CN109087575A - A kind of bridge construction simulator combined with intellectual analysis function - Google Patents

A kind of bridge construction simulator combined with intellectual analysis function Download PDF

Info

Publication number
CN109087575A
CN109087575A CN201811226170.6A CN201811226170A CN109087575A CN 109087575 A CN109087575 A CN 109087575A CN 201811226170 A CN201811226170 A CN 201811226170A CN 109087575 A CN109087575 A CN 109087575A
Authority
CN
China
Prior art keywords
main body
bridge
bridge construction
intellectual analysis
analysis function
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201811226170.6A
Other languages
Chinese (zh)
Inventor
关泽森
尤杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Rui Hang Intelligent Technology Co Ltd
Original Assignee
Guiyang Rui Hang Intelligent Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Rui Hang Intelligent Technology Co Ltd filed Critical Guiyang Rui Hang Intelligent Technology Co Ltd
Priority to CN201811226170.6A priority Critical patent/CN109087575A/en
Publication of CN109087575A publication Critical patent/CN109087575A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B25/00Models for purposes not provided for in G09B23/00, e.g. full-sized devices for demonstration purposes
    • G09B25/04Models for purposes not provided for in G09B23/00, e.g. full-sized devices for demonstration purposes of buildings

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Educational Technology (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses one kind can combine the bridge construction simulator with intellectual analysis function, it is related to bridge construction analogue technique field, including main body and bridge plate, running through at left and right sides of the inner wall of the main body has the first electric pushrod, and first between electric pushrod and main body to be fixedly connected, the bridge plate is placed in the inside of main body, and the bottom end of bridge plate is provided with fixed column, and the fixed column is connected by bolt with bridge plate.The beneficial effects of the present invention are: this can combine the bridge construction simulator with intellectual analysis function, pass through the setting to connection frame, pressure fan, bridge plate and fixed column, it and is to be flexibly connected between connection frame and pressure fan, start pressure fan, so that wind is to bridge plate, pass through the effect of the intellectual analysis component on the inside of device, so as to which the influence to wind speed, wind direction etc. to bridge plate judges, similar phenomenon is avoided to occur during actual bridge construction convenient for prompt staff.

Description

A kind of bridge construction simulator combined with intellectual analysis function
Technical field
The present invention relates to bridge construction analogue technique fields, specially a kind of to combine the bridge with intellectual analysis function Build simulator.
Background technique
With the development of science and technology and the progress of social times, the quantity of bridge is more and more, and before bridge construction It is required to simulate the bridge for completing the construction area by the way that the bridge construction simulator with intellectual analysis function can be combined Which problem can be encountered in practice, convenient for avoiding this kind of disadvantage in practical bridge building course, promote the suitable of bridge construction The property used.
A kind of bridge structure disclosed in 201310127317.7 U of Chinese invention patent application prospectus CN is prominent The simulator of damage, the simulator of bridge structure burst damage are sent out, although can be used to verify various structural health inspections The structural damage moment of the superiority and inferiority and applicability of survey method, record is more accurate, still, the simulation of bridge structure burst damage Device, having cannot be to the simulated operation carried out after bridge construction by natural calamity, while not having the function of intellectual analysis, makes Its shortcomings that there are limitations.
Summary of the invention
The purpose of the present invention is to provide one kind can combine the bridge construction simulator with intellectual analysis function, solves The problems mentioned above in the background art.
To achieve the above object, the invention provides the following technical scheme: a kind of can combine the bridge with intellectual analysis function Beam builds simulator, including main body and bridge plate, and running through at left and right sides of the inner wall of the main body has the first electric pushrod, and the To be fixedly connected between one electric pushrod and main body, the bridge plate is placed in the inside of main body, and the bottom end setting of bridge plate There is fixed column, the fixed column is connected by bolt with bridge plate, and fixed plate is mounted on the outside of fixed column, the fixation Mutually fixed between plate and fixed column by bolt, and the bottom end of fixed plate and fixed column is provided with fixing seat, the fixing seat with It is mutually fixed between main body by bolt, and the inner wall top of main body is equipped with camera, sets on the left of the inner tip of the main body It being equipped with connection frame, and is mounted with pressure fan on the right side of the bottom end of connection frame, the bottom of the main body is provided with the first hydraulic stem, and the One hydraulic stem is connected by the first multi-directional ball with main body, and the bottom end of first hydraulic stem is mounted with pedestal, and the bottom of pedestal Portion is provided with universal wheel, is flexibly connected between the universal wheel and pedestal, and is mounted with water tank at left and right sides of the top of pedestal, The inside of the water tank is equipped with water pump, and the output end of water pump is connected with outlet pipe, the one end of the outlet pipe far from water pump It is connected with main body, the water tank runs through close to the inside of base center axis line water inlet pipe, and the one end of water inlet pipe far from water tank It is connected with main body, the water tank is circumscribed with the first connecting plate, and the first connecting plate and pedestal on the inside of base center axis line Between to be fixedly connected.
Optionally, the perpendicular shape distribution in the side of first electric pushrod and main body, and the first electric pushrod is about master The central axes of body are symmetrical, and the front of the main body is equipped with control panel.
Optionally, the center line of the bridge plate and the center line of main body coincide, and the arc-shaped shape of bridge plate is distributed in The top of fixed column, the bottom end of the main body is provided with the second hydraulic stem, and the second hydraulic stem passes through the second multi-directional ball and main body It is flexibly connected, is provided with the second connecting plate at left and right sides of the top of the pedestal, and be fixed between the second connecting plate and pedestal Connection, the inner wall left and right sides of the main body, which is run through, the second electric pushrod.
Optionally, the connection frame constitutes detachable structure by bolt and main body, and is between connection frame and pressure fan It is flexibly connected, is provided with connecting tube on the outside of the water tank, and outer wall of the connecting tube close to water tank one end is provided with external screw thread, institute The inner wall for stating the output end of water tank offers internal screw thread.
Optionally, the inboard width of the outlet pipe and the inboard width of water inlet pipe are equal, and outlet pipe is in water inlet pipe Contour shape is distributed in the outside of main body, and the top outer of the main body is provided with door-hinge, and the outer wall activity of door-hinge is mounted with work Door is moved, fixing groove is offered on the inside of first connecting plate, and fixing groove passes through injection molding and the first being integrally formed of connecting plate Structure.
Optionally, the shape of first connecting plate matches with the shape of the second connecting plate, and the first connecting plate passes through Fixing groove, the first electric pushrod and main body constitute bascule.
Optionally, the elemental height of second hydraulic stem is equal with the elemental height of the first hydraulic stem, and second is hydraulic Bar is connect with the perpendicular shape of pedestal.
Optionally, the connecting tube is symmetrical about the transverse axis of main body, and connecting tube passes through external screw thread, internal screw thread and water The output end of case constitutes detachable structure.
Optionally, the dodge gate constitutes bascule, and the area of section and main body of dodge gate by door-hinge and main body Top end opening area of section it is equal.
The present invention provides one kind can combine the bridge construction simulator with intellectual analysis function, has following beneficial Effect:
1, this can combine the bridge construction simulator with intellectual analysis function, by connection frame, pressure fan, bridge The setting of plate and fixed column, and to be flexibly connected between connection frame and pressure fan, starting pressure fan, so that wind is to bridge plate, By the effect of the intellectual analysis component on the inside of device, so as to which the influence to wind speed, wind direction etc. to bridge plate is sentenced It is disconnected, avoid similar phenomenon from occurring during actual bridge construction convenient for prompt staff, and the arc-shaped shape of bridge plate It is distributed in the top of fixed column, the effect on the top of fixed column is distributed in by the bridge plate of arc-shaped shape, so that it simulates bridge Beam is across river two sides, and under the action of be connected between bridge plate and fixed column by bolt, convenient for staff and When replacement operation is carried out to different types of bridge plate so that staff is in subsequent practical bridge building course, to bridge The work such as type selecting, the materials of beam are more smooth.
2, this can combine the bridge construction simulator with intellectual analysis function, by the first electric pushrod, main body, The setting of outlet pipe and water inlet pipe, and the perpendicular shape distribution in the side of the first electric pushrod and main body, carry out in the second hydraulic stem Lifting processing, and on the inside of main body simulation bridge carry out earthquake type vibration operation when so that the first electric pushrod start, together When, output end is inserted into fixing groove, convenient for the operation such as being consolidated, being drawn to main body, avoid main body integrally occur on move down Dynamic phenomenon reduces device to the earthquake simulation effect after bridge construction on the inside of main body, and outlet pipe and water inlet pipe are in contour shape It is distributed in the outside of main body, under the interaction of outlet pipe and water inlet pipe, so that the water flow on the inside of main body is able to carry out circulation The flow operation of formula, convenient for the fixing seat in simulation bridge construction Bridge board bottom portion and fixed column etc. in the percussion by water flow Under, what kind of supporting effect when building on bridge plate, which generates, influences.
3, this can combine the bridge construction simulator with intellectual analysis function, by the first connecting plate, fixing groove, The setting of first electric pushrod, main body, the second hydraulic stem and the first hydraulic stem, and the first connecting plate passes through fixing groove, the first electricity Dynamic push rod and main body constitute bascule, when the detection that device carries out earthquake type to the simulation construction bridge on the inside of main body operates When, lifting processing is carried out by the second hydraulic stem, so that main body is swayed forwards and backwards, after enabling a device to simulation bridge construction Anti-seismic performance, and be compared with the anti-seismic performance theoretically born, and the elemental height of the second hydraulic stem and first hydraulic The elemental height of bar is equal, under the supporting role of the first hydraulic stem and the second hydraulic stem to main body, so that main body is in balance In state, the simulation bridge on the inside of main body is less prone to phenomenon of toppling over, and avoids influencing subsequent simulation work.
4, this can combine the bridge construction simulator with intellectual analysis function, by connecting tube, internal screw thread, outer spiral shell The setting of line and water tank, and connecting tube constitutes detachable structure by the output end of external screw thread, internal screw thread and water tank, in connecting tube Under the action of, the water on the inside of two water tanks can be subjected to connection operation, enable water flow on the inside of main body shape stream in a ring It is dynamic, in Lifting Water, it can preferably simulate the influence work in bridge construction by floods.
5, this can combine the bridge construction simulator with intellectual analysis function, by dodge gate, door-hinge and main body Setting, and dodge gate constitutes bascule by door-hinge and main body, when needing to the bridge construction emulation mode on the inside of main body When being changed operation, dodge gate can be pulled open by staff, and under the rotary action of door-hinge so that dodge gate with It completes to open work between main body, map function is carried out to the bridge construction simulated assembly on the inside of it convenient for staff, is promoted Flexibility of the device to bridge construction simulation work.
Detailed description of the invention
Fig. 1 is the structural schematic diagram that one kind of the present invention can combine the bridge construction simulator with intellectual analysis function;
Fig. 2 is the main body outboard structure that one kind of the present invention can combine the bridge construction simulator with intellectual analysis function Schematic diagram;
Fig. 3 is the side structure signal that one kind of the present invention can combine the bridge construction simulator with intellectual analysis function Figure;
Fig. 4 is the plan structure signal that one kind of the present invention can combine the bridge construction simulator with intellectual analysis function Figure;
Fig. 5 is that one kind of the present invention can combine enlarged structure at the A of the bridge construction simulator with intellectual analysis function Schematic diagram;
Fig. 6 is that one kind of the present invention can combine enlarged structure at the B of the bridge construction simulator with intellectual analysis function Schematic diagram;
Fig. 7 is the flowage structure signal that one kind of the present invention can combine the bridge construction simulator with intellectual analysis function Figure.
In figure: 1, main body;2, the first electric pushrod;3, bridge plate;4, camera;5, fixed plate;6, pressure fan;7, it connects Frame;8, water inlet pipe;9, water tank;10, water pump;11, outlet pipe;12, the first multi-directional ball;13, the first hydraulic stem;14, pedestal;15, Universal wheel;16, the first connecting plate;17, control panel;18, fixed column;19, fixing seat;20, the second multi-directional ball;21, the second liquid Compression bar;22, connecting tube;23, door-hinge;24, dodge gate;25, fixing groove;26, internal screw thread;27, external screw thread;28, it second electronic pushes away Bar;29, the second connecting plate.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
In the description of the present invention, unless otherwise indicated, the meaning of " plurality " is two or more;Term " on ", The orientation or positional relationship of the instructions such as "lower", "left", "right", "inner", "outside", " front end ", " rear end ", " head ", " tail portion " is It is based on the orientation or positional relationship shown in the drawings, is merely for convenience of description of the present invention and simplification of the description, rather than instruction or dark Show that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as pair Limitation of the invention.In addition, term " first ", " second ", " third " etc. are used for description purposes only, and should not be understood as instruction or Imply relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " connected " " connects Connect " it shall be understood in a broad sense, for example, it may be being fixedly connected, it may be a detachable connection, or be integrally connected;It can be machine Tool connection, is also possible to be electrically connected;It can be directly connected, it can also be indirectly connected through an intermediary.For this field For those of ordinary skill, the concrete meaning of above-mentioned term in the present invention can be understood with concrete condition.
Fig. 1-7 is please referred to, the present invention provides a kind of technical solution: one kind can combine the bridge with intellectual analysis function and build Make simulator, including main body 1, the first electric pushrod 2, bridge plate 3, camera 4, fixed plate 5, pressure fan 6, connection frame 7, into Water pipe 8, water tank 9, water pump 10, outlet pipe 11, the first multi-directional ball 12, the first hydraulic stem 13, pedestal 14, universal wheel 15, first connect Fishplate bar 16, control panel 17, fixed column 18, fixing seat 19, the second multi-directional ball 20, the second hydraulic stem 21, connecting tube 22, door-hinge 23, dodge gate 24, fixing groove 25, internal screw thread 26, external screw thread 27, the second electric pushrod 28 and the second connecting plate 29, main body 1 it is interior Through there is the first electric pushrod 2 at left and right sides of wall, and to be fixedly connected between the first electric pushrod 2 and main body 1, first electronic is pushed away The perpendicular shape in the side of bar 2 and main body 1 is distributed, and the first electric pushrod 2 is symmetrical about the central axes of main body 1, hydraulic second Bar 21 carries out lifting processing, and when carrying out earthquake type vibration operation to the simulation bridge of 1 inside of main body, so that the first electric pushrod 2 startings, meanwhile, output end is inserted into fixing groove 25, convenient for the operation such as being consolidated, being drawn to main body 1, avoids main body 1 whole The phenomenon that body moves up and down reduces device to the earthquake simulation effect after 1 inside bridge construction of main body;
The front of main body 1 is equipped with control panel 17, and bridge plate 3 is placed in the inside of main body 1, and the bottom end of bridge plate 3 It is provided with fixed column 18, the center line of bridge plate 3 and the center line of main body 1 coincide, and the arc-shaped shape of bridge plate 3 is distributed in admittedly The top of fixed column 18 is distributed in the effect on the top of fixed column 18 by the bridge plate 3 of arc-shaped shape, so that it simulates bridge cross Cross a river stream two sides, and under the action of be connected between bridge plate 3 and fixed column 18 by bolt, it is timely convenient for staff Replacement operation is carried out to different types of bridge plate 3, so that staff is in subsequent practical bridge building course, to bridge The work such as type selecting, materials it is more smooth, the bottom end of main body 1 is provided with the second hydraulic stem 21, and the second hydraulic stem 21 passes through the Two multi-directional balls 20 are flexibly connected with main body 1, and the elemental height of the second hydraulic stem 21 is equal with the elemental height of the first hydraulic stem 13, And second hydraulic stem 21 connect with the perpendicular shape of pedestal 14, in the support of the first hydraulic stem 13 and the second hydraulic stem 21 to main body 1 Under effect, so that main body 1 is in equilibrium state, the simulation bridge of 1 inside of main body is less prone to phenomenon of toppling over, after avoiding influence Continuous simulation work;
It is provided with the second connecting plate 29 at left and right sides of the top of pedestal 14, and is solid between the second connecting plate 29 and pedestal 14 Fixed connection, through there is the second electric pushrod 28, fixed column 18 is connected by bolt with bridge plate 3 for the inner wall left and right sides of main body 1 It connects, and the outside of fixed column 18 is mounted with fixed plate 5, is mutually fixed between fixed plate 5 and fixed column 18 by bolt, and fixed plate 5 are provided with fixing seat 19 with the bottom end of fixed column 18, are mutually fixed between fixing seat 19 and main body 1 by bolt, and main body 1 is interior Wall top is equipped with camera 4, and connection frame 7, and placement on the right side of the bottom end of connection frame 7 are provided on the left of the inner tip of main body 1 There is pressure fan 6, connection frame 7 constitutes detachable structure by bolt and main body 1, and is that activity connects between connection frame 7 and pressure fan 6 It connects, starts pressure fan 6, so that wind is to bridge plate 3, by the effect of the intellectual analysis component on the inside of device, so as to Influence to wind speed, wind direction etc. to bridge plate 3 judges, keeps away during actual bridge construction convenient for prompt staff Exempt from similar phenomenon to occur;
The outside of water tank 9 is provided with connecting tube 22, and outer wall of the connecting tube 22 close to 9 one end of water tank is provided with external screw thread 27, connecting tube 22 is symmetrical about the transverse axis of main body 1, and connecting tube 22 is defeated with water tank 9 by external screw thread 27, internal screw thread 26 Outlet constitutes detachable structure, under the action of connecting tube 22, the water of two 9 insides of water tank can be carried out connection operation, made The water flow of the inside of main body 1 shape can flow in a ring, in Lifting Water, can preferably simulate in bridge construction by To the influence work of floods, the inner wall of the output end of water tank 9 offers internal screw thread 26, and it is hydraulic that the bottom of main body 1 is provided with first Bar 13, and the first hydraulic stem 13 is connected by the first multi-directional ball 12 with main body 1, the bottom end of the first hydraulic stem 13 is mounted with pedestal 14, and the bottom of pedestal 14 is provided with universal wheel 15, is flexibly connected between universal wheel 15 and pedestal 14, and the top of pedestal 14 The left and right sides is mounted with water tank 9, and the inside of water tank 9 is equipped with water pump 10, and the output end of water pump 10 is connected with outlet pipe 11, out The inboard width of water pipe 11 is equal with the inboard width of water inlet pipe 8, and outlet pipe 11 and water inlet pipe 8 are distributed in main body in contour shape 1 outside, under the interaction of outlet pipe 11 and water inlet pipe 8, so that the water flow of 1 inside of main body is able to carry out circulating stream Dynamic operation, convenient for the fixing seat 19 of simulation 3 bottom of bridge construction jackshaft beam slab and fixed column 18 etc. in the percussion by water flow Under, what kind of supporting effect when building on bridge plate 3, which generates, influences, and the top outer of main body 1 is provided with door-hinge 23, and door-hinge 23 outer wall activity is mounted with dodge gate 24, and dodge gate 24 constitutes bascule by door-hinge 23 and main body 1, and dodge gate 24 Area of section is equal with the top end opening area of section of main body 1, when needing the bridge construction emulation mode to the inside of main body 1 to carry out When changing operation, dodge gate 24 can be pulled open by staff, and under the rotary action of door-hinge 23, so that dodge gate 24 It completes to open work between main body 1, map function is carried out to the bridge construction simulated assembly on the inside of it convenient for staff, is mentioned Rise flexibility of the device to bridge construction simulation work;
The inside of first connecting plate 16 offers fixing groove 25, and fixing groove 25 is made up of injection molding and the first connecting plate 16 Integral structure, the one end of outlet pipe 11 far from water pump 10 are connected with main body 1, inside of the water tank 9 close to 14 central axes of pedestal Through there is water inlet pipe 8, and the one end of water inlet pipe 8 far from water tank 9 is connected with main body 1, and water tank 9 is in 14 central axes of pedestal Side is circumscribed with the first connecting plate 16, and to be fixedly connected between the first connecting plate 16 and pedestal 14, the shape of the first connecting plate 16 It matches with the shape of the second connecting plate 29, and the first connecting plate 16 passes through fixing groove 25, the first electric pushrod 2 and 1 structure of main body It is hydraulic by second when device, which builds bridge to the simulation of 1 inside of main body, carries out the detection operation of earthquake type at bascule Bar 21 carries out lifting processing, so that main body 1 is swayed forwards and backwards, the anti-seismic performance after enabling a device to simulation bridge construction, And it is compared with the anti-seismic performance theoretically born.
In conclusion this can combine the bridge construction simulator with intellectual analysis function, in use, pass through first by Fixing seat 19, fixed column 18, fixed plate 5 and bridge plate 3 such as are combined by bolt, install at the operation, and are placed in main body 1 Inside, meanwhile, camera 4, connection frame 7, pressure fan 6 etc. are placed at dodge gate 24, and pushed and lived by staff Dynamic door 24, and under the rotary action of door-hinge 23, so that dodge gate 24 and main body 1 are completed to close work, then, start pressure fan 6, so that wind drives the photographing module in camera 4 to the bridge in wind to bridge plate 3, by the central processing unit on the inside of device The abnormal phenomenon that beam slab 3 generates is monitored operation, so that central processing unit drives analysis module to wind speed, wind direction etc. to bridge The influence of plate 3 is analyzed and processed, and avoids similar phenomenon from going out during actual bridge construction convenient for prompt staff It is existing, then, start water pump 10, so that inside of the water of 9 inside of water tank along the inflow main body 1 of outlet pipe 11, and water inlet pipe 8 Under effect, the water flow for flowing through main body 1 is flowed into another water tank 9, meanwhile, it, can be by two water by the effect of connecting tube 22 The water of the inside of case 9 carries out connection operation, and enabling the water flow of 1 inside of main body, shape flows in a ring, in Lifting Water, The influence work in bridge construction by floods can be preferably simulated, and camera shooting is driven by the central processing unit on the inside of device The abnormal phenomenon that photographing module in first 4 generates the bridge plate 3 in wind is monitored operation, so that central processing unit driving point It analyses influence of the module to floods to bridge plate 3 to be analyzed and processed, carries out earthquake type vibration in bridge of the device to 1 inside of main body When simulated operation, lifting processing is carried out by the second hydraulic stem 21, meanwhile, so that the first electric pushrod 2 (model: NKLA4) opens It is dynamic, meanwhile, output end is inserted into the fixing groove 25 of 16 inside of the first connecting plate, convenient for the behaviour such as being consolidated, being drawn to main body 1 The phenomenon that making, main body 1 is avoided integrally to move up and down reduces device and imitates to the earthquake simulation after 1 inside bridge construction of main body Fruit carries out lifting processing by the first hydraulic stem 13 after the completion of the vibration simulation of front and back, meanwhile, so that the second electric pushrod 28 (model: NKLA4) starting, and snaps into the second connecting plate 29, and main body 1 is effectively avoided to move integrally, and on the inside of device in The abnormal phenomenon that photographing module in central processor driving camera 4 generates the bridge plate 3 in wind is monitored operation, so that Central processing unit drives influence of the analysis module to different shock conditions etc. to bridge plate 3 to be analyzed and processed, and electrically member The operation power of part is required to power module to be powered work for it, and final analysis structure passes through control panel 17 The display module of inside completes display work.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (9)

1. one kind can combine the bridge construction simulator with intellectual analysis function, including main body (1) and bridge plate (3), Be characterized in that: running through at left and right sides of the inner wall of the main body (1) has the first electric pushrod (2), and the first electric pushrod (2) and master To be fixedly connected between body (1), the bridge plate (3) is placed in the inside of main body (1), and the bottom end of bridge plate (3) is provided with Fixed column (18), the fixed column (18) are connected by bolt with bridge plate (3), and are mounted on the outside of fixed column (18) solid Fixed board (5) is mutually fixed between the fixed plate (5) and fixed column (18) by bolt, and fixed plate (5) and fixed column (18) Bottom end is provided with fixing seat (19), is mutually fixed between the fixing seat (19) and main body (1) by bolt, and main body (1) is interior Wall top is equipped with camera (4), is provided with connection frame (7) on the left of the inner tip of the main body (1), and connection frame (7) It is mounted with pressure fan (6) on the right side of bottom end, the bottom of the main body (1) is provided with the first hydraulic stem (13), and the first hydraulic stem (13) it is connected by the first multi-directional ball (12) with main body (1), the bottom end of first hydraulic stem (13) is mounted with pedestal (14), And the bottom of pedestal (14) is provided with universal wheel (15), is flexibly connected between the universal wheel (15) and pedestal (14), and bottom It is mounted with water tank (9) at left and right sides of the top of seat (14), the inside of the water tank (9) is equipped with water pump (10), and water pump (10) Output end be connected with outlet pipe (11), the outlet pipe (11) is connected far from the one end of water pump (10) with main body (1), described Water tank (9) close to pedestal (14) central axes inside through having water inlet pipe (8), and the one end of water inlet pipe (8) far from water tank (9) with Main body (1) is connected, and the water tank (9) is circumscribed with the first connecting plate (16) on the inside of pedestal (14) central axes, and first It is to be fixedly connected between connecting plate (16) and pedestal (14).
2. one kind according to claim 1 can combine the bridge construction simulator with intellectual analysis function, feature Be: the perpendicular shape in the side of first electric pushrod (2) and main body (1) is distributed, and the first electric pushrod (2) is about main body (1) central axes are symmetrical, and the front of the main body (1) is equipped with control panel (17).
3. one kind according to claim 1 can combine the bridge construction simulator with intellectual analysis function, feature Be: the center line of the bridge plate (3) and the center line of main body (1) coincide, and bridge plate (3) arc-shaped shape is distributed in admittedly The bottom end on the top of fixed column (18), the main body (1) is provided with the second hydraulic stem (21), and the second hydraulic stem (21) passes through second Multi-directional ball (20) is flexibly connected with main body (1), is provided with the second connecting plate (29) at left and right sides of the top of the pedestal (14), and Running through to be fixedly connected between second connecting plate (29) and pedestal (14), at left and right sides of the inner wall of the main body (1) has the second electricity Dynamic push rod (28).
4. one kind according to claim 1 can combine the bridge construction simulator with intellectual analysis function, feature Be: the connection frame (7) constitutes detachable structure by bolt and main body (1), and between connection frame (7) and pressure fan (6) It to be flexibly connected, is provided with connecting tube (22) on the outside of the water tank (9), and connecting tube (22) is close to the outer of water tank (9) one end Wall is provided with external screw thread (27), and the inner wall of the output end of the water tank (9) offers internal screw thread (26).
5. one kind according to claim 1 can combine the bridge construction simulator with intellectual analysis function, feature Be: the inboard width of the outlet pipe (11) is equal with the inboard width of water inlet pipe (8), and outlet pipe (11) and water inlet pipe (8) outside of main body (1) is distributed in contour shape, the top outer of the main body (1) is provided with door-hinge (23), and door-hinge (23) Outer wall activity be mounted with dodge gate (24), offered fixing groove (25) on the inside of first connecting plate (16), and fixing groove (25) pass through injection molding and the first connecting plate (16) being integrally formed structure.
6. one kind according to claim 1 can combine the bridge construction simulator with intellectual analysis function, feature Be: the shape of first connecting plate (16) matches with the shape of the second connecting plate (29), and the first connecting plate (16) is logical It crosses fixing groove (25), the first electric pushrod (2) and main body (1) and constitutes bascule.
7. one kind according to claim 3 can combine the bridge construction simulator with intellectual analysis function, feature Be: the elemental height of second hydraulic stem (21) is equal with the elemental height of the first hydraulic stem (13), and the second hydraulic stem (21) it is connect with pedestal (14) perpendicular shape.
8. one kind according to claim 4 can combine the bridge construction simulator with intellectual analysis function, feature Be: the connecting tube (22) is symmetrical about the transverse axis of main body (1), and connecting tube (22) passes through external screw thread (27), interior spiral shell Line (26) and the output end of water tank (9) constitute detachable structure.
9. one kind according to claim 5 can combine the bridge construction simulator with intellectual analysis function, feature Be: the dodge gate (24) constitutes bascule by door-hinge (23) and main body (1), and the area of section of dodge gate (24) with The top end opening area of section of main body (1) is equal.
CN201811226170.6A 2018-10-20 2018-10-20 A kind of bridge construction simulator combined with intellectual analysis function Withdrawn CN109087575A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811226170.6A CN109087575A (en) 2018-10-20 2018-10-20 A kind of bridge construction simulator combined with intellectual analysis function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811226170.6A CN109087575A (en) 2018-10-20 2018-10-20 A kind of bridge construction simulator combined with intellectual analysis function

Publications (1)

Publication Number Publication Date
CN109087575A true CN109087575A (en) 2018-12-25

Family

ID=64844014

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811226170.6A Withdrawn CN109087575A (en) 2018-10-20 2018-10-20 A kind of bridge construction simulator combined with intellectual analysis function

Country Status (1)

Country Link
CN (1) CN109087575A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112365787A (en) * 2020-11-09 2021-02-12 张前进 Assembled bridge design model

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112365787A (en) * 2020-11-09 2021-02-12 张前进 Assembled bridge design model

Similar Documents

Publication Publication Date Title
US7926339B2 (en) Vertical wind tunnel with viewing facility
CN109087575A (en) A kind of bridge construction simulator combined with intellectual analysis function
CN104180967B (en) Outside-reactor experimental section for component
CN107280550A (en) A kind of gardens use can surge the mobile bath pond of pressure
CN108680724B (en) It is a kind of for simulating the native case apparatus of furrow structure
CN208039809U (en) The closed small space plate device of reinforced concrete structure
CN110608993A (en) Test device for artificially simulating rainfall kinetic energy to influence soil erosion
CN100503975C (en) Arch bridge vortex vibration control building membrane structure for arch bridge
CN206804491U (en) Seepage tests system
CN205881301U (en) A salt solution experimental apparatus for simulating compound ventilation of building shaft formula
CN209451265U (en) A kind of tennis service device of the physical education with cleaning function
CN209542046U (en) It is a kind of for testing the wind-tunnel jig of whole machine cabinet systematic air flow
CN207429222U (en) A kind of animal and veterinary cleaning device
CN209494093U (en) A kind of assembled architecture installation curtain wall connection component
CN103726863A (en) Jet fan for tunnel
CN211603187U (en) Rainfall simulation device for city design
CN208966350U (en) A kind of tunnel reinforcement and the mobile bracket of maintenance
CN220434366U (en) Runner overhauls platform
CN207452815U (en) A kind of circulating water conservancy ecosystem fish pass simulation system
CN107745782A (en) A kind of installation method of propeller shaft bracket
CN208899637U (en) A kind of building element structure based on BIM
CN113911281B (en) Underwater vehicle appearance optimization performance test platform and method
CN206058674U (en) The uncommon sieve fountain circulation demonstration device of teaching
CN206245626U (en) A kind of vertically communicated formula splicing guardrail
CN110375927A (en) A kind of water test complex for vehicle dormer window salt fog test

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20181225