CN109079974A - Curing cover - Google Patents

Curing cover Download PDF

Info

Publication number
CN109079974A
CN109079974A CN201811221764.8A CN201811221764A CN109079974A CN 109079974 A CN109079974 A CN 109079974A CN 201811221764 A CN201811221764 A CN 201811221764A CN 109079974 A CN109079974 A CN 109079974A
Authority
CN
China
Prior art keywords
column
tarpaulin
support bar
sliding part
curing cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811221764.8A
Other languages
Chinese (zh)
Other versions
CN109079974B (en
Inventor
蒋建平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Sany Kuaierju Housing Industry Co Ltd
Original Assignee
Hunan Sany Kuaierju Housing Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Sany Kuaierju Housing Industry Co Ltd filed Critical Hunan Sany Kuaierju Housing Industry Co Ltd
Priority to CN201811221764.8A priority Critical patent/CN109079974B/en
Publication of CN109079974A publication Critical patent/CN109079974A/en
Application granted granted Critical
Publication of CN109079974B publication Critical patent/CN109079974B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B11/00Apparatus or processes for treating or working the shaped or preshaped articles
    • B28B11/24Apparatus or processes for treating or working the shaped or preshaped articles for curing, setting or hardening

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Tents Or Canopies (AREA)

Abstract

The embodiment provides a kind of curing covers, are related to prefabricated components conservation technology field.The curing cover includes skeleton and tarpaulin, and tarpaulin is connect with skeleton, and the inside of tarpaulin forms maintenance space, and skeleton is located at side of the tarpaulin far from maintenance space.The curing cover can carry out advantageous protection to skeleton, and the environment of high temperature and humidity in curing cover is effectively prevent to lead to skeleton corrosion damage.

Description

Curing cover
Technical field
The present invention relates to prefabricated components conservation technology fields, in particular to a kind of curing cover.
Background technique
Prefabricated components generally put it into when needing steam curing and carry out steam curing in curing cover.
Inventor has found under study for action, existing at least to have the disadvantage in that in the related technology
Hot and humid environment in curing cover causes the steel structure framework of curing cover to be easy to happen corrosion damage.
Summary of the invention
The purpose of the present invention includes, for example, providing a kind of curing cover, improves the deficiencies in the prior art, can be to bone Frame carries out advantageous protection, and the environment of high temperature and humidity in curing cover is effectively prevent to lead to skeleton corrosion damage.
The embodiment of the present invention this can be implemented so that
The embodiment provides a kind of curing covers comprising skeleton and tarpaulin, the tarpaulin and the skeleton connect It connects, the inside of the tarpaulin forms maintenance space, and the skeleton is located at side of the tarpaulin far from the maintenance space.
Optionally, the skeleton is foldable, and some or all of top of the tarpaulin is mentioned with the folding of the skeleton Rise.
Optionally, the skeleton includes the bracket of bridging and gate, and the bracket includes that crossbeam and two are oppositely arranged Column group, the column group includes the multiple columns being set side by side, and is correspondingly arranged between the column of two column groups, institute Crossbeam is stated between two opposite column groups, and is connected respectively with two columns corresponding in two column groups It connects, is connected with the bridging between two adjacent columns.
Optionally, the bridging includes first support bar, second support bar, the first sliding part and the second sliding part, phase Two adjacent columns are respectively the first column and the second column, and one end of the first support bar and first column are cut with scissors It connects, the other end of the first support bar and first sliding part are hinged, and first sliding part and second column are sliding Dynamic connection, one end of the second support bar and second column are hinged, the middle part of the second support bar and described first The middle part of support rod is hinged, and the other end of the second support bar and second sliding part are hinged, second sliding part with First column is slidably connected.
Optionally, first sliding part and/or second sliding part are leaned on relative to the middle part of the first support bar The nearly crossbeam, the top of the tarpaulin is connect with first sliding part and/or second sliding part.
Optionally, the curing cover further includes first crossbar, one end of the first crossbar and one of them described column First sliding part of the bridging in group connects, the institute on the other end of the first crossbar and another described column group The first sliding part connection of bridging is stated, the top of the tarpaulin is connect with the first crossbar.
Optionally, the first crossbar is located at side of the tarpaulin far from the maintenance space.
Optionally, the quantity of the first crossbar is multiple, and multiple first crossbars are more along the same column group The parallel direction of a column is distributed.
Optionally, the curing cover further includes multiple first vertical bars, and multiple first vertical bars and the first crossbar are hung down Straight setting, first vertical bar is connect with the tarpaulin, and one end of first vertical bar is connect with the first crossbar.
Optionally, the curing cover further includes shift mechanism, and the shift mechanism includes first connecting rod, second connecting rod and mentions Connector is drawn, the first connecting rod is provided with the first articulated section and the second articulated section, and it is hinged that the second connecting rod is provided with third Portion and the 4th articulated section, first articulated section and a column in two adjacent columns it is hinged or with it is adjacent Two crossbeams in a crossbeam it is hinged, second articulated section and the third articulated section are hinged, described Another described column in four articulated sections and two adjacent columns it is hinged or in two adjacent crossbeams Another described crossbeam is hinged, and one end of the lifting connector is connect with the first connecting rod and/or the second connecting rod, institute The other end for stating lifting connector is connect with the top of the tarpaulin.
Optionally, the quantity of the crossbeam is multiple, and the lifting connector is between two adjacent crossbeams.
Optionally, the top of the tarpaulin is connect with the crossbeam.
Optionally, the quantity of the shift mechanism is multiple, and multiple shift mechanisms are more along the same column group The parallel direction of a column is distributed.
Optionally, the curing cover further includes second crossbar, and the top of the tarpaulin is connect with the second crossbar, described Lifting connector is connect close to one end of the tarpaulin with the second crossbar.
Optionally, the second crossbar is located at side of the tarpaulin far from the maintenance space.
Optionally, the bridging includes first support bar and second support bar, and two adjacent columns are respectively First column and the second column, first column include the first telescopic mast and the second telescopic mast, first telescopic mast and institute It states the second telescopic mast to be slidably connected, connect at the top of the one end of first telescopic mast far from second telescopic mast and the tarpaulin It connects, second column includes third telescopic mast and the 4th telescopic mast, and the third telescopic mast and the 4th telescopic mast slide Connection, the third telescopic mast are connect far from one end of the 4th telescopic mast with the top of the tarpaulin, first support One end of bar stretch with described first it is column articulated, the other end of the first support bar stretch with the described 4th it is column articulated, it is described One end of second support bar stretch with described second it is column articulated, in the middle part of the second support bar and the first support bar Portion is hinged, and the other end of the second support bar stretches column articulated with the third.
Optionally, the skeleton further includes traveling wheel, and the traveling wheel is connected to one of the column far from the crossbeam End.
Optionally, the curing cover further includes fixed pulley and rope, and first sliding part is relative to first support The middle part of bar is connect far from the crossbeam, the fixed pulley with the column or the crossbeam, one end of the rope with it is described The other end of the connection of first sliding part, the rope connect around the fixed pulley with the top of the tarpaulin.
Compared with prior art, the beneficial effect of the curing cover of the embodiment of the present invention includes, for example:
The skeleton of the curing cover mainly plays a supportive role, and tarpaulin mainly plays closing and insulation effect, which is placed in tarpaulin Outside, effectively preventing hot and humid environment in maintenance space leads to skeleton corrosion damage.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment attached Figure is briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not construed as pair The restriction of range for those of ordinary skill in the art without creative efforts, can also be according to this A little attached drawings obtain other relevant attached drawings.
Fig. 1 is the structural schematic diagram under the first first visual angle of curing cover provided in this embodiment;
Fig. 2 is the structural schematic diagram under the first second visual angle of curing cover provided in this embodiment;
Fig. 3 is the structural schematic diagram under the first curing cover third visual angle provided in this embodiment;
Fig. 4 is the structural schematic diagram under the first the 4th visual angle of curing cover provided in this embodiment;
Fig. 5 is the structural schematic diagram under the first visual angle of second of curing cover provided in this embodiment;
Fig. 6 is the structural schematic diagram under the second visual angle of second of curing cover provided in this embodiment;
Fig. 7 is the structural schematic diagram under second of curing cover third visual angle provided in this embodiment;
Fig. 8 is the structural schematic diagram under the 4th visual angle of second of curing cover provided in this embodiment;
Fig. 9 is the structural schematic diagram of the third curing cover provided in this embodiment;
Figure 10 is the structural schematic diagram under the 4th kind of the first visual angle of curing cover provided in this embodiment;
Figure 11 is the structural schematic diagram under the 4th kind of the second visual angle of curing cover provided in this embodiment.
Icon: 100- curing cover;10- skeleton;11- bridging;111- first support bar;112- second support bar;113- First sliding part;The second sliding part of 114-;12- bracket;121- crossbeam;122- the first column group;123- the second column group;124- First column;The first telescopic mast of 1241-;The second telescopic mast of 1242-;The second column of 125-;1251- third telescopic mast;1252- Four telescopic masts;20- tarpaulin;30- conserves space;40- first crossbar;The first vertical bar of 50-;60- shift mechanism;61- first connecting rod; 62- second connecting rod;63- lifts connector;70- traveling wheel;81- fixed pulley;82- rope;200- fixes die station;300- component.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is A part of the embodiment of the present invention, instead of all the embodiments.The present invention being usually described and illustrated herein in the accompanying drawings is implemented The component of example can be arranged and be designed with a variety of different configurations.
Therefore, the detailed description of the embodiment of the present invention provided in the accompanying drawings is not intended to limit below claimed The scope of the present invention, but be merely representative of selected embodiment of the invention.Based on the embodiments of the present invention, this field is common Technical staff's every other embodiment obtained without creative efforts belongs to the model that the present invention protects It encloses.
It should also be noted that similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi It is defined in a attached drawing, does not then need that it is further defined and explained in subsequent attached drawing.
In the description of the present invention, it should be noted that if occur term " center ", "upper", "lower", "left", "right", The orientation or positional relationship of the instructions such as "vertical", "horizontal", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, Either the invention product using when the orientation or positional relationship usually put, be merely for convenience of the description present invention and simplification retouched It states, rather than the device or element of indication or suggestion meaning must have a particular orientation, be constructed and operated in a specific orientation, Therefore it is not considered as limiting the invention.
In addition, being only used for distinguishing description if there is term " first ", " second ", " third " etc., and should not be understood as indicating Or imply relative importance.
In addition, be not offered as requiring component abswolute level or pendency if there is term "horizontal", "vertical", " pendency " etc., But it can be slightly tilted.It is not to indicate the knot if "horizontal" only refers to that its direction is more horizontal with respect to for "vertical" Structure is had to fully horizontally, but can be slightly tilted.
In the description of the present invention, it is also necessary to which explanation is unless specifically defined or limited otherwise, if there is term " setting ", " installation ", " connected ", " connection " etc. shall be understood in a broad sense, for example, it may be being fixedly connected, be also possible to detachable Connection, or be integrally connected;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, centre can also be passed through Medium is indirectly connected, and can be the connection inside two elements.It for the ordinary skill in the art, can specific feelings Condition understands the concrete meaning of above-mentioned term in the present invention.
It should be noted that in the absence of conflict, the feature in the embodiment of the present invention can be combined with each other.
Fig. 1-Fig. 4 is please referred to, a kind of curing cover 100 is present embodiments provided comprising skeleton 10 and tarpaulin 20, tarpaulin 20 It is connect with skeleton 10, the inside of tarpaulin 20 forms maintenance space 30, and skeleton 10 is located at side of the tarpaulin 20 far from maintenance space 30.
The skeleton 10 of the curing cover 100 mainly plays a supportive role, and tarpaulin 20 mainly plays closing and insulation effect, the skeleton 10 It is placed in outside tarpaulin 20, effectively preventing hot and humid environment in maintenance space 30 leads to the corrosion damage of skeleton 10.Such structure Setting, can make the steam being passed through in the inside of tarpaulin 20, and cannot easily touch skeleton 10, so as to extend bone The service life of frame 10.
For placing fixed die station 200 and the component 300 in fixed die station 200 in the maintenance space 30, pass through Component 300 can be conserved after steam.
In conjunction with Fig. 2 and Fig. 3, in the present embodiment, skeleton 10 is foldable, and some or all of top of tarpaulin 20 is with skeleton 10 Folding and hoisting depth.
Specifically, skeleton 10 fold during, the top area of tarpaulin 20 be possible to can there is a phenomenon where sagging, During skeleton 10 and component 300 generate relative movement, it is possible to which the top area of the tarpaulin 20 can rub with component 300 It wears wound, the top area of tarpaulin 20 can be damaged, therefore during skeleton 10 folds, the top of tarpaulin 20 can promote one Fixed height, in general, can be using the top of drawstring connection tarpaulin 20, during skeleton 10 folds, artificial pull should Drawstring, so that the top lift height of tarpaulin 20, when can also realize that skeleton 10 folds using some linkage mechanisms, tarpaulin 20 Top automatic lifting will carry out detailed explanation to this linkage mechanism below.It should be noted that in other embodiments, bone Frame 10 can not also be foldable.
In conjunction with Fig. 1 and Fig. 3, in the present embodiment, skeleton 10 includes the bracket 12 of bridging 11 and gate, and bracket 12 includes cross Beam 121 and two column groups being oppositely arranged, column group include the multiple columns being set side by side, between the column of two column groups It is correspondingly arranged, crossbeam 121 connects between two opposite column groups, and respectively with two columns corresponding in two column groups It connects, is connected with bridging 11 between two adjacent columns.
It should be noted that two column groups being oppositely arranged are respectively the first column group 122 and the second column group 123, The quantity of crossbeam 121 be it is multiple and be set side by side, the both ends of each crossbeam 121 respectively be oppositely arranged in two column groups two A column connection.That is, one end of crossbeam 121 is connect with a column in the first column group 122, crossbeam 121 it is another One end is connect with a column in the second column group 123, and the two columns are oppositely arranged, so that multiple crossbeams 121 It is in evenly distributed arrangement after installation.After installing in this way, entire bracket 12 is in gate, so that fixed die station 200 and component 300 can be with Smoothly enter or exit the maintenance space 30.
In other embodiments, which is also possible to folding mechanism.In other words, two adjacent crossbeams 121 it Between the bridging 11 can also be installed.In the present embodiment, a bridging 11, other realities are installed between two adjacent columns It applies in example, two, three or more bridging 11 can be installed between two adjacent columns.
In conjunction with Fig. 3, specifically, bridging 11 includes first support bar 111, second support bar 112, the first sliding part 113 With the second sliding part 114, two adjacent columns are respectively the first column 124 and the second column 125, first support bar 111 One end and the first column 124 are hinged, and the other end of first support bar 111 and the first sliding part 113 are hinged, the first sliding part 113 It is slidably connected with the second column 125, one end of second support bar 112 and the second column 125 are hinged, in second support bar 112 Portion and the middle part of first support bar 111 are hinged, and the other end of second support bar 112 and the second sliding part 114 are hinged, the second sliding Part 114 is slidably connected with the first column 124.
More specifically, column is equipped with traveling wheel 70 far from one end of crossbeam 121.First sliding part 113 and second Sliding part 114 is relative to first support bar 111 and second support bar 112 close to crossbeam 121, that is to say, that folds in skeleton 10 In the process, 114 upward sliding of the first sliding part 113 and the second sliding part.
It should be noted that the first sliding part 113, the second sliding part 114 can be sliding block, by be mounted on column Sliding rail adaptation, with realize both be slidably connected, be also possible to sliding sleeve, be set on column realize slide up and down.
In conjunction with Fig. 3, in the present embodiment, the first sliding part 113 and/or the second sliding part 114 are relative to first support bar 111 Middle part close to crossbeam 121, the top of tarpaulin 20 is connect with the first sliding part 113 and/or the second sliding part 114.
Optionally, the top of tarpaulin 20 is mounted on the first sliding part 113 and the second sliding part 114, is folded in skeleton 10 During, the first sliding part 113 and the second sliding part 114 move up, and the whole region with the top of tarpaulin 20 is upward Mobile, the height that the top lift of tarpaulin 20 can be made certain in this way realizes linkage effect.
It should be noted that the height at the top of the tarpaulin 20 in Fig. 1 and Fig. 3 is relatively low, the tarpaulin in Fig. 2 and Fig. 4 The height at 20 top is relatively high, in general, in maintenance work, the height at the top of tarpaulin 20 is relatively low, to mention High maintenance effect is then needed when needing fixed die station 200 and corresponding component 300 to leave curing cover 100 by the top of tarpaulin 20 Portion promotes certain height.
In conjunction with Fig. 1, in the present embodiment, curing cover 100 further includes first crossbar 40, one end of first crossbar 40 and wherein one First sliding part 113 of the bridging 11 in a column group connects, on the other end of first crossbar 40 and another column group First sliding part 113 of bridging 11 connects, and the top of tarpaulin 20 is connect with first crossbar 40.
That is, one end of first crossbar 40 is connect with the first sliding part 113 in the first column group 122, first is horizontal The other end of bar 40 is connect with the first sliding part 113 in the second column group 123, and the two first sliding parts 113 are corresponding It is arranged, so that skeleton 10, during folding, first crossbar 40 understands with the movement of the first sliding part 113 hoisting depth, To drive tarpaulin 20 to promote certain height, by installing first crossbar 40 on tarpaulin 20, tarpaulin can be preferably driven 20 top area is mobile, simultaneously because tarpaulin 20 and the tie point of first crossbar 40 are more, can make the top of tarpaulin 20 Region stress is more uniform, to prolong its service life.
In the present embodiment, first crossbar 40 is located at side of the tarpaulin 20 far from maintenance space 30.
The first crossbar 40 is located at the outside of tarpaulin 20, can directly contact to avoid with steam, can reduce its corrosion Probability.
In the present embodiment, the quantity of first crossbar 40 be it is multiple, multiple first crossbars 40 are multiple vertical along same column group The parallel direction of column is distributed.
The quantity of first crossbar 40 be it is multiple, can make being more uniformly stressed for tarpaulin 20, drive tarpaulin 20 mobile Effect is more preferable.
In conjunction with Fig. 1, in the present embodiment, curing cover 100 further includes multiple first vertical bars 50, multiple first vertical bars 50 and first Cross bar 40 is vertically arranged, and the first vertical bar 50 is connect with tarpaulin 20, and one end of the first vertical bar 50 is connect with first crossbar 40.
By the way that vertical rod piece, the state for allowing the lateral region of tarpaulin 20 to keep naturally drooping is arranged.
In conjunction with figure 5-8, optionally, curing cover 100 further includes shift mechanism 60, and shift mechanism 60 includes first connecting rod 61, second connecting rod 62 and lifting connector 63, first connecting rod 61 are provided with the first articulated section and the second articulated section, second connecting rod 62 It is provided with third articulated section and the 4th articulated section, the first articulated section and a column in two adjacent columns are hinged, and second Articulated section and third articulated section are hinged, and the 4th articulated section and another column in two adjacent columns are hinged, lifting connection One end of part 63 is connect with first connecting rod 61 and/or second connecting rod 62, lifts the other end of connector 63 and the top of tarpaulin 20 Connection.
Specifically, the first articulated section and the second hinge point are in the both ends of first connecting rod 61, third articulated section in conjunction with Fig. 7 With the 4th hinge point in the both ends of second connecting rod 62, the one end and first connecting rod 61 and second connecting rod 62 for lifting connector 63 are cut with scissors The position connection connect, and the other end for lifting connector 63 is connect with the top of tarpaulin 20.
It should be noted that part tarpaulin during skeleton 10 folds, between two adjacent crossbeams 121 20 be possible to can there is a phenomenon where sagging.By the lifting connector 63, it is described with the relative position in Fig. 7 and Fig. 8, works as bone When frame 10 folds, the first column 124 and the second column 125 are close to each other, the first articulated section of first connecting rod 61 and second connecting rod 62 the 4th articulated section is close to each other, and the elevated height of the second articulated section and third articulated section, to drive lifting connector 63 promote certain height avoids its sagging so that the top of tarpaulin 20 be driven to move up.In conjunction in Fig. 5 and Fig. 7, tarpaulin The height at 20 top is relatively low, and in conjunction in Fig. 6 and Fig. 8, the height at the top of tarpaulin 20 is relatively high.
Lifting connector 63 can select drawstring, can also select rod piece.
In the present embodiment, the quantity of crossbeam 121 be it is multiple, lift connector 63 between two adjacent crossbeams 121.
In this way, the position that lifting connector 63 can be made to connect with the top area of tarpaulin 20 is located at two adjacent cross Between beam 121, so that the stress of tarpaulin 20 is more uniform, tarpaulin 20 can be preferably pulled.
In conjunction in Fig. 5, it should be noted that one end of first connecting rod 61 and second connecting rod 62 can also directly and crossbeam 121 connections.
That is, optional, first articulated section be it is hinged with a crossbeam 121 in two adjacent crossbeams 121, And the 4th articulated section be it is hinged with another crossbeam in two adjacent crossbeams 121, equally may be implemented lifting effect.And And there are three shift mechanisms 60 for distribution on the same crossbeam 121.
In conjunction with Fig. 6, in the present embodiment, the top of tarpaulin 20 is connect with crossbeam 121.
The top of tarpaulin 20 and the connection of crossbeam 121 can make the position of tarpaulin 20 more stable, 60 need of shift mechanism The corresponding 20 region hoisting depth of tarpaulin between two adjacent crossbeams 121 can avoid tarpaulin 20 to connect with component 300 Touching.So that the top section region height of tarpaulin 20 does not change, and the elevated height of partial region, this part height The region promoted is spent between two adjacent crossbeams 121.
In the present embodiment, the quantity of shift mechanism 60 be it is multiple, multiple shift mechanisms 60 are multiple vertical along same column group The parallel direction of column is distributed.
By the way that multiple lifting connectors 63 are arranged, the top area of tarpaulin 20 can be made to be more uniformly stressed, Ke Yiti High pull-up effect.
Optionally, curing cover 100 further includes second crossbar, and the top of tarpaulin 20 is connect with second crossbar, lifts connector 63 connect close to one end of tarpaulin 20 with second crossbar.
It should be understood that can also be not connected to the top of tarpaulin 20 and crossbeam 121, and second crossbar is connected, lifting connection Part 63 pulls the second crossbar, by the certain height of the top lift of tarpaulin 20.
Similarly, second crossbar is located at side of the tarpaulin 20 far from maintenance space 30.Making for second crossbar can be extended in this way Use the service life.Similarly, the second vertical bar also can be set, naturally droop state with keep 20 side of tarpaulin.
In conjunction with Fig. 1-Fig. 8, in the present embodiment, skeleton 10 further includes traveling wheel 70, and traveling wheel 70 is connected to column far from horizontal One end of beam 121.
The traveling wheel 70 can be the steel wheel that universal caster wheel, direction-caster or matching track use.The traveling wheel 70 also position In side of the tarpaulin 20 far from maintenance space 30.
In conjunction with Fig. 9, optionally, curing cover 100 further includes fixed pulley 81 and rope 82, and the first sliding part 113 is relative to The middle part of one support rod 111 is connect far from crossbeam 121, fixed pulley 81 with column or crossbeam 121, and one end of rope 82 is sliding with first Moving part 113 connects, and the other end of rope 82 connect around fixed pulley 81 with the top of tarpaulin 20.
Skeleton 10 fold during, the first column 124 and the second column 125 are close to each other, the first sliding part 113 to Lower movement, since one end of rope 82 is connect with the first sliding part 113, the other end bypasses the top of fixed pulley 81 and tarpaulin 20 Connection, during the first sliding part 113 moves down, the top of tarpaulin 20 is moved up, to realize the top of tarpaulin 20 Portion promotes certain height.
Optionally, in conjunction with Figure 10 and Figure 11, bridging 11 includes first support bar 111 and second support bar 112, adjacent Two columns are respectively the first column 124 and the second column 125, and the first column 124 includes that the first telescopic mast 1241 and second is stretched Contracting column 1242, the first telescopic mast 1241 are slidably connected with the second telescopic mast 1242, and the first telescopic mast 1241 is far from the second telescopic mast 1242 one end is connect with the top of tarpaulin 20, and the second column 125 includes third telescopic mast 1251 and the 4th telescopic mast 1252, the Three telescopic masts 1251 are slidably connected with the 4th telescopic mast 1252, the one end of third telescopic mast 1251 far from the 4th telescopic mast 1252 with The top of tarpaulin 20 connects, and one end of first support bar 111 and the first telescopic mast 1241 are hinged, first support bar 111 it is another End and the 4th telescopic mast 1252 are hinged, and one end of second support bar 112 and the second telescopic mast 1242 are hinged, second support bar 112 Middle part and first support bar 111 middle part it is hinged, the other end and third telescopic mast 1251 of second support bar 112 are hinged.
During the first column 124 and the second column 125 close to each other, under the action of bridging 11, first stretches While contracting column 1241 and third telescopic mast 1251 promote certain height, with the certain height of the top lift of tarpaulin 20, When the folding of skeleton 10 has been achieved, the certain height of the top automatic lifting of tarpaulin 20.It should be noted that it is vertical to be located at first Crossbeam 121 between column group 122 and the second column group 123 and corresponding first telescopic mast 1241 or corresponding third telescopic mast 1251 connections, the crossbeam 121 can also be connect with the top of tarpaulin.
Second telescopic mast 1242 is connect far from one end of the first telescopic mast 1241 with traveling wheel 70, the 4th telescopic mast 1252 one end far from third telescopic mast 1251 is connect with traveling wheel 70.It should be noted that a column shown in Figure 10 In being slidably connected of both being realized in the form of being arranged of two telescopic masts, can also be sliding using sliding rail in other embodiments The form realization of slot is slidably connected.Column shown in Figure 10 includes two telescopic masts, in other embodiments, a column It also may include three telescopic masts, four telescopic masts etc..
Similarly, which can also include third cross bar and corresponding third vertical bar, while can also be on crossbeam 121 Shift mechanism 60 is installed, third cross bar connect with the top of tarpaulin 20 and is located at side of the tarpaulin 20 far from maintenance space 30, the Three cross bars are consistent with the arragement direction of crossbeam 121, but third cross bar is corresponding between two adjacent crossbeams 121, third One end of vertical bar is connect with third cross bar and third cross bar and third vertical bar are vertically arranged, and the side of third vertical bar and tarpaulin 20 connects It connects and is located at side of the tarpaulin 20 far from maintenance space 30.One end of the lifting connector 63 of shift mechanism 60 and third cross bar connect It connects, in this way when skeleton 10 folds, the part tarpaulin 20 between two adjacent crossbeams 121 connects in third cross bar and lifting It is difficult under the action of fitting 63 sagging.
Above provide several linkage mechanisms, and during the folding of skeleton 10 may be implemented, the top of tarpaulin 20 mentions automatically Rise certain height.It should be noted that several can also select together when it is implemented, a kind of linkage mechanism can be selected only With some other structure that similar effect may be implemented can also be selected.
According to the principle that a kind of curing cover 100 provided in this embodiment, curing cover 100 is:
Skeleton 10 is mounted on side of the tarpaulin 20 far from maintenance space 30, it can be made to avoid directly contacting with steam, drops The probability of its low corrosion, while being mounted with linkage mechanism, so that skeleton 10 is during folding, the top lift one of tarpaulin 20 Fixed height avoids tarpaulin 20 from contacting with component 300, reduces the probability of its scratch that is worn.
A kind of curing cover 100 provided in this embodiment has at least the following advantages:
The curing cover 100 is more suitable for the maintenance of component 300, and effectively reducing skeleton 10 is influenced by care environments and occurred The probability of corrosion phenomena;
It is separate that skeleton 10, first crossbar 40, the first vertical bar 50, shift mechanism 60, traveling wheel 70 etc. are installed in tarpaulin 20 The side in space 30 is conserved, use environment is preferable, longer life expectancy, and failure rate is lower;
Using linkage mechanism, there is the sagging skill in top of tarpaulin 20 during skeleton 10 folds in effective solution Art problem avoids tarpaulin 20 from being scratched by component 300.
In conclusion the skeleton 10 of the curing cover 100 mainly plays a supportive role the present invention provides a kind of curing cover 100, Tarpaulin 20 mainly plays closing and insulation effect, the skeleton 10 are placed in outside tarpaulin 20, and it is high to effectively prevent high temperature in maintenance space 30 Wet environment leads to the corrosion damage of skeleton 10.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any In the technical scope disclosed by the present invention, any changes or substitutions that can be easily thought of by those familiar with the art, all answers It is included within the scope of the present invention.Therefore, protection scope of the present invention should be with the scope of protection of the claims It is quasi-.

Claims (10)

1. a kind of curing cover, which is characterized in that including skeleton and tarpaulin, the tarpaulin is connect with the skeleton, the tarpaulin Inside forms maintenance space, and the skeleton is located at side of the tarpaulin far from the maintenance space.
2. curing cover according to claim 1, which is characterized in that the skeleton is foldable, the portion at the top of the tarpaulin Point or whole hoisting depths with the folding of the skeleton.
3. curing cover according to claim 2, which is characterized in that the skeleton includes the bracket of bridging and gate, institute Stating bracket includes crossbeam and two column groups being oppositely arranged, and the column group includes the multiple columns being set side by side, two institutes State and be correspondingly arranged between the column of column group, the crossbeam between two opposite column groups, and respectively with two Corresponding two columns connect in the column group, are connected with the bridging between two adjacent columns.
4. curing cover according to claim 3, which is characterized in that the bridging includes first support bar, the second support Bar, the first sliding part and the second sliding part, two adjacent columns are respectively the first column and the second column, and described first One end of support rod and first column are hinged, and the other end of the first support bar and first sliding part are hinged, institute It states the first sliding part to be slidably connected with second column, one end of the second support bar and second column are hinged, institute The middle part for stating second support bar and the middle part of the first support bar are hinged, the other end of the second support bar and described second Sliding part is hinged, and second sliding part is slidably connected with first column.
5. curing cover according to claim 4, which is characterized in that first sliding part and/or second sliding part Middle part relative to the first support bar is close to the crossbeam, the top of the tarpaulin and first sliding part and/or institute State the connection of the second sliding part.
6. curing cover according to claim 5, which is characterized in that the curing cover further includes first crossbar, and described first One end of cross bar is connect with the first sliding part of the bridging in column group described in one of them, the first crossbar it is another One end is connect with the first sliding part of the bridging in column group described in another, the top of the tarpaulin and described first Cross bar connection.
7. curing cover according to claim 3, which is characterized in that the curing cover further includes shift mechanism, the lifting Mechanism includes first connecting rod, second connecting rod and lifting connector, and the first connecting rod is provided with the first articulated section and second hingedly Portion, the second connecting rod are provided with third articulated section and the 4th articulated section, and first articulated section is described vertical with adjacent two A column in column is hinged or hinged with a crossbeam in two adjacent crossbeams, and described second is hinged Portion and the third articulated section are hinged, another described column in the 4th articulated section and two adjacent columns is cut with scissors It connects or hinged with another described crossbeam in two adjacent crossbeams, one end and described first of the lifting connector The other end of connecting rod and/or second connecting rod connection, the lifting connector is connect with the top of the tarpaulin.
8. curing cover according to claim 7, which is characterized in that the top of the tarpaulin is connect with the crossbeam.
9. curing cover according to claim 3, which is characterized in that the bridging includes first support bar and the second support Bar, two adjacent columns are respectively the first column and the second column, and first column includes the first telescopic mast and the Two telescopic masts, first telescopic mast are slidably connected with second telescopic mast, and first telescopic mast is stretched far from described second One end of contracting column is connect with the top of the tarpaulin, and second column includes third telescopic mast and the 4th telescopic mast, and described Three telescopic masts are slidably connected with the 4th telescopic mast, the one end of the third telescopic mast far from the 4th telescopic mast with it is described The top of tarpaulin connects, one end of the first support bar stretch with described first it is column articulated, the first support bar it is another End stretch with the described 4th it is column articulated, one end of the second support bar stretch with described second it is column articulated, it is described second support The middle part of bar and the middle part of the first support bar are hinged, and the other end of the second support bar and the third telescopic mast are cut with scissors It connects.
10. curing cover according to claim 4, which is characterized in that the curing cover further includes fixed pulley and rope, described First sliding part relative to the first support bar middle part far from the crossbeam, the fixed pulley and the column or the cross Beam connection, one end of the rope are connect with first sliding part, and the other end of the rope bypasses the fixed pulley and institute State the top connection of tarpaulin.
CN201811221764.8A 2018-10-19 2018-10-19 Maintenance cover Active CN109079974B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811221764.8A CN109079974B (en) 2018-10-19 2018-10-19 Maintenance cover

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811221764.8A CN109079974B (en) 2018-10-19 2018-10-19 Maintenance cover

Publications (2)

Publication Number Publication Date
CN109079974A true CN109079974A (en) 2018-12-25
CN109079974B CN109079974B (en) 2020-06-16

Family

ID=64843899

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811221764.8A Active CN109079974B (en) 2018-10-19 2018-10-19 Maintenance cover

Country Status (1)

Country Link
CN (1) CN109079974B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110258207A (en) * 2019-07-01 2019-09-20 中铁七局集团有限公司 A kind of maintenance of equipment for double-block ballastless track bed board
CN112318694A (en) * 2020-11-10 2021-02-05 新疆冶金建设(集团)有限责任公司 Foldable precast concrete component steam curing means

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09195586A (en) * 1996-01-16 1997-07-29 Sanee Kosakusho:Kk Pantograph device
CN2409275Y (en) * 2000-03-14 2000-12-06 张琨俞 Movable tent
CN201275793Y (en) * 2008-10-08 2009-07-22 黄冠勋 Anti-typhoon rainwater-proof apparatus for drying air dried brick of brick-yard
CN201517296U (en) * 2009-06-08 2010-06-30 刘诚 Foldable protection shed frame
GB2467529A (en) * 2009-01-30 2010-08-11 Hughes Safety Showers Ltd One-piece collapsible shelter frame
CN105201272A (en) * 2014-06-09 2015-12-30 天津比诺国际贸易有限公司 Multifunctional automatic-lifting detachable folding tent and support
CN205325950U (en) * 2016-01-28 2016-06-22 杭州建工建材有限公司 Portable, telescopic steam maintenance canopy

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09195586A (en) * 1996-01-16 1997-07-29 Sanee Kosakusho:Kk Pantograph device
CN2409275Y (en) * 2000-03-14 2000-12-06 张琨俞 Movable tent
CN201275793Y (en) * 2008-10-08 2009-07-22 黄冠勋 Anti-typhoon rainwater-proof apparatus for drying air dried brick of brick-yard
GB2467529A (en) * 2009-01-30 2010-08-11 Hughes Safety Showers Ltd One-piece collapsible shelter frame
CN201517296U (en) * 2009-06-08 2010-06-30 刘诚 Foldable protection shed frame
CN105201272A (en) * 2014-06-09 2015-12-30 天津比诺国际贸易有限公司 Multifunctional automatic-lifting detachable folding tent and support
CN205325950U (en) * 2016-01-28 2016-06-22 杭州建工建材有限公司 Portable, telescopic steam maintenance canopy

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110258207A (en) * 2019-07-01 2019-09-20 中铁七局集团有限公司 A kind of maintenance of equipment for double-block ballastless track bed board
CN112318694A (en) * 2020-11-10 2021-02-05 新疆冶金建设(集团)有限责任公司 Foldable precast concrete component steam curing means

Also Published As

Publication number Publication date
CN109079974B (en) 2020-06-16

Similar Documents

Publication Publication Date Title
CN111058618B (en) Combined type telescopic sleeve jacking device and method thereof
US20150136526A1 (en) Bridge maintenance vehicle with hinge-connected type hanging bracket and capable of avoiding bridge-side obstacles
CN109079974A (en) Curing cover
CN106395617B (en) A kind of crane for moving electric power equipment
CN205740051U (en) A kind of crane for moving electric power equipment
CN105048322A (en) Replacement system of capacitor on tower
US20150000034A1 (en) Electrically Elevated Baby Crib
CN102619535B (en) Folding tunnel widening trolley
KR100977581B1 (en) Ventilation equipment for vinyl house
CN207583301U (en) A kind of voluntarily double ladder
CN203947855U (en) A kind of foldable tent frame
CN105781091A (en) Adjustable-length single-guide-frame multilevel synchronous lifting working platform and construction method thereof
CN105970853B (en) Flexible lifeline
CN104261233B (en) Lifter
CN204452834U (en) Self-unloading oceangoing ship outrigger foldable belt conveyor
CN108515976A (en) Switching mechanism, kuppe and rail vehicle
CN209468697U (en) High-altitude construction auxiliary device
CN105715030A (en) Single-guide-frame multi-stage lifting working platform with adjustable spacing and length and construction method for single-guide-frame multi-stage lifting working platform
CN207481966U (en) A kind of transfer car(buggy)
CN208551672U (en) Facade cleaning device
CN105484154A (en) Multifunctional detection vehicle for bridge construction
CN214832025U (en) Concrete bridge disease prosthetic devices
CN220449516U (en) Box-type container hoisting protection device
US11498699B2 (en) Safety protection apparatus of boarding bridge walking mechanism
CN105804383A (en) Length-adjustable double-guide-frame multistage synchronous lifting working platform and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant