CN109087575A - A kind of bridge construction simulator combined with intellectual analysis function - Google Patents
A kind of bridge construction simulator combined with intellectual analysis function Download PDFInfo
- Publication number
- CN109087575A CN109087575A CN201811226170.6A CN201811226170A CN109087575A CN 109087575 A CN109087575 A CN 109087575A CN 201811226170 A CN201811226170 A CN 201811226170A CN 109087575 A CN109087575 A CN 109087575A
- Authority
- CN
- China
- Prior art keywords
- main body
- bridge
- bridge construction
- intellectual analysis
- analysis function
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- G—PHYSICS
- G09—EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
- G09B—EDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
- G09B25/00—Models for purposes not provided for in G09B23/00, e.g. full-sized devices for demonstration purposes
- G09B25/04—Models for purposes not provided for in G09B23/00, e.g. full-sized devices for demonstration purposes of buildings
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- Educational Administration (AREA)
- Educational Technology (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The invention discloses one kind can combine the bridge construction simulator with intellectual analysis function, it is related to bridge construction analogue technique field, including main body and bridge plate, running through at left and right sides of the inner wall of the main body has the first electric pushrod, and first between electric pushrod and main body to be fixedly connected, the bridge plate is placed in the inside of main body, and the bottom end of bridge plate is provided with fixed column, and the fixed column is connected by bolt with bridge plate.The beneficial effects of the present invention are: this can combine the bridge construction simulator with intellectual analysis function, pass through the setting to connection frame, pressure fan, bridge plate and fixed column, it and is to be flexibly connected between connection frame and pressure fan, start pressure fan, so that wind is to bridge plate, pass through the effect of the intellectual analysis component on the inside of device, so as to which the influence to wind speed, wind direction etc. to bridge plate judges, similar phenomenon is avoided to occur during actual bridge construction convenient for prompt staff.
Description
Technical field
The present invention relates to bridge construction analogue technique fields, specially a kind of to combine the bridge with intellectual analysis function
Build simulator.
Background technique
With the development of science and technology and the progress of social times, the quantity of bridge is more and more, and before bridge construction
It is required to simulate the bridge for completing the construction area by the way that the bridge construction simulator with intellectual analysis function can be combined
Which problem can be encountered in practice, convenient for avoiding this kind of disadvantage in practical bridge building course, promote the suitable of bridge construction
The property used.
A kind of bridge structure disclosed in 201310127317.7 U of Chinese invention patent application prospectus CN is prominent
The simulator of damage, the simulator of bridge structure burst damage are sent out, although can be used to verify various structural health inspections
The structural damage moment of the superiority and inferiority and applicability of survey method, record is more accurate, still, the simulation of bridge structure burst damage
Device, having cannot be to the simulated operation carried out after bridge construction by natural calamity, while not having the function of intellectual analysis, makes
Its shortcomings that there are limitations.
Summary of the invention
The purpose of the present invention is to provide one kind can combine the bridge construction simulator with intellectual analysis function, solves
The problems mentioned above in the background art.
To achieve the above object, the invention provides the following technical scheme: a kind of can combine the bridge with intellectual analysis function
Beam builds simulator, including main body and bridge plate, and running through at left and right sides of the inner wall of the main body has the first electric pushrod, and the
To be fixedly connected between one electric pushrod and main body, the bridge plate is placed in the inside of main body, and the bottom end setting of bridge plate
There is fixed column, the fixed column is connected by bolt with bridge plate, and fixed plate is mounted on the outside of fixed column, the fixation
Mutually fixed between plate and fixed column by bolt, and the bottom end of fixed plate and fixed column is provided with fixing seat, the fixing seat with
It is mutually fixed between main body by bolt, and the inner wall top of main body is equipped with camera, sets on the left of the inner tip of the main body
It being equipped with connection frame, and is mounted with pressure fan on the right side of the bottom end of connection frame, the bottom of the main body is provided with the first hydraulic stem, and the
One hydraulic stem is connected by the first multi-directional ball with main body, and the bottom end of first hydraulic stem is mounted with pedestal, and the bottom of pedestal
Portion is provided with universal wheel, is flexibly connected between the universal wheel and pedestal, and is mounted with water tank at left and right sides of the top of pedestal,
The inside of the water tank is equipped with water pump, and the output end of water pump is connected with outlet pipe, the one end of the outlet pipe far from water pump
It is connected with main body, the water tank runs through close to the inside of base center axis line water inlet pipe, and the one end of water inlet pipe far from water tank
It is connected with main body, the water tank is circumscribed with the first connecting plate, and the first connecting plate and pedestal on the inside of base center axis line
Between to be fixedly connected.
Optionally, the perpendicular shape distribution in the side of first electric pushrod and main body, and the first electric pushrod is about master
The central axes of body are symmetrical, and the front of the main body is equipped with control panel.
Optionally, the center line of the bridge plate and the center line of main body coincide, and the arc-shaped shape of bridge plate is distributed in
The top of fixed column, the bottom end of the main body is provided with the second hydraulic stem, and the second hydraulic stem passes through the second multi-directional ball and main body
It is flexibly connected, is provided with the second connecting plate at left and right sides of the top of the pedestal, and be fixed between the second connecting plate and pedestal
Connection, the inner wall left and right sides of the main body, which is run through, the second electric pushrod.
Optionally, the connection frame constitutes detachable structure by bolt and main body, and is between connection frame and pressure fan
It is flexibly connected, is provided with connecting tube on the outside of the water tank, and outer wall of the connecting tube close to water tank one end is provided with external screw thread, institute
The inner wall for stating the output end of water tank offers internal screw thread.
Optionally, the inboard width of the outlet pipe and the inboard width of water inlet pipe are equal, and outlet pipe is in water inlet pipe
Contour shape is distributed in the outside of main body, and the top outer of the main body is provided with door-hinge, and the outer wall activity of door-hinge is mounted with work
Door is moved, fixing groove is offered on the inside of first connecting plate, and fixing groove passes through injection molding and the first being integrally formed of connecting plate
Structure.
Optionally, the shape of first connecting plate matches with the shape of the second connecting plate, and the first connecting plate passes through
Fixing groove, the first electric pushrod and main body constitute bascule.
Optionally, the elemental height of second hydraulic stem is equal with the elemental height of the first hydraulic stem, and second is hydraulic
Bar is connect with the perpendicular shape of pedestal.
Optionally, the connecting tube is symmetrical about the transverse axis of main body, and connecting tube passes through external screw thread, internal screw thread and water
The output end of case constitutes detachable structure.
Optionally, the dodge gate constitutes bascule, and the area of section and main body of dodge gate by door-hinge and main body
Top end opening area of section it is equal.
The present invention provides one kind can combine the bridge construction simulator with intellectual analysis function, has following beneficial
Effect:
1, this can combine the bridge construction simulator with intellectual analysis function, by connection frame, pressure fan, bridge
The setting of plate and fixed column, and to be flexibly connected between connection frame and pressure fan, starting pressure fan, so that wind is to bridge plate,
By the effect of the intellectual analysis component on the inside of device, so as to which the influence to wind speed, wind direction etc. to bridge plate is sentenced
It is disconnected, avoid similar phenomenon from occurring during actual bridge construction convenient for prompt staff, and the arc-shaped shape of bridge plate
It is distributed in the top of fixed column, the effect on the top of fixed column is distributed in by the bridge plate of arc-shaped shape, so that it simulates bridge
Beam is across river two sides, and under the action of be connected between bridge plate and fixed column by bolt, convenient for staff and
When replacement operation is carried out to different types of bridge plate so that staff is in subsequent practical bridge building course, to bridge
The work such as type selecting, the materials of beam are more smooth.
2, this can combine the bridge construction simulator with intellectual analysis function, by the first electric pushrod, main body,
The setting of outlet pipe and water inlet pipe, and the perpendicular shape distribution in the side of the first electric pushrod and main body, carry out in the second hydraulic stem
Lifting processing, and on the inside of main body simulation bridge carry out earthquake type vibration operation when so that the first electric pushrod start, together
When, output end is inserted into fixing groove, convenient for the operation such as being consolidated, being drawn to main body, avoid main body integrally occur on move down
Dynamic phenomenon reduces device to the earthquake simulation effect after bridge construction on the inside of main body, and outlet pipe and water inlet pipe are in contour shape
It is distributed in the outside of main body, under the interaction of outlet pipe and water inlet pipe, so that the water flow on the inside of main body is able to carry out circulation
The flow operation of formula, convenient for the fixing seat in simulation bridge construction Bridge board bottom portion and fixed column etc. in the percussion by water flow
Under, what kind of supporting effect when building on bridge plate, which generates, influences.
3, this can combine the bridge construction simulator with intellectual analysis function, by the first connecting plate, fixing groove,
The setting of first electric pushrod, main body, the second hydraulic stem and the first hydraulic stem, and the first connecting plate passes through fixing groove, the first electricity
Dynamic push rod and main body constitute bascule, when the detection that device carries out earthquake type to the simulation construction bridge on the inside of main body operates
When, lifting processing is carried out by the second hydraulic stem, so that main body is swayed forwards and backwards, after enabling a device to simulation bridge construction
Anti-seismic performance, and be compared with the anti-seismic performance theoretically born, and the elemental height of the second hydraulic stem and first hydraulic
The elemental height of bar is equal, under the supporting role of the first hydraulic stem and the second hydraulic stem to main body, so that main body is in balance
In state, the simulation bridge on the inside of main body is less prone to phenomenon of toppling over, and avoids influencing subsequent simulation work.
4, this can combine the bridge construction simulator with intellectual analysis function, by connecting tube, internal screw thread, outer spiral shell
The setting of line and water tank, and connecting tube constitutes detachable structure by the output end of external screw thread, internal screw thread and water tank, in connecting tube
Under the action of, the water on the inside of two water tanks can be subjected to connection operation, enable water flow on the inside of main body shape stream in a ring
It is dynamic, in Lifting Water, it can preferably simulate the influence work in bridge construction by floods.
5, this can combine the bridge construction simulator with intellectual analysis function, by dodge gate, door-hinge and main body
Setting, and dodge gate constitutes bascule by door-hinge and main body, when needing to the bridge construction emulation mode on the inside of main body
When being changed operation, dodge gate can be pulled open by staff, and under the rotary action of door-hinge so that dodge gate with
It completes to open work between main body, map function is carried out to the bridge construction simulated assembly on the inside of it convenient for staff, is promoted
Flexibility of the device to bridge construction simulation work.
Detailed description of the invention
Fig. 1 is the structural schematic diagram that one kind of the present invention can combine the bridge construction simulator with intellectual analysis function;
Fig. 2 is the main body outboard structure that one kind of the present invention can combine the bridge construction simulator with intellectual analysis function
Schematic diagram;
Fig. 3 is the side structure signal that one kind of the present invention can combine the bridge construction simulator with intellectual analysis function
Figure;
Fig. 4 is the plan structure signal that one kind of the present invention can combine the bridge construction simulator with intellectual analysis function
Figure;
Fig. 5 is that one kind of the present invention can combine enlarged structure at the A of the bridge construction simulator with intellectual analysis function
Schematic diagram;
Fig. 6 is that one kind of the present invention can combine enlarged structure at the B of the bridge construction simulator with intellectual analysis function
Schematic diagram;
Fig. 7 is the flowage structure signal that one kind of the present invention can combine the bridge construction simulator with intellectual analysis function
Figure.
In figure: 1, main body;2, the first electric pushrod;3, bridge plate;4, camera;5, fixed plate;6, pressure fan;7, it connects
Frame;8, water inlet pipe;9, water tank;10, water pump;11, outlet pipe;12, the first multi-directional ball;13, the first hydraulic stem;14, pedestal;15,
Universal wheel;16, the first connecting plate;17, control panel;18, fixed column;19, fixing seat;20, the second multi-directional ball;21, the second liquid
Compression bar;22, connecting tube;23, door-hinge;24, dodge gate;25, fixing groove;26, internal screw thread;27, external screw thread;28, it second electronic pushes away
Bar;29, the second connecting plate.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
In the description of the present invention, unless otherwise indicated, the meaning of " plurality " is two or more;Term " on ",
The orientation or positional relationship of the instructions such as "lower", "left", "right", "inner", "outside", " front end ", " rear end ", " head ", " tail portion " is
It is based on the orientation or positional relationship shown in the drawings, is merely for convenience of description of the present invention and simplification of the description, rather than instruction or dark
Show that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as pair
Limitation of the invention.In addition, term " first ", " second ", " third " etc. are used for description purposes only, and should not be understood as instruction or
Imply relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " connected " " connects
Connect " it shall be understood in a broad sense, for example, it may be being fixedly connected, it may be a detachable connection, or be integrally connected;It can be machine
Tool connection, is also possible to be electrically connected;It can be directly connected, it can also be indirectly connected through an intermediary.For this field
For those of ordinary skill, the concrete meaning of above-mentioned term in the present invention can be understood with concrete condition.
Fig. 1-7 is please referred to, the present invention provides a kind of technical solution: one kind can combine the bridge with intellectual analysis function and build
Make simulator, including main body 1, the first electric pushrod 2, bridge plate 3, camera 4, fixed plate 5, pressure fan 6, connection frame 7, into
Water pipe 8, water tank 9, water pump 10, outlet pipe 11, the first multi-directional ball 12, the first hydraulic stem 13, pedestal 14, universal wheel 15, first connect
Fishplate bar 16, control panel 17, fixed column 18, fixing seat 19, the second multi-directional ball 20, the second hydraulic stem 21, connecting tube 22, door-hinge
23, dodge gate 24, fixing groove 25, internal screw thread 26, external screw thread 27, the second electric pushrod 28 and the second connecting plate 29, main body 1 it is interior
Through there is the first electric pushrod 2 at left and right sides of wall, and to be fixedly connected between the first electric pushrod 2 and main body 1, first electronic is pushed away
The perpendicular shape in the side of bar 2 and main body 1 is distributed, and the first electric pushrod 2 is symmetrical about the central axes of main body 1, hydraulic second
Bar 21 carries out lifting processing, and when carrying out earthquake type vibration operation to the simulation bridge of 1 inside of main body, so that the first electric pushrod
2 startings, meanwhile, output end is inserted into fixing groove 25, convenient for the operation such as being consolidated, being drawn to main body 1, avoids main body 1 whole
The phenomenon that body moves up and down reduces device to the earthquake simulation effect after 1 inside bridge construction of main body;
The front of main body 1 is equipped with control panel 17, and bridge plate 3 is placed in the inside of main body 1, and the bottom end of bridge plate 3
It is provided with fixed column 18, the center line of bridge plate 3 and the center line of main body 1 coincide, and the arc-shaped shape of bridge plate 3 is distributed in admittedly
The top of fixed column 18 is distributed in the effect on the top of fixed column 18 by the bridge plate 3 of arc-shaped shape, so that it simulates bridge cross
Cross a river stream two sides, and under the action of be connected between bridge plate 3 and fixed column 18 by bolt, it is timely convenient for staff
Replacement operation is carried out to different types of bridge plate 3, so that staff is in subsequent practical bridge building course, to bridge
The work such as type selecting, materials it is more smooth, the bottom end of main body 1 is provided with the second hydraulic stem 21, and the second hydraulic stem 21 passes through the
Two multi-directional balls 20 are flexibly connected with main body 1, and the elemental height of the second hydraulic stem 21 is equal with the elemental height of the first hydraulic stem 13,
And second hydraulic stem 21 connect with the perpendicular shape of pedestal 14, in the support of the first hydraulic stem 13 and the second hydraulic stem 21 to main body 1
Under effect, so that main body 1 is in equilibrium state, the simulation bridge of 1 inside of main body is less prone to phenomenon of toppling over, after avoiding influence
Continuous simulation work;
It is provided with the second connecting plate 29 at left and right sides of the top of pedestal 14, and is solid between the second connecting plate 29 and pedestal 14
Fixed connection, through there is the second electric pushrod 28, fixed column 18 is connected by bolt with bridge plate 3 for the inner wall left and right sides of main body 1
It connects, and the outside of fixed column 18 is mounted with fixed plate 5, is mutually fixed between fixed plate 5 and fixed column 18 by bolt, and fixed plate
5 are provided with fixing seat 19 with the bottom end of fixed column 18, are mutually fixed between fixing seat 19 and main body 1 by bolt, and main body 1 is interior
Wall top is equipped with camera 4, and connection frame 7, and placement on the right side of the bottom end of connection frame 7 are provided on the left of the inner tip of main body 1
There is pressure fan 6, connection frame 7 constitutes detachable structure by bolt and main body 1, and is that activity connects between connection frame 7 and pressure fan 6
It connects, starts pressure fan 6, so that wind is to bridge plate 3, by the effect of the intellectual analysis component on the inside of device, so as to
Influence to wind speed, wind direction etc. to bridge plate 3 judges, keeps away during actual bridge construction convenient for prompt staff
Exempt from similar phenomenon to occur;
The outside of water tank 9 is provided with connecting tube 22, and outer wall of the connecting tube 22 close to 9 one end of water tank is provided with external screw thread
27, connecting tube 22 is symmetrical about the transverse axis of main body 1, and connecting tube 22 is defeated with water tank 9 by external screw thread 27, internal screw thread 26
Outlet constitutes detachable structure, under the action of connecting tube 22, the water of two 9 insides of water tank can be carried out connection operation, made
The water flow of the inside of main body 1 shape can flow in a ring, in Lifting Water, can preferably simulate in bridge construction by
To the influence work of floods, the inner wall of the output end of water tank 9 offers internal screw thread 26, and it is hydraulic that the bottom of main body 1 is provided with first
Bar 13, and the first hydraulic stem 13 is connected by the first multi-directional ball 12 with main body 1, the bottom end of the first hydraulic stem 13 is mounted with pedestal
14, and the bottom of pedestal 14 is provided with universal wheel 15, is flexibly connected between universal wheel 15 and pedestal 14, and the top of pedestal 14
The left and right sides is mounted with water tank 9, and the inside of water tank 9 is equipped with water pump 10, and the output end of water pump 10 is connected with outlet pipe 11, out
The inboard width of water pipe 11 is equal with the inboard width of water inlet pipe 8, and outlet pipe 11 and water inlet pipe 8 are distributed in main body in contour shape
1 outside, under the interaction of outlet pipe 11 and water inlet pipe 8, so that the water flow of 1 inside of main body is able to carry out circulating stream
Dynamic operation, convenient for the fixing seat 19 of simulation 3 bottom of bridge construction jackshaft beam slab and fixed column 18 etc. in the percussion by water flow
Under, what kind of supporting effect when building on bridge plate 3, which generates, influences, and the top outer of main body 1 is provided with door-hinge 23, and door-hinge
23 outer wall activity is mounted with dodge gate 24, and dodge gate 24 constitutes bascule by door-hinge 23 and main body 1, and dodge gate 24
Area of section is equal with the top end opening area of section of main body 1, when needing the bridge construction emulation mode to the inside of main body 1 to carry out
When changing operation, dodge gate 24 can be pulled open by staff, and under the rotary action of door-hinge 23, so that dodge gate 24
It completes to open work between main body 1, map function is carried out to the bridge construction simulated assembly on the inside of it convenient for staff, is mentioned
Rise flexibility of the device to bridge construction simulation work;
The inside of first connecting plate 16 offers fixing groove 25, and fixing groove 25 is made up of injection molding and the first connecting plate 16
Integral structure, the one end of outlet pipe 11 far from water pump 10 are connected with main body 1, inside of the water tank 9 close to 14 central axes of pedestal
Through there is water inlet pipe 8, and the one end of water inlet pipe 8 far from water tank 9 is connected with main body 1, and water tank 9 is in 14 central axes of pedestal
Side is circumscribed with the first connecting plate 16, and to be fixedly connected between the first connecting plate 16 and pedestal 14, the shape of the first connecting plate 16
It matches with the shape of the second connecting plate 29, and the first connecting plate 16 passes through fixing groove 25, the first electric pushrod 2 and 1 structure of main body
It is hydraulic by second when device, which builds bridge to the simulation of 1 inside of main body, carries out the detection operation of earthquake type at bascule
Bar 21 carries out lifting processing, so that main body 1 is swayed forwards and backwards, the anti-seismic performance after enabling a device to simulation bridge construction,
And it is compared with the anti-seismic performance theoretically born.
In conclusion this can combine the bridge construction simulator with intellectual analysis function, in use, pass through first by
Fixing seat 19, fixed column 18, fixed plate 5 and bridge plate 3 such as are combined by bolt, install at the operation, and are placed in main body 1
Inside, meanwhile, camera 4, connection frame 7, pressure fan 6 etc. are placed at dodge gate 24, and pushed and lived by staff
Dynamic door 24, and under the rotary action of door-hinge 23, so that dodge gate 24 and main body 1 are completed to close work, then, start pressure fan
6, so that wind drives the photographing module in camera 4 to the bridge in wind to bridge plate 3, by the central processing unit on the inside of device
The abnormal phenomenon that beam slab 3 generates is monitored operation, so that central processing unit drives analysis module to wind speed, wind direction etc. to bridge
The influence of plate 3 is analyzed and processed, and avoids similar phenomenon from going out during actual bridge construction convenient for prompt staff
It is existing, then, start water pump 10, so that inside of the water of 9 inside of water tank along the inflow main body 1 of outlet pipe 11, and water inlet pipe 8
Under effect, the water flow for flowing through main body 1 is flowed into another water tank 9, meanwhile, it, can be by two water by the effect of connecting tube 22
The water of the inside of case 9 carries out connection operation, and enabling the water flow of 1 inside of main body, shape flows in a ring, in Lifting Water,
The influence work in bridge construction by floods can be preferably simulated, and camera shooting is driven by the central processing unit on the inside of device
The abnormal phenomenon that photographing module in first 4 generates the bridge plate 3 in wind is monitored operation, so that central processing unit driving point
It analyses influence of the module to floods to bridge plate 3 to be analyzed and processed, carries out earthquake type vibration in bridge of the device to 1 inside of main body
When simulated operation, lifting processing is carried out by the second hydraulic stem 21, meanwhile, so that the first electric pushrod 2 (model: NKLA4) opens
It is dynamic, meanwhile, output end is inserted into the fixing groove 25 of 16 inside of the first connecting plate, convenient for the behaviour such as being consolidated, being drawn to main body 1
The phenomenon that making, main body 1 is avoided integrally to move up and down reduces device and imitates to the earthquake simulation after 1 inside bridge construction of main body
Fruit carries out lifting processing by the first hydraulic stem 13 after the completion of the vibration simulation of front and back, meanwhile, so that the second electric pushrod 28
(model: NKLA4) starting, and snaps into the second connecting plate 29, and main body 1 is effectively avoided to move integrally, and on the inside of device in
The abnormal phenomenon that photographing module in central processor driving camera 4 generates the bridge plate 3 in wind is monitored operation, so that
Central processing unit drives influence of the analysis module to different shock conditions etc. to bridge plate 3 to be analyzed and processed, and electrically member
The operation power of part is required to power module to be powered work for it, and final analysis structure passes through control panel 17
The display module of inside completes display work.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto,
Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its
Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.
Claims (9)
1. one kind can combine the bridge construction simulator with intellectual analysis function, including main body (1) and bridge plate (3),
Be characterized in that: running through at left and right sides of the inner wall of the main body (1) has the first electric pushrod (2), and the first electric pushrod (2) and master
To be fixedly connected between body (1), the bridge plate (3) is placed in the inside of main body (1), and the bottom end of bridge plate (3) is provided with
Fixed column (18), the fixed column (18) are connected by bolt with bridge plate (3), and are mounted on the outside of fixed column (18) solid
Fixed board (5) is mutually fixed between the fixed plate (5) and fixed column (18) by bolt, and fixed plate (5) and fixed column (18)
Bottom end is provided with fixing seat (19), is mutually fixed between the fixing seat (19) and main body (1) by bolt, and main body (1) is interior
Wall top is equipped with camera (4), is provided with connection frame (7) on the left of the inner tip of the main body (1), and connection frame (7)
It is mounted with pressure fan (6) on the right side of bottom end, the bottom of the main body (1) is provided with the first hydraulic stem (13), and the first hydraulic stem
(13) it is connected by the first multi-directional ball (12) with main body (1), the bottom end of first hydraulic stem (13) is mounted with pedestal (14),
And the bottom of pedestal (14) is provided with universal wheel (15), is flexibly connected between the universal wheel (15) and pedestal (14), and bottom
It is mounted with water tank (9) at left and right sides of the top of seat (14), the inside of the water tank (9) is equipped with water pump (10), and water pump (10)
Output end be connected with outlet pipe (11), the outlet pipe (11) is connected far from the one end of water pump (10) with main body (1), described
Water tank (9) close to pedestal (14) central axes inside through having water inlet pipe (8), and the one end of water inlet pipe (8) far from water tank (9) with
Main body (1) is connected, and the water tank (9) is circumscribed with the first connecting plate (16) on the inside of pedestal (14) central axes, and first
It is to be fixedly connected between connecting plate (16) and pedestal (14).
2. one kind according to claim 1 can combine the bridge construction simulator with intellectual analysis function, feature
Be: the perpendicular shape in the side of first electric pushrod (2) and main body (1) is distributed, and the first electric pushrod (2) is about main body
(1) central axes are symmetrical, and the front of the main body (1) is equipped with control panel (17).
3. one kind according to claim 1 can combine the bridge construction simulator with intellectual analysis function, feature
Be: the center line of the bridge plate (3) and the center line of main body (1) coincide, and bridge plate (3) arc-shaped shape is distributed in admittedly
The bottom end on the top of fixed column (18), the main body (1) is provided with the second hydraulic stem (21), and the second hydraulic stem (21) passes through second
Multi-directional ball (20) is flexibly connected with main body (1), is provided with the second connecting plate (29) at left and right sides of the top of the pedestal (14), and
Running through to be fixedly connected between second connecting plate (29) and pedestal (14), at left and right sides of the inner wall of the main body (1) has the second electricity
Dynamic push rod (28).
4. one kind according to claim 1 can combine the bridge construction simulator with intellectual analysis function, feature
Be: the connection frame (7) constitutes detachable structure by bolt and main body (1), and between connection frame (7) and pressure fan (6)
It to be flexibly connected, is provided with connecting tube (22) on the outside of the water tank (9), and connecting tube (22) is close to the outer of water tank (9) one end
Wall is provided with external screw thread (27), and the inner wall of the output end of the water tank (9) offers internal screw thread (26).
5. one kind according to claim 1 can combine the bridge construction simulator with intellectual analysis function, feature
Be: the inboard width of the outlet pipe (11) is equal with the inboard width of water inlet pipe (8), and outlet pipe (11) and water inlet pipe
(8) outside of main body (1) is distributed in contour shape, the top outer of the main body (1) is provided with door-hinge (23), and door-hinge (23)
Outer wall activity be mounted with dodge gate (24), offered fixing groove (25) on the inside of first connecting plate (16), and fixing groove
(25) pass through injection molding and the first connecting plate (16) being integrally formed structure.
6. one kind according to claim 1 can combine the bridge construction simulator with intellectual analysis function, feature
Be: the shape of first connecting plate (16) matches with the shape of the second connecting plate (29), and the first connecting plate (16) is logical
It crosses fixing groove (25), the first electric pushrod (2) and main body (1) and constitutes bascule.
7. one kind according to claim 3 can combine the bridge construction simulator with intellectual analysis function, feature
Be: the elemental height of second hydraulic stem (21) is equal with the elemental height of the first hydraulic stem (13), and the second hydraulic stem
(21) it is connect with pedestal (14) perpendicular shape.
8. one kind according to claim 4 can combine the bridge construction simulator with intellectual analysis function, feature
Be: the connecting tube (22) is symmetrical about the transverse axis of main body (1), and connecting tube (22) passes through external screw thread (27), interior spiral shell
Line (26) and the output end of water tank (9) constitute detachable structure.
9. one kind according to claim 5 can combine the bridge construction simulator with intellectual analysis function, feature
Be: the dodge gate (24) constitutes bascule by door-hinge (23) and main body (1), and the area of section of dodge gate (24) with
The top end opening area of section of main body (1) is equal.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811226170.6A CN109087575A (en) | 2018-10-20 | 2018-10-20 | A kind of bridge construction simulator combined with intellectual analysis function |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811226170.6A CN109087575A (en) | 2018-10-20 | 2018-10-20 | A kind of bridge construction simulator combined with intellectual analysis function |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109087575A true CN109087575A (en) | 2018-12-25 |
Family
ID=64844014
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811226170.6A Withdrawn CN109087575A (en) | 2018-10-20 | 2018-10-20 | A kind of bridge construction simulator combined with intellectual analysis function |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109087575A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112365787A (en) * | 2020-11-09 | 2021-02-12 | 张前进 | Assembled bridge design model |
-
2018
- 2018-10-20 CN CN201811226170.6A patent/CN109087575A/en not_active Withdrawn
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112365787A (en) * | 2020-11-09 | 2021-02-12 | 张前进 | Assembled bridge design model |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7926339B2 (en) | Vertical wind tunnel with viewing facility | |
CN109087575A (en) | A kind of bridge construction simulator combined with intellectual analysis function | |
CN104180967B (en) | Outside-reactor experimental section for component | |
CN107280550A (en) | A kind of gardens use can surge the mobile bath pond of pressure | |
CN108680724B (en) | It is a kind of for simulating the native case apparatus of furrow structure | |
CN208039809U (en) | The closed small space plate device of reinforced concrete structure | |
CN110608993A (en) | Test device for artificially simulating rainfall kinetic energy to influence soil erosion | |
CN100503975C (en) | Arch bridge vortex vibration control building membrane structure for arch bridge | |
CN206804491U (en) | Seepage tests system | |
CN205881301U (en) | A salt solution experimental apparatus for simulating compound ventilation of building shaft formula | |
CN209451265U (en) | A kind of tennis service device of the physical education with cleaning function | |
CN209542046U (en) | It is a kind of for testing the wind-tunnel jig of whole machine cabinet systematic air flow | |
CN207429222U (en) | A kind of animal and veterinary cleaning device | |
CN209494093U (en) | A kind of assembled architecture installation curtain wall connection component | |
CN103726863A (en) | Jet fan for tunnel | |
CN211603187U (en) | Rainfall simulation device for city design | |
CN208966350U (en) | A kind of tunnel reinforcement and the mobile bracket of maintenance | |
CN220434366U (en) | Runner overhauls platform | |
CN207452815U (en) | A kind of circulating water conservancy ecosystem fish pass simulation system | |
CN107745782A (en) | A kind of installation method of propeller shaft bracket | |
CN208899637U (en) | A kind of building element structure based on BIM | |
CN113911281B (en) | Underwater vehicle appearance optimization performance test platform and method | |
CN206058674U (en) | The uncommon sieve fountain circulation demonstration device of teaching | |
CN206245626U (en) | A kind of vertically communicated formula splicing guardrail | |
CN110375927A (en) | A kind of water test complex for vehicle dormer window salt fog test |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20181225 |