CN109084445A - A kind of initial opening method of adjustment, device and the air conditioner of electric expansion valve - Google Patents

A kind of initial opening method of adjustment, device and the air conditioner of electric expansion valve Download PDF

Info

Publication number
CN109084445A
CN109084445A CN201810966692.3A CN201810966692A CN109084445A CN 109084445 A CN109084445 A CN 109084445A CN 201810966692 A CN201810966692 A CN 201810966692A CN 109084445 A CN109084445 A CN 109084445A
Authority
CN
China
Prior art keywords
initial opening
expansion valve
electric expansion
air conditioner
aperture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810966692.3A
Other languages
Chinese (zh)
Other versions
CN109084445B (en
Inventor
任小辉
刘合心
黄春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Aux Electric Co Ltd
Original Assignee
Ningbo Aux Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Aux Electric Co Ltd filed Critical Ningbo Aux Electric Co Ltd
Priority to CN201810966692.3A priority Critical patent/CN109084445B/en
Publication of CN109084445A publication Critical patent/CN109084445A/en
Priority to PCT/CN2019/093741 priority patent/WO2020038113A1/en
Application granted granted Critical
Publication of CN109084445B publication Critical patent/CN109084445B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/70Control systems characterised by their outputs; Constructional details thereof
    • F24F11/80Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air
    • F24F11/83Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air by controlling the supply of heat-exchange fluids to heat-exchangers
    • F24F11/84Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air by controlling the supply of heat-exchange fluids to heat-exchangers using valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • F24F11/63Electronic processing
    • F24F11/64Electronic processing using pre-stored data
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/89Arrangement or mounting of control or safety devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B41/00Fluid-circulation arrangements
    • F25B41/30Expansion means; Dispositions thereof
    • F25B41/31Expansion valves
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/70Efficient control or regulation technologies, e.g. for control of refrigerant flow, motor or heating

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Signal Processing (AREA)
  • Physics & Mathematics (AREA)
  • Fuzzy Systems (AREA)
  • Mathematical Physics (AREA)
  • Thermal Sciences (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

The present invention provides initial opening method of adjustment, device and the air conditioners of a kind of electric expansion valve, by obtain initial opening, air conditioner of the electric expansion valve in electricity operation on air conditioner it is stable when operating parameter and when stable air conditioner electric expansion valve stabilization aperture, the refrigerant charging grade of air conditioner is determined according to operating parameter, according to refrigerant charging grade and stablize aperture adjustment initial opening, initial opening adjusted value is obtained, so that initial opening electric expansion valve starts next time when is initial opening adjusted value.The application is adjusted initial opening according to the stabilization aperture of electric expansion valve when the refrigerant charging grade and air conditioner stable operation of air conditioner, the initial opening of electric expansion valve is realized to the adaptive of refrigerant charge, initial opening is no longer fixed value, it avoids in refrigerant charging excess, the excessive generation for leading to back liquid of the initial opening of electric expansion valve, promotes the reliability of air conditioner.

Description

A kind of initial opening method of adjustment, device and the air conditioner of electric expansion valve
Technical field
The present invention relates to air conditioner controlling technology field, in particular to the initial opening method of adjustment of a kind of electric expansion valve, Device and air conditioner.
Background technique
In existing convertible frequency air-conditioner, especially multi-line system, throttle part mostly uses electronic expansion valve controls.It considers Compressor start platform, output speed and startup stage refrigerant Rapid Circulation, in air conditioner startup stage, electric expansion valve Also can all there be the process of a starting initialization, start to automatically control after some time again.Air-conditioning producer is universal at present Way is, in the fixed time period of startup stage, a fixed initial opening or range, this control is arranged in electron expansion valve Mode processed is only applicable to the suitable or on the low side situation of the refrigerant charging in air conditioner, empty when refrigerant charging excess Adjusting device to there is startup stage because the initial opening of electric expansion valve is excessive causes flow bigger than normal, so that evaporator has little time to evaporate Refrigerant liquid, that is, there is a phenomenon where returning liquid, reduces the reliability of air conditioner so that refrigerant liquid flows into compressor.
Summary of the invention
In view of this, the present invention is directed to propose initial opening method of adjustment, device and the air conditioner of a kind of electric expansion valve, To solve in the prior art, because the initial opening of electric expansion valve is set as fixed value, so that air conditioner is in initial operation stage The technical issues of liquid easily occurs back.
In order to achieve the above objectives, the technical scheme of the present invention is realized as follows:
In a first aspect, being applied to air conditioner, institute the present invention provides a kind of initial opening method of adjustment of electric expansion valve Stating air conditioner includes electric expansion valve, which comprises
Obtain initial opening of the electric expansion valve in electricity operation on the air conditioner;
Obtain the air conditioner it is stable when operating parameter;
Obtain the air conditioner it is stable when the electric expansion valve stabilization aperture;
The refrigerant charging grade of the air conditioner is determined according to the operating parameter;
The initial opening is adjusted according to the refrigerant charging grade and the stable aperture, obtains initial opening adjustment Value, so that the initial opening electric expansion valve starts next time when is the initial opening adjusted value.
Further, described according to the refrigerant charging grade and the stable aperture adjusts the initial opening, it obtains Include: to the step of initial opening adjusted value
Calculate the difference between the initial opening and the stable aperture;
The initial opening adjusted value is calculated according to the refrigerant charging grade and the difference.
Further, the first mapping table and the second mapping table are prestored in the air conditioner, wherein described One mapping table records the corresponding relationship for having refrigerant charging grade and regulation coefficient, and the second mapping table record has Initial opening and the corresponding relationship for stablizing the difference and adjustment a reference value between aperture, it is described according to the refrigerant charging grade And the difference calculates the step of initial opening adjusted value and includes:
The corresponding regulation coefficient of the refrigerant charging grade is determined in first mapping table;
The corresponding adjustment a reference value of the difference is determined in second mapping table;
The initial opening adjusted value is calculated according to the regulation coefficient and the adjustment a reference value.
Further, described according to the regulation coefficient and the adjustment a reference value calculates the initial opening adjusted value Step includes:
According to formula P1'=P1- μ * Δ P calculates the initial opening adjusted value, wherein P1' adjusted for the initial opening Value, P1For the initial opening of the electric expansion valve, μ is the regulation coefficient, and Δ P is the adjustment a reference value.
Further, the operating parameter includes the average aperture P of the electric expansion valvex, system high pressure saturation temperature TH, system low-voltage saturation temperature TLAnd degree of supercooling Δ T, it is described to determine that the refrigerant of the air conditioner fills according to the operating parameter Infuse grade the step of include:
Work as Px>k1And TH≤Ta+m1And TL≤Tb-n1And Δ T≤h1When, determine that the refrigerant charging grade is first etc. Grade, wherein k1For the first default aperture, TaFor condensation side environment temperature, m1For the first preset temperature, TbFor evaporation side environment temperature Degree, n1For the second preset temperature, h1For third preset temperature;
Work as k2≤Px≤k1And Ta+m1<TH≤Ta+m2And Tb-n1<TL≤Tb-n2And h1<ΔT≤h2When, determine the refrigeration It is the second grade that agent, which fills grade, wherein k2For the second default aperture, m2For the 4th preset temperature, n2For the 5th preset temperature, h2For the 6th preset temperature;
Work as k3≤Px<k2And Ta+m2<TH<Ta+m3And Tb-n2<TL<Tb-n3And h2<ΔT<h3When, determine that the refrigerant fills Note grade is the tertiary gradient, wherein k3Aperture, m are preset for third3For the 7th preset temperature, n3For the 8th preset temperature, h3For 9th preset temperature;
Work as Px<k3And TH≥Ta+m3And TL≥Tb-n3And h2≥h3When, determine that the refrigerant charging grade is 4th etc. Grade.
Further, the minimum value of the initial opening adjusted value is given threshold.
Second aspect, the present invention also provides a kind of initial openings of electric expansion valve to adjust device, is applied to air conditioner, The air conditioner includes electric expansion valve, and described device includes:
Initial opening obtains module, for obtaining the electric expansion valve initially opening in electricity operation on the air conditioner Degree;
Parameter acquisition module, for obtain the air conditioner it is stable when operating parameter;
Stablize aperture and obtain module, for obtain the air conditioner it is stable when the electric expansion valve stabilization open Degree;
Level determination module is filled, for determining the refrigerant charging grade of the air conditioner according to the operating parameter;
Initial opening adjusts module, for described initial according to the refrigerant charging grade and the stable aperture adjustment Aperture obtains initial opening adjusted value, so that the initial opening electric expansion valve starts next time when is initially opened to be described Spend adjusted value.
Further, the initial opening adjustment module includes:
Difference calculating module, for calculating the difference between the initial opening and the stable aperture;
Adjustment calculation module, for calculating the initial opening according to the refrigerant charging grade and the difference Adjusted value.
Further, the first mapping table and the second mapping table are prestored in the air conditioner, wherein described One mapping table records the corresponding relationship for having refrigerant charging grade and regulation coefficient, and the second mapping table record has Initial opening and the corresponding relationship for stablizing the difference and adjustment a reference value between aperture;
The adjustment calculation module is used to determine the refrigerant charging grade pair in first mapping table The regulation coefficient answered determines the corresponding adjustment a reference value of the difference in second mapping table, and according to the tune Integral coefficient and the adjustment a reference value calculate the initial opening adjusted value.
Further, the adjustment calculation module is used for according to formula P1'=P1- μ * Δ P calculates the initial opening tune Whole value, wherein P1' it is the initial opening adjusted value, P1For the initial opening of the electric expansion valve, μ is adjustment system Number, Δ P are the adjustment a reference value.
Further, the operating parameter includes the average aperture P of the electric expansion valvex, system high pressure saturation temperature TH, system low-voltage saturation temperature TLAnd degree of supercooling Δ T;
The filling level determination module is for working as Px>k1And TH≤Ta+m1And TL≤Tb-n1And Δ T≤h1When, determine institute Stating refrigerant charging grade is the first estate, wherein k1For the first default aperture, TaFor condensation side environment temperature, m1It is pre- for first If temperature, TbFor evaporation side environment temperature, n1For the second preset temperature, h1For third preset temperature;Work as k2≤Px≤k1And Ta+m1< TH≤Ta+m2And Tb-n1<TL≤Tb-n2And h1<ΔT≤h2When, determine that the refrigerant charging grade is the second grade, wherein k2 For the second default aperture, m2For the 4th preset temperature, n2For the 5th preset temperature, h2For the 6th preset temperature;Work as k3≤Px<k2And Ta+m2<TH<Ta+m3And Tb-n2<TL<Tb-n3And h2<ΔT<h3When, determine that the refrigerant charging grade is the tertiary gradient, In, k3Aperture, m are preset for third3For the 7th preset temperature, n3For the 8th preset temperature, h3For the 9th preset temperature;Work as Px<k3 And TH≥Ta+m3And TL≥Tb-n3And h2≥h3When, determine that the refrigerant charging grade is the fourth estate.
The third aspect, the present invention also provides a kind of air conditioner, the air conditioner includes controller and is stored with computer The memory of program when the computer program is read and run by the controller, realizes side described in above-mentioned first aspect Method.
Compared with the existing technology, the initial opening method of adjustment of electric expansion valve of the present invention has the advantage that
The initial opening method of adjustment of electric expansion valve of the present invention obtains the electric expansion valve in the air-conditioning Initial opening on device when electricity operation;Obtain the air conditioner it is stable when operating parameter;Obtain the air conditioner operation The stabilization aperture of electric expansion valve when stablizing;The refrigerant charging etc. of the air conditioner is determined according to the operating parameter Grade;The initial opening is adjusted according to the refrigerant charging grade and the stable aperture, obtains initial opening adjusted value, with Initial opening initial opening adjusted value when starting the electric expansion valve next time.The application is according to air conditioner Initial opening of the stabilization aperture of electric expansion valve to electric expansion valve when refrigerant charging grade and air conditioner stable operation It is adjusted, realizes the initial opening of electric expansion valve to the adaptive of refrigerant charge, initial opening is no longer fixed Value, avoids when refrigerant charging excess, and the initial opening of electric expansion valve is excessive to cause air conditioner that liquid phenomenon occurs back, To effectively reduce back liquid risk, the reliability of air conditioner is promoted.
The initial opening adjustment device and the air conditioner of the electric expansion valve and initially opening for above-mentioned electric expansion valve Spending method of adjustment, possessed advantage is identical compared with the existing technology, and details are not described herein.
Detailed description of the invention
The attached drawing for constituting a part of the invention is used to provide further understanding of the present invention, schematic reality of the invention It applies example and its explanation is used to explain the present invention, do not constitute improper limitations of the present invention.In the accompanying drawings:
Fig. 1 is the structural block diagram of air conditioner described in the embodiment of the present invention;
Fig. 2 is the flow diagram of the initial opening method of adjustment of electric expansion valve described in the embodiment of the present invention;
Fig. 3 is the schematic diagram of the corresponding relationship of operating parameter described in the embodiment of the present invention and refrigerant charging grade;
Fig. 4 is the sub-step schematic diagram of step S105 in Fig. 2;
Fig. 5 is the schematic diagram of the first mapping table described in the embodiment of the present invention;
Fig. 6 is the schematic diagram of the second mapping table described in the embodiment of the present invention;
Fig. 7 is that the initial opening of electric expansion valve described in the embodiment of the present invention adjusts the functional block diagram of device.
Fig. 8 is the specific functional modules schematic diagram that initial opening adjusts module in Fig. 7.
Icon: 1- air conditioner;2- electric expansion valve;3- condenser;4- evaporator;5- compressor;6- first pressure sensing Device;7- second pressure sensor;The first temperature sensor of 8-;9- second temperature sensor;10- third temperature sensor;11- is deposited Reservoir;12- controller;The initial opening of 13- electric expansion valve adjusts device;14- initial opening obtains module;15- parameter obtains Modulus block;16- stablizes aperture and obtains module;17- fills level determination module;18- initial opening adjusts module;19- difference meter Calculate module;20- adjustment calculation module.
Specific embodiment
Below in conjunction with attached drawing in the embodiment of the present invention, technical solution in the embodiment of the present invention carries out clear, complete Ground description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Usually exist The component of the embodiment of the present invention described and illustrated in attached drawing can be arranged and be designed with a variety of different configurations herein.Cause This, is not intended to limit claimed invention to the detailed description of the embodiment of the present invention provided in the accompanying drawings below Range, but it is merely representative of selected embodiment of the invention.Based on the embodiment of the present invention, those skilled in the art are not doing Every other embodiment obtained under the premise of creative work out, shall fall within the protection scope of the present invention.
The initial opening method of adjustment and device of electric expansion valve provided by the embodiment of the present invention can be applied to shown in Fig. 1 Air conditioner 1 in.The air conditioner 1 include electric expansion valve 2, condenser 3, evaporator 4, compressor 5, first pressure sensor 6, Second pressure sensor 7, the first temperature sensor 8, second temperature sensor 9, third temperature sensor 10, memory 11 and control Device 12 processed is sequentially connected between electric expansion valve 2, evaporator 4, compressor 5 and condenser 3 with pipeline, formed one it is closed System, refrigerant constantly circulate in system pipeline;The first pressure sensor 6 is arranged in the compressor 5 and institute It states on the pipeline between condenser 3, the pressure for being vented side ducts for detecting compressor 5, i.e. system high pressure;The second pressure Sensor 7 is arranged on the pipeline between the compressor 5 and the evaporator 4, for detecting 5 air-breathing side ducts of compressor Pressure, i.e. system low-voltage;First temperature sensor 8 is used to detect the outlet pipe temperature of the condenser 3;The second temperature Sensor 9 is for detecting condensation side environment temperature (environment temperature locating for the i.e. described condenser 3);The third temperature sensor 10 for detecting evaporation side environment temperature (environment temperature locating for the i.e. described evaporator 4).The electric expansion valve 2, condenser 3, evaporator 4, compressor 5, first pressure sensor 6, second pressure sensor 7, the first temperature sensor 8, second temperature pass Sensor 9, third temperature sensor 10, memory 11 are electrically connected with controller 12, on the air conditioner 1 after electricity operation, control The working condition of electric expansion valve 2, condenser 3, evaporator 4, compressor 5 can be monitored in real time in device 12 processed, and obtains in real time System low-voltage, the first temperature sensor 8 that system high pressure, the second pressure sensor 7 of the detection of one pressure sensor 6 detect detect The outlet pipe temperature of condenser 3, the condensation side environment temperature that detects of second temperature sensor 9 and third temperature sensor 10 examine The evaporation side environment temperature of survey, to judge the refrigerant charging grade in air conditioner 1, and according to refrigerant charging etc. The stabilization aperture of electric expansion valve 2 is adjusted the initial opening of electric expansion valve 2 when grade, 1 stable operation of air conditioner, so that Initial opening electric expansion valve 2 starts next time when is initial opening adjusted, to realize the initial of electric expansion valve 2 Aperture avoids when refrigerant charging excess the adaptive of refrigerant charge, the initial opening mistake of electric expansion valve 2 Cause air conditioner 1 that liquid phenomenon occurs back greatly, to effectively reduce back liquid risk, promotes the reliability of air conditioner 1.
Referring to figure 2., the process for the initial opening method of adjustment of electric expansion valve provided by the embodiment of the present invention is shown It is intended to.It should be noted that the initial opening method of adjustment of electric expansion valve of the present invention is not with Fig. 2 and following institute The specific order stated is limitation.It should be appreciated that in other embodiments, the initial opening tune of electric expansion valve of the present invention The sequence of adjusting method part step can be exchanged with each other according to actual needs or part steps therein also can be omitted Or it deletes.The initial opening method of adjustment of the electric expansion valve can be applicable in above-mentioned controller 12, below will be to shown in Fig. 2 Detailed process be described in detail.
Step S101 obtains initial opening of the electric expansion valve 2 in electricity operation on the air conditioner 1.
In the present embodiment, controller 12 obtains the initial opening of the electric expansion valve 2 in electricity operation on air conditioner 1.
Step S102, obtain the air conditioner 1 it is stable when operating parameter.
In the present embodiment, controller 12 after electricity operation, carries out the real time execution parameter of air conditioner 1 on air conditioner 1 Monitoring, when real time execution parameter does not change, shows that air conditioner 1 has run on stable state, real time execution ginseng at this time Number is the operating parameter when air conditioner 1 is stable.
In the present embodiment, which includes the average aperture P of electric expansion valve 2x, system high pressure saturation temperature TH、 System low-voltage saturation temperature TLAnd degree of supercooling Δ T.Wherein, the average aperture P of electric expansion valve 2xIt is electric expansion valve 2 from starting The average value of aperture when stage reaches stable state;System high pressure saturation temperature THRefer to the corresponding saturation temperature of system high pressure It spends, the corresponding relationship of system high pressure and saturation temperature is stored in controller 12, controller 12 is examined according to first pressure sensor 6 The system high pressure of survey can obtain the corresponding saturation temperature of system high pressure;System low-voltage saturation temperature TLRefer to that system low-voltage is corresponding Saturation temperature, the corresponding relationship of system low-voltage and saturation temperature is stored in controller 12, controller 12 is according to second pressure The system low-voltage that sensor 7 detects can obtain the corresponding saturation temperature of system low-voltage;Degree of supercooling Δ T is system high pressure saturation Temperature THDifference between the outlet pipe temperature of condenser 3, the system low-voltage saturation temperature T that controller 12 will acquireLWith condenser Degree of supercooling Δ T can be obtained in 3 outlet pipe temperature after subtracting each other.
Step S103, obtain the air conditioner 1 it is stable when the electric expansion valve 2 stabilization aperture.
In the present embodiment, when controller 12 judges that air conditioner 1 runs on stable state, electric expansion valve 2 is obtained Current aperture that is to say the stabilization aperture of electric expansion valve 2.
Step S104 determines the refrigerant charging grade of the air conditioner 1 according to the operating parameter.
In the present embodiment, controller 12 is according to the average aperture P of electric expansion valve 2x, system high pressure saturation temperature TH, be Unite low pressure saturation temperature TLAnd degree of supercooling Δ T judges the refrigerant charging grade of air conditioner 1.Step S104 is specifically included: Work as Px>k1And TH≤Ta+m1And TL≤Tb-n1And Δ T≤h1When, determine that the refrigerant charging grade is the first estate, wherein k1For the first default aperture, TaFor condensation side environment temperature, m1For the first preset temperature, TbFor evaporation side environment temperature, n1It is Two preset temperatures, h1For third preset temperature;Work as k2≤Px≤k1And Ta+m1<TH≤Ta+m2And Tb-n1<TL≤Tb-n2And h1<ΔT ≤h2When, determine that the refrigerant charging grade is the second grade, wherein k2For the second default aperture, m2For the 4th default temperature Degree, n2For the 5th preset temperature, h2For the 6th preset temperature;Work as k3≤Px<k2And Ta+m2<TH<Ta+m3And Tb-n2<TL<Tb-n3And h2<ΔT<h3When, determine that the refrigerant charging grade is the tertiary gradient, wherein k3Aperture, m are preset for third3It is pre- for the 7th If temperature, n3For the 8th preset temperature, h3For the 9th preset temperature;Work as Px<k3And TH≥Ta+m3And TL≥Tb-n3And h2≥h3When, Determine that the refrigerant charging grade is the fourth estate.
In the present embodiment, the first estate can be set as " charging amount is few ", the second grade is " charging amount is suitable ", third etc. Grade is " charging amount is more ", and the fourth estate is " charging amount is seriously more ", the first default aperture k1For 350 steps, the second default aperture k2For 150 steps, third preset aperture k3For 100 steps, the first preset temperature m1It is 10 DEG C, the second preset temperature n1It is 12 DEG C, third is default Temperature h1It is 2 DEG C, the 4th preset temperature m2It is 13 DEG C, the 5th preset temperature n2It is 8 DEG C, the 6th preset temperature h2It is 3 DEG C, the 7th Preset temperature m3It is 18 DEG C, the 8th preset temperature n3It is 5 DEG C, the 9th preset temperature h3It is 5 DEG C, then operation shown in Fig. 3 can be obtained The corresponding relationship of parameter and refrigerant charging grade, after operating parameter of the controller 12 when obtaining 1 stable operation of air conditioner, ginseng According to corresponding relationship shown in Fig. 3, refrigerant charging grade can be determined.
Step S105 adjusts the initial opening according to the refrigerant charging grade and the stable aperture, obtains just Beginning aperture adjusted value, so that the initial opening electric expansion valve 2 starts next time when is the initial opening adjusted value.
As shown in figure 4, step S105 includes following sub-step:
Sub-step S1051 calculates the difference between the initial opening and the stable aperture.
In this example, it is assumed that the initial opening of electric expansion valve 2 is P1, the stabilization aperture of electric expansion valve 2 is P2, Then controller 12 is according to initial opening P1With stablize aperture P2Difference P can be calculated2-P1
Sub-step S1052 calculates the initial opening adjusted value according to the refrigerant charging grade and the difference.
In the present embodiment, the first mapping table and the second mapping table are prestored in the air conditioner 1, wherein The first mapping table record has the corresponding relationship of refrigerant charging grade and regulation coefficient, second mapping table Record has initial opening and stablizes the corresponding relationship of the difference and adjustment a reference value between aperture.Sub-step S1052 is specifically wrapped It includes: determining the corresponding regulation coefficient of the refrigerant charging grade in first mapping table, it is corresponding described second The corresponding adjustment a reference value of the difference is determined in relation table, according to described in the regulation coefficient and adjustment a reference value calculating Initial opening adjusted value.
In the present embodiment, " charging amount is few " corresponding regulation coefficient μ is preferably " 0 " in refrigerant charging grade;" filling Amount is suitable " corresponding regulation coefficient μ is preferably " 1 ";The value range of " charging amount is more " corresponding regulation coefficient μ be [1.05, 1.1], preferably " 1.05 ";The value range of " charging amount is seriously more " corresponding regulation coefficient μ be (1.1,1.2], preferably "1.2";In this way, available first mapping table shown in fig. 5.
In the present embodiment, difference P is set2-P1When less than or equal to " 0 ", corresponding adjustment a reference value Δ P is preferably "0";Difference P2-P1When greater than " 0 " and being less than or equal to " 50 ", the value range of corresponding adjustment a reference value Δ P is [10,20], Preferably " 20 ";Difference P2-P1When greater than " 50 " and being less than or equal to " 100 ", the value range of corresponding adjustment a reference value Δ P For (20,40], preferably 40;Difference P2-P1When greater than " 100 ", it is corresponding adjustment a reference value Δ P value range be (40, 60], preferably 60;In this way, available second mapping table shown in fig. 6.
The controller 12 obtains the corresponding adjustment system of refrigerant charging grade in the first mapping table according to figure 5 It, can be according to formula P after second mapping table several and according to figure 6 obtains the corresponding adjustment a reference value of difference1'= P1- μ * Δ P calculates the initial opening adjusted value, wherein P1' it is the initial opening adjusted value, P1For the electric expansion valve 2 initial opening, μ are the regulation coefficient, and Δ P is the adjustment a reference value.As it can be seen that when refrigerant charge is on the low side, it is empty It adjusts device 1 substantially without time liquid risk, therefore does not need amendment initial opening;When refrigerant charge is excessive, initial opening P1With it is steady Determine aperture P2Between difference it is bigger, the actuation time of electric expansion valve 2 is longer, return liquid risk it is bigger.Therefore, it adjusts Initial opening P1When, refrigerant charge is more, and regulation coefficient μ is bigger, initial opening P1With stablize aperture P2Between difference get over Greatly, adjustment a reference value Δ P also should be bigger, with this come the flow of electric expansion valve 2 when reducing electricity operation on air conditioner 1 and when stablizing Between, reduce back liquid risk.In this way, controller 12 will control electric expansion valve 2 when the upper electricity operation next time of air conditioner 1 Initial opening is initial opening adjusted value, and the initial opening for realizing electric expansion valve 2 is adaptive according to refrigerant charge progress It should adjust, and no longer be fixed value.
It should be noted that in practice, controller 12 is when adjusting the initial opening of electric expansion valve 2, electronic expansion The initial opening of valve 2 can not be turned down unlimitedly, be easy to cause electric expansion valve 2 not open normally, influence air conditioner 1 It works normally.Therefore, in the present embodiment, a given threshold is previously stored in controller 12, which is described The minimum value of initial opening adjusted value in other words when adjusting the initial opening of electric expansion valve 2, needs to guarantee to obtain Initial opening adjusted value cannot be below the given threshold, if be lower than the given threshold, using the given threshold as this Initial opening adjusted value.For example, the given threshold can be Pmin+ A, wherein PminIt is opened for the minimum of electric expansion valve 2 Degree, determine that A is preset value by 2 self-characteristic of electric expansion valve, can in [30,50] range value, preferably 30.Controller 12 are calculating initial opening adjusted value P1' after, it is also necessary to further judge initial opening adjusted value P1' whether meet P1′≥ Pmin+ A, if not satisfied, then by initial opening adjusted value P1' it is determined as Pmin+ A, to guarantee initial opening adjusted value P1' most Small value is given threshold Pmin+A。
Fig. 7 is please referred to, is that the initial opening of electric expansion valve provided by the embodiment of the present invention adjusts the function of device 13 Module diagram.It should be noted that the initial opening of electric expansion valve described in the embodiment of the present invention adjusts device 13, base Present principles and the technical effect of generation are identical as preceding method embodiment, to briefly describe, do not refer to part in the present embodiment, can With reference to the corresponding contents of preceding method embodiment.The initial opening adjustment device 13 of the electric expansion valve can be applied above-mentioned In controller 12 comprising initial opening obtains module 14, parameter acquisition module 15, stable aperture and obtains module 16, filling etc. Grade determining module 17 and initial opening adjust module 18.
It is appreciated that above-mentioned initial opening obtain module 14, parameter acquisition module 15, stablize aperture obtain module 16, Filling level determination module 17 and initial opening adjustment module 18 can be the software function module being stored in memory 11 and Computer program, and can be executed by controller 12.
The initial opening obtains module 14 for obtaining the electric expansion valve 2 in electricity operation on the air conditioner 1 Initial opening.
It is appreciated that the initial opening, which obtains module 14, can execute above-mentioned steps S101.
The parameter acquisition module 15 be used for obtain the air conditioner 1 it is stable when operating parameter.
It is appreciated that the parameter acquisition module 15 can execute above-mentioned steps S102.
The stable aperture obtain module 16 be used to obtain the air conditioner 1 it is stable when the electric expansion valve 2 Stablize aperture.
It is appreciated that the stable aperture, which obtains module 16, can execute above-mentioned steps S103.
The filling level determination module 17 is used to determine the refrigerant charging of the air conditioner 1 according to the operating parameter Grade.
In the present embodiment, the operating parameter includes the average aperture P of the electric expansion valve 2x, system high pressure saturation Temperature TH, system low-voltage saturation temperature TLAnd degree of supercooling Δ T, the filling level determination module 17 are specifically used for working as Px>k1And TH ≤Ta+m1And TL≤Tb-n1And Δ T≤h1When, determine that the refrigerant charging grade is the first estate, wherein k1It is pre- for first If aperture, TaFor condensation side environment temperature, m1For the first preset temperature, TbFor evaporation side environment temperature, n1For the second default temperature Degree, h1For third preset temperature;Work as k2≤Px≤k1And Ta+m1<TH≤Ta+m2And Tb-n1<TL≤Tb-n2And h1<ΔT≤h2When, Determine that the refrigerant charging grade is the second grade, wherein k2For the second default aperture, m2For the 4th preset temperature, n2It is Five preset temperatures, h2For the 6th preset temperature;Work as k3≤Px<k2And Ta+m2<TH<Ta+m3And Tb-n2<TL<Tb-n3And h2<ΔT<h3 When, determine that the refrigerant charging grade is the tertiary gradient, wherein k3Aperture, m are preset for third3For the 7th preset temperature, n3 For the 8th preset temperature, h3For the 9th preset temperature;Work as Px<k3And TH≥Ta+m3And TL≥Tb-n3And h2≥h3When, determine described in Refrigerant charging grade is the fourth estate.
It is appreciated that the filling level determination module 17 can execute above-mentioned steps S104.
The initial opening adjustment module 18 is used to adjust institute according to the refrigerant charging grade and the stable aperture Initial opening is stated, initial opening adjusted value is obtained, so that the initial opening electric expansion valve 2 starts next time when is described Initial opening adjusted value.
It is appreciated that the initial opening adjustment module 18 can execute above-mentioned steps S105.
As shown in figure 8, the initial opening adjustment module 18 includes difference calculating module 19 and adjustment calculation module 20.
The difference calculating module 19 is used to calculate the difference between the initial opening and the stable aperture.
It is appreciated that the difference calculating module 19 can execute above-mentioned steps S1051.
The adjustment calculation module 20 is used to calculate according to the refrigerant charging grade and the difference described first Beginning aperture adjusted value.
In the present embodiment, the first mapping table and the second mapping table are prestored in the air conditioner 1, wherein The first mapping table record has the corresponding relationship of refrigerant charging grade and regulation coefficient, second mapping table Record has initial opening and stablizes the corresponding relationship of the difference and adjustment a reference value between aperture.The adjustment calculation module 20 It is corresponding described second for determining the corresponding regulation coefficient of the refrigerant charging grade in first mapping table The corresponding adjustment a reference value of the difference is determined in relation table, and calculates institute according to the regulation coefficient and the adjustment a reference value Initial opening adjusted value is stated, specifically, the adjustment calculation module 20 is used for according to formula P1'=P1Described in-μ * Δ P is calculated Initial opening adjusted value, wherein P1' it is the initial opening adjusted value, P1For the initial opening of the electric expansion valve 2, μ is The regulation coefficient, Δ P are the adjustment a reference value.
It is appreciated that the adjustment calculation module 20 can execute above-mentioned steps S1052.
In conclusion initial opening method of adjustment, device and the air-conditioning of electric expansion valve provided by the embodiment of the present invention Device, by obtaining initial opening of the electric expansion valve in electricity operation on the air conditioner;Obtain the air conditioner operation Operating parameter when stablizing;Obtain the air conditioner it is stable when the electric expansion valve stabilization aperture;According to the fortune Row parameter determines the refrigerant charging grade of the air conditioner;According to the refrigerant charging grade and the stable aperture adjustment The initial opening obtains initial opening adjusted value, so that the initial opening electric expansion valve starts next time when is institute State initial opening adjusted value.The application is according to electronic expansion when the refrigerant charging grade and air conditioner stable operation of air conditioner The stabilization aperture of valve is adjusted the initial opening of electric expansion valve, realizes the initial opening of electric expansion valve to refrigerant Charging amount it is adaptive, initial opening is no longer fixed value, avoid when refrigerant charging excess, electric expansion valve just Beginning aperture is excessive to cause air conditioner that liquid phenomenon occurs back, to effectively reduce back liquid risk, promotes the reliability of air conditioner.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Within mind and principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (12)

1. a kind of initial opening method of adjustment of electric expansion valve is applied to air conditioner (1), the air conditioner (1) includes electronics Expansion valve (2), which is characterized in that the described method includes:
Obtain initial opening of the electric expansion valve (2) in electricity operation on the air conditioner (1);
Obtain the air conditioner (1) it is stable when operating parameter;
Obtain the air conditioner (1) it is stable when the electric expansion valve (2) stabilization aperture;
The refrigerant charging grade of the air conditioner (1) is determined according to the operating parameter;
The initial opening is adjusted according to the refrigerant charging grade and the stable aperture, obtains initial opening adjusted value, So that the initial opening electric expansion valve (2) starts next time when is the initial opening adjusted value.
2. the initial opening method of adjustment of electric expansion valve according to claim 1, which is characterized in that described in the foundation The step of refrigerant charging grade and the stable aperture adjust the initial opening, obtain initial opening adjusted value include:
Calculate the difference between the initial opening and the stable aperture;
The initial opening adjusted value is calculated according to the refrigerant charging grade and the difference.
3. the initial opening method of adjustment of electric expansion valve according to claim 2, which is characterized in that the air conditioner (1) the first mapping table and the second mapping table are prestored in, wherein the first mapping table record has refrigerant The corresponding relationship of grade and regulation coefficient is filled, the second mapping table record has initial opening and stablizes between aperture The corresponding relationship of difference and adjustment a reference value, it is described described initial according to the refrigerant charging grade and difference calculating The step of aperture adjusted value includes:
The corresponding regulation coefficient of the refrigerant charging grade is determined in first mapping table;
The corresponding adjustment a reference value of the difference is determined in second mapping table;
The initial opening adjusted value is calculated according to the regulation coefficient and the adjustment a reference value.
4. the initial opening method of adjustment of electric expansion valve according to claim 3, which is characterized in that described in the foundation Regulation coefficient and the adjustment a reference value calculate the step of initial opening adjusted value and include:
According to formula P1'=P1- μ * Δ P calculates the initial opening adjusted value, wherein P1' it is the initial opening adjusted value, P1 For the initial opening of the electric expansion valve (2), μ is the regulation coefficient, and Δ P is the adjustment a reference value.
5. the initial opening method of adjustment of electric expansion valve according to claim 1, which is characterized in that the operating parameter Average aperture P including the electric expansion valve (2)x, system high pressure saturation temperature TH, system low-voltage saturation temperature TLAnd supercooling Δ T is spent, the step of refrigerant charging grade that the air conditioner (1) is determined according to the operating parameter includes:
Work as Px>k1And TH≤Ta+m1And TL≤Tb-n1And Δ T≤h1When, determine that the refrigerant charging grade is the first estate, In, k1For the first default aperture, TaFor condensation side environment temperature, m1For the first preset temperature, TbFor evaporation side environment temperature, n1For Second preset temperature, h1For third preset temperature;
Work as k2≤Px≤k1And Ta+m1<TH≤Ta+m2And Tb-n1<TL≤Tb-n2And h1<ΔT≤h2When, determine that the refrigerant fills Note grade is the second grade, wherein k2For the second default aperture, m2For the 4th preset temperature, n2For the 5th preset temperature, h2For 6th preset temperature;
Work as k3≤Px<k2And Ta+m2<TH<Ta+m3And Tb-n2<TL<Tb-n3And h2<ΔT<h3When, determine described refrigerant charging etc. Grade is the tertiary gradient, wherein k3Aperture, m are preset for third3For the 7th preset temperature, n3For the 8th preset temperature, h3It is the 9th Preset temperature;
Work as Px<k3And TH≥Ta+m3And TL≥Tb-n3And h2≥h3When, determine that the refrigerant charging grade is the fourth estate.
6. the initial opening method of adjustment of electric expansion valve according to claim 1-5, which is characterized in that described The minimum value of initial opening adjusted value is given threshold.
7. a kind of initial opening of electric expansion valve adjusts device, it is applied to air conditioner (1), the air conditioner (1) includes electronics Expansion valve (2), which is characterized in that described device includes:
Initial opening obtains module (14), for obtaining the electric expansion valve (2) in electricity operation on the air conditioner (1) Initial opening;
Parameter acquisition module (15), for obtain the air conditioner (1) it is stable when operating parameter;
Stablize aperture and obtain module (16), for obtain the air conditioner (1) it is stable when the electric expansion valve (2) it is steady Determine aperture;
It fills level determination module (17), for determining the refrigerant charging etc. of the air conditioner (1) according to the operating parameter Grade;
Initial opening adjusts module (18), for described initial according to the refrigerant charging grade and the stable aperture adjustment Aperture obtains initial opening adjusted value, so that the initial opening electric expansion valve (2) starts next time when is described initial Aperture adjusted value.
8. the initial opening of electric expansion valve according to claim 7 adjusts device, which is characterized in that the initial opening Adjusting module (18) includes:
Difference calculating module (19), for calculating the difference between the initial opening and the stable aperture;
Adjustment calculation module (20), for calculating the initial opening according to the refrigerant charging grade and the difference Adjusted value.
9. the initial opening of electric expansion valve according to claim 8 adjusts device, which is characterized in that the air conditioner (1) the first mapping table and the second mapping table are prestored in, wherein the first mapping table record has refrigerant The corresponding relationship of grade and regulation coefficient is filled, the second mapping table record has initial opening and stablizes between aperture The corresponding relationship of difference and adjustment a reference value;
The adjustment calculation module (20) is used to determine the refrigerant charging grade pair in first mapping table The regulation coefficient answered determines the corresponding adjustment a reference value of the difference in second mapping table, and according to the tune Integral coefficient and the adjustment a reference value calculate the initial opening adjusted value.
10. the initial opening of electric expansion valve according to claim 9 adjusts device, which is characterized in that the adjusted value Computing module (20) is used for according to formula P1'=P1- μ * Δ P calculates the initial opening adjusted value, wherein P1' it is described initial Aperture adjusted value, P1For the initial opening of the electric expansion valve (2), μ is the regulation coefficient, and Δ P is the adjustment benchmark Value.
11. the initial opening of electric expansion valve according to claim 7 adjusts device, which is characterized in that the operation ginseng Number includes the average aperture P of the electric expansion valve (2)x, system high pressure saturation temperature TH, system low-voltage saturation temperature TLAnd mistake Cold degree Δ T;
The filling level determination module (17) is for working as Px>k1And TH≤Ta+m1And TL≤Tb-n1And Δ T≤h1When, determine institute Stating refrigerant charging grade is the first estate, wherein k1For the first default aperture, TaFor condensation side environment temperature, m1It is pre- for first If temperature, TbFor evaporation side environment temperature, n1For the second preset temperature, h1For third preset temperature;Work as k2≤Px≤k1And Ta+m1< TH≤Ta+m2And Tb-n1<TL≤Tb-n2And h1<ΔT≤h2When, determine that the refrigerant charging grade is the second grade, wherein k2 For the second default aperture, m2For the 4th preset temperature, n2For the 5th preset temperature, h2For the 6th preset temperature;Work as k3≤Px<k2And Ta+m2<TH<Ta+m3And Tb-n2<TL<Tb-n3And h2<ΔT<h3When, determine that the refrigerant charging grade is the tertiary gradient, In, k3Aperture, m are preset for third3For the 7th preset temperature, n3For the 8th preset temperature, h3For the 9th preset temperature;Work as Px<k3 And TH≥Ta+m3And TL≥Tb-n3And h2≥h3When, determine that the refrigerant charging grade is the fourth estate.
12. a kind of air conditioner (1), which is characterized in that the air conditioner (1) includes controller (12) and is stored with computer program Memory (11), the computer program reads by the controller (12) and when running, realize as claim 1-5 is any Method described in.
CN201810966692.3A 2018-08-23 2018-08-23 A kind of initial opening method of adjustment, device and the air conditioner of electric expansion valve Active CN109084445B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201810966692.3A CN109084445B (en) 2018-08-23 2018-08-23 A kind of initial opening method of adjustment, device and the air conditioner of electric expansion valve
PCT/CN2019/093741 WO2020038113A1 (en) 2018-08-23 2019-06-28 Method and device for adjusting initial opening degree of electronic expansion valve, and air conditioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810966692.3A CN109084445B (en) 2018-08-23 2018-08-23 A kind of initial opening method of adjustment, device and the air conditioner of electric expansion valve

Publications (2)

Publication Number Publication Date
CN109084445A true CN109084445A (en) 2018-12-25
CN109084445B CN109084445B (en) 2019-10-29

Family

ID=64794342

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810966692.3A Active CN109084445B (en) 2018-08-23 2018-08-23 A kind of initial opening method of adjustment, device and the air conditioner of electric expansion valve

Country Status (2)

Country Link
CN (1) CN109084445B (en)
WO (1) WO2020038113A1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110500831A (en) * 2019-08-23 2019-11-26 珠海格力电器股份有限公司 Equipment steady-state operation control method, device, storage medium and system
WO2020038113A1 (en) * 2018-08-23 2020-02-27 宁波奥克斯电气股份有限公司 Method and device for adjusting initial opening degree of electronic expansion valve, and air conditioner
CN113959051A (en) * 2021-10-08 2022-01-21 青岛海尔空调电子有限公司 Control method for air conditioner and air conditioner
CN114152001A (en) * 2021-10-20 2022-03-08 山东和同信息科技股份有限公司 High-precision control method and system for stepping electronic expansion valve

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1786602A (en) * 2004-12-06 2006-06-14 三星电子株式会社 Multi-air conditioning system and valve opening controlling method thereof
CN104676996A (en) * 2015-03-19 2015-06-03 珠海格力电器股份有限公司 Method and device for generating initial opening degree of electronic expansion valve
CN104848487A (en) * 2015-05-14 2015-08-19 珠海格力电器股份有限公司 Intelligent maintenance control system and method
CN105783193A (en) * 2016-04-13 2016-07-20 Tcl空调器(中山)有限公司 Initial opening degree control method and device for electronic expansion valve
KR101710941B1 (en) * 2015-12-18 2017-02-28 서울대학교산학협력단 Method for detecting shortage of refrigerant in heat pump system
CN106556099A (en) * 2015-09-25 2017-04-05 约克广州空调冷冻设备有限公司 The control method of the electric expansion valve of the indoor set of multi-online air-conditioning system
CN107702270A (en) * 2017-10-11 2018-02-16 珠海格力电器股份有限公司 Electronic expansion valve control method and device and air conditioner
CN108088041A (en) * 2017-12-06 2018-05-29 广东美的制冷设备有限公司 Control method, radiation air-conditioner and the storage medium of electric expansion valve

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018017479A (en) * 2016-07-29 2018-02-01 株式会社富士通ゼネラル Air conditioner
CN106322870B (en) * 2016-11-14 2019-04-05 广东美的暖通设备有限公司 The control method and control device of electric expansion valve, air conditioner heat pump system
CN109084445B (en) * 2018-08-23 2019-10-29 宁波奥克斯电气股份有限公司 A kind of initial opening method of adjustment, device and the air conditioner of electric expansion valve

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1786602A (en) * 2004-12-06 2006-06-14 三星电子株式会社 Multi-air conditioning system and valve opening controlling method thereof
CN104676996A (en) * 2015-03-19 2015-06-03 珠海格力电器股份有限公司 Method and device for generating initial opening degree of electronic expansion valve
CN104848487A (en) * 2015-05-14 2015-08-19 珠海格力电器股份有限公司 Intelligent maintenance control system and method
CN106556099A (en) * 2015-09-25 2017-04-05 约克广州空调冷冻设备有限公司 The control method of the electric expansion valve of the indoor set of multi-online air-conditioning system
KR101710941B1 (en) * 2015-12-18 2017-02-28 서울대학교산학협력단 Method for detecting shortage of refrigerant in heat pump system
CN105783193A (en) * 2016-04-13 2016-07-20 Tcl空调器(中山)有限公司 Initial opening degree control method and device for electronic expansion valve
CN107702270A (en) * 2017-10-11 2018-02-16 珠海格力电器股份有限公司 Electronic expansion valve control method and device and air conditioner
CN108088041A (en) * 2017-12-06 2018-05-29 广东美的制冷设备有限公司 Control method, radiation air-conditioner and the storage medium of electric expansion valve

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020038113A1 (en) * 2018-08-23 2020-02-27 宁波奥克斯电气股份有限公司 Method and device for adjusting initial opening degree of electronic expansion valve, and air conditioner
CN110500831A (en) * 2019-08-23 2019-11-26 珠海格力电器股份有限公司 Equipment steady-state operation control method, device, storage medium and system
CN113959051A (en) * 2021-10-08 2022-01-21 青岛海尔空调电子有限公司 Control method for air conditioner and air conditioner
CN113959051B (en) * 2021-10-08 2023-08-15 青岛海尔空调电子有限公司 Control method for air conditioner and air conditioner
CN114152001A (en) * 2021-10-20 2022-03-08 山东和同信息科技股份有限公司 High-precision control method and system for stepping electronic expansion valve

Also Published As

Publication number Publication date
WO2020038113A1 (en) 2020-02-27
CN109084445B (en) 2019-10-29

Similar Documents

Publication Publication Date Title
CN109084445B (en) A kind of initial opening method of adjustment, device and the air conditioner of electric expansion valve
CN107036256B (en) The control method of delivery temperature, the control device of delivery temperature and air conditioner
CN110849007B (en) Automatic refrigerant quantity adjusting and controlling method and device and air conditioner
CN101821507B (en) For the system and method for monitoring overheat of compressor
US8919139B2 (en) Air conditioning apparatus
CN103512145B (en) Adjusting method and adjusting device of electronic expansion valve for air conditioning unit
CN109373501B (en) A kind of control method of electric expansion valve, device and multi-line system
US20170115043A1 (en) System and Method for Controlling Refrigerant in Vapor Compression System
CN105042969B (en) The expansion valve control system and method for air-conditioning equipment
CN110094857A (en) Control method, device, computer product and the air-conditioning of air conditioner electronic expansion valve
CN107940811A (en) Progress control method, device, air conditioner and computer-readable recording medium
CN113339946B (en) Air conditioner operation control method and device, air conditioner and computer storage medium
CN107702291B (en) Refrigerant charging control method and system and air conditioner
CN104006445A (en) Multi-connected air conditioner and control method thereof
CN108375256A (en) Automatic oil return control method and device for air conditioner
CN110094858A (en) Control method, device, computer product and the air-conditioning of air conditioner electronic expansion valve
CN109780673A (en) Control method, multi-split air conditioner and the storage medium of multi-split air conditioner
CN110579039A (en) control method of refrigerant circulating system
US20220412625A1 (en) Refrigerant leak detection system and method
CN103671050B (en) Compressor liquid spraying control method and device and air conditioning system
CN112665236A (en) Refrigerant filling control method, device, equipment and system and air conditioning system
CN109780684A (en) A kind of air conditioning control method, device, air-conditioning and storage medium
US20230259111A1 (en) Abnormality detection system and refrigerator, abnormality detection method, and abnormality detection program
CN111425987A (en) Indoor unit of air conditioner, control method, air conditioner and readable storage medium
CN109114749B (en) Control method and device for air conditioning system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant