CN109087069A - Two change fusion management system of one kind passes through mark consultation process Management Advisory Services platform - Google Patents
Two change fusion management system of one kind passes through mark consultation process Management Advisory Services platform Download PDFInfo
- Publication number
- CN109087069A CN109087069A CN201810869496.4A CN201810869496A CN109087069A CN 109087069 A CN109087069 A CN 109087069A CN 201810869496 A CN201810869496 A CN 201810869496A CN 109087069 A CN109087069 A CN 109087069A
- Authority
- CN
- China
- Prior art keywords
- project
- interface
- leader
- manager
- account
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Engineering & Computer Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Operations Research (AREA)
- Economics (AREA)
- Marketing (AREA)
- Data Mining & Analysis (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention provides two change fusion management system of one kind and passes through mark consultation process Management Advisory Services platform, which is characterized in that including presentation layer, operation layer, service layer and data access layer;On the one hand, through the invention, the interactive operation Shi Guanbiao enterprise of platform is global to project and process has overall understanding, it thus can preferably enter project role, it on the other hand, being capable of propagation and popularization more quick and that widely carry out passing through mark experience also by the process and project mode after solidifying on platform.
Description
Technical field
The present invention relates to teaching fields, and in particular to it is flat that two change fusion management system of one kind passes through mark consultation process Management Advisory Services
Platform.
Background technique
The two of current IT application in enterprises and industrialization construction change fusion management system, for either informatization
It is persistently and mature, or be all a strange management method just for the enterprise of contact informatization and informationization technology
By, although having carried out passing through the guidance of task and work during mark in a manner of results-driven on official's platform, how
It is that very ignorantly, can not find point of penetration and direction when enterprise carries out bidding work development to the output of these results
's.The mode setting of this platform, it is intended to take result as the standard of guiding by refining Responsibility of Staff, the job requirement in each stage
Change and instructs enterprise's progress is essential to pass through mark under project management standard process.
Summary of the invention
In view of this, passing through mark official communication the technical problem to be solved by the present invention is being intended to provide one kind two and changing fusion management system
Ask process management consultation platform.In order to achieve this goal, the invention patent uses following technical scheme:
Two change fusion management system of one kind passes through mark consultation process Management Advisory Services platform, is developed based on B/S framework, special
Sign is, including presentation layer, operation layer, service layer and data access layer;
(1) service layer includes project process control module, Template Manager, message center and training module;
(2) the access object of data access layer includes internal staff and external staff;
Internal staff includes Project Director (PD), project manager (PM);External staff includes leader (L), manager
(H), participant (TM) and internal anditor (TA);
Project Director account type is supervisor, has following permission: inquiry all items establish new projects, management PM
Account, maintenance template and exam pool and milestone trial;
Project manager's account type is administrator, has following permission: undertaken project operation and examination & approval and management item
Leader's account in mesh, the account account number are 1;
Leader's account type is primary account number, which is n, and n is positive integer, has following permission: negative to it
Project operation is blamed, and manages it and is responsible for project account;
Manager's account type is to check account, which is 2, has undertaken project query and examination and approval authority
Limit;
Participant's account type be tourist's account, the account account number be not more than 10, have undertaken project query and on
Pass permission;
Internal anditor type is student's account, which is not more than 50, and having an interior careful stage makes a report on permission;
The entitled PD of Project Director account;
Project manager's account entitled PM-n, n are positive integer;
The entitled entry name abbreviation of leader's account;
The entitled entry name abbreviation-H (X) of manager's account, X are 1 or 2;
The entitled entry name abbreviation-T (Y) of participant's account, Y are no more than 10 positive integers;
The entitled entry name abbreviation-A (Z) of internal anditor account, Z are no more than 50 positive integers;
(3) presentation layer include login interface, main interface, grassroot project interface, grassroot project team, change cryptographic interface,
The interface user list-PM, user list-project interface, main interface, template list interface, paper topic interface, my examination circle
Face and message center interface;
All users pass through login interface login system;Login interface is equipped with the option that forgets Password, can be by forgetting Password
Option connection backstage;
Project Director passes through grassroot project interface grassroot project;PM password is modified by change cryptographic interface;Pass through user
List-PM checks project list in interface;The contents of a project are checked by main interface;Template maintenance is carried out by template list interface;
Message is received by message center interface;
Project manager carries out project management by main interface;Pass through grassroot project group interface grassroot project group interface New any
Mesh;Project leader password is modified by change cryptographic interface;Check that project list initiates item by user list-project interface
Mesh index;Message is received by message center interface;
Leader enters system by main interface;Project leader password is modified by change cryptographic interface;Pass through message
Center interface receives message;Pass through paper topic interface;It is taken an exam by my examination interface;
Manager enters system by main interface and carries out project query;Message is received by message center interface;
Internal anditor enters system by main interface;It is taken an exam by my examination interface;By message center interface into
The row project implementation;
(4) operation layer content include: project of establishing and pass through mark starting, Current Situation Investigation and diagnosis, system anlysis and planning with
And documentation and publication;
Establish project and pass through mark Booting sequence the following steps are included:
S1, Project Director pass through login interface login system;Pass through main interface login system;It is new by grassroot project interface
It is submitted after building project;
S2, system background carry out gathering prompting in association phase;Project list is improved at project list interface;Project list
It is presented at project list interface;Project account is generated in user list interface;Project account is presented in user list interface;
S3, project manager set up project team and carry out censure distribution;And grassroot project group address list;
S4, leader, which establish, passes through mark tissue and responsibility;It carries out appointing pipe generation and establishes Guan Biao group;
S5, project manager and leader link up the project plan, formulate the project plan;The project plan is under project management interface
Progress column is presented;
S6, project leader, which prepare, passes through mark starting meeting;It establishes and passes through mark range, prepares to start meeting data and issue starting and can lead to
Know;
S7, leader, which hold, passes through mark starting meeting;
S8, project manager's confirmation " passing through mark starting scheme " are completed and are carried out passing through mark startup stage summary;
Current Situation Investigation and diagnostic process the following steps are included:
S1, project manager and leader link up investigation plan;
S2, project manager execute field research, management status field research record;
S1, project manager's truth field research record, are managed status field research by message center and arrange;
S3, leader confirm fill data by message center;
S4, participant, which fill in two changes by message center, merges status business survey questionnaire and technical investigation and analytical evaluation questionnaire;
S5, project manager confirm fill data by message center;
S6, leader fill in two change convergent messaging systems situations by message center;
S7, project manager confirm fill data by message center;
S8, project manager, which write report and be uploaded in the heart in the message, to be passed through in mark startup stage summary;
S9, leader are audited by message center;
S10, internal anditor are audited by message center;
S11, project manager's confirmation " passing through mark startup stage " are completed, and carry out Current Situation Investigation and diagnostic phases are summarized;
System anlysis and planning process the following steps are included:
S1, leader provide management lists of documents;
S2, project manager, which confirm, to be provided full text inventory and manages lists of documents;
S3, leader provide file full text, manage file full-text search;
Fusion system inventory is changed in S4, project manager's combing two;
S5, project manager and leader, which discuss, determines that two change fusion lists of documents;
S6, project manager and leader, which discuss, determines that two change fusion target and policy;
S7, project manager write two changes fusion and pass through mark embodiment and uploaded by message center;
S8, leader are audited by message center;
S9, internal anditor are audited by message center;
S10, project manager confirm that " the system anlysis and planning " stage completes and uploads carry out system point by message center
Analysis and programming phase are summarized;
Documentation and publication process the following steps are included:
S1, leader organize to carry out documentation, and upper transmitting file first draft;
S2, project manager and leader carry out preparation of document confirmation;
S3, the evaluation of leader's organization internal file;
S4, project manager confirm evaluation course file;
S5, leader organize to carry out file distribution;
S6, project manager confirm file distribution procedure file;
S7, project manager confirm that " the system anlysis and planning " stage completes;
The beneficial effects of the present invention are: the present invention is based on multiple two to change the implementation warp that fusion management system passes through mark consulting item
It tests, by multiple discs and Optimal improvements, in the every rated condition for ensuring to meet national requirements, changes fusion management for two
System is passed through the elements such as people, thing, object, time, fund required by mark consulting item each stage and node milestone and is combined, and leads to
The mode that platform shows is crossed, the process solidification of project management and requirement is carried out.On the one hand, make to pass through mark by the interactive operation of platform
Enterprise is global to project and process has overall understanding, thus can preferably enter project role, on the other hand also by
Process and project mode after solidifying on platform, being capable of propagation and popularization more quick and that widely carry out passing through mark experience.
Specific embodiment
In order to which technical problems, technical solutions and advantages to be solved are more clearly understood, tie below
Embodiment is closed, the present invention will be described in detail.It should be noted that specific embodiment described herein is only to explain
The present invention is not intended to limit the present invention, and the product for being able to achieve said function belongs to replacement and improves, and is included in the present invention
Protection scope within.The specific method is as follows:
Embodiment 1: two change fusion management system of one kind passes through mark consultation process Management Advisory Services platform, is carried out based on B/S framework
Exploitation, which is characterized in that including presentation layer, operation layer, service layer and data access layer;
Service layer includes project process control module, Template Manager, message center and training module;
The access object of data access layer includes internal staff and external staff;Internal staff includes Project Director, project
Manager;External staff includes leader, manager, participant and internal anditor;
Presentation layer includes login interface, main interface, grassroot project interface, grassroot project team, change cryptographic interface, user
The interface list-PM, user list-project interface, main interface, template list interface, paper topic interface, my examination interface and
Message center interface;
All users pass through login interface login system;Login interface is equipped with the option that forgets Password, can be by forgetting Password
Option connection backstage;
Project Director passes through grassroot project interface grassroot project;PM password is modified by change cryptographic interface;Pass through user
List-PM checks project list in interface;The contents of a project are checked by main interface;Template maintenance is carried out by template list interface;
Message is received by message center interface;
Project manager carries out project management by main interface;Pass through grassroot project group interface grassroot project group interface New any
Mesh;Project leader password is modified by change cryptographic interface;Check that project list initiates item by user list-project interface
Mesh index;Message is received by message center interface;
Leader enters system by main interface;Project leader password is modified by change cryptographic interface;Pass through message
Center interface receives message;Pass through paper topic interface;It is taken an exam by my examination interface;
Manager enters system by main interface and carries out project query;Message is received by message center interface;
Internal anditor enters system by main interface;It is taken an exam by my examination interface;By message center interface into
The row project implementation;
Operation layer content includes: project of establishing and passes through mark starting, Current Situation Investigation and diagnosis, system anlysis and planning and text
Part establishment and publication;
Establish project and pass through in mark start-up course: Project Director passes through login interface login system;It is logged in by main interface
System;By being submitted after the grassroot project of grassroot project interface;System background carries out gathering prompting in association phase;In project list
Project list is improved at interface;Project list is presented at project list interface;Project account is generated in user list interface;Project account
It number is presented in user list interface;Project manager sets up project team and carries out censure distribution;And grassroot project group address list;It is main
The person of leading, which establishes, passes through mark tissue and responsibility;It carries out appointing pipe generation and establishes Guan Biao group;Project manager and leader link up project meter
It draws, formulates the project plan;Project plan progress column under project management interface is presented;Project leader, which prepares, passes through mark starting meeting;
It establishes and passes through mark range, prepares to start meeting data and issue starting to be notified that;Leader, which holds, passes through mark starting meeting;Project manager's confirmation
" passing through mark starting scheme " completes and carries out passing through mark startup stage summary;
During Current Situation Investigation and diagnostic process: project manager and leader link up investigation plan;Project manager executes existing
Field investigation, management status field research record;Project manager's truth field research record, is managed status by message center
Field research arranges;Leader confirms fill data by message center;Participant fills in two changes fusion now by message center
Shape business survey questionnaire and technical investigation and analytical evaluation questionnaire;Project manager confirms fill data by message center;Leader passes through message
Fill in two change convergent messaging systems situations in center;Project manager confirms fill data by message center;Project manager writes report
It accuses and is uploaded in the heart in the message and passed through in mark startup stage summary;Leader is audited by message center;Internal anditor is logical
Cross message center audit;Project manager's confirmation " passing through mark startup stage " is completed, and carries out Current Situation Investigation and diagnostic phases are summarized;
In system anlysis and planning flowchart process: leader provides management lists of documents;Project manager, which confirms, provides full text
Inventory simultaneously manages lists of documents;Leader provides file full text, manages file full-text search;Fusion is changed in project manager's combing two
It is inventory;Project manager and leader, which discuss, determines that two change fusion lists of documents;Project manager and leader, which discuss, determines that two change
Merge target and policy;Project manager, which writes two changes fusion, passes through mark embodiment and is uploaded by message center;Leader passes through
Message center audit;Internal anditor is audited by message center;Project manager confirms that " the system anlysis and planning " stage completes and leads to
It crosses message center and uploads progress system anlysis and programming phase summary;
During documentation and publication process include: leader organizes to carry out documentation, and upper transmitting file first draft;?
Mesh manager and leader carry out preparation of document confirmation;The evaluation of leader's organization internal file;Project manager confirms evaluation course text
Part;Leader organizes to carry out file distribution;Project manager confirms file distribution procedure file;Project manager confirms " system anlysis
And planning " stage completion;
Whole system is based on B/S framework and is developed, therefore can be grasped in the PC or other terminals that can access service
Make and do not have to install any special software, the extension of client zero dimension shield, system is very easy to.System uses modular side
Formula is developed, and realizes the multiplexing of functional module.Framework is layered, including presentation layer, operation layer, service layer, data access
Layer has accomplished layering isolation.The platform be mainly two changes fusion management system pass through mark consulting item service, seek advice from practical matter
It is ten big kens in the PMbok project management method opinion that the theory of mesh management is proposed with reference to U.S.'s Project Management Association, five big
Process group, 47 processes carry out the design of project process and element.In addition, having the right using this platform and serving as project manager role
Personnel need to obtain PMP certificate by project manager's Qualification attestation examination of PMI association and organization.
The above is only a preferred embodiment of the present invention, it is noted that due to the finiteness of literal expression, and it is objective
On there are unlimited specific structures, for those skilled in the art, before not departing from the principle of the invention
It puts, several improvement, retouching or variation can also be made, above-mentioned technical characteristic can also be combined in the right way;
These improve retouching, variation or combination, or it is not improved the conception and technical scheme of invention are directly applied into other occasions,
It is regarded as protection scope of the present invention.
Claims (1)
1. one kind two, which changes fusion management system, passes through mark consultation process Management Advisory Services platform, developed based on B/S framework, feature
It is, including presentation layer, operation layer, service layer and data access layer;
(1) service layer includes project process control module, Template Manager, message center and training module;
(2) the access object of the data access layer includes internal staff and external staff;
The internal staff includes Project Director (PD), project manager (PM);The external staff includes leader (L), management
Person (H), participant (TM) and internal anditor (TA);
The Project Director account type is supervisor, has following permission: inquiry all items establish new projects, management PM
Account, maintenance template and exam pool and milestone trial;
Project manager's account type is administrator, has following permission: undertaken project operation and examination & approval, and management institute
Leader's account in project is stated, which is 1;
Leader's account type is primary account number, which is n, and n is positive integer, has following permission: negative to it
Project operation is blamed, and described its of management is responsible for project account;
Manager's account type is to check account, which is 2, has undertaken project query and examination and approval authority
Limit;
Participant's account type be tourist's account, the account account number be not more than 10, have undertaken project query and on
Pass permission;
The internal anditor type is student's account, which is not more than 50, and having an interior careful stage makes a report on permission;
The entitled PD of Project Director account;
The entitled PM-n of project manager's account, n is positive integer;
The entitled entry name abbreviation of leader's account;
The entitled entry name abbreviation-H(X of manager's account), X is 1 or 2;
The entitled entry name abbreviation-T(Y of participant's account), Y is no more than 10 positive integers;
The entitled entry name abbreviation-A(Z of internal anditor account), Z is no more than 50 positive integers;
(3) presentation layer include login interface, main interface, grassroot project interface, grassroot project team, change cryptographic interface,
The interface user list-PM, user list-project interface, main interface, template list interface, paper topic interface, my examination circle
Face and message center interface;
All users pass through login interface login system;The login interface is equipped with the option that forgets Password, and can be forgotten by described
Cryptographic options connection backstage;
The Project Director passes through grassroot project interface grassroot project;PM password is modified by the change cryptographic interface;
Project list is checked by the interface the user list-PM;The contents of a project are checked by the main interface;It is arranged by the template
Surface and interface carries out template maintenance;Message is received by the message center interface;
The project manager carries out project management by the main interface;Pass through grassroot project group interface grassroot project class boundary
Face grassroot project;Project leader password is modified by the change cryptographic interface;It is looked by the user list-project interface
See that project list initiates index of articles;Message is received by the message center interface;
The leader enters system by the main interface;Project leader password is modified by the change cryptographic interface;
Message is received by the message center interface;Pass through paper topic interface;It is taken an exam by my examination interface;
The manager enters system by the main interface and carries out project query;It is received and is disappeared by the message center interface
Breath;
The internal anditor enters system by the main interface;It is taken an exam by my examination interface;By in the message
Heart interface carries out the project implementation;
(4) the operation layer content include: project of establishing and pass through mark starting, Current Situation Investigation and diagnosis, system anlysis and planning with
And documentation and publication;
It is described establish project and pass through mark Booting sequence the following steps are included:
S1, the Project Director pass through login interface login system;Pass through the main interface login system;Pass through the New any
It is submitted after the grassroot project of mesh interface;
S2, system background carry out gathering prompting in association phase;Project list is improved at project list interface;The project list
It is presented at the project list interface;Project account is generated in the user list interface;The project account is in the user
It is presented in list interface;
S3, the project manager set up project team and carry out censure distribution;And grassroot project group address list;
S4, the leader, which establish, passes through mark tissue and responsibility;It carries out appointing pipe generation and establishes Guan Biao group;
S5, the project manager and the leader link up the project plan, formulate the project plan;The project plan is in the item
Progress column is presented under mesh administration interface;
S6, the project leader, which prepare, passes through mark starting meeting;It establishes and passes through mark range, prepares to start meeting data and issue starting and can lead to
Know;
S7, the leader, which hold, passes through mark starting meeting;
S8, the project manager confirm that " passing through mark starting scheme " completes and carry out described pass through to mark startup stage summary;
The Current Situation Investigation and diagnostic process the following steps are included:
S1, the project manager and the leader link up investigation plan;
S2, the project manager execute field research, management status field research record;
S1, project manager's truth field research record, are managed status field research by the message center and arrange;
S3, the leader confirm fill data by the message center;
S4, the participant, which fill in two changes by the message center, merges status business survey questionnaire and technical investigation and analytical evaluation questionnaire;
S5, the project manager confirm fill data by the message center;
S6, the leader fill in two change convergent messaging systems situations by message center;
S7, the project manager confirm fill data by the message center;
S8, the project manager, which write report and be uploaded in the message center, to be passed through in mark startup stage summary;
S9, the leader are audited by the message center;
S10, the internal anditor are audited by the message center;
S11, project manager confirmation " passing through mark startup stage " are completed, and carry out Current Situation Investigation and diagnostic phases are summarized;
The system anlysis and planning process the following steps are included:
S1, the leader provide management lists of documents;
S2, the project manager, which confirm, to be provided full text inventory and manages lists of documents;
S3, the leader provide file full text, manage file full-text search;
Fusion system inventory is changed in S4, project manager combing two;
S5, the project manager and the leader, which discuss, determines that two change fusion lists of documents;
S6, the project manager and the leader, which discuss, determines that two change fusion target and policy;
S7, the project manager write two changes fusion and pass through mark embodiment and uploaded by message center;
S8, the leader are audited by the message center;
S9, the internal anditor are audited by the message center;
S10, the project manager confirm that " the system anlysis and planning " stage completes and uploads carry out system point by message center
Analysis and programming phase are summarized;
The documentation and publication process the following steps are included:
S1, the leader organize to carry out documentation, and upper transmitting file first draft;
S2, the project manager and the leader carry out preparation of document confirmation;
S3, leader's organization internal file evaluation;
S4, the project manager confirm evaluation course file;
S5, the leader organize to carry out file distribution;
S6, the project manager confirm file distribution procedure file;
S7, the project manager confirm that " the system anlysis and planning " stage completes.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810869496.4A CN109087069A (en) | 2018-08-02 | 2018-08-02 | Two change fusion management system of one kind passes through mark consultation process Management Advisory Services platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810869496.4A CN109087069A (en) | 2018-08-02 | 2018-08-02 | Two change fusion management system of one kind passes through mark consultation process Management Advisory Services platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109087069A true CN109087069A (en) | 2018-12-25 |
Family
ID=64833812
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810869496.4A Pending CN109087069A (en) | 2018-08-02 | 2018-08-02 | Two change fusion management system of one kind passes through mark consultation process Management Advisory Services platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109087069A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116821866A (en) * | 2023-08-29 | 2023-09-29 | 北京轻松致远科技有限责任公司 | Role authority control method of application program |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107480956A (en) * | 2017-08-25 | 2017-12-15 | 广州博士信息技术研究院有限公司 | A kind of research and development project management system and method |
CN108335080A (en) * | 2018-01-25 | 2018-07-27 | 广州建衡工程咨询有限公司 | A kind of Construction Audit system and implementation method |
-
2018
- 2018-08-02 CN CN201810869496.4A patent/CN109087069A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107480956A (en) * | 2017-08-25 | 2017-12-15 | 广州博士信息技术研究院有限公司 | A kind of research and development project management system and method |
CN108335080A (en) * | 2018-01-25 | 2018-07-27 | 广州建衡工程咨询有限公司 | A kind of Construction Audit system and implementation method |
Non-Patent Citations (2)
Title |
---|
吕莹斌 等: "经销公司贯标管理信息系统的设计与实现", 《柳钢科技》 * |
张镁: "企业两化融合管理体系实施过程和要点", 《科技创新导报》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116821866A (en) * | 2023-08-29 | 2023-09-29 | 北京轻松致远科技有限责任公司 | Role authority control method of application program |
CN116821866B (en) * | 2023-08-29 | 2023-11-10 | 北京轻松致远科技有限责任公司 | Role authority control method of application program |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Broeder et al. | Federated identity management for research collaborations | |
CN103400226A (en) | Integrated tobacco industry information security, operation and maintenance application platform system | |
CN102663008B (en) | Government integrated business platform business library and construction method of base library | |
CN108074068A (en) | A kind of government affairs division data manages system | |
Mutis et al. | Cloud BIM governance framework for implementation in construction firms | |
He et al. | Governmental inter-sectoral strategies to prevent and control COVID-19 in a megacity: a policy brief from Shanghai, China | |
CN109087069A (en) | Two change fusion management system of one kind passes through mark consultation process Management Advisory Services platform | |
Kraus et al. | Theoretical and methodological knowledge of the information economy under the prism of innovation and digitization | |
Rappoport et al. | Reopening during the unprecedented: the Association of Biomolecular Resource Facilities Community Coronavirus Disease 2019 Pandemic Response. part 2: efforts to effectively ramp up core facility activities | |
Tolentino et al. | Linking primary care information systems and public health vertical programs in the Philippines: an open-source experience | |
Barokah et al. | E-Government development: Online industrial business license services system in Indonesia | |
Xiaoming et al. | The system analysis and design of student management information based on uml | |
Buzdugan et al. | Cyber security in the nuclear and radiological domain: case study of Republic of Moldova | |
CN109829698A (en) | A kind of comprehensive transaction system of intellectual property | |
Hayeri Khyavi et al. | The Missing Circle Of ISMS (LL-ISMS) | |
CN105243319B (en) | The access method of controlling security of XBRL application platforms | |
Nikolić et al. | Migration from Sakai to Canvas | |
Nagle et al. | Parental substance misuse: an islington perspective. | |
Board et al. | A New Vision for Research Administrative Systems | |
Rhee et al. | Global city teams challenge 2018 kickoff and IES-city framework workshop: smart and secure cities and communities challenge | |
Lewis-Hughes et al. | Pandemic planning: data, information and evidence | |
Zheng et al. | Design and realization of professional title evaluation system for high educational institutions based on J2EE techniques | |
Lee | Public Policy and Health Care in China: The Case of Public Insurance | |
UGA et al. | 5.4 Grenoble INP graduate school of engineering and management, University Grenoble Alpes (Grenoble INP-UGA) | |
Wang | Optimization and Upgrade of Special Database Management System for University Archives Based on Cloud Computing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20181225 |
|
WD01 | Invention patent application deemed withdrawn after publication |