CN109098699A - The poly- station overall skid-mounted integrated apparatus of novel oilfield intelligence special high-pressure water filling note - Google Patents
The poly- station overall skid-mounted integrated apparatus of novel oilfield intelligence special high-pressure water filling note Download PDFInfo
- Publication number
- CN109098699A CN109098699A CN201811118344.7A CN201811118344A CN109098699A CN 109098699 A CN109098699 A CN 109098699A CN 201811118344 A CN201811118344 A CN 201811118344A CN 109098699 A CN109098699 A CN 109098699A
- Authority
- CN
- China
- Prior art keywords
- water
- pump
- shell
- water filling
- skid
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 132
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 4
- 230000003447 ipsilateral effect Effects 0.000 claims abstract description 4
- 239000010959 steel Substances 0.000 claims abstract description 4
- 238000000034 method Methods 0.000 claims description 8
- 230000001105 regulatory effect Effects 0.000 claims description 7
- 230000007423 decrease Effects 0.000 claims description 5
- 238000005086 pumping Methods 0.000 claims description 5
- 239000008400 supply water Substances 0.000 claims description 5
- 230000009466 transformation Effects 0.000 claims description 5
- 230000008859 change Effects 0.000 claims description 4
- 230000033228 biological regulation Effects 0.000 claims description 3
- 230000004048 modification Effects 0.000 claims description 3
- 238000012986 modification Methods 0.000 claims description 3
- 239000013589 supplement Substances 0.000 claims description 3
- 230000008901 benefit Effects 0.000 abstract description 8
- 238000004134 energy conservation Methods 0.000 abstract description 5
- 238000005265 energy consumption Methods 0.000 abstract description 4
- 230000009467 reduction Effects 0.000 abstract description 3
- 238000002347 injection Methods 0.000 description 19
- 239000007924 injection Substances 0.000 description 19
- 230000005611 electricity Effects 0.000 description 13
- 238000012423 maintenance Methods 0.000 description 9
- 235000009827 Prunus armeniaca Nutrition 0.000 description 6
- 244000018633 Prunus armeniaca Species 0.000 description 6
- 230000000694 effects Effects 0.000 description 6
- 238000011084 recovery Methods 0.000 description 6
- 238000013461 design Methods 0.000 description 5
- 238000004519 manufacturing process Methods 0.000 description 5
- 230000006872 improvement Effects 0.000 description 4
- 241000196324 Embryophyta Species 0.000 description 3
- 238000004458 analytical method Methods 0.000 description 3
- 238000006243 chemical reaction Methods 0.000 description 3
- 238000011161 development Methods 0.000 description 3
- 239000007788 liquid Substances 0.000 description 3
- 238000004891 communication Methods 0.000 description 2
- 238000006073 displacement reaction Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000008676 import Effects 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 239000000243 solution Substances 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000005119 centrifugation Methods 0.000 description 1
- 231100000749 chronicity Toxicity 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000000284 extract Substances 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000011835 investigation Methods 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 239000003129 oil well Substances 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 230000008520 organization Effects 0.000 description 1
- 238000012856 packing Methods 0.000 description 1
- 239000003208 petroleum Substances 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 239000000047 product Substances 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000009738 saturating Methods 0.000 description 1
- 230000007480 spreading Effects 0.000 description 1
- 238000003892 spreading Methods 0.000 description 1
- 230000004083 survival effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/20—Displacing by water
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Control Of Non-Positive-Displacement Pumps (AREA)
Abstract
The invention discloses the poly- station overall skid-mounted integrated apparatus of novel oilfield intelligence special high-pressure water filling note, including shell and water filling assembly, the shell includes shell, the bottom of the shell is equipped with air-permeable layer, the air-permeable layer is hollow steel plate, the air-permeable layer both ends are equipped with skid hole, the shell and skid hole are ipsilateral equipped with side door, check lock lever is connected on the side door, the side of the shell is equipped with operation door, internal lock is connected on the operation door, the water filling assembly includes water injecting pump, the water injecting pump is divided into two work water injecting pumps and a spare water injecting pump, water injecting pump, which powers on, is connected with frequency changer, appliance doors are equipped with outside the water filling assembly.The advantages of the present invention over the prior art are that: by project implementation, reach reduction energy consumption, improves efficiency, operating cost is reduced, electric cost expenditure is reduced, extends service life of equipment, improve the purpose of environment, while also making a contribution of enterprise for the completion of national energy conservation and emission reduction target.
Description
Technical field
The present invention relates to water filling polymer-injecting pump apparatus field, in particular to the poly- station of novel oilfield intelligence special high-pressure water filling note are whole
Body skid integrated apparatus.
Background technique
The exploitation and control of the energy be-a global project, it is directly related to the survival and development of the mankind.Currently,
China is faced with the electricity shortage and nervous situation of chronicity in terms of electricity consumption, as " People's Republic of China (PRC) is energy saving
Method ", Measures for Conserving Electricity, the relevant policies, method such as " General Office of the State Council about carry out resource-effective movable notice "
The successive appearance of rule encourages each electricity consumption enterprise to increase energy saving technical reconstruction by the way of good, and energy conservation is included in government's work
Make range, examined as government function-item important means.According to world energy sources research report, the current electric power notch of China is very
Greatly, economize on electricity will become the last one national conditions industry, and economize on electricity cost is not controlled last-item cost.
Economize on electricity most direct income for enterprise and user is exactly to save electricity charge spending, reduces cost, improves economic effect
Benefit.The spending of the electricity charge at present has become the operational expenditure that many enterprises occupy third or the 4th, control of the past enterprise to the electricity charge
System seems unable to do what one wishes, pays the electricity charge and seems right and proper.The application of advanced energy-saving equipment, making electricity charge spending, uncontrollable become can
Control, for enterprise development finally-item cost control provides condition.And since the advanced energy-saving equipment investment payback time is shorter, enterprise
Thus industry will obtain long-term abundant section branch and return, secondly, advanced energy-saving equipment comes into operation, can also extend the existing equipment longevity
Life, greatly reduces equipment damage rate and its equipment replacement and maintenance cost, avoids and directly influences because equipment fault is shut down
Massive losses caused by stopping production, while the investment of power expansion is reduced, overall economic efficiency is very significant.
Summary of the invention
The technical problem to be solved by the present invention is to replace efficient high-pressure by ROSO to water filling polymer-injecting pump group entry transformation
Plunger pump polymer-injecting pump improves efficiency, reduces energy consumption.
In order to solve the above technical problems, technical solution provided by the invention are as follows: a kind of poly- station note of novel water filling note is poly- and work
Skill overall skid-mounted integrated apparatus, including shell and water filling assembly, the shell includes shell, and the bottom of the shell is equipped with saturating
Gas-bearing formation, the air-permeable layer are hollow steel plate, and the air-permeable layer both ends are equipped with skid hole, the shell with skid hole is ipsilateral is equipped with
Side door is connected with check lock lever on the side door, and the side of the shell is equipped with operation door, on the operation door inside connection
Lock, the water filling assembly includes water injecting pump, and the water injecting pump is divided into two work water injecting pumps and a spare water injecting pump, water injecting pump
It powers on and is connected with frequency changer, appliance doors are equipped with outside the water filling assembly.
The advantages of the present invention over the prior art are that: by project implementation, reach reduction energy consumption, improves efficiency,
Operating cost is reduced, electric cost expenditure is reduced, extends service life of equipment, improves the purpose of environment, while also subtracting for national energy-saving
A contribution of enterprise is made in the completion of row's target.
As an improvement, the water injecting pump is plunger pump, model 5SPH880-150/32, polymer-injecting pump model A6ZY-8/
28。
As an improvement, the motor of speed regulation is bis- pole three 1250kW/660V asynchronous machine, it is easy to implement fixed-voltage altering-current amount tune
Speed control.
As an improvement, its method of operation are as follows:
1. being pumped when water consumption is few by Frequency Converter Control 1, constant pressure water supply control is carried out;
2. its motor is switched to power frequency when the working frequency that water consumption gradually increases No. 1 pump reaches close to 50HZ
Power supply power supply, while frequency converter being switched on No. 2 pumps, supplement water supply is carried out by No. 2 pumps;
3. conversely, when water consumption gradually decreases, even if the working frequency of No. 2 pumps has been reduced to lower frequency limit;
4. then turning off No. 1 pump when pressure of supply water is still bigger than normal, while the working frequency of No. 2 pumps is increased rapidly, and carry out perseverance
Voltage-controlled system.
As an improvement, establishing following modification scheme according to requirement of actual working condition and best equipment configuration:
1. the motor for being used to adjust the speed in pumping plant is changed to bis- pole three 1250kW/660V asynchronous machine, it is easy to implement perseverance
Buckling flow speed regulating control;
2. installing EI-1400K-3H variable-frequency governor additional;
3. control system configures power transformation and automatic voltage regulator;
4. fixed-voltage altering-current amount speed-regulating control device;
5. whole system combines in one movable and skid-mounted (12*4.5*2.8m).
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the poly- station overall skid-mounted integrated apparatus of novel oilfield intelligence special high-pressure water filling note.
It is as shown in the figure: 1, shell, 2, air-permeable layer, 3, skid hole, 4, side door, 5, check lock lever, 6, operation door, 7, internal lock,
8, appliance doors.
Specific embodiment
Present invention will be described in further detail below with reference to the accompanying drawings.
The poly- station overall skid-mounted integrated apparatus of novel oilfield intelligence special high-pressure water filling note, including shell and water filling assembly,
The shell includes shell 1, and the bottom of the shell 1 is equipped with air-permeable layer 2, and the air-permeable layer 2 is hollow steel plate, the air-permeable layer
2 both ends are equipped with skid hole 3, the shell 1 with skid hole 3 is ipsilateral is equipped with side door 4, be connected with check lock lever on the side door 4
5, the side of the shell 1 is equipped with operation door 6, connects internal lock 7 on the operation door 6, and the water filling assembly includes water injecting pump,
The water injecting pump is divided into two work water injecting pumps and a spare water injecting pump, and water injecting pump, which powers on, is connected with frequency changer, the note
Appliance doors 8 are equipped with outside water assembly.
The water injecting pump is plunger pump, model 5SPH880-150/32, polymer-injecting pump model A6ZY-8/28.
The motor of speed regulation is bis- pole three 1250kW/660V asynchronous machine, is easy to implement fixed-voltage altering-current amount speed regulating control.
The working principle of the invention: two major class of water injecting pump point at present, one kind are centrifugal multistage pump multiple centrifugal pump, and another kind of is high-pressure plunger
Pump, respectively there is advantage and disadvantage.It is energy-efficient based on plunger pump with the appearance of external import brand plunger pump assembly enlargement product
Advantage replaces centrifugal multistage pump multiple centrifugal pump to have been achieved for extensive market recognition using the big-flow high-pressure plunger pump of import brand.
Centrifugal multistage pump multiple centrifugal pump working principle is to increase liquid energy step by step by impeller, what pump has be increased by several times, work
Pressure is directly proportional to the series of revolving speed, impeller diameter and pump;Flow is directly proportional to revolving speed and impeller width.Such as deviate declared working condition
Operation, then real pump effect rate is far below pump design efficiency.The discharge capacity of centrifugal pump can be needed to export by system pressure influence of fluctuations, discharge capacity
Regulating valve is adjusted, to cause a large amount of waste of energy.
Centrifugal pump fragile part is more, and maintenance cost is higher, heavy workload, and overhaul needs all to disintegrate, replacement impeller, each
Components, the rotors such as grade choma, guide vane, bearing need to verify dynamic balancing again, need professional machine maintenance strength.
Centrifugal pump advantage: running smoothly, and is suitable for big flow, low lift situation.
: easily there is surge in centrifugal pump disadvantage, and single-stage pump, which forces down, the efficiency of pump is low, there is outlet lift gradually declines situation.
Plunger pump is moved by piston reciprocation, and the pressurized delivered to medium is realized in constantly sucking and discharge liquid medium.
Discharge capacity is related with revolving speed and diameter of plunger and stroke, and pressure is related with arranged medium pipeline characteristic, and maximum pressure depends in pump
In the power of motor of quality and outfit.Plunger pump displacement constant under setpoint frequency, not by system pressure influence of fluctuations.Plunger pump
Only need to regularly replace plunger packing under normal operating maintenance, the power end rotatable parts service life of plunger pump was up to 25 years or more.
Plunger pump advantage: compact-sized, pressure is high, pump efficiency is high, few easy workout part, easy to operate and maintain
Plunger pump disadvantage: the discharge of liquid is the reciprocating motion by plunger, will lead to fluid and generates pulse, but adds
Pulsing effect can be completely eliminated after outlet surge tank.
One mine apricot of the 4th oil recovery factory of Daqing oil field, 18 water-injection station water injecting pump equipment operation condition summarizes Daqing oil field the
Four oil recovery factories, one mine apricot, 18 water-injection stations are new, and old two water filling hilllocks were built up in 2006 and 1993 puts into operation, fill the water at present
It stands about 13400 cubes of average daily water injection rate (i.e. 550 cubic meters/hour).Water-injection station shares 6 multistage centrifugal water injecting pumps, wherein 4 notes
Pumps design flow 250m3/h, 1650 meters of lift, model DF250-150x11.
18 water-injection station of Daqing oil field apricot possesses 6 multistage centrifugal water injecting pumps at present, using 2 operations (1)
250m3/h and 1 300m3/h), 4 spare modes carry out flooding production.Since service life is longer, equipment is old, centrifugation
Pump has been unable to reach its design value, and DF250 multistage centrifugal water injecting pump daily total power consumption in 1 now run is about
40680KW, about 26442 yuan of the daily electricity charge, water filling unit consumption is 6.72kw/m3.
The efficiency of centrifugal pump that scene operation at present uses is relatively low, and theoretically centrifugal pump nameplate efficiency is all 73%, at present in fact
Border monitors service efficiency 60% or so, influences pump operation effect.
Mainly there is following factor:
1. the manufacture and Overhaul Quality of pump be not high, decline the way.
2. pump cannot be maintained at from the operation of effect area, water injecting pump external system parameters and pump performance operating parameter are mismatched.With
The sternness of water filling Development Finance, water-injection station water supply capacity increasingly mismatches with outer net demand, and the operational efficiency of pump is caused to drop
It is low.To realize operation optimization ,-aspect needs technical staff's water injection rate in conjunction with needed for pump characteristic curve, water-injection station, pressure to become
Change trend pumps combined running by different model, compares and analyzes to parameters such as pump pressure, pump efficiency, unit consumption, summarizes water injecting pump
Optimum operation mode.
6 water injecting pumps in one mine apricot of the 4th oil recovery factory of Daqing oil field, 18 water-injection station at present, wherein 3 water injecting pumps are
Operation uses 10 years or more, and the problems such as due to On-the-spot factor and maintenance, these pumps have reached the maximum service life, is badly in need of more
It changes.
The water injecting pump service life, the-was service life, and the usual period is longer there are two concept ,-as at 10 years or more.Second
It is normal service life, refers to the service life of vulnerable part and the overhaul time by pump performance indicators trial running during pump operation
Limit.The factor for influencing the water injecting pump service life mainly has water quality, material and process and assemble quality.
6 water injecting pumps at present -18 water-injection station of mine apricot scene there are problems that various using the often parking of needs
Maintenance.
Especially wherein 3 operations use 10 years or more water injecting pumps, and internal impeller and bearing fouling are serious, can not
It is filled the water according to design discharge, urgent need more renews pump, it is ensured that the normal operation of water-injection station.
Our company is investigated by the on-the-spot investigation to water-injection station scene, and the technology for having provided more advantage according to field condition changes
Scheme is made,
Concrete scheme is as follows
1. removing original 1 DF250 water injecting pump.
2. increasing by 1 5SPH880-150/32 water injecting pump in original position.
The upgrading to water injecting pump is completed in the case where changing very little, improves the service life of water filling pumping unit and is expired
Sufficient oil field produces waterflooding requirement.
It is recorded according in 6 centrifugal multistage pump multiple centrifugal pump scene operating parameters of the 18 water-injection station scene of apricot to flood pattern
Analysis, our company think rationally to be transformed.Using 1 5SPH880-150/32 plunger pump (working flow 250m3/h, work
Make pressure 16.5MPa) the 1 DF250 water injecting pump run now is replaced, to meet the daily water injection rate of water-injection station.Remaining state
It is spare to produce DF250 centrifugal tundish, in case parking maintenance works.
The 1 5SPH880-150/32 plunger pump increased newly after removing original 1 domestic multistage centrifugal water injecting pump can be with
It is mounted in original water injecting pump workshop, no longer needs to newly construct the factory buildings to dispose new water injecting pump.
Water flood recovery is the common measure that many oil fields keep stable high yield.Principle is exactly spreading in oil-producing region stratum
Oil focuses near oil well, then extracts up.For fracture block oil field since each block water filling range is relatively small, water injection rate
With the variation of the extension oilbearing stratum situation of mining time, often to adjust.Oil-field flooding is since pressure is high, water is big, water filling
Motor is high power motor mostly, and motor is chronically at the operation of highly energy-consuming state.And actually water flooding pump station is in construction
All there are problems that metered flow is not matched that with actual flow.For above situation, it is believed that use frequency converter
Variable speed is carried out to oil-field flooding pump motor to adjust, and realizes that the control of water injecting pump variable water volume is that a very effective energy conservation is arranged
It applies.
Old filed much all has water flooding pump station when founding the factory, and is supplied water using high pressure water injection mode, the size and pressure of flow
The height of power realizes control using flashboard valve.According to the technological requirements, long-time small displacement is not allowed to run, otherwise water injecting pump meeting
The problems such as cavitation and parts are burnt caused by increasing because of temperature, therefore be forced to reduce temperature rise using big reflow method, it results in this way
A large amount of consumption of electric power cause a large amount of energy loss to oil field, increase the production cost of enterprise.
In former designing system operating condition, system water filling is carried out frequently with two water injecting pumps.The flood pattern energy consumption of the operating condition
Loss is mainly in control valve throttling.By our analysis, as long as reducing water by combining DP technology is needed to match fluence
Pressure, the valve for reducing each hollow well control pressure difference, it should can achieve the purpose that energy-saving.
Variable frequency water supply control principle
Due to the actual flow of water injecting pump be certainly less than or equal to pump metered flow, have certain energy conservation potential.
The water filling control of frequency-conversion water supply system water injecting pump is by frequency converter by the feedback pressure value of pressure transmitter, and is preset in frequency conversion
Pressure value in device is compared, and operation adjusting is carried out according to difference by the PID regulator in frequency converter, to control frequency conversion
Device frequency control operation;Meanwhile the operating parameter of frequency converter can be passed by the communication interface and communications protocol of frequency converter institute band
Transport to computer workstation;System running pressure, motor speed, input/defeated can be detected and controlled at any time on computers
The parameters such as voltage, input/output electric current out achieve the purpose that system automatic energy saving is run.
Water supply pumping plant in Oilfield Operation District often shares three same vertical water injecting pumps of model, and two is standby with one.The specified function of motor
Rate 1250KW, voltage rating 6000V, rated current 1400A or so, 2900 revs/min of rated speed, rated frequency 50HZ, absolutely
F grades of edge grade.The transformation of frequency converter timing constant pressure water supply is carried out for the water injecting pump two spare actual conditions that work.
Control process is: being pumped when water consumption is few by Frequency Converter Control 1, carries out constant pressure water supply control.When water consumption gradually
When increasing the working frequency of No. 1 pump and reaching close to 50HZ, its motor is switched into power frequency supply power supply, while frequency converter being cut
It changes on No. 2 pumps, carries out supplement water supply by No. 2 pumps, conversely, when water consumption gradually decreases, even if the working frequency of No. 2 pumps has dropped
For lower frequency limit.And pressure of supply water it is still bigger than normal when, then turn off No. 1 pump, while increasing the working frequencies of No. 2 pumps rapidly, and carry out
Isobarically Control.This scheme is mainly characterized by only with a frequency converter, and the calculating that this scheme takes electrical power is as follows:
Assuming that the no-load loss of motor are as follows: 10%
The specified water supply flow of pump: Qn
Drive motor capacity: Pm
Daily average total water supply flow are as follows: 160%Qn
The drive motor capacity of 1250KW: Pmn=1250KW,
No. 1 pump is full speed, averagely takes power: Pml=1250KW
The 60% of the mean speed of No. 2 pumps, averagely take power: Pm2=(0.6*1250) KW=750KW two pumps take
Total mean power: 1250+750=2000KW
Power saving rate: 20%3.2 if it is assumed that daily average total water supply flow is 140%Qn, other operating conditions are constant, we
The electrisity consumption of such situation is calculated again:
No. 1 pump is Pml=Pm=1250KW at full speed, averagely to take power
The 40% of No. 2 mean speeds, averagely taking power is Pm2=(0.4*1250) KW=500KW
The total mean power that two pumps are taken is 1250+500=1750KW
Power saving rate: 30%
Following modification scheme is established according to requirement of actual working condition and best equipment configuration:
1. the motor for being used to adjust the speed in pumping plant is changed to bis- pole three 1250kW/660V asynchronous machine, it is easy to implement perseverance
Buckling flow speed regulating control;
2. installing EI-1400K-3H variable-frequency governor additional;
3. control system configures power transformation and automatic voltage regulator;
4. fixed-voltage altering-current amount speed-regulating control device;
5. whole system combines in one movable and skid-mounted (12*4.5*2.8m).
The three, programs are compared with original control system
Using frequency control way, whole automation remote controls are totally-enclosed unattended, easy to operate, without manual
Regulating water inlet valve door greatly alleviates the labor intensity of worker, improves work efficiency.
Starting low noise, motor slowly accelerates since low frequency during startup, reach setpoint frequency after 20 seconds, by
In starting current very little, the impact to power grid is reduced, electrical equipment is protected, extend the service life of motor, improved
The efficiency of motor saves maintenance cost.
System uses one-to-one or one drag two control mode, using pressure transmitter fed-back current signals (4-20mA) to change
Frequency device central processing unit (CPU), forms closed-loop control system through PID control.The size of its output frequency is by effect processor control
System, increases or decreases the revolving speed of motor automatically;Keep work water pressure constant.
The reactive power of motor is not only reduced in this way, and improves the working efficiency of water pump, has saved the energy.
Common industrial frequency control mode (original control mode) then can not achieve such purpose, and starting and stopping needs
Want manual operation, it is also necessary to adjust the valve switch of water inlet to meet working condition requirement, i.e., it is time-consuming and laborious, and be easy to appear artificial
Factor operation error causes unnecessary loss.The revolving speed of the motor of power frequency operation control mode is uncontrollable, and is opened
Streaming current is big, needs the size of manual adjustment inlet valve to meet pressure of supply water when pressure of supply water is more than required pressure value.
At this moment motor is still with oepration at full load, and extra power just consumes on valve, and energy waste is very big.
By the analysis to the above actual condition, it is entirely capable of meeting the needs of production by the way of frequency control, so that
Water injecting pump both can big flow, can also small flow, both can high pressure, can also low-pressure operation.Utilize pressure closed loop or flow closed loop
Control water filling pressure or flow, injection station operating condition change when, frequency converter can make water injecting pump automatic adjustment water injection pressure or
Flow.At this point, the outlet valve standard-sized sheet of pump, makes the pressure difference of pump be reduced as zero.In this way, having saved electric energy, and reduce valve
Maintenance also improve the automatization level of system at the same time, reduce the noise of system, improve the environment of work, subtract
The light labor intensity of worker.Therefore water flow actually required is obtained using frequency control, not only saved electric energy, improve
System automation runs degree;Frequency converter adjusts revolving speed, and smooth steady automatically according to demand, reduces the labour of personnel
Intensity;The operating parameter of water pump is improved, and system effectiveness greatly improves.
This project designs embodiment, implements to install to the project organization together, debugging, running one month.
Between trial run period, to equipment, the data of operation, parameter, carry out real-time monitoring, after trial operation, hair without exception
Raw, operation data is expected power conservation requirement as a result, meeting, and Daqing oil field oil recovery factory signature trial operation is normal, energy conservation report and item
Mesh acceptance certificate file, after the project acceptance inspection is qualified, by expert in Daqing oil field oil recovery factory and middle petroleum system, tissue is investigated together
Concurrent table entry achievement, report and popularization
The present invention and its embodiments have been described above, this description is no restricted, shown in the drawings
Only one of embodiments of the present invention, actual structure is not limited to this.All in all if the ordinary skill of this field
Personnel are enlightened by it, without departing from the spirit of the invention, are not inventively designed and the technical solution phase
As frame mode and embodiment, be within the scope of protection of the invention.
Claims (5)
1. the poly- station overall skid-mounted integrated apparatus of novel oilfield intelligence special high-pressure water filling note, including shell and water filling assembly,
Be characterized in that: the shell includes shell (1), and the bottom of the shell (1) is equipped with air-permeable layer (2), during the air-permeable layer (2) is
Empty steel plate, air-permeable layer (2) both ends are equipped with skid hole (3), and the shell (1) and skid hole (3) are ipsilateral equipped with side door
(4), it is connected with check lock lever (5) on the side door (4), the side of the shell (1) is equipped with operation door (6), the operation door
(6) internal lock (7) are connected on, the water filling assembly includes water injecting pump, and the water injecting pump is divided into two work water injecting pumps and one
Spare water injecting pump, water injecting pump, which powers on, is connected with frequency changer, is equipped with appliance doors (8) outside the water filling assembly.
2. the poly- station overall skid-mounted integrated apparatus of novel oilfield intelligence special high-pressure water filling note according to claim 1,
Be characterized in that: the water injecting pump is plunger pump, model 5SPH880-150/32.
3. the poly- station overall skid-mounted integrated apparatus of novel oilfield intelligence special high-pressure water filling note according to claim 1,
Be characterized in that: the motor of speed regulation is bis- pole three 1250kW/660V asynchronous machine, is easy to implement fixed-voltage altering-current amount speed regulating control.
4. the poly- station overall skid-mounted integrated apparatus of novel oilfield intelligence special high-pressure water filling note according to claim 1,
It is characterized in that, the method for operation are as follows:
1. being pumped when water consumption is few by Frequency Converter Control 1, constant pressure water supply control is carried out;
2. its motor is switched to power frequency supply when the working frequency that water consumption gradually increases No. 1 pump reaches close to 50HZ
Power supply, while frequency converter being switched on No. 2 pumps, supplement water supply is carried out by No. 2 pumps;
3. conversely, when water consumption gradually decreases, even if the working frequency of No. 2 pumps has been reduced to lower frequency limit;
4. then turning off No. 1 pump when pressure of supply water is still bigger than normal, while the working frequency of No. 2 pumps is increased rapidly, and carry out constant pressure control
System.
5. the poly- station overall skid-mounted integrated apparatus of novel oilfield intelligence special high-pressure water filling note according to claim 1,
It is characterized in that: following modification scheme is established according to requirement of actual working condition and best equipment configuration:
1. the motor for being used to adjust the speed in pumping plant is changed to bis- pole three 1250kW/660V asynchronous machine, it is easy to implement constant pressure change
Flow speed regulating control;
2. installing EI-1400K-3H variable-frequency governor additional;
3. control system configures power transformation and automatic voltage regulator;
4. fixed-voltage altering-current amount speed-regulating control device;
5. whole system combines in one movable and skid-mounted (12*4.5*2.8m).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811118344.7A CN109098699A (en) | 2018-09-20 | 2018-09-20 | The poly- station overall skid-mounted integrated apparatus of novel oilfield intelligence special high-pressure water filling note |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811118344.7A CN109098699A (en) | 2018-09-20 | 2018-09-20 | The poly- station overall skid-mounted integrated apparatus of novel oilfield intelligence special high-pressure water filling note |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109098699A true CN109098699A (en) | 2018-12-28 |
Family
ID=64867592
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811118344.7A Pending CN109098699A (en) | 2018-09-20 | 2018-09-20 | The poly- station overall skid-mounted integrated apparatus of novel oilfield intelligence special high-pressure water filling note |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109098699A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114286738A (en) * | 2019-07-19 | 2022-04-05 | 拉德博伊尔-科斯维希工业伙伴有限公司 | Robot unit for machine tool and/or automatic assembling machine |
CN114607580A (en) * | 2022-03-22 | 2022-06-10 | 鸿鲲新能源(海南)有限公司 | Oil well pressurization liquid injection system |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201714361U (en) * | 2010-07-15 | 2011-01-19 | 黑龙江省神州电站配套设备有限公司 | Skid-mounted water injection equipment |
US20120152532A1 (en) * | 2010-12-21 | 2012-06-21 | ENX COMPRESSORS SA de C.V. | Artificial lift integral system for the production of hydrocarbons for oil wells by means of pneumatic pumping with natural gas autonomously supplied by oil wells |
CN105278352A (en) * | 2014-05-28 | 2016-01-27 | 株洲变流技术国家工程研究中心有限公司 | Oil field water injection automatic control system and method thereof |
CN206617147U (en) * | 2016-12-20 | 2017-11-07 | 中国石油天然气股份有限公司 | A kind of skid-mounted water injecting device |
CN209212220U (en) * | 2018-09-20 | 2019-08-06 | 冮振双 | The poly- station overall skid-mounted integrated apparatus of novel oilfield intelligence special high-pressure water filling note |
-
2018
- 2018-09-20 CN CN201811118344.7A patent/CN109098699A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201714361U (en) * | 2010-07-15 | 2011-01-19 | 黑龙江省神州电站配套设备有限公司 | Skid-mounted water injection equipment |
US20120152532A1 (en) * | 2010-12-21 | 2012-06-21 | ENX COMPRESSORS SA de C.V. | Artificial lift integral system for the production of hydrocarbons for oil wells by means of pneumatic pumping with natural gas autonomously supplied by oil wells |
CN105278352A (en) * | 2014-05-28 | 2016-01-27 | 株洲变流技术国家工程研究中心有限公司 | Oil field water injection automatic control system and method thereof |
CN206617147U (en) * | 2016-12-20 | 2017-11-07 | 中国石油天然气股份有限公司 | A kind of skid-mounted water injecting device |
CN209212220U (en) * | 2018-09-20 | 2019-08-06 | 冮振双 | The poly- station overall skid-mounted integrated apparatus of novel oilfield intelligence special high-pressure water filling note |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114286738A (en) * | 2019-07-19 | 2022-04-05 | 拉德博伊尔-科斯维希工业伙伴有限公司 | Robot unit for machine tool and/or automatic assembling machine |
CN114607580A (en) * | 2022-03-22 | 2022-06-10 | 鸿鲲新能源(海南)有限公司 | Oil well pressurization liquid injection system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106499005B (en) | A kind of water supply pump station feedback control system | |
CN102900477B (en) | High-power hydraulic turbine energy recovery system | |
CN104121049A (en) | Compressed air electric power energy storage system | |
CN109098699A (en) | The poly- station overall skid-mounted integrated apparatus of novel oilfield intelligence special high-pressure water filling note | |
CN209212220U (en) | The poly- station overall skid-mounted integrated apparatus of novel oilfield intelligence special high-pressure water filling note | |
CN111306448A (en) | Energy-saving water injection device and method for one-pump-controlled multi-pump | |
CN105007022A (en) | Frequency-conversing compensating and energy saving control apparatus of oil pumping unit in oil fields | |
CN201738383U (en) | Pressure-stabilizing and frequency-converting water supply system of deep-well pump | |
CN212005189U (en) | Energy-saving water injection device with multiple pumps controlled by one pump | |
CN203905918U (en) | Energy-saving water injection supercharging device | |
CN103104508A (en) | Regulating system of closed loop pressure | |
CN204858732U (en) | Auxiliary engine variable frequency power supply system of power plant based on give drive of water pump drive steam turbine | |
CN203462513U (en) | Negative-flow energy-saving device of hydraulic excavator | |
CN210887401U (en) | But deep frequency conversion's of closed circulative cooling unit river limit water supply system | |
CN204003331U (en) | A kind of novel air compressor energy saving device | |
Wang et al. | Analysis on energy-saving technology of oil field pumping unit | |
CN205064005U (en) | Pure little steam turbine of formula that congeals of double -fed alternator speed governing drives for water pump system | |
CN201265435Y (en) | Replacing pressure reducing valve by screw expansion power generator in steel-making exhaust heat steam recovery and utilization course | |
CN207093298U (en) | A kind of mining energy-saving emulsion power pack | |
CN111980625A (en) | Intelligent wellhead heating switch pressure regulating system | |
CN204283918U (en) | Viscose glue regulates the control gear of acid bath flow in producing | |
CN202181928U (en) | High-power hydraulic turbine energy recovery system | |
CN2773345Y (en) | Plunger-type oil-well pump with direct underground dynamic drive | |
CN204041035U (en) | A kind of oil/gas well stimulation system | |
CN107956458A (en) | A kind of energy saving flood pattern of intelligent control |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |