CN109101460A - A kind of thermal power generation unit operational safety performance evaluation method based on safety allowance - Google Patents

A kind of thermal power generation unit operational safety performance evaluation method based on safety allowance Download PDF

Info

Publication number
CN109101460A
CN109101460A CN201810644676.2A CN201810644676A CN109101460A CN 109101460 A CN109101460 A CN 109101460A CN 201810644676 A CN201810644676 A CN 201810644676A CN 109101460 A CN109101460 A CN 109101460A
Authority
CN
China
Prior art keywords
value
temperature
allowance
safety
safety allowance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810644676.2A
Other languages
Chinese (zh)
Other versions
CN109101460B (en
Inventor
杨兴森
刘科
王海超
张绪辉
王守恩
尹静
胡志宏
刘景龙
张利孟
郭新根
崔福兴
赵晴川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201810644676.2A priority Critical patent/CN109101460B/en
Publication of CN109101460A publication Critical patent/CN109101460A/en
Application granted granted Critical
Publication of CN109101460B publication Critical patent/CN109101460B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F17/00Digital computing or data processing equipment or methods, specially adapted for specific functions
    • G06F17/10Complex mathematical operations
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Mathematical Physics (AREA)
  • Data Mining & Analysis (AREA)
  • General Physics & Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Computational Mathematics (AREA)
  • Pure & Applied Mathematics (AREA)
  • Databases & Information Systems (AREA)
  • Software Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Algebra (AREA)
  • Control Of Steam Boilers And Waste-Gas Boilers (AREA)

Abstract

The thermal power generation unit operational safety performance evaluation method based on safety allowance that the invention discloses a kind of.Present invention determination first can reflect the parameter of unit operational safety performance;Then the calculation method of its safety allowance is determined according to the characteristic of each parameter;The safety allowance of each parameter is calculated further according to setting formula;Finally calculate total safety allowance of unit.The comprehensive objective appraisal that may be implemented to thermal power generation unit operational safety performance is ranked up to unit with this.

Description

A kind of thermal power generation unit operational safety performance evaluation method based on safety allowance
Technical field
The present invention relates to thermal power generating technology field, specifically a kind of thermal power generation unit based on safety allowance runs peace Full method of evaluating performance.
Background technique
With the needs of China's power industry and national economy sustainable development, extra-high voltage grid is gradually built up, wind The clean energy resourcies such as electricity, solar energy, nuclear power access on a large scale, and thermoelectricity installed capacity is seriously superfluous, peak load regulation network scarce capacity, thermoelectricity Unit, which participates in the depth of peak regulation and length, will all greatly increase.Prolonged underrun, quickly frequent high underload is cut It changes, all brings difficulty to the safe operation of unit.Therefore how the operational safety performance of unit is monitored, assessed and arranged Sequence needs a set of scientific and rational method.
The evaluation of usual thermal power unit operation safety, is based purely on the degree of closeness of each parameter and alarming value, closer to report Alert value is then more dangerous.This method is only applicable to the safety evaluatio of single parameter, for multiple parameters, then cannot measure comprehensively Change the security situation of reaction unit.For example, a unit has multiple parameters distance alarm value, all there are also very big allowances, but have one Parameter is very close to alarming value, and all parameters of another unit are all very close to alarming value, conventional method in this case It is difficult to make the safety of the two and objectively evaluates.
Summary of the invention
In view of the above-mentioned problems, each key parameter can correspond to one present invention introduces the concept of safety allowance dimension Safety allowance value can also further obtain the total allowance value of unit, and being ranked up with this to unit, which may be implemented, sends out firepower Comprehensive objective appraisal of motor group operational safety performance.
The technical scheme is that a kind of thermal power generation unit operational safety performance evaluation side based on safety allowance Method, characterized in that the following steps are included:
1) determination can reflect the parameter of unit operational safety performance;
2) calculation method of its safety allowance is determined according to the characteristic of each parameter;
3) safety allowance of each parameter is calculated according to setting formula;
4) total safety allowance of unit is calculated.
Preferably, the parameter that can reflect unit operational safety performance that step 1) determines are as follows: choose overheating steam temperature, again hot vapour Temperature, superheated steam pressure, reheated steam pressure, SCR inlet smoke temperature and combustion chamber draft totally 6 parameters as security performance evaluation 6 dimensions.
Wherein step 2) determines the calculation method of its safety allowance according to the characteristic of each parameter are as follows:
2-1) overheating steam temperature
When (- 10 DEG C of alarming value)≤overheating steam temperature≤alarming value, this dimension safety allowance A1:
When overheating steam temperature < (- 10 DEG C of alarming value), A1=1;
When overheating steam temperature > alarming value, A1=0;
2-2) reheat steam temperature: calculation method is identical as overheating steam temperature;
2-3) superheated steam pressure
When (alarming value -0.5MPa)≤superheated steam pressure≤alarming value, this dimension safety allowance A3:
When superheated steam pressure < (alarming value -0.5MPa), A3=1;
When superheated steam pressure > alarming value, A3=0.
2-4) reheated steam pressure
When (alarming value -0.2MPa)≤reheated steam pressure≤alarming value, this dimension safety allowance A4:
When reheated steam pressure < (alarming value -0.2MPa), A4=1;
When reheated steam pressure > alarming value, A4=0;
2-5) SCR inlet smoke temperature
When (- 5 DEG C of high temperature alarm value)≤flue-gas temperature≤high temperature alarm value, this dimension safety allowance A5:
Low-temperature warning value≤flue-gas temperature≤(at+5 DEG C of low-temperature warning value),
When (+5 DEG C of low-temperature warning value) < flue-gas temperature < (- 5 DEG C of high temperature alarm value), A5=1;
When flue-gas temperature < low-temperature warning value, A5=0;
When flue-gas temperature > high temperature alarm value, A5=0;
2-6) combustion chamber draft
With the standard deviation sigma of negative pressure fluctuation in 2 minutesjFor judgment basis,
Work as σjWhen < 100, this dimension safety allowance A6:
Work as σjWhen >=100, A6=0.
Wherein, above-mentioned standard deviation calculation method are as follows: calculate combustion chamber draft when safety allowance when, calculate the moment forward Take 2 minutes combustion chamber draft values, every 1 second numerical value, totally 120 numbers, then standard deviation formula is as follows.
In formula:
Pi--- (120-i) before the second unit combustion chamber draft value;
PIt is average--- the average value of the unit combustion chamber draft in 2 minutes.
The step 3) calculates total safety allowance of unit are as follows: squared to the quadratic sum of the safety allowance of each dimension Root, obtains the total safety allowance of unit and sequence, and total safety allowance A is each dimension allowance quadratic sum AiSquare root.
Wherein, overheating steam temperature: boiler finishing superheater outlet steam temperature (Stream temperature).
Wherein, superheated steam pressure: boiler finishing superheater outlet vapor pressure.
Wherein, reheat steam temperature: boiler final reheater outlet steam temperature (reheat steam temperature).
Wherein, reheated steam pressure: boiler final reheater outlet vapor pressure.
Wherein, SCR inlet smoke temperature: boiler SCR denitration device entrance flue gas temperature.
The principle of the present invention is as shown in Fig. 2, by taking three overheating steam temperature, SCR inlet smoke temperature and reheat steam temperature dimensions as an example, and three The safety allowance of a dimension is coordinate of total safety allowance in three dimensions, the value of total safety allowance be the point to origin away from From square root sum square of that is, three dimension safety allowances.Origin is that each safety index is in alarming value (critical shape State) operating states of the units coordinate description.Safety allowance index is the measurement of the distance of virtual condition and critical state.
The beneficial effects of the present invention are: the present invention selects the parameter of reflection unit operational safety performance, each key first Parameter corresponds to a safety allowance value, and further obtains the total allowance value of unit, and being ranked up with this to unit may be implemented Comprehensive objective appraisal to thermal power generation unit operational safety performance has thermal power generation unit safety in operation important Meaning.
Detailed description of the invention
Fig. 1 is the flow chart of evaluation method of the invention;
Fig. 2 is total safety allowance physical significance schematic diagram.
Specific embodiment
Below with reference to application example, specific embodiments of the present invention will be described in further detail.
By taking tri- units of A, B, C as an example, using method of the invention, three unit operational safety performances of a certain moment are obtained Sequence, process is as shown in Figure 1, shown in specific step is as follows:
1, it is negative that overheating steam temperature, reheat steam temperature, superheated steam pressure, reheated steam pressure, SCR inlet smoke temperature and burner hearth are chosen Press 6 dimensions of totally 6 parameters as security performance evaluation;Then the alarm of the above-mentioned each dimension of tri- units of A, B, C is recorded Value and real value, the moment, each supplemental characteristic was as shown in table 1;
2, the calculation method of the safety allowance determined according to the characteristic of each parameter, parameter enter proximal to the danger area of alarming value Start to calculate safety allowance behind domain, safety allowance is 1 except danger zone, and the calculation formula of specific each dimension is as follows:
(1) overheating steam temperature
When (- 10 DEG C of alarming value)≤overheating steam temperature≤alarming value, this dimension safety allowance A1:
When overheating steam temperature < (- 10 DEG C of alarming value), A1=1;
When overheating steam temperature > alarming value, A1=0.
(2) reheat steam temperature: calculation method is identical as overheating steam temperature;
(3) superheated steam pressure
When (alarming value -0.5MPa)≤superheated steam pressure≤alarming value, this dimension safety allowance A3:
When superheated steam pressure < (alarming value -0.5MPa), A3=1;
When superheated steam pressure > alarming value, A3=0.
(4) reheated steam pressure
When (alarming value -0.2MPa)≤reheated steam pressure≤alarming value, this dimension safety allowance A4:
When reheated steam pressure < (alarming value -0.2MPa), A4=1;
When reheated steam pressure > alarming value, A4=0.
(5) SCR inlet smoke temperature
When (- 5 DEG C of high temperature alarm value)≤flue-gas temperature≤high temperature alarm value, this dimension safety allowance A5:
When low-temperature warning value≤flue-gas temperature≤+ 5 DEG C of low-temperature warning value,
When+5 DEG C of low-temperature warning value < flue-gas temperature < -5 DEG C of high temperature alarm value, A5=1;
When flue-gas temperature < low-temperature warning value, A5=0;
When flue-gas temperature > high temperature alarm value, A5=0;
(6) combustion chamber draft
With the standard deviation sigma of negative pressure fluctuation in 2 minutesjFor judgment basis,
Work as σjWhen < 100, this dimension safety allowance A6:
Work as σjWhen >=100, A6=0.
When safety allowance when calculating combustion chamber draft, 2 minutes combustion chamber draft values are taken forward calculating the moment, every 1 second One numerical value, totally 120 numbers, then standard deviation formula is as follows.
In formula:
Pi--- (120-i) before the second unit combustion chamber draft value;
PIt is average--- the average value of the unit combustion chamber draft in 2 minutes.
3, to the quadratic sum extraction of square root of the safety allowance of each dimension, the total safety allowance of unit and sequence are obtained, always Safety allowance A is each dimension allowance square root sum square,
It is calculated according to the moment each supplemental characteristic in above-mentioned calculation formula and table 1, obtains A unit, B unit and C The safety allowance of three each dimensions of unit of unit, then calculates total safety allowance.The peace obtained according to safety allowance numerical value Full performance is by being ordered as A, B, C to difference well.
Total safety allowance computational chart of 1 three units of table

Claims (5)

1. a kind of thermal power generation unit operational safety performance evaluation method based on safety allowance, characterized in that including following step It is rapid:
1) determination can reflect the parameter of unit operational safety performance;
2) calculation method of its safety allowance is determined according to the characteristic of each parameter;
3) safety allowance of each parameter is calculated according to setting formula;
4) total safety allowance of unit is calculated.
2. a kind of thermal power generation unit operational safety performance evaluation method based on safety allowance as described in claim 1, It is characterized in, the parameter that can reflect unit operational safety performance that the step 1) determines are as follows: overheating steam temperature, reheat steam temperature, overheat Steam pressure, reheated steam pressure, SCR inlet smoke temperature and combustion chamber draft.
3. a kind of thermal power generation unit operational safety performance evaluation method based on safety allowance as claimed in claim 2, It is characterized in,
The step 2) determines the calculation method of its safety allowance according to the characteristic of each parameter are as follows:
2-1) overheating steam temperature
When (- 10 DEG C of alarming value)≤overheating steam temperature≤alarming value, this dimension safety allowance A1:
When overheating steam temperature < (- 10 DEG C of alarming value), A1=1;
When overheating steam temperature > alarming value, A1=0;
2-2) reheat steam temperature: calculation method is identical as overheating steam temperature;
2-3) superheated steam pressure
When (alarming value -0.5MPa)≤superheated steam pressure≤alarming value, this dimension safety allowance A3:
When superheated steam pressure < (alarming value -0.5MPa), A3=1;
When superheated steam pressure > alarming value, A3=0;
2-4) reheated steam pressure
When (alarming value -0.2MPa)≤reheated steam pressure≤alarming value, this dimension safety allowance A4:
When reheated steam pressure < alarming value -0.2MPa, A4=1;
When reheated steam pressure > alarming value, A4=0;
2-5) SCR inlet smoke temperature
When (- 5 DEG C of high temperature alarm value)≤flue-gas temperature≤high temperature alarm value, this dimension safety allowance A5:
Low-temperature warning value≤flue-gas temperature≤(at+5 DEG C of low-temperature warning value), this dimension safety allowance A5:
When (+5 DEG C of low-temperature warning value) < flue-gas temperature < (- 5 DEG C of high temperature alarm value), A5=1;
When flue-gas temperature < low-temperature warning value, A5=0;
When flue-gas temperature > high temperature alarm value, A5=0;
2-6) combustion chamber draft
With the standard deviation sigma of negative pressure fluctuation in 2 minutesjFor judgment basis,
Work as σjWhen < 100, this dimension safety allowance A6:
Work as σjWhen >=100, A6=0.
4. a kind of thermal power generation unit operational safety performance evaluation method based on safety allowance as claimed in claim 3, Be characterized in, the step 2-6) standard deviation calculation method are as follows: calculate combustion chamber draft when safety allowance when, calculate the moment it is past Before take 2 minutes combustion chamber draft values, every 1 second numerical value, totally 120 numbers, then standard deviation formula is as follows:
In formula:
Pi--- (120-i) before the second unit combustion chamber draft value;
PIt is average--- the average value of the unit combustion chamber draft in 2 minutes.
5. a kind of thermal power generation unit operational safety performance based on safety allowance as described in any one of claim 1-4 Evaluation method, characterized in that the step 3) calculates total safety allowance of unit are as follows: total safety allowance A is that each dimension allowance is flat Square root sum square,
CN201810644676.2A 2018-06-21 2018-06-21 Thermal generator set operation safety performance evaluation method based on safety margin Active CN109101460B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810644676.2A CN109101460B (en) 2018-06-21 2018-06-21 Thermal generator set operation safety performance evaluation method based on safety margin

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810644676.2A CN109101460B (en) 2018-06-21 2018-06-21 Thermal generator set operation safety performance evaluation method based on safety margin

Publications (2)

Publication Number Publication Date
CN109101460A true CN109101460A (en) 2018-12-28
CN109101460B CN109101460B (en) 2022-09-20

Family

ID=64845049

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810644676.2A Active CN109101460B (en) 2018-06-21 2018-06-21 Thermal generator set operation safety performance evaluation method based on safety margin

Country Status (1)

Country Link
CN (1) CN109101460B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101907300A (en) * 2010-08-19 2010-12-08 上海上电电力工程有限公司 Enclosed air system of medium speed mill in heat-engine plant
CN102331772A (en) * 2011-03-30 2012-01-25 浙江省电力试验研究院 Method for carrying out early warning of abnormal superheated steam temperature and fault diagnosis on direct current megawatt unit
US20130180244A1 (en) * 2012-01-13 2013-07-18 General Cybernation Group, Inc. Model-Free Adaptive Control of Supercritical Circulating Fluidized-Bed Boilers
RU2577515C1 (en) * 2015-04-27 2016-03-20 Александр Сергеевич Карандаев Device for controlling dual-speed motor of blower fan
CN105758661A (en) * 2016-05-05 2016-07-13 华电国际电力股份有限公司技术服务中心 System and method for evaluating service life of boiler heating surface
CN107067143A (en) * 2016-12-30 2017-08-18 山东鲁能软件技术有限公司 A kind of equipment safety grade separation method
CN107906499A (en) * 2017-10-09 2018-04-13 李吉宁 Fired power generating unit intelligence control system
CN107976909A (en) * 2017-12-14 2018-05-01 华润电力(海丰)有限公司 Extra-supercritical unit overheating steam temperature multi objective control method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101907300A (en) * 2010-08-19 2010-12-08 上海上电电力工程有限公司 Enclosed air system of medium speed mill in heat-engine plant
CN102331772A (en) * 2011-03-30 2012-01-25 浙江省电力试验研究院 Method for carrying out early warning of abnormal superheated steam temperature and fault diagnosis on direct current megawatt unit
US20130180244A1 (en) * 2012-01-13 2013-07-18 General Cybernation Group, Inc. Model-Free Adaptive Control of Supercritical Circulating Fluidized-Bed Boilers
RU2577515C1 (en) * 2015-04-27 2016-03-20 Александр Сергеевич Карандаев Device for controlling dual-speed motor of blower fan
CN105758661A (en) * 2016-05-05 2016-07-13 华电国际电力股份有限公司技术服务中心 System and method for evaluating service life of boiler heating surface
CN107067143A (en) * 2016-12-30 2017-08-18 山东鲁能软件技术有限公司 A kind of equipment safety grade separation method
CN107906499A (en) * 2017-10-09 2018-04-13 李吉宁 Fired power generating unit intelligence control system
CN107976909A (en) * 2017-12-14 2018-05-01 华润电力(海丰)有限公司 Extra-supercritical unit overheating steam temperature multi objective control method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
MICHELE PRENCIPE: "The Use of Low Power Fuel Cells for Power Supply", 《IEEE XPLORE》 *
王立春: "火电机组在线能耗监测及指标管理系统", 《中国优秀博硕士学位论文全文数据库(工程科技Ⅱ辑)》 *

Also Published As

Publication number Publication date
CN109101460B (en) 2022-09-20

Similar Documents

Publication Publication Date Title
CN102494325B (en) Method for monitoring intra-furnace dynamic wall temperature in high-temperature tube system of power station boiler
CN106642059A (en) Safety online monitoring method for high-temperature heated faces of utility boiler
CN104763537A (en) Method and device for main steam temperature control at combined cycle unit starting stage
CN113240280A (en) Heat economy evaluation method for cogeneration unit
Li et al. Modeling for the performance evaluation of 600 MW supercritical unit operating No. 0 high pressure heater
CN109101460A (en) A kind of thermal power generation unit operational safety performance evaluation method based on safety allowance
CN106289754B (en) A kind of fired power generating unit component capabilities variation determination method based on Statistical Control Technique
WO2014204347A1 (en) Hybrid atomic power station
Li et al. Prediction of pollution state of heating surface in coal-fired utility boilers
CN106033496B (en) Steam generator design margin calculation method
Kler et al. Coordinated optimization of the parameters of the cooled gas-turbine flow path and the parameters of gas-turbine cycles and combined-cycle power plants
Galashov et al. Thermal efficiency of three-cycle utilization-type steam-gas units
CN103983841B (en) The determination method that power is affected by the economy of cogeneration units
Zhao et al. The condenser performance test and thermal performance analysis of variable conditions in TQNPC
CN103954380B (en) A kind of assay method of Turbo-generator Set exhaust enthalpy
CN114460489A (en) Method and device for detecting short circuit of steam extraction of steam turbine regenerative system in high-pressure heater
Zhang et al. Sensitivity analysis and optimization of a coal-fired power plant in different modes of flue gas recirculation
Xie et al. Study of Internal Exergy Parameters in Fault Diagnosis of Nuclear Power Plant Systems
Li et al. Thermal stress analysis of 600MW steam turbine rotor in different governing modes
Dobkiewicz-Wieczorek Influence of surface condensers connection configuration on power plant unit performance
Al-Qudah et al. Thermal Analysis of a Combined Cycle Power Plant under Varying Operating Conditions.
Sun et al. A general calculation model on the effect of main steam pressure variation on the coal consumption rate of steam turbines
Guo et al. Analysis of the stage group efficiency of steam turbine based on the unified model for coal-fired power unit
Zhang et al. Investigation on identification of boiler tube temperature anomaly based on Sankey diagram
Guo et al. The Computational Model of the Peak Regulation Capacity of Cogeneration Units and Its Application

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant