CN109098143A - 一种增强涌潮的人工河道设计方法 - Google Patents

一种增强涌潮的人工河道设计方法 Download PDF

Info

Publication number
CN109098143A
CN109098143A CN201811165387.0A CN201811165387A CN109098143A CN 109098143 A CN109098143 A CN 109098143A CN 201811165387 A CN201811165387 A CN 201811165387A CN 109098143 A CN109098143 A CN 109098143A
Authority
CN
China
Prior art keywords
tidal bore
river
tidal
area
bore
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811165387.0A
Other languages
English (en)
Inventor
潘存鸿
潘冬子
曾剑
郑君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Institute of Hydraulics and Estuary
Original Assignee
Zhejiang Institute of Hydraulics and Estuary
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Institute of Hydraulics and Estuary filed Critical Zhejiang Institute of Hydraulics and Estuary
Priority to CN201811165387.0A priority Critical patent/CN109098143A/zh
Publication of CN109098143A publication Critical patent/CN109098143A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/02Stream regulation, e.g. breaking up subaqueous rock, cleaning the beds of waterways, directing the water flow
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B1/00Equipment or apparatus for, or methods of, general hydraulic engineering, e.g. protection of constructions against ice-strains

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Revetment (AREA)

Abstract

本发明一种增强涌潮的人工河道设计方法,属于治河工程领域。包括:确定涌潮特征量,确定涌潮入口断面和涌潮欣赏区断面的几何特征关系;确定河道沿潮流方向收缩率三个步骤。本发明提供了一种增强涌潮的人工河道设计方法;利用本发明的方法对感潮河段的河道体型进行设计,河道中的涌潮现象能够得到明显加强,该方法节省了设计成本,降低了施工难度。

Description

一种增强涌潮的人工河道设计方法
技术领域
本发明涉及一种河道型式的设计方法,尤其是一种用于增强涌潮的人工河道设计方法,属于治河工程领域。
背景技术
涌潮是一定条件下存在于河口的特殊水动力现象,涌潮前后存在水位、流速 (流量)的突变。涌潮过后,水位急剧抬升,同时流速从落潮流转变为涨潮流,并在数分钟至数十分钟内流速达到极值。世界上大约有450个河口存在涌潮,但有欣赏价值的涌潮则只有10余条河口,其中钱塘江与巴西的亚马逊河涌潮最为壮观。
有涌潮的河口一般有两个条件,一是在平面上大多为喇叭形,使潮波能量集中,潮差增大;二是河口区要有适当的水深条件,既不能太深,也不能太浅。
至今看到的涌潮景观大多为天然形成,或者因其它目的建造的涉水工程被动的人为造成。随着社会经济的发展,人们对涌潮保护意识的加强,如何通过主动设计,局部调控涌潮景观,使得涌潮既不是太大,有利于防灾;也不能太小,欣赏价值不高。因此,保留现有合适的涌潮景观,调控太大或太小(甚至没有)的涌潮景观,对于涌潮保护和涌潮防灾均具有重要意义。
现有技术中对如何通过河道设计来人为制造涌潮没有有效的方法。
发明内容
本发明所要解决的技术问题是:基于涌潮成因机理和影响因素,设计河道的宽度、水深,人为地产生强度适当的涌潮。
具体而言本发明一种增强涌潮的人工河道设计方法,包括如下步骤:
1)确定涌潮特征量,所述特征量包括:涌潮高度,潮前水深,涌潮流速;
根据长期的观测结果,对于有欣赏价值的涌潮高度大于2m,潮前水深不超过2m,涌潮流速3.5~4.5m;
涌潮高度与潮前水深的比值为0.96及以上。
涌潮流速的设计方法为:
对于旋滚涌潮
式中,下标1表示潮前,h为水深,C为涌潮传播速度,Fr为相对佛汝德数。
人工河道中潮前流速忽略,即v1=0,则
式中,下标2表示潮后,ΔH为涌潮高度。代入上式,则有
涌潮高度的设计方法为:
根据公式
式中h1和h2分别为涌潮前、后水深。
将Fr=1.7代入上式,则有
设涌潮高度△H
ΔH=h2-h1
2)确定涌潮入口断面,即河道与海边相接断面和涌潮欣赏区断面,即河道上游欣赏涌潮的断面的几何特征关系;
涌潮欣赏区断面面积与涌潮入口断面面积比为:1/3到1/4之间;
涌潮欣赏区水深与涌潮入口断面水深比为:1/1.2到1/2.4之间;
涌潮欣赏区河宽与涌潮入口断面河宽比为:1/2到1/4之间。
对于入口断面,根据一维恒定流估算,则有
式中下标“in”表示涌潮入口断面,下标“end”表示河道末端的涌潮欣赏区,V 表示流速,A表示断面面积,h表示水深,B表示河宽。
设计时要求涌潮入口断面的涌潮高度为0.5m左右。
则要求Ain=2.5Aend,考虑到势能的增加、流量沿程减少以及沿程损失,要求
Ain=(3~4)Aend(公式6)
3)河道沿潮流方向收缩率设计;
设河宽沿潮流方向变化为
Bx=Bineαx
式中Bx为x处河宽;α为河宽收缩率。则
设断面积潮流方向变化为
Ax=Aineβx
式中Ax为x处断面积;β为面积收缩率。则
本发明的有益效果是:
1、本发明提供了一种增强涌潮的人工河道设计方法;
2、利用本发明的方法对感潮河段的河道体型进行设计,河道中的涌潮现象能够得到明显加强,该方法节省了设计成本,降低了施工难度。
附图说明
图1是本发明河道涌潮入口断面和涌潮欣赏区断面水深比、河宽比及面积比关系示意图;其中下标in表示涌潮入口断面、end表示涌潮欣赏区断面;A为断面面积;B为河宽;h为水深;
图2是本发明沿程河宽和面积变化示意图;其中距离0m表示涌潮入口断面,距离200m表示涌潮欣赏区断面;Bin/Bend=2.5,Ain/Aend=4;
图3是本发明河道沿程水深变化示意图;其中距离0m表示涌潮入口断面,距离200m表示涌潮欣赏区断面;Bin/Bend=2.5,Ain/Aend=4;
图4是本发明河道体型设计结果示意图。
具体实施方式
下面结合附图对本发明的实施例进行详细阐述,以使本发明的优点和特征能更易于被本领域技术人员理解,从而对本发明的保护范围做出更为清楚明确的界定。
实施例一
对于河长为200m的一段感潮河道:
1)确定涌潮特征量,所述特征量包括:涌潮高度,潮前水深,涌潮流速;
根据长期的观测结果,对于有欣赏价值的涌潮高度大于2m,潮前水深不超过2m,涌潮流速3.5~4.5m;
涌潮高度与潮前水深的比值为0.96。
2)确定入口断面和涌潮欣赏区的几何特征关系;
涌潮欣赏区断面面积与涌潮入口断面面积比为:1/3到1/4之间;
涌潮欣赏区水深与涌潮入口断面水深比为:1/1.2到1/2.4之间;
涌潮欣赏区河宽与涌潮入口断面河宽比为:1/2到1/4之间。
河长200m,涌潮入口处宽度为100m,即Bin=100m;
涌潮入口断面河宽为Bin
Bx=Bineαx
设Bin=100m,则Bend=100e-0.0046*200=100*0.399=39.9≈40(m)
Ax=Aineβx
设Ain=300m2,则Aend=300e-0.0069*200=300*0.2516=75.47≈75(m2)
根据上述河宽、断面积收缩率公式,可得到沿程河宽和面积。
涌潮欣赏河段为直立式海堤,断面为矩形,即水深h=断面积A/河宽B。其设计的河宽、面积和水深见图2和图3;其中涌潮入口断面1面积为300m2,涌潮入口断面1水深为3.0m;河道左岸3和河道右岸4为直立海堤,其长度为200m,河道中任何断面的宽度为Bx=100e-0.0046x,其中x是从涌潮入口断面1到任何断面的距离,河道中任何断面的面积为Ax=300e-0.0069x
得到的河道形状图如图4所示。
实施例二
根据图4的河道形状,制作了全钢板衬砌,具体而言钢板衬砌包括以下部分:
钢板支撑桩,用于打入河床底部将钢板固定;
钢板底部龙骨,用于维持钢板底部形状;
钢板底面,作为河床面;
钢板左岸边和钢板右岸边,作为两岸河床;
施工时按照方程Bx=100e-0.0046x,x每米为单位,宽度根据方程计算值Bx裁切钢板底面和钢板底部龙骨;
钢板左岸边和钢板右岸边最小高度按照下式计算
钢左岸边和钢板右岸边也是x以每米为单位,高度根据上式hx计算值,裁切钢板左岸边和钢板右岸边。
裁切后的形式为三块钢板,尺寸分别为:
钢板底面为等腰梯形:长边宽Bx=100e-0.0046x米,短边宽Bx+1= 100e-0.0046(x+1)米;
钢板左岸边和钢板右岸边均为直角梯形:长边高hx=3e-0.0023x米,短边高 hx+1=3e-0.0023(x+1)米;直角边长与钢板底面等腰梯形的腰长相等;
施工时首先将钢板底面与钢板龙骨焊接,将钢板支撑桩焊接在钢板龙骨上,然后将这1m长的等腰梯形钢板底面焊接在钢板龙骨上,最后将组合好的一节河道底面吊装在河道中;
然后将钢板左岸边和钢板右岸边的直角边与钢板底面的两腰焊,完成一节河道的制作安装;
然后将其他节一米一米地安装在原河道中。
对河道进行施工,得到了2.5m高,流速为4m/s的涌潮,取得了经济和景观效益。

Claims (1)

1.一种增强涌潮的人工河道设计方法,其特征在于:包括如下步骤:
1)确定涌潮特征量,所述特征量包括:涌潮高度,潮前水深,涌潮流速;
涌潮高度大于2m,潮前水深不超过2m,涌潮流速3.5~4.5m;
涌潮高度与潮前水深的比值为0.96及以上;
2)确定涌潮入口断面和涌潮欣赏区断面的几何特征关系;
涌潮欣赏区断面面积与涌潮入口断面面积比为:1/3到1/4之间;
涌潮欣赏区水深与涌潮入口断面水深比为:1/1.2到1/2.4之间;
涌潮欣赏区河宽与涌潮入口断面河宽比为:1/2到1/4之间;
3)河道沿潮流方向收缩率设计;
河宽沿潮流方向变化为
Bx=Bineαx
式中Bx为x处河宽;α为河宽收缩率,则
断面积沿潮流方向变化为
Ax=Aineβx
式中Ax为x处断面积;β为面积收缩率;则
CN201811165387.0A 2018-10-08 2018-10-08 一种增强涌潮的人工河道设计方法 Pending CN109098143A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811165387.0A CN109098143A (zh) 2018-10-08 2018-10-08 一种增强涌潮的人工河道设计方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811165387.0A CN109098143A (zh) 2018-10-08 2018-10-08 一种增强涌潮的人工河道设计方法

Publications (1)

Publication Number Publication Date
CN109098143A true CN109098143A (zh) 2018-12-28

Family

ID=64868266

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811165387.0A Pending CN109098143A (zh) 2018-10-08 2018-10-08 一种增强涌潮的人工河道设计方法

Country Status (1)

Country Link
CN (1) CN109098143A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110020477A (zh) * 2019-04-08 2019-07-16 浙江省水利河口研究院 圆柱型构筑物的涌潮作用力计算方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19925604C1 (de) * 1999-06-04 2001-01-11 Hermann Christiansen Vorrichtung für fließende Gewässer
US20060193696A1 (en) * 2003-07-04 2006-08-31 Po Tung Lim Method for preventing and discharging flood
US20130262063A1 (en) * 2010-12-03 2013-10-03 Total Sa Method for simulating the geological formation of a river zone
CN103981833A (zh) * 2014-05-27 2014-08-13 浙江省水利河口研究院 高含沙量涌潮模拟试验方法
RU2552949C1 (ru) * 2014-04-03 2015-06-10 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Кубанский государственный аграрный университет" Способ охраны береговых ландшафтов рек от подтоплений
CN106951596A (zh) * 2017-02-23 2017-07-14 浙江省水利河口研究院 一种涌潮与海塘相互作用的sph数值模拟技术
CN107330228A (zh) * 2017-08-01 2017-11-07 交通运输部天津水运工程科学研究所 一种内河航道整治建筑物主尺寸确定方法

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19925604C1 (de) * 1999-06-04 2001-01-11 Hermann Christiansen Vorrichtung für fließende Gewässer
US20060193696A1 (en) * 2003-07-04 2006-08-31 Po Tung Lim Method for preventing and discharging flood
US20130262063A1 (en) * 2010-12-03 2013-10-03 Total Sa Method for simulating the geological formation of a river zone
RU2552949C1 (ru) * 2014-04-03 2015-06-10 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Кубанский государственный аграрный университет" Способ охраны береговых ландшафтов рек от подтоплений
CN103981833A (zh) * 2014-05-27 2014-08-13 浙江省水利河口研究院 高含沙量涌潮模拟试验方法
CN106951596A (zh) * 2017-02-23 2017-07-14 浙江省水利河口研究院 一种涌潮与海塘相互作用的sph数值模拟技术
CN107330228A (zh) * 2017-08-01 2017-11-07 交通运输部天津水运工程科学研究所 一种内河航道整治建筑物主尺寸确定方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
曹颖等: "高阶涌潮方程的一种数值方法", 浙江水利科技, 28 October 2004 (2004-10-28), pages 5 - 7 *
潘存鸿等: "钱塘江涌潮特性及其数值模拟", 水利水运工程学报, 15 June 2008 (2008-06-15), pages 1 - 9 *
韩曾萃;曹颖;尤爱菊;: "强涌潮河口河相关系及其验证", 水利水运工程学报, no. 04, 15 December 2009 (2009-12-15), pages 83 - 90 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110020477A (zh) * 2019-04-08 2019-07-16 浙江省水利河口研究院 圆柱型构筑物的涌潮作用力计算方法
CN110020477B (zh) * 2019-04-08 2023-01-24 浙江省水利河口研究院 圆柱型构筑物的涌潮作用力计算方法

Similar Documents

Publication Publication Date Title
Yao et al. Numerical simulation of hydraulic performance with free overfall flow
Hager Energy dissipators and hydraulic jump
Dugue et al. Reduction of bend scour with an air-bubble screen–morphology and flow patterns
CN203188185U (zh) 一种超低佛氏数下的联合消能结构
CN114218662A (zh) 一种回头潮涌潮造景设计方法
US9611832B2 (en) Water flow power generation apparatus
CN109098143A (zh) 一种增强涌潮的人工河道设计方法
CN107663851A (zh) 一种防空化破坏曲型阶梯溢流坝
CN208995977U (zh) 一种增强涌潮的人工河道
Dugué et al. Influencing bend morphodynamics by means of an air-bubble screen-Topography and velocity field
CN212294570U (zh) 一种带倒三角楔体尾墩的消能池
Zhou et al. Application of permeable spur dike in mountain river training
Yu Experimental study on flow structure around spur dikes of different types
CN207582437U (zh) 一种防空化破坏曲型阶梯溢流坝
CN101538841A (zh) 消力池内的差动式挑流消能工
Cheng et al. Numerical simulation of dissolved oxygen concentration in the downstream of Three Gorges Dam
CN102912761A (zh) 一种风力疏浚河道的方法
CN116644499B (zh) 适用于运河浪岸坡击区作用范围的确定方法及船行波模型试验装置
Yu et al. Experimental research of turbulence kinetic and water force acting on spur dike
CN204511758U (zh) 江河常态下的水利发电系统
Ji et al. Branch Channel Evolution and Its Effects on Tail Channel in the Yellow River Estuary
Xu et al. Analysis and research on sluice gate flow of a hydropower station under different working conditions
CN207244551U (zh) 一种用于保障河口三角洲供水的丁坝群
CN205804301U (zh) 一种用于已建小型引水式水电站下泄生态流量的装置
Shichang et al. Prediction on Changes of Seabed due to Sluice Built on entrance of Haiyou Branch in Sanmen Bay

Legal Events

Date Code Title Description
PB01 Publication