3, LNG liquefied gas carrier filling docking flexibility improves.
Detailed description of the invention
Fig. 1 is piping connection schematic diagram of the invention;
Fig. 2 is that filling station interface elbow exchanges piping connection schematic diagram;
Fig. 3 is that filling station interface valve pipeline exchanges connection schematic diagram.
In figure: 1, high position LNG liquid fills general pipeline;2, high position LNG gaseous state fills general pipeline;3, low level fills general pipeline;4, gas
State gathering tube;5, liquid gathering tube;6, liquid branch pipe one;7, gaseous state branch pipe one;8, liquid branch pipe two;9, gaseous state branch pipe two;10,
Gaseous state bridge pipe;11, liquid bridge pipe;12, it is shorted elbow one;13, it is shorted elbow two;14, gaseous state branch pipe valve;15, liquid
Branch pipe valve.
Specific embodiment
The embodiment of the present invention is described below in detail, examples of the embodiments are shown in the accompanying drawings, wherein from beginning to end
Same or similar label indicates same or similar element or element with the same or similar functions.Below with reference to attached
The embodiment of figure description is exemplary, and for explaining only the invention, and is not considered as limiting the invention.
In the description of the present invention, unless otherwise specified and limited, it should be noted that term " installation ", " connected ",
" connection " shall be understood in a broad sense, for example, it may be mechanical connection or electrical connection, the connection being also possible to inside two elements can
It, can also be indirectly connected through an intermediary to be to be connected directly.It for the ordinary skill in the art, can basis
Concrete condition understands the concrete meaning of above-mentioned term.
As shown in Figure 1, including that two high-order general pipeline and three low levels of filling fill general pipeline 3, the high-order filling general pipeline is used
Ship or high-order filing provision docking are filled in the LNG with different filling interfaces, the low level filling general pipeline 3 is used for and harbour bank station
The docking of different LNG filling interfaces;Described two high-order filling general pipeline include a high position LNG liquid filling general pipeline 1 and one
High-order LNG gaseous state fills general pipeline 2, connects two branch pipes on the high position LNG liquid filling general pipeline 1, is liquid branch pipe 1 respectively
With gaseous state branch pipe 1;Two branch pipes are connected on the high position LNG gaseous state filling general pipeline 2, are liquid branch pipe 28 and gaseous state respectively
Branch pipe 29;The filling station further includes a gaseous state bridge pipe 10 and a liquid bridge pipe 11, and the gaseous state bridge pipe 10 connects
Gaseous state gathering tube 4 is connect, the liquid bridge pipe 11 connects liquid gathering tube 5;Filling station is by being shorted elbow, blank flange and institute
Branch pipe connection different on two high-order filling general pipeline is stated, the liquid in high-order LNG liquid filling general pipeline 1 passes through liquid branch pipe one
6, which flow into short circuit elbow 1, enters liquid gathering tube 5, and the gas in high-order LNG gaseous state filling general pipeline 2 passes through gaseous state branch pipe 29
It flows into and is shorted elbow 2 13 into gaseous state bridge pipe 10, realize that the fluids in two high-order filling general pipeline flow into gaseous state gathering tubes 4
Or liquid gathering tube 5, to realize that high-order filling general pipeline is connected from different filling interfaces.
Preferably, the branch pipe of two high-order filling general pipeline of all filling interfaces, which passes through, is shorted bend pipe connection, and in liquid
Valve, liquid branch pipe 1 and liquid are increased separately on state branch pipe 1, gaseous state branch pipe 1, liquid branch pipe 28 and gaseous state branch pipe 29
State branch pipe 28 is respectively arranged with by piping connection to liquid gathering tube 5, and on liquid branch pipe 1 and liquid branch pipe 28 respectively
Liquid branch pipe valve 15;Gaseous state branch pipe 1 and gaseous state branch pipe 29 are respectively by piping connection to gaseous state gathering tube 4, and gaseous state branch
It is respectively arranged with gaseous state branch pipe valve 14 on pipe 1 and gaseous state branch pipe 29, by the opening and closing of valve, realizes two high-order filling
Fluid in general pipeline flows into gaseous state gathering tube 4 or liquid gathering tube 5, to realize that high-order filling general pipeline connects from different filling interfaces
It connects.
A method of LNG filling is carried out using LNG ship filling station, comprising the following steps:
Liquid in step S1, high-order LNG liquid filling general pipeline 1 is flowed by liquid branch pipe 1 is shorted elbow 1 into liquid
State gathering tube 5, high-order LNG gaseous state fill the gas in general pipeline 2 and flow into short circuit elbow 2 13 into gaseous state by gaseous state branch pipe 29
Bridge pipe 10;
Step S2 will be shorted elbow 1 when needing the filled function by high-order LNG liquid filling general pipeline 1 to be converted to gaseous state
It removes, is shut liquid branch pipe 1 with blind plate, elbow 2 13 will be shorted and be connected on gaseous state branch pipe 1, the gas of filling will be from
High-order LNG liquid filling general pipeline 1 flows through gaseous state branch pipe 1 and enters gaseous state bridge pipe 10;
Step S3 will be shorted elbow 2 13 when needing the filled function by high-order LNG gaseous state filling general pipeline 2 to be converted to liquid
It removes, is shut gaseous state branch pipe 29 with blind plate, elbow 1 will be shorted and be connected on liquid branch pipe 28, the liquid of filling will be from
High-order LNG gaseous state filling general pipeline 2 flows into liquid branch pipe 28 and enters liquid bridge pipe 11.
A method of LNG filling is carried out using LNG ship filling station, comprising the following steps:
Liquid in step S1, high-order LNG liquid filling general pipeline 1 passes through liquid branch pipe 1 and the liquid branch pipe valve 15 opened
Into liquid gathering tube 11, the gas in high-order LNG gaseous state filling general pipeline 2 passes through gaseous state branch pipe 29 and the gaseous state branch pipe opened
Valve 14 enters gaseous state bridge pipe 10;
Step S2, when needing the filled function by high-order LNG liquid filling general pipeline 1 to be converted to gaseous state, by liquid branch pipe valve
15 close, and open gaseous state branch pipe valve 14, the gas of filling will be filled from high-order LNG liquid general pipeline 1 flow through gaseous state branch pipe 1 into
Enter gaseous state gathering tube 4;
Step S3 closes gaseous state branch pipe valve 14 when needing the filled function by gaseous state general pipeline to be converted to liquid, opens liquid
State branch pipe valve 15, the liquid of filling will fill general pipeline 2 from high-order LNG gaseous state and flow into liquid branch pipe 28 into liquid gathering tube
5。
As shown in Fig. 2, under normal circumstances, high-order LNG liquid filling is total using elbow and blind plate realization function switch is shorted
Liquid in pipe is flowed by liquid branch pipe to be shorted elbow and enters liquid gathering tube, when needing to turn the filled function of liquid general pipeline
When being changed to gaseous state, elbow will be shorted and removed, shut liquid branch pipe with blind plate, elbow will be shorted and be connected on gaseous state branch pipe, added
The gas of note will flow through gaseous state branch pipe from liquid filling general pipeline and enter gaseous state gathering tube by gaseous state bridge pipe, similarly, positive reason
Under condition, fills gas in the gaseous state general pipeline of general pipeline and flow into be shorted elbow and enter gaseous state bridge pipe by gaseous state branch pipe and enter gaseous state
Gathering tube will be shorted elbow and remove, with blind plate by gaseous state branch pipe when needing the filled function by gaseous state general pipeline to be converted to liquid
It shuts, elbow will be shorted and be connected on liquid branch pipe, the liquid of filling will flow into liquid branch pipe from gaseous state filling general pipeline and pass through liquid
State bridge pipe enters liquid gathering tube.
It is that gaseous state filling interface-liquid fills interface (V-L) sequence in docking filling interface in embodiment as shown in Figure 2
Interface when, bend pipe will be shorted and be connected to liquid branch pipe, liquid Zhi Guanyong blank flange is shut, while by gaseous state branch pipe, connection
Onto gaseous state branch pipe, gaseous state Zhi Guanyong blank flange is shut.By liquid bridge pipe and gaseous state bridge pipe, realize that liquid filling connects
Gaseous state LNG can be communicated to gaseous state gathering tube by liquid filler and realize filling by the conversion of mouth and gaseous state filler function,
Liquid LNG realizes filling by gaseous state filler communication channel liquid gathering tube.
In another embodiment as shown in Figure 3, by it is all filling interfaces with branch pipe by short circuit bend pipe be connected to, and
Increase valve on branch pipe, by valve opening and the power and energy for realizing that a high position fills interface sum is closed, to be applicable in liquid
Filling interface-gaseous state filling interface (L-V) or the docking filling of gaseous state filling interface-liquid filling interface (V-L) sequence connect
Mouthful;Under normal circumstances, fill liquid in the liquid general pipeline of general pipeline by liquid branch pipe and open liquid branch pipe valve flow into it is short
It connects elbow and enters liquid gathering tube, when needing the filled function by liquid general pipeline to be converted to gaseous state, liquid branch pipe valve is closed
It closes, opens gaseous state branch pipe valve, the gas of filling will flow through gaseous state branch pipe from liquid filling general pipeline and be entered by gaseous state bridge pipe
Gaseous state gathering tube similarly under normal circumstances, fills the gaseous state that the gas in the gaseous state general pipeline of general pipeline passes through gaseous state branch pipe and opening
Branch pipe valve, which flows into, to be shorted elbow and enters gaseous state bridge pipe and enter gaseous state gathering tube, when needing to turn the filled function of gaseous state general pipeline
When being changed to liquid, gaseous state branch pipe valve is closed, opens liquid branch pipe valve, the liquid of filling will fill general pipeline from gaseous state and flow into
Liquid branch pipe enters liquid gathering tube by liquid bridge pipe.
In the description of this specification, the description meaning of reference term " one embodiment ", " example " or " some examples " etc.
Refer to that particular features, structures, materials, or characteristics described in conjunction with this embodiment or example are contained at least one reality of the invention
It applies in example or example.In the present specification, schematic expression of the above terms are not necessarily referring to identical embodiment or show
Example.Moreover, particular features, structures, materials, or characteristics described can be in any one or more of the embodiments or examples
It can be combined in any suitable manner.
Although an embodiment of the present invention has been shown and described, it will be understood by those skilled in the art that: not
A variety of change, modification, replacement and modification can be carried out to these embodiments in the case where being detached from the principle of the present invention and objective, this
The range of invention is defined by the claims and their equivalents.
Claims (4)
1. a kind of LNG ship filling station, which is characterized in that general pipeline is filled including two high-order general pipeline and three low levels of filling, it is described
High position filling general pipeline is used for and the LNG filling ship of different filling interfaces or high-order filing provision docking, the low level filling general pipeline
Docking for LNGs different with harbour bank station filling interface;Described two high-order filling general pipeline include that a high position LNG liquid adds
General pipeline and high position LNG gaseous state of note fills general pipeline, connects two branch pipes on the high position LNG liquid filling general pipeline, is respectively
Liquid branch pipe one and gaseous state branch pipe one;Two branch pipes are connected on the high position LNG gaseous state filling general pipeline, are liquid branch pipe two respectively
With gaseous state branch pipe two;The filling station further includes a gaseous state bridge pipe and a liquid bridge pipe, and the gaseous state bridge pipe connects
Gaseous state gathering tube is connect, the liquid bridge pipe connects liquid gathering tube;Filling station is by being shorted elbow, blank flange and described two
A root high position fills branch pipe connection different on general pipeline, and the liquid in high-order LNG liquid filling general pipeline is flowed by liquid branch pipe one
Be shorted elbow one and enter liquid gathering tube, the gas in high-order LNG gaseous state filling general pipeline flowed by gaseous state branch pipe two be shorted it is curved
First two enter gaseous state bridge pipe, realize that the fluid in two high-order filling general pipeline flows into gaseous state gathering tube or liquid gathering tube, with
Realize that high-order filling general pipeline is connected from different filling interfaces.
2. a kind of LNG ship filling station, which is characterized in that the branch pipe of the high-order filling general pipeline of two of all filling interfaces passes through short circuit
Bend pipe connection, and valve, liquid are increased separately on liquid branch pipe one, gaseous state branch pipe one, liquid branch pipe two and gaseous state branch pipe two
Branch pipe one and liquid branch pipe two are distinguished on liquid branch pipe one and liquid branch pipe two respectively by piping connection to liquid gathering tube
It is provided with liquid branch pipe valve;Gaseous state branch pipe one and gaseous state branch pipe two are respectively by piping connection to gaseous state gathering tube, and gaseous state
It is respectively arranged with gaseous state branch pipe valve on branch pipe one and gaseous state branch pipe two, by the opening and closing of valve, realizes that two high-order filling are total
Fluid in pipe flows into gaseous state gathering tube or liquid gathering tube, to realize that high-order filling general pipeline is connected from different filling interfaces.
3. a kind of method for carrying out LNG filling using LNG ship filling station described in claim 1, which is characterized in that including following step
It is rapid:
Liquid in step S1, high-order LNG liquid filling general pipeline is flowed by liquid branch pipe one is shorted elbow one into liquid remittance
Gas in general pipeline, high-order LNG gaseous state filling general pipeline is flowed by gaseous state branch pipe two is shorted elbow two into gaseous state bridge pipe;
Step S2 will be shorted elbow one and tear open when needing the filled function by high-order LNG liquid filling general pipeline to be converted to gaseous state
Under, liquid branch pipe one is shut with blind plate, elbow two will be shorted and be connected on gaseous state branch pipe one, the gas of filling will be from a high position
LNG liquid filling general pipeline flows through gaseous state branch pipe one and enters gaseous state bridge pipe;
Step S3 will be shorted elbow two and tear open when needing the filled function by high-order LNG gaseous state filling general pipeline to be converted to liquid
Under, gaseous state branch pipe two is shut with blind plate, elbow one will be shorted and be connected on liquid branch pipe two, the liquid of filling will be from a high position
LNG gaseous state filling general pipeline flows into liquid branch pipe two and enters liquid bridge pipe.
4. a kind of method for carrying out LNG filling using LNG ship filling station described in claim 2, which is characterized in that including following step
It is rapid:
Liquid in step S1, high-order LNG liquid filling general pipeline is entered by liquid branch pipe one and the liquid branch pipe valve opened
Liquid gathering tube, high-order LNG gaseous state fill the gas in general pipeline and are entered by gaseous state branch pipe two and the gaseous state branch pipe valve opened
Gaseous state bridge pipe;
Step S2 closes liquid branch pipe valve when needing the filled function by high-order LNG liquid filling general pipeline to be converted to gaseous state
It closes, opens gaseous state branch pipe valve, the gas of filling will fill general pipeline from high-order LNG liquid and flow through gaseous state branch pipe one into gaseous state remittance
General pipeline;
Step S3 closes gaseous state branch pipe valve when needing the filled function by gaseous state general pipeline to be converted to liquid, opens liquid
Branch pipe valve, the liquid of filling will fill general pipeline from high-order LNG gaseous state and flow into liquid branch pipe two into liquid gathering tube.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811284762.3A CN109114417A (en) | 2018-10-31 | 2018-10-31 | A kind of filling station and charging method of LNG ship |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811284762.3A CN109114417A (en) | 2018-10-31 | 2018-10-31 | A kind of filling station and charging method of LNG ship |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109114417A true CN109114417A (en) | 2019-01-01 |
Family
ID=64855850
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811284762.3A Pending CN109114417A (en) | 2018-10-31 | 2018-10-31 | A kind of filling station and charging method of LNG ship |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109114417A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113063091A (en) * | 2021-03-23 | 2021-07-02 | 中车西安车辆有限公司 | Liquefied natural gas tank car adds row composite pipeline system |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202252834U (en) * | 2011-08-29 | 2012-05-30 | 成都华气厚普燃气成套设备有限公司 | Wharf boat LNG (liquefied natural gas) filling station |
CN203731079U (en) * | 2014-01-14 | 2014-07-23 | 新地能源工程技术有限公司 | LNG (Liquefied Natural Gas) filling system for inland lake ship |
CN105889754A (en) * | 2016-06-02 | 2016-08-24 | 连云港远洋流体装卸设备有限公司 | Telescoping bank foundation LNG filling arm |
CN105927846A (en) * | 2016-05-09 | 2016-09-07 | 杭州市燃气集团有限公司 | LNG field station loading and unloading integrated system and loading and unloading method using same |
CN206091956U (en) * | 2016-08-23 | 2017-04-12 | 山东科瑞机械制造有限公司 | Multifunctional pipe converges |
WO2017078155A1 (en) * | 2015-11-06 | 2017-05-11 | 川崎重工業株式会社 | Ship |
CN206191260U (en) * | 2016-11-09 | 2017-05-24 | 武汉三江航天远方科技有限公司 | LNG filling device that adapts to big height of water |
CN207608569U (en) * | 2017-11-28 | 2018-07-13 | 甘肃酒钢集团宏兴钢铁股份有限公司 | A kind of online plugging device for replacing blast furnace bucket pressure equalizing blow off valve |
-
2018
- 2018-10-31 CN CN201811284762.3A patent/CN109114417A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202252834U (en) * | 2011-08-29 | 2012-05-30 | 成都华气厚普燃气成套设备有限公司 | Wharf boat LNG (liquefied natural gas) filling station |
CN203731079U (en) * | 2014-01-14 | 2014-07-23 | 新地能源工程技术有限公司 | LNG (Liquefied Natural Gas) filling system for inland lake ship |
WO2017078155A1 (en) * | 2015-11-06 | 2017-05-11 | 川崎重工業株式会社 | Ship |
CN105927846A (en) * | 2016-05-09 | 2016-09-07 | 杭州市燃气集团有限公司 | LNG field station loading and unloading integrated system and loading and unloading method using same |
CN105889754A (en) * | 2016-06-02 | 2016-08-24 | 连云港远洋流体装卸设备有限公司 | Telescoping bank foundation LNG filling arm |
CN206091956U (en) * | 2016-08-23 | 2017-04-12 | 山东科瑞机械制造有限公司 | Multifunctional pipe converges |
CN206191260U (en) * | 2016-11-09 | 2017-05-24 | 武汉三江航天远方科技有限公司 | LNG filling device that adapts to big height of water |
CN207608569U (en) * | 2017-11-28 | 2018-07-13 | 甘肃酒钢集团宏兴钢铁股份有限公司 | A kind of online plugging device for replacing blast furnace bucket pressure equalizing blow off valve |
Non-Patent Citations (1)
Title |
---|
杨茅甄: "《散货港口管理实务》", 30 June 2010, 上海人民出版社 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113063091A (en) * | 2021-03-23 | 2021-07-02 | 中车西安车辆有限公司 | Liquefied natural gas tank car adds row composite pipeline system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108361547B (en) | Novel LNG (liquefied Natural gas) filling station and working method thereof | |
CN103619629B (en) | For opening the device of sucting according to pressure | |
CN109114417A (en) | A kind of filling station and charging method of LNG ship | |
CN206871323U (en) | A kind of top margin ballast tank ballast water bleed-off system | |
CN205590276U (en) | Automatic oil discharge device of tank wagon | |
CN211716235U (en) | Hydrogen grading filling device | |
CN210800426U (en) | Water seal device for gas pipeline | |
CN206203877U (en) | A kind of charging machine pipeline shunt switching system and charging machine | |
CN206069456U (en) | Series-parallel connection ion exchange Tower System | |
CN206918642U (en) | A kind of tetrad valve group peculiar to vessel | |
CN209385660U (en) | A kind of novel valve convenient for connection rubber tube | |
CN106081393B (en) | A kind of the multifunctional pipe connection and valve control structure of hold-up vessel | |
CN208295553U (en) | A kind of single pump hydraulic pressure pipe-line transportation system with a variety of transport models | |
CN207715829U (en) | Two-way valve and automobile oil-way two-way valve | |
CN208041609U (en) | A kind of integrated form low temperature valve | |
CN207157997U (en) | A kind of multifunctional pipe connection of hold-up vessel and Valve controlling structure | |
CN207005735U (en) | Oil storage tank single hose enters outlet line | |
CN217422923U (en) | Hydrogenation machine capable of switching large flow and small flow filling | |
CN109779708A (en) | A kind of high-order balance pressure self weight power time fluid circulation | |
CN209064375U (en) | A kind of collection tube road and hair oil pipeline spare aviation fuel filing provision mutually | |
CN109139574A (en) | A kind of pressure autonomous control hydraulic system | |
CN219272222U (en) | Liquid continuous separation device | |
CN207814484U (en) | Full deflector hole rising stem (RS.) Single Disc Flat Gate Valves | |
CN221008126U (en) | Liquid level control mechanism | |
CN216952629U (en) | Device for transporting extra-thick oil mixed with water |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190101 |