CN109080762A - A method of it is fixed temporarily for LNG ship cargo tank sublevel insulated case - Google Patents

A method of it is fixed temporarily for LNG ship cargo tank sublevel insulated case Download PDF

Info

Publication number
CN109080762A
CN109080762A CN201810547428.6A CN201810547428A CN109080762A CN 109080762 A CN109080762 A CN 109080762A CN 201810547428 A CN201810547428 A CN 201810547428A CN 109080762 A CN109080762 A CN 109080762A
Authority
CN
China
Prior art keywords
insulated case
sublevel
epoxy resin
fastening device
cargo tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810547428.6A
Other languages
Chinese (zh)
Inventor
徐军
孙明
艾清
蒋竹敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hudong Zhonghua Shipbuilding Group Co Ltd
Original Assignee
Hudong Zhonghua Shipbuilding Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hudong Zhonghua Shipbuilding Group Co Ltd filed Critical Hudong Zhonghua Shipbuilding Group Co Ltd
Priority to CN201810547428.6A priority Critical patent/CN109080762A/en
Publication of CN109080762A publication Critical patent/CN109080762A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B71/00Designing vessels; Predicting their performance
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/02Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
    • B63B25/08Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid
    • B63B25/12Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed
    • B63B25/16Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed heat-insulated

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The invention discloses a kind of methods being fixed temporarily for LNG ship cargo tank sublevel insulated case, belong to shipbuilding technical field.Method includes the following steps: Step 1: testing test performance after epoxy resin is matched and toasted to epoxy resin adhesive tape and keeping sample, in sublevel insulated case surface epoxy resin coating adhesive tape;Step 2: coated sublevel insulated case is seated to bulkhead designated position;Step 3: being fixed temporarily using temporary fastening device to sublevel insulated case, the sublevel insulated case and the flatness of adjacent sublevel insulated case is made to meet design requirement;Step 4: testing after 24 hours epoxy resin adhesive tape sample, if meeting design requirement, temporary fastening device is removed and changes insulated case connectivity kit;If not meeting design requirement, the fixed device of the batch and insulated case are removed, epoxy resin adhesive tape is removed.It is fixed temporarily sublevel insulated case using this method, improves the installation effectiveness of sublevel insulated case, shortens the construction period of liquid goods containment system.

Description

A method of it is fixed temporarily for LNG ship cargo tank sublevel insulated case
Technical field
The invention belongs to shipbuilding technical fields, face more particularly to one kind for LNG ship cargo tank sublevel insulated case When fixed method.
Background technique
LNG ship is known as world's ship for civil use " jewel on imperial crown ", liquid goods containment system, liquid cargo barge fortune system and spy Different power propulsion system constitutes three big features of LNG ship.Wherein, liquid goods containment system is the most special area of entire LNG ship Domain, and design and construction maximum a part of difficulty.
No.96 membrane LNG tanker is very high to the flatness requirement of cargo tank, and liquid goods containment system is mainly by primary and secondary layer Insulated case and primary and secondary layer invar steel composition, can completely cut off liquefied natural gas, avoid it from absorbing heat from cargo hold, while by liquid The pressure of natural gas is transmitted to cargo hold, and ensures that liquefied natural gas will not be revealed.The transmitting of liquid natural atmospheric pressure mainly passes through It is realized in sublevel insulated case by the epoxy resin adhesive tape that planned course and type are coated with.
The epoxy resin adhesive tape on sublevel insulated case surface is in the soft stage at installation initial stage, need to use temporary fastening device It is fixed in sublevel insulated case, the flatness of sublevel insulated case is finely tuned by pressing epoxy resin adhesive tape.To ensure asphalt mixtures modified by epoxy resin Rouge adhesive tape properties meet design requirement, need to survey after 24 hours to the epoxy resin adhesive tape sample of batch coating Examination can use dedicated insulated case connectivity kit to be permanently fixed sublevel insulated case after meeting the requirements.
With volume of compartment for 17.4 ten thousand m3No.96 membrane LNG tanker for, plane domain need be fixed temporarily sublevel insulation About 24000, case, each insulated case quadrangle is fixed temporarily by a support base, currently, the peace installation and dismantling of temporary fastening device It unloads and is both needed to manually twist spanner completion, production efficiency is low, large labor intensity, and construction cost is high.
Summary of the invention
For the deficiencies in the prior art, it is exhausted for LNG ship cargo tank sublevel that the object of the present invention is to provide one kind The method that edge case is fixed temporarily, for solving the problems, such as that existing sublevel insulated case installation positioning is inaccurate, time-consuming and laborious.
The purpose of the present invention is what is be achieved through the following technical solutions:
A method of it is fixed temporarily for LNG ship cargo tank sublevel insulated case, method includes the following steps:
Step 1: performance of the test epoxy resin with when 120 DEG C of epoxide-resin glue item bakings after twenty minutes, meets design and wants It asks, one section of epoxy resin adhesive tape sample after overbaking is left and taken on glued board, according to bulkhead situation by design requirement secondary Layer insulated case surface epoxy resin coating adhesive tape;
Step 2: coated sublevel insulated case is seated to bulkhead designated position;
Step 3: be fixed temporarily using temporary fastening device to sublevel insulated case, the temporary fastening device include connecting rod, Fixing bolt and more than one support component, the top of the connecting rod are equipped with threaded hole, and the fixing bolt is half-thread spiral shell Bolt, the lower end of the fixing bolt are arranged in the threaded hole at the top of connecting rod Nei and are threadedly coupled with connecting rod, the connecting rod Lower end be equipped with the external screw thread that matches with cargo tank bulkhead upper connector pedestal internal screw thread, the support component includes link block And support rod, one end of the link block are equipped with first through hole, the link block is set on fixing bolt by first through hole, The support rod is threadedly coupled with the other end of link block, and the lower end of support rod extend out to the lower section of link block, the support The top of bar is equipped with adjustment driving portion, and the bottom of the support rod is equipped with support base, and the bottom of the support base has support flat Face, and supporting plane and the center line of connecting rod are perpendicular, and fixed sublevel insulated case is needed according to each temporary fastening device Quantity, determine the quantity of support component in each temporary fastening device, the lower end of connecting rod screwed in the company of cargo tank bulkhead On fitting pedestal, rotation adjustment driving portion is pressed in the supporting plane of support base in sublevel insulated case, adjustment sublevel insulated case Highly, the flatness of the sublevel insulated case of the sublevel insulated case and adjacent position is made to meet design requirement;
Step 4: being tested for the property after 24 hours to epoxy resin adhesive tape sample, if meeting design requirement, dress will be fixed temporarily It sets and removes and change dedicated insulated case connectivity kit;If not meeting design requirement, the fixed device of the batch and insulated case are removed, The epoxy resin adhesive tape for removing tank surface, enters step one.
Preferably, in the step 3, each temporary fastening device includes 1 to 4 support component.
When the temporary fastening device is for the fixed insulated case for being in edge, when each temporary fastening device, each Temporary fastening device includes a support component for the edge of insulated case to be fixed;When temporary fastening device setting exists When in the gap between two insulated cases, each temporary fastening device includes two support components, and two support components are symmetrical The two sides of connecting rod are set, are fixed for the insulated case to its two sides;When the temporary fastening device needs simultaneously to three When a insulated case is fixed, each temporary fastening device includes that three support components are used to carry out the vertex of three insulated cases It is fixed;When the temporary fastening device is in the apex of four insulated cases, each temporary fastening device includes four support groups Part is for being fixed the vertex of four insulated cases.
Preferably, in the step 3, the adjustment driving portion is the first hexagon-head that support bar top is arranged in.
Preferably, in the step 3, the top of the fixing bolt is equipped with and the first hexagon-head shape consistent the Two hexagon-heads.
Preferably, in the step 3, pass through rotary fixing screw bolt for connecting rod and liquid using electric or pneumatic tool Connection pedestal on cargo hold bulkhead is threadedly coupled, and adjusts driving portion for support base by rotation using electric or pneumatic tool Supporting plane is pressed in sublevel insulated case.
Sublevel insulated case is fixed using electric or pneumatic tool, it is time saving and energy saving, it can quickly improve sublevel insulation The fixed speed of case.
Preferably, in the step 3, the lower end of the support base and support rod is connected by bulb.
The lower end of support base and support rod is connected by bulb, and can rotate between support base and support rod is propped up simultaneously Angle between support plane and support rod also may be implemented to finely tune, and conveniently adapt to the feelings on insulated case surface Yu support rod out of plumb Condition.
Preferably, the center line of the support rod is parallel with the center line of connecting rod.
The center line of support rod is parallel with the center line of connecting rod, convenient for the power in connecting rod to be accurately transferred to On support rod, and be conducive to the adjusting of support rod, prevent support rod driving support base when compressing to insulated case to insulated case Surface scratching.
Preferably, the rotation direction of thread of the fixing bolt and the externally threaded rotation direction of thread phase in connecting rod lower end Together.
The rotation direction of thread of fixing bolt is identical as the externally threaded rotation direction of thread in connecting rod lower end.Work as fixing bolt Lower end screw in the threaded hole at the top of connecting rod after, convenient for by electric or pneumatic tool rotary fixing screw bolt, and make to connect The lower end of extension bar is screwed into the internal screw thread of the connecting piece base on bulkhead surface.
In the step 1, the proportion of epoxy resin used by different cargo tank containment systems is different, therefore will insulate Before case is fixed temporarily, the proportion of epoxy resin need to be tested, be wanted with confirming whether the proportion of epoxy resin meets design It asks.
One section of epoxy resin adhesive tape sample after overbaking is left and taken on glued board, is in order to after 24 hours to epoxy Resin adhesive tape sample is tested for the property to confirm that epoxy resin adhesive tape used in the sublevel insulated case being fixed temporarily Whether design requirement is met.
It needs to test flatness before epoxy resin coating, each position resin adhesive tape is determined by GTT special-purpose software Type, then according to require coating after install again, so chest coating resin after substantially one-to-one specific position, therefore In step 2, coated sublevel insulated case is seated to bulkhead designated position.
The epoxy resin adhesive tape sample that glued board is left and taken mainly test for 24 hours after hardness, in order to not influence production, so first Hardness test after microwave stove heating, qualification could produces, but producing qualified finally confirming is the hardness after room temperature for 24 hours.
In the step 1, if the proportion of epoxy resin and the epoxy resin adhesive tape performance after overbaking are not achieved Design requirement then needs to check dispensing equipment and adjustment charging pump with ratio.
The beneficial effects of the present invention are: the present invention realizes the installation and removal of the device by pneumatic or electric tools, greatly The installation effectiveness of sublevel insulated case is improved greatly, shortens the construction period of liquid goods containment system;Being fixed temporarily in the present invention Device is connected as an entirety, avoids the missing of components small after dismantling;Zero of temporary fastening device in the present invention Part is general, and after some damage of components, quick release and replacement avoid some parts damages from causing the report of whole device It is useless;The support base of temporary fastening device in the present invention can universal adjustment, when plane have certain angle when, device stress condition More preferably, support effect is more preferably.
Detailed description of the invention
Fig. 1 is the method flow diagram that the present invention is fixed temporarily for LNG ship cargo tank sublevel insulated case.
Fig. 2 is LNG ship cargo tank sublevel insulated case temporary fastening device overall structure diagram of the present invention.
Fig. 3 is LNG ship cargo tank sublevel insulated case temporary fastening device top view of the present invention.
In Fig. 2 and Fig. 3: 1 is connecting rod, and 2 be fixing bolt, and 3 be link block, and 4 be support rod, and 5 be support base.
Specific embodiment
Come with reference to the accompanying drawing with specific case study on implementation temporarily solid for LNG ship cargo tank sublevel insulated case to the present invention Fixed method further describes in detail, and in the hope of being more fully apparent from expresses structure feature and concrete application of the invention, But it is not intended to limit the protection scope of the present invention.
Embodiment: as shown in Figure 1 to Figure 3, a method of it is fixed temporarily for LNG ship cargo tank sublevel insulated case, it should Method the following steps are included:
Step 1: performance of the test epoxy resin with when 120 DEG C of epoxide-resin glue item bakings after twenty minutes, meets design and wants It asks, one section of epoxy resin adhesive tape sample after overbaking is left and taken on glued board, according to bulkhead situation by design requirement secondary Layer insulated case surface epoxy resin coating adhesive tape;
Step 2: coated sublevel insulated case is seated to bulkhead designated position;
Step 3: being fixed temporarily using temporary fastening device to sublevel insulated case, which includes connecting rod 1, fixing bolt 2 and more than one support component, the top of the connecting rod 1 are equipped with threaded hole, and the fixing bolt 2 is half spiral shell Line bolt, the lower end of the fixing bolt 2 is arranged in the threaded hole at 1 top of connecting rod and is threadedly coupled with connecting rod 1, described The lower end of connecting rod 1 is equipped with the external screw thread to match with cargo tank bulkhead upper connector pedestal internal screw thread, the support component packet Link block 3 and support rod 4 are included, one end of the link block 3 is equipped with first through hole, and the link block 3 is arranged by first through hole On fixing bolt 2, the support rod 4 is threadedly coupled with the other end of link block 3, and the lower end of support rod 4 extend out to connection The lower section of block 3, the top of the support rod 4 are equipped with adjustment driving portion, and the bottom of the support rod 4 is equipped with support base 5, the branch The bottom for supportting seat 5 has supporting plane, and supporting plane and the center line of connecting rod 1 are perpendicular, are fixed temporarily dress according to each The quantity for needing fixed sublevel insulated case is set, the quantity of support component in each temporary fastening device is determined, by connecting rod 1 Lower end screws on the connecting piece base of cargo tank bulkhead, and rotation adjustment driving portion makes the supporting plane of support base 5 be pressed in sublevel exhausted On edge case, the height of sublevel insulated case is adjusted, the flatness of the sublevel insulated case of the sublevel insulated case and adjacent position is met Design requirement;
Step 4: being tested for the property after 24 hours to epoxy resin adhesive tape sample, if meeting design requirement, dress will be fixed temporarily It sets and removes and change dedicated insulated case connectivity kit;If not meeting design requirement, the fixed device of the batch and insulated case are removed, The epoxy resin adhesive tape for removing tank surface, enters step one.
Preferably, each temporary fastening device includes 1 to 4 support component in the step 3.
When the temporary fastening device is for the fixed insulated case for being in edge, when each temporary fastening device, each Temporary fastening device includes a support component for the edge of insulated case to be fixed;When temporary fastening device setting exists When in the gap between two insulated cases, each temporary fastening device includes two support components, and two support components are symmetrical The two sides of connecting rod 1 are set, are fixed for the insulated case to its two sides;When the temporary fastening device needs simultaneously to three When a insulated case is fixed, each temporary fastening device includes that three support components are used to carry out the vertex of three insulated cases It is fixed;When the temporary fastening device is in the apex of four insulated cases, each temporary fastening device includes four support groups Part is for being fixed the vertex of four insulated cases.
As a further preference, in the step 3, the adjustment driving portion is first that 4 top of support rod is arranged in Hexagon-head.
As further preferably, in the step 3, the top of the fixing bolt 2 is equipped with and the first hexagon-head Consistent second hexagon-head of shape.
As further preferably, in the step 3, pass through rotary fixing screw bolt 2 using electric or pneumatic tool Connecting rod 1 is threadedly coupled with the connection pedestal on cargo tank bulkhead, is driven using electric or pneumatic tool by rotation adjustment The supporting plane of support base 5 is pressed in sublevel insulated case by dynamic portion.
Sublevel insulated case is fixed using electric or pneumatic tool, it is time saving and energy saving, it can quickly improve sublevel insulation The fixed speed of case.
As further preferably, in the step 3, the lower end of the support base 5 and support rod 4 passes through bulb and connects It connects.
Support base 5 is connect with the lower end of support rod 4 by bulb, can rotate between support base 5 and support rod 4, together When supporting plane and support rod 4 between angle also may be implemented to finely tune, conveniently adapt to insulated case surface and 4 out of plumb of support rod The case where.
As further preferably, the center line of the support rod 4 is parallel with the center line of connecting rod 1.
The center line of support rod 4 is parallel with the center line of connecting rod 1, convenient for accurately turning the power in connecting rod 1 Move on on support rod 4, and be conducive to the adjusting of support rod 4, prevent support rod 4 drive support base 5 to insulated case compress when pair The surface scratching of insulated case.
As further preferred, the rotation direction of thread and the externally threaded spiral shell in 1 lower end of connecting rod of the fixing bolt 2 Line direction of rotation is identical.
The rotation direction of thread of fixing bolt 2 is identical as the connecting rod externally threaded rotation direction of thread in 1 lower end.When fixed spiral shell After the lower end of bolt 2 screws in the threaded hole at 1 top of connecting rod, convenient for passing through electric or pneumatic tool rotary fixing screw bolt 2, and It is screwed into the lower end of connecting rod 1 in the internal screw thread of the connecting piece base on bulkhead surface.
In the step 1, the proportion of epoxy resin used by different cargo tank containment systems is different, therefore will insulate Before case is fixed temporarily, the proportion of epoxy resin need to be tested, be wanted with confirming whether the proportion of epoxy resin meets design It asks.
One section of epoxy resin adhesive tape sample after overbaking is left and taken on glued board, is in order to after 24 hours to epoxy Resin adhesive tape sample is tested for the property to confirm that epoxy resin adhesive tape used in the sublevel insulated case being fixed temporarily Whether design requirement is met.
It needs to test flatness before epoxy resin coating, each position resin adhesive tape is determined by GTT special-purpose software Type, then according to require coating after install again, so chest coating resin after substantially one-to-one specific position, therefore In step 2, coated sublevel insulated case is seated to bulkhead designated position.
The epoxy resin adhesive tape sample that glued board is left and taken mainly test for 24 hours after hardness, in order to not influence production, so first Hardness test after microwave stove heating, qualification could produces, but producing qualified finally confirming is the hardness after room temperature for 24 hours.
In the step 1, if the proportion of epoxy resin and the epoxy resin adhesive tape performance after overbaking are not achieved Design requirement then needs to check dispensing equipment and adjustment charging pump with ratio.

Claims (6)

1. a kind of method being fixed temporarily for LNG ship cargo tank sublevel insulated case, which is characterized in that this method includes following step It is rapid:
Step 1: performance of the test epoxy resin with when 120 DEG C of epoxide-resin glue item bakings after twenty minutes, meets design and wants It asks, one section of epoxy resin adhesive tape sample after overbaking is left and taken on glued board, according to bulkhead situation by design requirement secondary Layer insulated case surface epoxy resin coating adhesive tape;
Step 2: coated sublevel insulated case is seated to bulkhead designated position;
Step 3: being fixed temporarily using temporary fastening device to sublevel insulated case, which includes connecting rod (1), the top of fixing bolt (2) and more than one support component, the connecting rod (1) is equipped with threaded hole, the fixing bolt It (2) is half-thread bolt, the lower end of the fixing bolt (2) is arranged in the threaded hole at the top of connecting rod (1) Nei and and connecting rod (1) it is threadedly coupled, the lower end of the connecting rod (1) is equipped with the outer spiral shell to match with cargo tank bulkhead upper connector pedestal internal screw thread Line, the support component include link block (3) and support rod (4), and one end of the link block (3) is equipped with first through hole, described Link block (3) is set on fixing bolt (2) by first through hole, the other end screw thread of the support rod (4) and link block (3) Connection, and the lower end of support rod (4) extend out to the lower section of link block (3), the top of the support rod (4) is equipped with adjustment driving The bottom in portion, the support rod (4) is equipped with support base (5), and the bottom of the support base (5) has supporting plane, and supports flat The center line in face and connecting rod (1) is perpendicular, the quantity of fixed sublevel insulated case is needed according to each temporary fastening device, really The lower end of connecting rod (1), is screwed in the connector base of cargo tank bulkhead by the quantity of support component in fixed each temporary fastening device On seat, rotation adjustment driving portion is pressed in the supporting plane of support base (5) in sublevel insulated case, adjusts the height of sublevel insulated case Degree, makes the flatness of the sublevel insulated case of the sublevel insulated case and adjacent position meet design requirement;
Step 4: being tested for the property after 24 hours to epoxy resin adhesive tape sample, if meeting design requirement, dress will be fixed temporarily It sets and removes and change dedicated insulated case connectivity kit;If not meeting design requirement, the fixed device of the batch and insulated case are removed, The epoxy resin adhesive tape for removing tank surface, enters step one.
2. a kind of method being fixed temporarily for LNG ship cargo tank sublevel insulated case according to claim 1, feature exist In in the step 3, each temporary fastening device includes 1 to 4 support component.
3. a kind of method being fixed temporarily for LNG ship cargo tank sublevel insulated case according to claim 1, feature exist In in the step 3, the adjustment driving portion is the first hexagon-head being arranged at the top of support rod (4).
4. a kind of LNG ship cargo tank sublevel insulated case temporary fastening device according to claim 3, which is characterized in that institute It states in step 3, the top of the fixing bolt (2) is equipped with and consistent second hexagon-head of the first hexagon-head shape.
5. a kind of LNG ship cargo tank sublevel insulated case temporary fastening device according to claim 4, which is characterized in that institute It states in step 3, it will be on connecting rod (1) and cargo tank bulkhead by rotary fixing screw bolt (2) using electric or pneumatic tool It connects pedestal to be threadedly coupled, driving portion is adjusted for the supporting plane of support base (5) by rotation using electric or pneumatic tool It is pressed in sublevel insulated case.
6. a kind of LNG ship cargo tank sublevel insulated case temporary fastening device according to claim 1, which is characterized in that institute It states in step 3, the support base (5) is connect with the lower end of support rod (4) by bulb.
CN201810547428.6A 2018-05-31 2018-05-31 A method of it is fixed temporarily for LNG ship cargo tank sublevel insulated case Pending CN109080762A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810547428.6A CN109080762A (en) 2018-05-31 2018-05-31 A method of it is fixed temporarily for LNG ship cargo tank sublevel insulated case

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810547428.6A CN109080762A (en) 2018-05-31 2018-05-31 A method of it is fixed temporarily for LNG ship cargo tank sublevel insulated case

Publications (1)

Publication Number Publication Date
CN109080762A true CN109080762A (en) 2018-12-25

Family

ID=64839239

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810547428.6A Pending CN109080762A (en) 2018-05-31 2018-05-31 A method of it is fixed temporarily for LNG ship cargo tank sublevel insulated case

Country Status (1)

Country Link
CN (1) CN109080762A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113941977A (en) * 2021-11-22 2022-01-18 沪东中华造船(集团)有限公司 Device and method for installing liquid cargo hold containment system module
CN115535175A (en) * 2022-09-22 2022-12-30 沪东中华造船(集团)有限公司 LNG ship containment system installation auxiliary device and bottom surface installation method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001130479A (en) * 1999-11-09 2001-05-15 Mitsubishi Heavy Ind Ltd Structure and method for mounting heat insulating box for lng gas tank
CN101204796A (en) * 2007-12-12 2008-06-25 沪东中华造船(集团)有限公司 Spider clip and insulation box installing method for liquefy natural gas boat insulation install
CN204368397U (en) * 2014-11-10 2015-06-03 沪东中华造船(集团)有限公司 The erecting equipment of cargo tank end face insulated case
CN204688349U (en) * 2014-08-18 2015-10-07 沪东中华造船(集团)有限公司 The installation frame of high-mobility, multipurpose, wheeled vehicle corner insulated case
CN105083486A (en) * 2015-08-03 2015-11-25 上海海洋大学 Temporary fixing device and construction method thereof
CN107878672A (en) * 2017-07-06 2018-04-06 沪东中华造船(集团)有限公司 A kind of method for improving LNG ship bicomponent epoxy resin adhesive tape forming quality
CN107931022A (en) * 2017-12-12 2018-04-20 沪东中华造船(集团)有限公司 A kind of auxiliary device for the batch coating of LNG ship corner insulated case epoxy resin

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001130479A (en) * 1999-11-09 2001-05-15 Mitsubishi Heavy Ind Ltd Structure and method for mounting heat insulating box for lng gas tank
CN101204796A (en) * 2007-12-12 2008-06-25 沪东中华造船(集团)有限公司 Spider clip and insulation box installing method for liquefy natural gas boat insulation install
CN204688349U (en) * 2014-08-18 2015-10-07 沪东中华造船(集团)有限公司 The installation frame of high-mobility, multipurpose, wheeled vehicle corner insulated case
CN204368397U (en) * 2014-11-10 2015-06-03 沪东中华造船(集团)有限公司 The erecting equipment of cargo tank end face insulated case
CN105083486A (en) * 2015-08-03 2015-11-25 上海海洋大学 Temporary fixing device and construction method thereof
CN107878672A (en) * 2017-07-06 2018-04-06 沪东中华造船(集团)有限公司 A kind of method for improving LNG ship bicomponent epoxy resin adhesive tape forming quality
CN107931022A (en) * 2017-12-12 2018-04-20 沪东中华造船(集团)有限公司 A kind of auxiliary device for the batch coating of LNG ship corner insulated case epoxy resin

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113941977A (en) * 2021-11-22 2022-01-18 沪东中华造船(集团)有限公司 Device and method for installing liquid cargo hold containment system module
CN115535175A (en) * 2022-09-22 2022-12-30 沪东中华造船(集团)有限公司 LNG ship containment system installation auxiliary device and bottom surface installation method

Similar Documents

Publication Publication Date Title
CN109080762A (en) A method of it is fixed temporarily for LNG ship cargo tank sublevel insulated case
CN104476223B (en) Following adaptive supporting mechanism for thin-wall cover hood like parts
CN109655333B (en) Tensile-bending composite fatigue test fixture for flat test piece
CN106706419A (en) Device for simulating boundary condition of simple support during plate piece testing
CN104236906A (en) Device for testing radial rigidity of tail rotor steady bearings
CN209148432U (en) A kind of cold spraying metal coating bond strength test device
CN101646276B (en) Microwave quick-restoring device
CN102922444B (en) Fixed clamping device for detecting complex blade vibration performance
CN108110431A (en) A kind of reflecting surface installation adjusting method of reflector antenna
CN208459451U (en) High-potting line fixes device
CN103822823B (en) A kind of rock sample pre-assembled clamp device for hard rock true triaxial test
CN213364178U (en) Clamp for vibration experiment of airborne display of airplane
CN203245469U (en) Groove cutting tooling for fillister hexagon head bolt
CN104215522B (en) Technical stud welding sample bending test tool
CN108225548B (en) Low-temperature stainless steel pipe vibration measuring device for LNG ship
CN205898588U (en) Pole sample shearing mechanism
CN109632474B (en) Tensile-compression-bending composite fatigue test fixture for round bar test piece
CN114701619A (en) Main engine positioning and mounting method based on block construction
CN103600228B (en) Engine link rises disconnected hole bolt installation method
CN109015510B (en) Stringer installation method of instrument installation platform in sealed cabin secondary structure
CN104907755A (en) Special splicing tool for critical turboset low-pressure cylinder
CN209509407U (en) The snap-type steel skirting of bright bolt decoration
CN206163682U (en) Low slow little active phased array detection radar antenna array assembly structure
CN204771290U (en) Critical turbine unit low pressure jar concatenation specialized tool
CN205111650U (en) Cooling turbine is experimental with integration anchor clamps

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181225

RJ01 Rejection of invention patent application after publication