CN109063913A - One kind based on power distribution cabinet intelligent optimization electronically with system - Google Patents

One kind based on power distribution cabinet intelligent optimization electronically with system Download PDF

Info

Publication number
CN109063913A
CN109063913A CN201810885401.8A CN201810885401A CN109063913A CN 109063913 A CN109063913 A CN 109063913A CN 201810885401 A CN201810885401 A CN 201810885401A CN 109063913 A CN109063913 A CN 109063913A
Authority
CN
China
Prior art keywords
energy consumption
electrical equipment
power distribution
efficiency
energy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810885401.8A
Other languages
Chinese (zh)
Inventor
龚兆嗣
王凯浩
戴健杰
陈佳圣
柳杨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Yingtai Electric Co Ltd
Original Assignee
Ningbo Yingtai Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Yingtai Electric Co Ltd filed Critical Ningbo Yingtai Electric Co Ltd
Priority to CN201810885401.8A priority Critical patent/CN109063913A/en
Publication of CN109063913A publication Critical patent/CN109063913A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P80/00Climate change mitigation technologies for sector-wide applications
    • Y02P80/10Efficient use of energy, e.g. using compressed air or pressurized fluid as energy carrier
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/126Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wireless data transmission

Abstract

The present invention provides one kind based on power distribution cabinet intelligent optimization electronically and system, to solve the problem of that business electrical low efficiency causes energy waste, this method comprises: S10: monitoring the energy consumption data and running state parameter of each electrical equipment on-line;S20: energy efficiency model and energy consumption and energy efficiency indexes system are established, and the energy consumption data of the electrical equipment are analyzed, obtains the energy consumption level and energy consumption efficiency of each electrical equipment;S30: according to the energy consumption level and energy consumption efficiency, corresponding efficiency prioritization scheme is generated, is optimized with the energy consumption to the electrical equipment.Using the present invention, by carrying out real-time monitoring to business electrical equipment, it can intuitively monitor with power information, to optimize to electricity consumption, improve power consumption efficiency, reduce grid electricity fee cost, meanwhile, it is capable to which real-time watch device operating status, formulates maintenance management scheme for equipment, guarantee safety utilization of electric power, saves cost of equipment maintenance.

Description

One kind based on power distribution cabinet intelligent optimization electronically with system
Technical field
The present invention relates to distribution management fields, more particularly to one kind electronically and to be based on power distribution cabinet intelligent optimization System.
Background technique
With the rapid development of power industry, imbalance between power supply and demand is changed, in the mistake of electric power enterprise rapid development Cheng Zhong, electricity consumption become a very important part in enterprise's production cost.Enterprise all lacks corresponding electric energy pipe at present The department of reason and monitoring, for business electrical equipment in the continual course of work, power consumption is big, and utilization rate is lower, Unnecessary waste of energy is caused, this improves the production cost of enterprise on the one hand, is on the other hand also the wave to the energy Take.
Meanwhile also lacking with electricity consumption for enterprise, manages accordingly and safeguards, is unfavorable for the permanent use of power equipment, example Such as, once power failure occurs for power distribution room, electric power cannot be supplied, and will directly affect the production of enterprise.
The Chinese patent of Publication No. 107834703A discloses a kind of smart grid power distribution room monitoring management system and side Method, system include intelligent patrol detection terminal, electricity management terminal and main website management terminal, and intelligent patrol detection terminal is used for using wired And/or wireless networking mode acquires the operation and environmental parameter of controller switching equipment in power grid in real time;Electricity management terminal is for adopting With the parameters of electric power in networking mode acquisition power grid wiredly and/or wirelessly on business electrical route;Main website management terminal is used for Remote monitoring and administration is carried out to the controller switching equipment according to the operation of intelligent patrol detection terminal acquisition and environmental parameter;Also Described in the operation and environmental parameter and electricity management terminal acquisition for being acquired according to the intelligent patrol detection terminal Parameters of electric power is monitored management to the electricity consumption of enterprise.The invention can continue power distribution room to twist conduct monitoring at all levels, reduce distribution The maintenance difficulties in room still cannot analyze the energy consumption level of electrical equipment, optimize to the energy consumption of electrical equipment.
Summary of the invention
The technical problem to be solved in the present invention be designed to provide it is a kind of based on power distribution cabinet intelligent optimization electronically and System, to solve the problem of the lower shortage electric power safety monitoring of enterprise electrical energy utilization rate and maintenance management.
To achieve the goals above, The technical solution adopted by the invention is as follows:
One kind being based on power distribution cabinet intelligent optimization electronically, comprising steps of
S10: the energy consumption data and running state parameter of each electrical equipment are monitored on-line;
S20: energy efficiency model and energy consumption and energy efficiency indexes system are established, and the energy consumption data of the electrical equipment are carried out Analysis, obtains the energy consumption level and energy consumption efficiency of each electrical equipment;
S30: according to the energy consumption level and energy consumption efficiency, corresponding efficiency prioritization scheme is generated, to the electricity consumption The energy consumption of equipment optimizes.
Further, it is further comprised the steps of: before the step S10
S00: the electrical equipment is monitored by default monitoring device, and will be each by wired or wireless communication mode The energy consumption data and running state parameter of electrical equipment are sent to monitoring platform to be monitored on-line.
Further, it further comprises the steps of:
S301: according to the running state parameter of each electrical equipment, corresponding maintenance management scheme, the dimension are generated Shield Managed Solution includes distribution defect expressivity, scene rush to repair, Daily Round Check, preventive experiment, establishes daily sheet.
Further, it further comprises the steps of:
S31: obtaining the power distribution information of each electrical equipment, is sent to the monitoring platform;
S32: the power distribution information and preset alarm data are compared, judge the power distribution information whether with default report Alert Data Matching, if so, generating alarm signal.
Further, it further comprises the steps of:
S41: connection is established with mobile terminal;
S42: the energy consumption level, energy consumption efficiency and power distribution information of the electrical equipment are sent to the mobile terminal.
A kind of system based on power distribution cabinet intelligent optimization electricity consumption, comprising:
Monitoring modular: for monitoring the energy consumption data and running state parameter of each electrical equipment on-line;
Energy consumption analysis module: for establishing energy efficiency model and energy consumption and energy efficiency indexes system, and to the electrical equipment Energy consumption data analyzed, obtain the energy consumption level and energy consumption efficiency of each electrical equipment;
Schemes generation module: for generating corresponding efficiency prioritization scheme according to the energy consumption level and energy consumption efficiency, It is optimized with the energy consumption to the electrical equipment.
Further, the system also includes:
Real-time monitoring unit: for monitoring the electrical equipment by default monitoring device, and by wired or wireless The energy consumption data and running state parameter of each electrical equipment are sent to monitoring platform to monitor on-line by communication mode.
Further, further includes:
System maintaining module: for the running state parameter according to each electrical equipment, corresponding maintenance pipe is generated Reason scheme, the maintenance management scheme include distribution defect expressivity, scene rush to repair, Daily Round Check, preventive experiment, establish daily paper Table.
Further, further includes:
Power distribution information acquiring unit: for obtaining the power distribution information of each electrical equipment, it is sent to the monitoring platform;
Alarm Unit: for comparing the power distribution information and default alarm data, judge that the power distribution information is No and preset alarm Data Matching, if so, generating alarm signal.
Further, further includes:
Connection unit: for establishing connection with mobile terminal;
Information transmitting unit: the energy consumption level, energy consumption efficiency and power distribution information of the electrical equipment are sent to described Mobile terminal.
Using the present invention, by carrying out real-time monitoring to business electrical equipment, can intuitively monitor with power information, from And the energy consumption of electrical equipment is optimized, utilization rate of electrical is improved, grid electricity fee cost is reduced, meanwhile, it is capable to real-time monitoring adapted Electric equipment operating status guarantees safety utilization of electric power to formulate maintenance management scheme with electrical equipment, saves cost of equipment maintenance.
Detailed description of the invention
Fig. 1 is that one kind that one embodiment of the present invention provides is based on power distribution cabinet intelligent optimization electronically flow chart;
Fig. 2 is that one kind that one embodiment of the present invention provides is based on power distribution cabinet intelligent optimization electronically flow chart;
Fig. 3 is a kind of system construction drawing based on power distribution cabinet intelligent optimization electricity consumption that one embodiment of the present invention provides.
Specific embodiment
Following is a specific embodiment of the present invention in conjunction with the accompanying drawings, technical scheme of the present invention will be further described, However, the present invention is not limited to these examples.
Embodiment one
With reference to Fig. 1, present embodiments provides one kind and be based on power distribution cabinet intelligent optimization electronically, comprising steps of
S10: the energy consumption data and running state parameter of each electrical equipment are monitored on-line;
S20: energy efficiency model and energy consumption and energy efficiency indexes system are established, and the energy consumption data of the electrical equipment are carried out Analysis, obtains the energy consumption level and energy consumption efficiency of each electrical equipment;
S30: according to the energy consumption level and energy consumption efficiency, corresponding efficiency prioritization scheme is generated, to the electricity consumption The energy consumption of equipment optimizes.
In the application, the type of its electrical equipment of different types of electricity consumption enterprise is had nothing in common with each other, such as the electricity consumption of steel mill is set Standby includes steel rolling equipment, rectifier equipment, pickler etc., and the electrical equipment of the enterprise in building then includes heating and ventilating equipment, supplies Wetting system, power supply unit etc..
It in the present embodiment, is described in detail by taking steel mill as an example, the electrical equipment in steel mill is carried out with electrically optimized, raising The utilization rate of electrical of steel mill's electrical equipment reduces the grid electricity fee cost in production.
In step S10, it is monitored to including steel rolling equipment, rectifier equipment, the pickler in steel mill, wherein pass through The energy consumption data that energy monitor terminal can monitor the electrical equipment of distinct interface are accessed on power distribution cabinet
For the data electrical equipment that consumes energy in real-time electricity consumption etc., running state parameter includes the opening and closing of electrical equipment, electricity consumption Equipment distribution voltage and distribution electric current etc..
In the present embodiment, before step S10 further include:
S00: the electrical equipment is monitored by default monitoring device, and will be each by wired or wireless communication mode The energy consumption data and running state parameter of electrical equipment are sent to monitoring platform to be monitored on-line.
In the present embodiment, monitoring device, that is, energy monitor terminal is preset, monitoring platform being capable of the various data letters of real-time display Breath checks that energy monitor terminal is by wired or wireless communication mode by the real-time of electrical equipment for management user in time Energy consumption data and running state parameter are sent to monitoring platform.
In step S20, energy efficiency model is typical energy consumption system energy efficiency model, and energy efficiency indexes system includes advanced both at home and abroad Enterprise uses energy system index etc..
By comparing and analyzing the electricity consumption energy consumption data of steel mill with energy efficiency model and energy efficiency indexes system, can obtain To the energy consumption level and energy consumption efficiency of steel mill's distinct device, while it can also further obtain the energy-saving potential of distinct device Deng.
In step S30, prioritization scheme carries out formulation generation, by taking steel mill as an example, prioritization scheme according to different site environments Adjust including optimization electricity consumption strategy, production process, reduce integral load, declare rational utilization of electricity demand etc., to reduce electricity consumption The energy consumption of equipment is horizontal, improves utilization rate of electrical.
In the present embodiment, optimization electricity consumption strategy includes the unreasonable place analyzed in electricity consumption behavior according to monitoring data, to keep away Exempt from the waste of electric energy;Whether production process adjustment can then be repeated by unlatching of real-time monitoring electrical equipment etc. come analysis procedure, Carry out purposive be adjusted;Integral load is reduced by monitoring electricity consumption of all electrical equipments etc. to adjust integral load Input, reduces unnecessary load, such as is the part throttle characteristics table in two month of steel mill in following table.
Count month Maximum load Minimum load Average load Rate of load condensate
This month 549.60 -96.26 205.49 37.39%
Last month 557.80 -191.04 187.15 33.35%
By the Load Characteristic Analysis to this month and last month, the corresponding scheme for reducing integral load is formulated.
By monitoring the energy consumption data and running state parameter of electrical equipment on-line, electricity consumption can be got information about in real time The state of equipment, and by comparison energy efficiency model and energy efficiency indexes system, can further to the energy consumption of electrical equipment into Row optimization, proposes optimisation strategy, to reduce productive power cost.
Embodiment two
With reference to Fig. 2, present embodiments provides one kind and be based on power distribution cabinet intelligent optimization electronically, comprising steps of
S301: according to the running state parameter of each electrical equipment, corresponding maintenance management scheme, the dimension are generated Shield Managed Solution includes distribution defect expressivity, scene rush to repair, Daily Round Check, preventive experiment, establishes daily sheet;
S31: obtaining the power distribution information of each electrical equipment, is sent to the monitoring platform;
S32: the power distribution information and preset alarm data are compared, judge the power distribution information whether with default report Alert Data Matching, if so, generating alarm signal;
S41: connection is established with mobile terminal;
S42: the energy consumption level, energy consumption efficiency and power distribution information of the electrical equipment are sent to the mobile terminal.
In step S301, the running state parameter of electrical equipment, hair are obtained by the default monitoring device in embodiment one Send to monitoring platform, monitoring platform to formulate corresponding maintenance management scheme according to the operating status of electrical equipment, such as when When equipment breaks down, then scene rush to repair scheme can be generated, when equipment normal operation, then only generates Daily Round Check scheme.
In step S31, power distribution information includes distribution voltage, distribution electric current etc., can show each electricity consumption in monitoring platform Equipment matches point information, and administrator is facilitated intuitively quickly to understand situation.
In step S32, preset alarm data are to reach the condition of alarm, wherein have transformer overload, transformer overload, Transformer heavy duty, one-phase overload, low-voltage, current imbalance, idle overfill etc., by taking transformer overloads as an example, work as power distribution information In the public 120%≤public apparent energy for the becoming stoichiometric point < public affairs change rated capacity for becoming rated capacity 140%, and duration More than two hours, then it is determined as that transformer overloads, alarm signal will be generated.
In step S41, mobile terminal includes mobile phone or computer, and mobile terminal can be established wirelessly or non-wirelessly with monitoring platform Connection, for example, being wirelessly connected by foundation such as WIFI wireless network or cloud servers.
In step S42, mobile terminal can understand the state parameter etc. of electrical equipment in real time, when there is alarm signal Mobile terminal can also be sent by warning message, be moved easily the operation conditions that terminal timely understands equipment, it is mobile simultaneously Terminal is also capable of the state parameter etc. of the query facility of active, to comprehensively supervise electrical equipment.
By monitoring platform and mobile terminal, real-time monitoring can be carried out with electrical equipment to intelligence in real time, work as appearance When the problems such as failure, warning message can also be pushed, meanwhile, by maintenance management scheme, it is capable of the management of streamlining management personnel Process, and guarantee that data in time, accurately, improve the real-time of supervision, by information-based maintenance scheme, also reduce artificial The maintenance cost of site inspection.
Embodiment three
With reference to Fig. 3, a kind of system based on power distribution cabinet intelligent optimization electricity consumption is present embodiments provided, comprising:
Monitoring modular 31: for monitoring the energy consumption data and running state parameter of each electrical equipment on-line;
Energy consumption analysis module 32: for establishing energy efficiency model and energy consumption and energy efficiency indexes system, and the electricity consumption is set Standby energy consumption data are analyzed, and the energy consumption level and energy consumption efficiency of each electrical equipment are obtained;
Schemes generation module 33: for generating corresponding efficiency optimization side according to the energy consumption level and energy consumption efficiency Case is optimized with the energy consumption to the electrical equipment.
In the present embodiment, on-line monitoring as the result is shown on monitoring platform, monitoring modular 31 is integrated on monitoring platform, Also, energy consumption analysis module 32 and schemes generation module 33 are all integrated on monitoring platform, what schemes generation module 33 generated Prioritization scheme is directly shown on monitoring platform.
In the present embodiment, further includes:
Real-time monitoring unit 313: for monitoring the electrical equipment by default monitoring device, and by wired or wireless Communication mode the energy consumption data and running state parameter of each electrical equipment are sent to monitoring platform to be supervised online It surveys.
Real-time monitoring unit is integrated to regard for oneself in default monitoring device, and establishes connection with monitoring platform.
In the present embodiment, further includes:
System maintaining module 301: for the running state parameter according to each electrical equipment, corresponding maintenance is generated Managed Solution, the maintenance management scheme include distribution defect expressivity, scene rush to repair, Daily Round Check, preventive experiment, establish day Report.
System maintaining module 301 is integrated on monitoring platform, and maintenance management scheme is directly shown on monitoring platform, with Administrator is facilitated to check and implement.
In the present embodiment, further includes:
Power distribution information acquiring unit 311: for obtaining the power distribution information of each electrical equipment, it is flat to be sent to the monitoring Platform;
Alarm Unit 312: for comparing the power distribution information and default alarm data, judge the power distribution information Whether with preset alarm Data Matching, if so, generate alarm signal.
Power distribution information can be obtained by default monitoring device, and in the present embodiment, power distribution information acquiring unit 311 is integrated in In default monitoring device.
In the present embodiment, Alarm Unit 312 is integrated on monitoring platform, facilitates and warning message is timely sent to management Person.
In the present embodiment, further includes:
Connection unit 41: for establishing connection with mobile terminal;
Information transmitting unit 42: the energy consumption level, energy consumption efficiency and power distribution information of the electrical equipment are sent to institute State mobile terminal.
In the present embodiment, connection unit 41 and information transmitting unit 42 are all integrated in monitoring platform, facilitate acquisition data And data information is sent to mobile terminal.
By monitoring the energy consumption data and running state parameter of business electrical equipment on-line, can get information about in real time The state of electrical equipment, and by comparison energy efficiency model and energy efficiency indexes system, it can be further to the energy of electrical equipment Consumption optimizes, and optimisation strategy is proposed, to reduce productive power cost.
Specific embodiment described herein is only an example for the spirit of the invention.The neck of technology belonging to the present invention The technical staff in domain can make various modifications or additions to the described embodiments or replace by a similar method In generation, however, it does not deviate from the spirit of the invention or beyond the scope of the appended claims.

Claims (10)

1. one kind is based on power distribution cabinet intelligent optimization electronically, which is characterized in that comprising steps of
S10: the energy consumption data and running state parameter of each electrical equipment are monitored on-line;
S20: energy efficiency model and energy consumption and energy efficiency indexes system are established, and the energy consumption data of the electrical equipment are divided Analysis, obtains the energy consumption level and energy consumption efficiency of each electrical equipment;
S30: according to the energy consumption level and energy consumption efficiency, corresponding efficiency prioritization scheme is generated, to the electrical equipment Energy consumption optimize.
2. one kind according to claim 1 is based on power distribution cabinet intelligent optimization electronically, which is characterized in that the step It is further comprised the steps of: before S10
S00: monitoring the electrical equipment by default monitoring device, and by wired or wireless communication mode by each electricity consumption The energy consumption data and running state parameter of equipment are sent to monitoring platform to be monitored on-line.
3. one kind according to claim 1 is based on power distribution cabinet intelligent optimization electronically, which is characterized in that further include step It is rapid:
S301: according to the running state parameter of each electrical equipment, corresponding maintenance management scheme, the maintenance pipe are generated Reason scheme includes distribution defect expressivity, scene rush to repair, Daily Round Check, preventive experiment, establishes daily sheet.
4. one kind according to claim 1 or 2 is based on power distribution cabinet intelligent optimization electronically, which is characterized in that also wrap Include step:
S31: obtaining the power distribution information of each electrical equipment, is sent to the monitoring platform;
S32: the power distribution information and preset alarm data are compared, judge the power distribution information whether with preset alarm number According to matching, if so, generating alarm signal.
5. one kind according to claim 1 is based on power distribution cabinet intelligent optimization electronically, which is characterized in that further include step It is rapid:
S41: connection is established with mobile terminal;
S42: the energy consumption level, energy consumption efficiency and power distribution information of the electrical equipment are sent to the mobile terminal.
6. a kind of system based on power distribution cabinet intelligent optimization electricity consumption characterized by comprising
Monitoring modular: for monitoring the energy consumption data and running state parameter of each electrical equipment on-line;
Energy consumption analysis module: for establishing energy efficiency model and energy consumption and energy efficiency indexes system, and to the consumption of the electrical equipment Energy data are analyzed, and the energy consumption level and energy consumption efficiency of each electrical equipment are obtained;
Schemes generation module: for corresponding efficiency prioritization scheme being generated, with right according to the energy consumption level and energy consumption efficiency The energy consumption of the electrical equipment optimizes.
7. a kind of system based on power distribution cabinet intelligent optimization electricity consumption according to claim 6, which is characterized in that the system Further include:
Real-time monitoring unit: for monitoring the electrical equipment by default monitoring device, and pass through wired or wireless communication The energy consumption data and running state parameter of each electrical equipment are sent to monitoring platform to monitor on-line by mode.
8. a kind of system based on power distribution cabinet intelligent optimization electricity consumption according to claim 6, which is characterized in that further include:
System maintaining module: for the running state parameter according to each electrical equipment, corresponding maintenance management side is generated Case, the maintenance management scheme include distribution defect expressivity, scene rush to repair, Daily Round Check, preventive experiment, establish daily sheet.
9. a kind of system based on power distribution cabinet intelligent optimization electricity consumption according to claim 6 or 7, which is characterized in that also wrap It includes:
Power distribution information acquiring unit: for obtaining the power distribution information of each electrical equipment, it is sent to the monitoring platform;
Alarm Unit: for the power distribution information and default alarm data to be compared, judge the power distribution information whether with Preset alarm Data Matching, if so, generating alarm signal.
10. a kind of system based on power distribution cabinet intelligent optimization electricity consumption according to claim 6, which is characterized in that further include:
Connection unit: for establishing connection with mobile terminal;
Information transmitting unit: the energy consumption level, energy consumption efficiency and power distribution information of the electrical equipment are sent to the movement Terminal.
CN201810885401.8A 2018-08-06 2018-08-06 One kind based on power distribution cabinet intelligent optimization electronically with system Pending CN109063913A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810885401.8A CN109063913A (en) 2018-08-06 2018-08-06 One kind based on power distribution cabinet intelligent optimization electronically with system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810885401.8A CN109063913A (en) 2018-08-06 2018-08-06 One kind based on power distribution cabinet intelligent optimization electronically with system

Publications (1)

Publication Number Publication Date
CN109063913A true CN109063913A (en) 2018-12-21

Family

ID=64831736

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810885401.8A Pending CN109063913A (en) 2018-08-06 2018-08-06 One kind based on power distribution cabinet intelligent optimization electronically with system

Country Status (1)

Country Link
CN (1) CN109063913A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110764462A (en) * 2019-11-27 2020-02-07 珠海横琴华迪科技有限公司 PLC intelligent electric cabinet control method and device and PLC control server

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103713632A (en) * 2014-01-08 2014-04-09 广西云涌科技有限公司 User-side energy efficiency diagnosing and analyzing system
CN106300651A (en) * 2015-05-11 2017-01-04 江苏中自电气技术有限公司 A kind of intelligent low voltage power distribution cabinet system
CN106339819A (en) * 2016-08-30 2017-01-18 聊城科创节能设备有限公司 Public platform of intelligent energy management system
CN107947364A (en) * 2017-12-06 2018-04-20 宜昌南瑞永光电气设备有限公司 A kind of controller switching equipment management system and method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103713632A (en) * 2014-01-08 2014-04-09 广西云涌科技有限公司 User-side energy efficiency diagnosing and analyzing system
CN106300651A (en) * 2015-05-11 2017-01-04 江苏中自电气技术有限公司 A kind of intelligent low voltage power distribution cabinet system
CN106339819A (en) * 2016-08-30 2017-01-18 聊城科创节能设备有限公司 Public platform of intelligent energy management system
CN107947364A (en) * 2017-12-06 2018-04-20 宜昌南瑞永光电气设备有限公司 A kind of controller switching equipment management system and method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赵付章: "《电力系统自动装置》", 31 March 2016, 吉林大学出版社 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110764462A (en) * 2019-11-27 2020-02-07 珠海横琴华迪科技有限公司 PLC intelligent electric cabinet control method and device and PLC control server
CN110764462B (en) * 2019-11-27 2021-05-18 珠海横琴华迪科技有限公司 PLC intelligent electric cabinet control method and device and PLC control server

Similar Documents

Publication Publication Date Title
CN107200248A (en) A kind of elevator Internet of Things network operation real-time monitoring system based on cloud platform
CN104283308A (en) Smart central strategy control system for micro-grid
CN102856982B (en) Enterprise energy consumption monitoring and management system
CN103984316A (en) Energy management device and system
CN103400205B (en) A kind of power distribution network energy efficiency management system and method for coordinating control based on idle work optimization
CN102999035A (en) Intelligent building energy-saving system based on Institute of Electrical and Electronics Engineers (IEEE) 1888 standard
CN102945028B (en) Cloud technology application smart home with intelligent house grid control function
CN109167437A (en) A kind of method and system based on power distribution cabinet intelligent power distribution management
CN204391903U (en) A kind of line loss monitoring system
CN111769637A (en) Intelligent management system for power utilization
CN105391182B (en) A kind of intelligent energy efficiency management system
CN206993156U (en) Power station auxiliary power big data application apparatus
CN201717676U (en) Administrative territory electric energy management system
CN103023138A (en) District-county integrated automatic voltage control system
CN112905670B (en) Electric energy meter system for indoor power failure fault research and judgment and indoor power failure fault research and judgment method
CN109063913A (en) One kind based on power distribution cabinet intelligent optimization electronically with system
CN107546856A (en) A kind of ring-main unit comprehensive monitoring system
CN101729342B (en) Realization method of real-time memory calculation data structure of mixed mobile power system
CN103296756A (en) Managing and monitoring system for transformer substation
CN203596662U (en) Photovoltaic power station network scheduling system
CN203455377U (en) Power consumption monitoring device
CN111047279A (en) Energy efficiency management cloud platform network information system based on energy efficiency information gateway
Hui et al. Monitoring platform of energy management system for smart community
CN205405152U (en) Intelligent building equipment control system
CN111273075B (en) Distribution network automatic current setting alarm method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination