CN109087487A - It is a kind of to support the multistage warning message method for pushing being delayed - Google Patents
It is a kind of to support the multistage warning message method for pushing being delayed Download PDFInfo
- Publication number
- CN109087487A CN109087487A CN201811240346.3A CN201811240346A CN109087487A CN 109087487 A CN109087487 A CN 109087487A CN 201811240346 A CN201811240346 A CN 201811240346A CN 109087487 A CN109087487 A CN 109087487A
- Authority
- CN
- China
- Prior art keywords
- data
- push
- delay
- warning message
- pushing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G08—SIGNALLING
- G08B—SIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
- G08B25/00—Alarm systems in which the location of the alarm condition is signalled to a central station, e.g. fire or police telegraphic systems
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/50—Network services
- H04L67/55—Push-based network services
Landscapes
- Business, Economics & Management (AREA)
- Emergency Management (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Alarm Systems (AREA)
Abstract
The multistage warning message method for pushing being delayed is supported the invention discloses a kind of, belong to device status monitoring and warning message push field, method content are as follows: after receiving data D, by judging early period to obtain the whether normal result of data D, if a plurality of data are abnormal, delay push judgement is then carried out, to having paid attention to equipment but do not receive the client of PUSH message, push delay process is carried out according to the push of the data D rank L that is delayed.The present invention is by comparing the state change of current data and historical data and introduces delay strategy, meets different stage personnel to the different attention rates of Same Alarm message, also effectively reduces message push cost.
Description
Technical field
The invention belongs to device status monitorings and warning message to push field, and in particular to a kind of to support the multistage report being delayed
Alert information push method.
Background technique
Warning message push is indispensable one of the function of various kinds of equipment monitoring software system, is generallyd use at present
Warning message method for pushing has the following deficiencies:
1, when equipment state is continuous or is frequently in except given threshold, the warning message largely pushed in a short time may
Cause recipient to be sick of, or even misses important warning message.
2, it is not able to satisfy enterprise different stage personnel (such as a line operator on duty, administrative staff and decision-maker) to equipment report
The different attention rates requirement of alert message.
Summary of the invention
According to the deficiency of background above technology, the technical problem to be solved by the present invention is to propose a kind of multistage delay of support
Warning message method for pushing, by comparing the state change of current data and historical data and introduce delay strategy, meet not
Same level personnel also effectively reduce message push cost to the different attention rates of Same Alarm message.
In order to solve the above-mentioned technical problem, the technical solution adopted by the present invention are as follows: a kind of that the multistage alarm being delayed is supported to disappear
Method for pushing is ceased, after receiving data D, after judgement operation early period being compared with historical data, whether just to obtain data D
It is normal as a result, carry out delay push judgement if continuous a plurality of data are abnormal, to having paid attention to equipment but do not receive
The client of PUSH message carries out push delay process according to the push of data D delay rank L.
In the above method, judgement early period includes judging whether data D is first data, judges whether data D is normal
And judge whether upper data C is normal.In judgement early period, if judging result is normal, more new equipment last state table.
The a plurality of data are abnormal to refer to that data D and upper data C are abnormal.
In the above method, the calculation method of the push delay rank L is to calculate data D according to upper data C and data D
Push be delayed rank L:
Step is 1.: obtaining the corresponding duration K of preset push delay at different levelsi, 1≤i≤N;
Step is 2.: the time difference E of time in computing system current time and upper data C;
Step is 3.: each push is examined successively and completes mark FiIf FiIt is more than K for 0 and Ei, then L=i is obtained.
The push delay process method particularly includes:
1) the push delay rank L of data D is calculated;
2) all user list U for having paid close attention to corresponding equipment V and push delay rank is L are obtained;
3) judge whether the data in user list U are disposed;
If 4), for each user in U, generate corresponding warning message P that processing terminate and join the team to report
Alert PUSH message queue Q, time of fire alarming are set as the time of fire alarming of data C;
If 5) processing terminate, more new equipment last state table.
The medicine have the advantages that by the multiple judgement to data in the present invention, progressive updating equipment last state table,
And according to judging result, update the time of fire alarming in state table;Delay strategy is introduced, meets different stage personnel to same report
The different attention rates of alert message also effectively reduce message push cost.
Detailed description of the invention
Content expressed by this specification attached drawing and the label in figure are briefly described below:
Fig. 1 is the process signal of the warning message method for pushing of the support multistage delay of a specific embodiment of the invention
Figure.
Specific embodiment
Below against attached drawing, by the description of the embodiment, for example related each component of a specific embodiment of the invention
Shape, construction, the mutual alignment between each section and connection relationship, the effect of each section and working principle, manufacturing process and
Operate with method etc., is described in further detail, to help those skilled in the art to inventive concept of the invention, technology
Scheme has more complete, accurate and deep understanding.
It is a kind of to support the multistage warning message method for pushing being delayed, after receiving data D, by being compared with historical data
Judgement operation early period after, whether normal as a result, if continuous a plurality of data abnormal, main in the present invention if obtaining data D
Refer to that received current data D and upper data C are abnormal, then carry out delay push judgement, to have paid attention to equipment but
The client for not receiving PUSH message carries out push delay process according to the push of data D delay rank L.Specific method step
Are as follows:
Step 1: the every a line established in equipment last state table T, T contain an equipment newest working condition and
Complement mark etc. is pushed, T is initially free of any row.
Step 2: the every a line established in alarm PUSH message queue Q, Q represents the message that will be pushed (i.e. originally
The output result of method), Q is initially free of any row.
Step 3: receiving data D, D is usually from data acquisition subsystem, and it comprises the necessary information of a certain equipment, packets
Include device id, equipment working state, acquisition time, for the first time time of fire alarming etc..
Step 4: obtaining the push complement mark F that D in T corresponds to the delays at different levels of equipment Vi(1≤i≤N, N are message push
Delay rank sum), each FiInitial value to be 0 (indicate not yet to have paid close attention to V to all and be delayed user that rank is i all
Message is pushed).
Step 5: and then judgement early period is carried out, concrete operations are to be compared with historical data, including judging data D
Whether it is first data, judges whether data D is normal and judge whether upper data C is normal.If it is judged that be it is normal, then
More new equipment last state table, particular content are as follows: check T, judge D whether the first data for being V set because T does not include initially
The last state of standby V should add corresponding line to T if D is first data, when follow-up data to receive V with row progress
It compares.
Step 5.1: if D is the first data of V, continuing to judge whether D is normal (in the threshold range i.e. in setting);
Step 5.1.1: if D is normal, D is inserted into T (time of fire alarming for the first time of setting V is sky), and go to step
3;
Step 5.1.2: if D is abnormal, D is inserted into T (time of fire alarming for the first time of setting V is the time in D, after
Continued access will be compared when receiving alert data with the time, so as to the push alarm that judges whether to be delayed), and go to step 3.
Step 5.2: if D is not the first data of V, continuing to judge whether D is normal;
Step 5.2.1: if D is normal, the corresponding row of V in T (time of fire alarming for the first time of modification V is sky) is updated, and go to
Step 3;
Step 5.2.2: if D is abnormal, the upper data C of V is obtained from T, and continues to judge whether C is normal, only
When the continuous a plurality of data of V are abnormal, it is likely to push warning message.
Step 5.2.2.1: if C is normal, update the corresponding row of V in T (modification V time of fire alarming for the first time be D in when
Between), and go to step 3;
Step 5.2.2.2: it if C is abnormal, continues to determine whether all to have pushed to all users for having paid close attention to V and disappears
Breath, if (the i.e. corresponding each F of ViIt is 1,1≤i≤N), then step 3 is gone to;(the i.e. corresponding each F of V if notiIn at least one
It is 0,1≤i≤N), execute following logics:
1) the push delay rank L of D is calculated, according to C and D so as to subsequent other provided with this delay stages to all couples of V
User pushes warning message.Specific calculating logic are as follows:
Step is 1.: obtaining the corresponding duration K of preset push delay at different levelsi(1≤i≤N);
Step is 2.: the time difference E of time in computing system current time and C;
Step is 3.: each F is examined successivelyiIf FiIt is more than K for 0 and Ei, i.e., only when the time span of continuous a plurality of alert data
It has been more than KiWhen, it is likely to push warning message, then obtains L=i.
2) all user list U for having paid close attention to V and delay rank is L are obtained;
3) judge whether the data in user list U are disposed;
If 4) be not disposed, for each user in U, generating corresponding warning message P, (time of fire alarming is set
Be set to the time of fire alarming of C) and enqueue to Q, continuation step 3);It is universal that this step is clearly distinguishable from traditional alert method for pushing institute
" the pushing alarm if currently receiving the threshold value that data are more than setting " of use and " different messages recipient is not distinguished to same
The simple messages alarming logic such as degree of concern of equipment alarm ".
If 5) be disposed, the corresponding row of V is (by F in update TLIt is revised as 1), and goes to step 3.
The warning message method for pushing provided by the invention for supporting multistage delay, establishes equipment last state table and alarm disappears
Breath push queue, is judged by data, compares the state change of current data and historical data and introduce delay strategy, met not
Same level personnel also effectively reduce message push cost to the different attention rates of Same Alarm message.
The present invention is exemplarily described above in conjunction with attached drawing, it is clear that the present invention implements not by aforesaid way
Limitation, as long as the improvement for the various unsubstantialities that the inventive concept and technical scheme of the present invention carry out is used, or without changing
It is within the scope of the present invention into the conception and technical scheme of the invention are directly applied to other occasions.This hair
Bright protection scope should be determined by the scope of protection defined in the claims.
Claims (6)
1. a kind of support the multistage warning message method for pushing being delayed, which is characterized in that after receiving data D, by with history number
Whether after judgement operation early period being compared, it is normal as a result, if continuous a plurality of data are abnormal to obtain data D,
Delay push judgement is then carried out, to having paid attention to equipment but not receiving the client of PUSH message, is delayed according to the push of data D
Rank L carries out push delay process.
2. the warning message method for pushing according to claim 1 for supporting multistage delay, which is characterized in that the early period is sentenced
Disconnected includes judging whether data D is first data, judges whether data D is normal and judge whether upper data C is normal.
3. the warning message method for pushing according to claim 2 for supporting multistage delay, which is characterized in that the early period is sentenced
In disconnected, if judging result is normal, more new equipment last state table.
4. the warning message method for pushing according to claim 2 for supporting multistage delay, which is characterized in that a plurality of number
Refer to that data D and upper data C are abnormal according to abnormal.
5. the warning message method for pushing according to claim 1 for supporting multistage delay, which is characterized in that the push is prolonged
When rank L calculation method be to calculate the push of data D according to upper data C and data D to be delayed rank L:
Step is 1.: obtaining the corresponding duration K of preset push delay at different levelsi, 1≤i≤N;
Step is 2.: the time difference E of time in computing system current time and upper data C;
Step is 3.: each push is examined successively and completes mark FiIf FiIt is more than K for 0 and Ei, then L=i is obtained.
6. the warning message method for pushing according to claim 1 for supporting multistage delay, which is characterized in that the push is prolonged
When handle method particularly includes:
1) the push delay rank L of data D is calculated;
2) all user list U for having paid close attention to corresponding equipment V and push delay rank is L are obtained;
3) judge whether the data in user list U are disposed;
If 4) be not disposed, for each user in U, generates corresponding warning message P and join the team to alarm and push away
Message queue Q is sent, time of fire alarming is set as the time of fire alarming of data C;
If 5) be disposed, more new equipment last state table.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811240346.3A CN109087487B (en) | 2018-10-23 | 2018-10-23 | Alarm message pushing method supporting multi-stage time delay |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811240346.3A CN109087487B (en) | 2018-10-23 | 2018-10-23 | Alarm message pushing method supporting multi-stage time delay |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109087487A true CN109087487A (en) | 2018-12-25 |
CN109087487B CN109087487B (en) | 2020-05-15 |
Family
ID=64843922
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811240346.3A Active CN109087487B (en) | 2018-10-23 | 2018-10-23 | Alarm message pushing method supporting multi-stage time delay |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109087487B (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101170448A (en) * | 2007-11-22 | 2008-04-30 | 中兴通讯股份有限公司 | System and method for processing a large number reporting message on topology interface in telecommunication network management system |
CN102088363A (en) * | 2009-12-08 | 2011-06-08 | 大唐移动通信设备有限公司 | Alarm processing method and system |
CN102118275A (en) * | 2009-12-30 | 2011-07-06 | 大唐移动通信设备有限公司 | Alarm storm processing method and processing device |
EP2439709A1 (en) * | 2010-10-05 | 2012-04-11 | Cooper Security Limited | Alarm system power supply housing that has integrated signal transmitting means |
CN102625349A (en) * | 2012-03-09 | 2012-08-01 | 浪潮通信信息系统有限公司 | Method for processing data under alarm storm |
CN105471661A (en) * | 2015-12-28 | 2016-04-06 | 福建星网锐捷网络有限公司 | Alarming processing method and system |
KR20180000106A (en) * | 2016-06-22 | 2018-01-02 | 주식회사 컴애드커뮤니케이션 | System for conversational real-time translation service for booking accommodation and method thereof |
-
2018
- 2018-10-23 CN CN201811240346.3A patent/CN109087487B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101170448A (en) * | 2007-11-22 | 2008-04-30 | 中兴通讯股份有限公司 | System and method for processing a large number reporting message on topology interface in telecommunication network management system |
CN102088363A (en) * | 2009-12-08 | 2011-06-08 | 大唐移动通信设备有限公司 | Alarm processing method and system |
CN102118275A (en) * | 2009-12-30 | 2011-07-06 | 大唐移动通信设备有限公司 | Alarm storm processing method and processing device |
EP2439709A1 (en) * | 2010-10-05 | 2012-04-11 | Cooper Security Limited | Alarm system power supply housing that has integrated signal transmitting means |
CN102625349A (en) * | 2012-03-09 | 2012-08-01 | 浪潮通信信息系统有限公司 | Method for processing data under alarm storm |
CN105471661A (en) * | 2015-12-28 | 2016-04-06 | 福建星网锐捷网络有限公司 | Alarming processing method and system |
KR20180000106A (en) * | 2016-06-22 | 2018-01-02 | 주식회사 컴애드커뮤니케이션 | System for conversational real-time translation service for booking accommodation and method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN109087487B (en) | 2020-05-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP4667412B2 (en) | Electronic device centralized management program, electronic device centralized management apparatus, and electronic device centralized management method | |
CN109088775B (en) | Abnormity monitoring method and device and server | |
US20070182376A1 (en) | Battery management | |
CN113824768B (en) | Health check method and device in load balancing system and flow forwarding method | |
CN110990245A (en) | Micro-service operation state judgment method and device based on call chain data | |
CN113468021B (en) | Method, device, equipment and storage medium for monitoring performance data | |
CN109087487A (en) | It is a kind of to support the multistage warning message method for pushing being delayed | |
JP6381498B2 (en) | Weighing meter state change detection device and program | |
CN109981338A (en) | Alarm method, device and the storage medium that code pulls | |
CN117133105A (en) | Intelligent early warning system for commodity inventory management | |
CN110007940B (en) | Gray scale release verification method, system, server and readable storage medium | |
WO2023273461A1 (en) | Robot operating state monitoring system, and method | |
CN108919157A (en) | A kind of Real-time Alarm method and apparatus of comparatron operating condition | |
CN114820043A (en) | Market risk monitoring method and system based on knowledge graph | |
CN114661562A (en) | Data warning method, device, equipment and medium | |
CN114297034A (en) | Cloud platform monitoring method and cloud platform | |
CN109800122B (en) | Monitoring prompting method and device, computer equipment and storage medium | |
CN111967713A (en) | Construction safety supervisory systems | |
CN116991683B (en) | Alarm information processing method, device, equipment and medium | |
CN109885468A (en) | Various dimensions configuration system, method and storage medium for monitoring | |
CN109917865A (en) | A kind of hydrologic data monitoring system | |
CN116991684B (en) | Alarm information processing method, device, equipment and medium | |
CN109446035A (en) | A kind of computer system monitoring method | |
CN117251461A (en) | Database change on duty method | |
CN116434511A (en) | Equipment early warning method, device and medium based on wearable biosensor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |