CN109063997A - The Supervision of design alteration in project supervision - Google Patents

The Supervision of design alteration in project supervision Download PDF

Info

Publication number
CN109063997A
CN109063997A CN201810820318.2A CN201810820318A CN109063997A CN 109063997 A CN109063997 A CN 109063997A CN 201810820318 A CN201810820318 A CN 201810820318A CN 109063997 A CN109063997 A CN 109063997A
Authority
CN
China
Prior art keywords
colour developing
design alteration
common
supervision
design
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810820318.2A
Other languages
Chinese (zh)
Inventor
桂群
李家润
林呈煜
盛辉
罗玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Overseas Construction Supervision Co Ltd
Original Assignee
Guangdong Overseas Construction Supervision Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Overseas Construction Supervision Co Ltd filed Critical Guangdong Overseas Construction Supervision Co Ltd
Priority to CN201810820318.2A priority Critical patent/CN109063997A/en
Publication of CN109063997A publication Critical patent/CN109063997A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06395Quality analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Abstract

The present invention relates to project supervision technical fields, for the lower problem of efficiency, provide a kind of Supervision of design alteration in project supervision, the technical solution is as follows: including, (1) design drawing is audited: the design drawing common ink after all changes is printed on several blank drawings to form several common drawings, design drawing before change is sequentially printed on common drawing with ultraviolet colour development material to form several colour developing drawings correspondingly by common drawing, the ultraviolet colour development material transparent state under no ultraviolet light, observation colour developing drawing in the UV lamp, pick out ultraviolet colour developing figure and the inconsistent colour developing drawing of common ink figure;(2) tissue change evaluation;(3) evaluation course is recorded;(4) report is provided.Whether the figure under ultraviolet light irradiation on observation colour developing drawing before design alteration is completely covered the figure after design alteration, so that easy to operate when supervisor's verification change drawing, operating efficiency is higher.

Description

The Supervision of design alteration in project supervision
Technical field
The present invention relates to project supervision technical fields, more specifically, it relates to design alteration in a kind of project supervision Supervision.
Background technique
Project supervision refers to engineering project of the supervisor with related qualification by the commission of Party A, according to state approval File, the law in relation to engineering construction, regulation and engineering supervision contract and other construction contracts are built, Party A is represented A kind of proficient service activity to the engineering construction implementing monitoring of Party B.Project supervision is a kind of paid engineering consulting clothes Business;It is to be entrusted to carry out by Party A;The main foundation of management is law, regulation, technical standard, related contract and file;Management Criterion be to abide by the law, is sincere, is just and scientific;Management purpose is to ensure that engineering construction quality and safety, improves engineering construction water It is flat, give full play to returns of investment.
During engineering construction, due to the limitation of actual conditions, it may be necessary to design drawing is changed, if After meter change, need to the design drawing organization of examination and comment after change, evaluation can be ratified to change after passing through, to guarantee engineering matter Amount before change evaluation, needs to be audited drawing change part by supervisor and is supplied to evaluation team, can guarantee evaluation course Nothing is left, but since engineering drawing quantity is more, supervisor is by printing all drawings before changing and after change And when checked one by one to determine change drawing, efficiency is lower, therefore there are also improve space.
Summary of the invention
In view of the deficiencies of the prior art, the present invention intends to provide a kind of prison of design alteration in project supervision Reason method has the advantages that efficiency is higher.
To achieve the above object, the present invention provides the following technical scheme that
The Supervision of design alteration in a kind of project supervision, comprising the following steps:
(1) design drawing is audited, specific as follows:
Supervisor prints the design drawing after all changes on several blank drawings with shape sequentially through the first printer At several common drawings, by the design drawing before change by the one-to-one sequence of common drawing by with the first printer specification one The second printer caused is printed on common drawing to form several colour developing drawings, is common in the print cartridge of first printer Ink is ultraviolet colour development material in the print cartridge of second printer, and the ultraviolet colour development material is under no ultraviolet light The colour developing drawing is placed under ultraviolet lamp and observes one by one, picks out ultraviolet colour developing figure and common ink figure by pellucidity Shape has inconsistent colour developing drawing;
(2) tissue change evaluation, specific as follows:
The colour developing drawing classification by special function that reviewer will be singled out is supplied to reviewer, and reviewer will develop the color drawing placement Distinctive points in observation colour developing drawing after design alteration in the UV lamp, are evaluated;
(3) evaluation course is recorded;
(4) report is provided.
By adopting the above technical scheme, the design drawing after change is printed by the first printer to form common figure Paper, then printed the design drawing before change to be formed and be shown with ultraviolet colour development material on common drawing by the second printer Chromatic graph paper, due to the figure before making supervisor only need to can observe design alteration on colour developing drawing under ultraviolet light irradiation Figure after design alteration whether is completely covered proves that the drawing does not change if being completely covered, if only partially covering Lid, then prove that the drawing has made change, so that easy to operate when supervisor's verification change drawing, operating efficiency is higher;By In ultraviolet colour development material under no ultraviolet light transparent state, when so that drawing being provided to reviewer, reviewer can Switched by the operation of irradiating ultraviolet light and not irradiating ultraviolet light, easily obtains the modification information in drawing, while not changing and setting After the figure " stealth " of meter, no longer influence reviewer observes the figure after design for change, so that reviewer evaluates Efficiency increase, while obtaining more accurate review result.
Preferably, the ultraviolet colour development material is stealthy fluoresent printing ink.
By adopting the above technical scheme, by using stealthy fluoresent printing ink, so that " stealth " figure printed is steady Qualitative good, color developing effect is preferable when ultraviolet light.
Preferably, the stealthy fluoresent printing ink colour developing is different from common ink colour developing.
By adopting the above technical scheme, it is developed the color by stealthy fluoresent printing ink different from common ink colour developing, so that setting It is more easily compared between figure after counting figure and design alteration before changing, improves supervisor and check when changing drawing Accuracy and efficiency.
Preferably, the common ink colour developing is red, and the stealth fluoresent printing ink colour developing is green.
By adopting the above technical scheme, by common ink colour developing be red with stealthy fluoresent printing ink colour developing be it is green with Using the red sharp contrast with green, so that relatively sharp clear to the judgement of drawing change part.
Preferably, in the step (1), when the second printer prints colour developing drawing, pass through ultraviolet light irradiation second and print The exit slot of machine, observes whether the colour developing drawing printed develops the color to determine whether the ultraviolet colour development material in print cartridge is sufficient.
By adopting the above technical scheme, by the exit slot of ultraviolet the second printer of light irradiation so that the second printer prints Colour developing drawing it is profiling in exit slot, it is not profiling if discovery colour developing drawing or prove in the second printer if profiling effect is deteriorated Stealthy fluoresent printing ink has run out or is nearly finished, and supervisor need to add stealthy fluoresent printing ink in time, avoid because " stealth " characteristic of stealthy UV inks cause to be difficult to learn colour developing drawing whether successful print the case where.
Preferably, in the step (1), first blank drawing is placed on the supporting plate of the first printer paper inlet and is incited somebody to action After blank drawing and print area centering, then the print job to blank drawing is carried out, after forming common drawing, first will commonly schemed Paper is placed on the supporting plate of the second printer paper inlet and by after the print area centering of common drawing and the second printer, then Carry out the print job to common drawing.
By adopting the above technical scheme, by by the print area centering of blank drawing and the first printer, by will be common The print area centering of drawing and the second printer, simultaneously because the first printer and the second printer are the printing of same model Machine, so that the first printer will with the second printer by region of the drawing dump on blank drawing after design alteration Region of the drawing dump on common drawing before design alteration is more consistent.
Preferably, in the step (1), the design drawing before design alteration is printed upon common drawing and goes forward, and first becomes design The printing line width of more preceding drawing content is adjusted to the 110% of the printing line width of the drawing content after design alteration.
By adopting the above technical scheme, the figure after design alteration is located at by the printing line width of the drawing content before design alteration The 110% of the printing line width of paper content so that the effect of the drawing content after the change of drawing content covering design before design alteration More preferably.
Preferably, in the step (1), picking out ultraviolet colour developing figure and common ink figure has inconsistent colour developing After drawing, in such enterprising line flag of drawing that develops the color.
By adopting the above technical scheme, by having inconsistent drawing enterprising with common ink figure in ultraviolet colour developing figure The design drawing changed is distributed to the case where omitting when reviewer evaluates to reduce by line flag.
Preferably, in the step (3), supervisor is shot by camera live, passes through recording pen live recording again Cooperation notes are to record evaluation course.
By adopting the above technical scheme, by the camera live shooting, by recording pen live recording again cooperate notes with Complete record file is formed, to provide sufficient evidence-based for the subsequent report provided.
Preferably, the ultraviolet lamp uses the desk lamp with lampshade, and supervisor and reviewer are passing through ultraviolet lamp When observing drawing, opaque gloves and sunglasses are worn.
By adopting the above technical scheme, by having the desk lamp of lampshade, reduction ultraviolet light distributes around, impermeable by wearing Bright gloves and sunglasses protect supervisor and reviewer, reduce the case where ultraviolet light causes damage.
In conclusion the invention has the following advantages:
1. by with common ink by the drawing content after design alteration and with ultraviolet colour development material by the figure before design alteration Paper dump can become in observation design on the same print area of same drawing under ultraviolet light irradiation on colour developing drawing Whether more preceding figure is completely covered the figure after design alteration, so that supervisor checks easy to operate when change drawing, work Industry efficiency is higher;
2. since transparent state, irradiating ultraviolet light can be obtained easily in drawing ultraviolet colour development material under no ultraviolet light Modification information, not after irradiating ultraviolet light, no longer influence reviewer the figure after design for change is observed so that evaluation The efficiency of personnel's evaluation increases, while obtaining more accurate review result;
3. by the exit slot of ultraviolet the second printer of light irradiation so that the colour developing drawing that prints of the second printer is in exit slot It is profiling, to judge whether stealthy fluoresent printing ink is sufficient, and " stealth " characteristic because of stealthy UV inks is avoided to cause to be difficult to Know colour developing drawing whether successful print the case where.
Specific embodiment
Below with reference to embodiment, the present invention will be described in detail.
The Supervision of design alteration in a kind of project supervision, comprising the following steps:
(1) design drawing is audited, specific as follows:
Unit in charge of construction after proposing that design alteration request, design alteration request are committed to construction unit, builds according to site operation situation If unit proposes design drawing change request to designing unit, designing unit provides a whole set of design after design alteration as needed Drawing is to supervisor.
Supervisor distributes a whole set of design drawing after design alteration to specified supervisor, and supervisor becomes design If a whole set of design drawing after more sequentially through the first printer by drawing dump on several blank drawings to be formed Common drawing is done, uses common ink in the print cartridge of the first printer.
Several common drawings are pressed into former page order marshalling, the common drawing of marshalling is placed on the second printing The paper inlet of machine, by the second printer by the drawing content before design alteration by corresponding suitable with common drawing placement order Sequence is printed upon on several common drawings print zone of the drawing content on blank drawing to form the drawing that develops the color, after design alteration Domain is consistent with print area of the drawing content on common drawing before design alteration.
Second printer is consistent with the first printer specification, and ultraviolet colour development material is used in the print cartridge of the second printer, purple Outer colour development material uses ultraviolet colour development material generally in the art, is specially stealthy fluoresent printing ink in the present embodiment, wherein To be red, stealthy fluoresent printing ink colour developing is green for common ink colour developing, is differed greatly using red with green, so that sentencing Whether the drawing content before determining design alteration is more easily observable when having any different with the drawing content after design alteration, and efficiency is higher.
Before printing on blank drawing, the print area of blank drawing and the first printer is first subjected to centering, then again Start print job.
Before printing on common drawing, the print area of common drawing and the second printer is first subjected to centering, simultaneously will The printing line width of drawing content before design alteration is adjusted to the 110% of the printing line width of the drawing content after design alteration, then Start print job again.
When second printer prints, with the exit slot of ultraviolet the second printer of light irradiation, observes the second printer and print Colour developing drawing on whether have the figure that clearly develops the color, if discovery colour developing figure it is smudgy or intermittent, prove second The ultraviolet colour development material surplus of print cartridge is insufficient in printer, needs to add in time.
Colour developing drawing is placed under ultraviolet lamp and observes one by one by supervisor, and ultraviolet colour developing figure can not be completely covered commonly The colour developing drawing of ink pattern selects differentiation, which is to be related to the colour developing drawing of design alteration, then in the part The blank corner being related on the colour developing drawing of design alteration is marked with signature pen, will finally be related to the colour developing of design alteration Drawing arranges neatly with stand-by.
(2) tissue change evaluation, specific as follows:
Reviewer is convened, the colour developing drawing for being related to design alteration is distributed to reviewer on hand, reviewer is in ultraviolet lamp The part that is not covered by colour developing figure in lower observation colour developing drawing, with observe after design alteration with the distinctive points before design alteration, Cancel irradiation of the ultraviolet lamp to the colour developing drawing for being related to design alteration, the drawing content " stealth " before design alteration will be made, so The drawing content after design alteration is evaluated afterwards.
(3) evaluation course is recorded, specific as follows:
In evaluation course, supervisor is taken on site by video camera, carries out live recording and cooperation by recording pen Notes, record evaluation course, and video, audio and the paper document of all on-the-spot records are packaged processing and file using as rear The continuous evidence support for providing report.
(4) report is provided, specific as follows:
According to review result, the report whether design alteration passes through is provided, if passing through, is issued to site supervision personnel execution, It notifies designing unit to modify if not passing through, repeats above-mentioned steps after the completion of modification and evaluated next time.
During the entire process of step (1)-step (4), all ultraviolet lamps are all made of the desk lamp with lampshade, supervisor And reviewer need to wear opaque gloves and wear too when observing drawing and operation ultraviolet lamp by ultraviolet lamp Positive mirror.
By the way that the drawing dump after design alteration is formed common drawing on blank drawing with common ink, and By with ultraviolet colour development material by the drawing dump before design alteration sequentially corresponding common drawing it is same a dozen It prints on region, i.e., so that the drawing content before design alteration and the drawing content after design alteration appear in same figure simultaneously On paper, become so that the figure before design alteration can be observed on colour developing drawing under ultraviolet light irradiation, design whether is completely covered Figure after more proves that the drawing may relate to design alteration if non-colour developing figure can not be completely covered by being related to colour developing figure, Examine whether printing error can determine that whether the drawing is related to design alteration, when so that supervisor checking change drawing Easy to operate, operating efficiency is higher.
Since transparent state, irradiating ultraviolet light can be obtained easily in drawing ultraviolet colour development material under no ultraviolet light Modification information, while after not irradiating ultraviolet light, no longer influence reviewer observes the figure after design for change, subtracts The case where few reviewer's " seeing presbyopia ", so that the efficiency of reviewer's evaluation increases, while obtaining more accurate evaluation knot Fruit.
Carried out before printing by blank drawing with the centering operation of the first printer print area, while cooperating common figure Paper carry out before printing with the centering operation of the second printer print area, and due to the first printer and the second printer Specification is consistent, so that the drawing dump after design alteration is in the region on blank drawing and the drawing content before design alteration The region being printed upon on corresponding common drawing is consistent, guarantees that colour developing figure covers the effect of non-colour developing figure.
By the printing for setting the printing line width of the drawing content before design alteration to the drawing content after design alteration The 110% of line width, so that the drawing dump after design alteration is in the region on blank drawing and the drawing before design alteration When holding the region micro error of generation being printed upon on common drawing, it also can preferably realize that colour developing figure covers non-colour developing figure Effect.
The above is only a preferred embodiment of the present invention, protection scope of the present invention is not limited merely to above-mentioned implementation Example, all technical solutions belonged under thinking of the present invention all belong to the scope of protection of the present invention.It should be pointed out that for the art Those of ordinary skill for, several improvements and modifications without departing from the principles of the present invention, these improvements and modifications It should be regarded as protection scope of the present invention.

Claims (10)

1. the Supervision of design alteration in a kind of project supervision, it is characterized in that: the following steps are included:
(1) design drawing is audited, specific as follows:
Supervisor prints the design drawing after all changes on several blank drawings with shape sequentially through the first printer At several common drawings, by the design drawing before change by the one-to-one sequence of common drawing by with the first printer specification one The second printer caused is printed on common drawing to form several colour developing drawings, is common in the print cartridge of first printer Ink is ultraviolet colour development material in the print cartridge of second printer, and the ultraviolet colour development material is under no ultraviolet light The colour developing drawing is placed under ultraviolet lamp and observes one by one, picks out ultraviolet colour developing figure and common ink figure by pellucidity Shape has inconsistent colour developing drawing;
(2) tissue change evaluation, specific as follows:
The colour developing drawing classification by special function that reviewer will be singled out is supplied to reviewer, and reviewer will develop the color drawing placement Distinctive points in observation colour developing drawing after design alteration in the UV lamp, are evaluated;
(3) evaluation course is recorded;
(4) report is provided.
2. the Supervision of design alteration in project supervision according to claim 1, it is characterized in that: the ultraviolet colour developing material Material is stealthy fluoresent printing ink.
3. the Supervision of design alteration in project supervision according to claim 2, it is characterized in that: the stealth is ultraviolet glimmering Light ink colour developing is different from common ink colour developing.
4. the Supervision of design alteration in project supervision according to claim 3, it is characterized in that: the common ink is aobvious Color is red, and the stealth fluoresent printing ink colour developing is green.
5. the Supervision of design alteration in project supervision according to claim 1 to 4, it is characterized in that: the step (1) it in, when the second printer printing colour developing drawing, by the exit slot of ultraviolet the second printer of light irradiation, observes and prints Whether colour developing drawing develops the color to determine whether the ultraviolet colour development material in print cartridge is sufficient.
6. the Supervision of design alteration in project supervision according to claim 5, it is characterized in that: in the step (1), First blank drawing is placed on the supporting plate of the first printer paper inlet and by after blank drawing and print area centering, then into Print job of the row to blank drawing, after forming common drawing, is first placed on holding for the second printer paper inlet for common drawing On supporting plate and by after the print area centering of common drawing and the second printer, then carry out the print job to common drawing.
7. the Supervision of design alteration in project supervision according to claim 6, it is characterized in that: in the step (1), Design drawing before design alteration is printed upon common drawing and goes forward, and is first adjusted to the printing line width of the drawing content before design alteration The 110% of the printing line width of drawing content after design alteration.
8. the Supervision of design alteration in project supervision according to claim 7, it is characterized in that: in the step (1), After picking out ultraviolet colour developing figure and common ink figure there is inconsistent colour developing drawing, in such enterprising rower of drawing that develops the color Note.
9. the Supervision of design alteration in project supervision according to claim 5, it is characterized in that: in the step (3), Supervisor is shot by camera live, cooperates notes to record evaluation course again by recording pen live recording.
10. the Supervision of design alteration in project supervision according to claim 5, it is characterized in that: the ultraviolet lamp is adopted With the desk lamp with lampshade, supervisor and reviewer wear opaque gloves when observing drawing by ultraviolet lamp And sunglasses.
CN201810820318.2A 2018-07-24 2018-07-24 The Supervision of design alteration in project supervision Pending CN109063997A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810820318.2A CN109063997A (en) 2018-07-24 2018-07-24 The Supervision of design alteration in project supervision

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810820318.2A CN109063997A (en) 2018-07-24 2018-07-24 The Supervision of design alteration in project supervision

Publications (1)

Publication Number Publication Date
CN109063997A true CN109063997A (en) 2018-12-21

Family

ID=64835188

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810820318.2A Pending CN109063997A (en) 2018-07-24 2018-07-24 The Supervision of design alteration in project supervision

Country Status (1)

Country Link
CN (1) CN109063997A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110398238A (en) * 2019-07-18 2019-11-01 广东建瀚工程管理有限公司 Project supervision method
CN113714391A (en) * 2021-09-01 2021-11-30 深圳市振富源五金电子有限公司 Numerical control precision film cutting machine

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1284438A (en) * 1999-12-27 2001-02-21 天津戈德防伪识别有限公司 Bill capable of preventing irregularity during filling and its detection method
CN101620794A (en) * 2009-08-06 2010-01-06 黄若东 Calligraphy practice method using copybook with a part of invisible model words and word display device
CN101882339A (en) * 2006-09-29 2010-11-10 阿鲁策株式会社 Card identifying apparatus
CN102890840A (en) * 2012-08-22 2013-01-23 山东新北洋信息技术股份有限公司 Method and device for identifying paper money

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1284438A (en) * 1999-12-27 2001-02-21 天津戈德防伪识别有限公司 Bill capable of preventing irregularity during filling and its detection method
CN101882339A (en) * 2006-09-29 2010-11-10 阿鲁策株式会社 Card identifying apparatus
CN101620794A (en) * 2009-08-06 2010-01-06 黄若东 Calligraphy practice method using copybook with a part of invisible model words and word display device
CN102890840A (en) * 2012-08-22 2013-01-23 山东新北洋信息技术股份有限公司 Method and device for identifying paper money

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110398238A (en) * 2019-07-18 2019-11-01 广东建瀚工程管理有限公司 Project supervision method
CN113714391A (en) * 2021-09-01 2021-11-30 深圳市振富源五金电子有限公司 Numerical control precision film cutting machine
CN113714391B (en) * 2021-09-01 2023-10-27 东莞市钛科光电科技有限公司 Numerical control precise film cutting machine

Similar Documents

Publication Publication Date Title
CN109063997A (en) The Supervision of design alteration in project supervision
CN108960674A (en) The Supervision that process joins in project supervision
CN103649993B (en) For the system and method for the article assembly that inspects the sanitary conditions
CN103369952B (en) The analysis Work support information display system of inspecting substrate result and support method
KR101465376B1 (en) Method for processing banknotes
CN108596318A (en) Electronic tag and the method for carrying out product back-tracing using the electronic tag
RU2628227C2 (en) Method of production verification of protected document composite protective image on production equipment line and digital computer environment for its implementation
CN109507207A (en) The image detection of maculature management and the printed matter with defect type
DE102010055974A1 (en) Method and device for determining a class reference data set for the classification of value documents
CN106203567A (en) Method for anti-counterfeit and the system of figure is hidden based on high-fidelity
CN205523047U (en) Printed matter defect detection system
EP4028266A1 (en) Manufacture of a security device
WO2017202134A1 (en) Mask management system and mask use method
CN107239326A (en) Accept insurance multithreading batch processing method and system
KR20100132519A (en) Banknote handling apparatus
JP2017159600A (en) Image formation device and method for imparting mark
DE102009057360A1 (en) Method for verifying authenticity of personalized safety document, involves comparing photographic view produced for verifying authenticity with another photographic view stored in data memory for confirmation of authenticity of document
JP2013063611A (en) Image recording apparatus, image recording method, and image recorded matter
US10890870B2 (en) ITM dent identification utilizing integrated defect maps
CN113379959B (en) Banknote identification method, device and storage medium
CN213161972U (en) Printed matter inspection equipment of categorised early warning
CN102213923B (en) Image forming apparatus and display packing
DE102015112177A1 (en) Image storage device with removable fixing device, associated control method and associated control program storing the storage medium
JP2020154903A (en) Printed matter follow-up survey method
JP2022144838A (en) Paper sheet identification device and paper sheet identification method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: Room 402, 59 Jianzhong Road, Tianhe District, Guangzhou City, Guangdong 510000

Applicant after: Guangdong Overseas Construction Consulting Co., Ltd.

Address before: Room 701, East, 66 Jianzhong Road, Tianhe District, Guangzhou City, Guangdong 510000

Applicant before: Guangdong Overseas Construction Supervision Co., Ltd.

CB02 Change of applicant information
RJ01 Rejection of invention patent application after publication

Application publication date: 20181221

RJ01 Rejection of invention patent application after publication