CN109060065A - 一种城市湿地的污水容纳量研究方法 - Google Patents
一种城市湿地的污水容纳量研究方法 Download PDFInfo
- Publication number
- CN109060065A CN109060065A CN201810694322.9A CN201810694322A CN109060065A CN 109060065 A CN109060065 A CN 109060065A CN 201810694322 A CN201810694322 A CN 201810694322A CN 109060065 A CN109060065 A CN 109060065A
- Authority
- CN
- China
- Prior art keywords
- wetland
- research object
- sewage
- drainage pipeline
- research
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01F—MEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
- G01F22/00—Methods or apparatus for measuring volume of fluids or fluent solid material, not otherwise provided for
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N33/00—Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
- G01N33/24—Earth materials
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A40/00—Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
- Y02A40/10—Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
- Y02A40/22—Improving land use; Improving water use or availability; Controlling erosion
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Health & Medical Sciences (AREA)
- Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Chemical & Material Sciences (AREA)
- Food Science & Technology (AREA)
- Remote Sensing (AREA)
- Geology (AREA)
- Medicinal Chemistry (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Analytical Chemistry (AREA)
- Biochemistry (AREA)
- General Health & Medical Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Immunology (AREA)
- Pathology (AREA)
- Fluid Mechanics (AREA)
- Sewage (AREA)
Abstract
本发明公开了一种城市湿地的污水容纳量研究方法,包括研究对象的选取、统计某一时间段内研究对象中排水管道流出量和进入研究对象内的流入量、计算出研究对象地表面积存的水量、计算出每小时研究对象绿色海绵体污水容纳量、计算出单位面积湿地平均污水容纳量D1’、根据D1’获得某个城市在不改变已有排水管网设施基础上的湿地的恢复面积或是某个城市在不改变已有湿地构建面积基础上的排水管网设施量。采用本发明的研究方法,获得城市湿地每小时平均污水容量,可根据该值作为城市湿地恢复面积和排水管网设施的建设理论基础,有效提高城市湿地的建设效率,真正解决城市内涝问题。
Description
技术领域
本发明涉及一种城市湿地的污水容纳量研究方法,属于城市湿地建设技术领域。
背景技术
湿地是指陆地与水域全年或间歇地被水淹没的土地,是陆生生态系统和水生生态系统之间的过渡带,是一种复杂的生态系统。世界上绝大部分的历史文化名城都与湿地密切相关。不同大小、不同风格的城市湿地周边既是人类择居的理想场所,又具备城市发展的客观条件。但是随着人们片面追求城市效率,大量的湿地被城市化进程蚕食,工业及生活污水使得城市湿地水质不断下降,而湿地消失和退化容易引发洪灾隐患、水体污染、环境恶化。
针对上述问题,现在世界在大力推进湿地城市的建设,通过恢复河流湿地、建设花园城市等措施来实现城市生态湿地的恢复,以促进城市雨水的就地消纳和利用,而在城市需要时将蓄存的水资源“释放”并加以利用,以解决城市内涝、水体污染等问题。现期规划设计中,对所恢复的城市湿地的蓄水能力没有专门的研究,可能会导致管网设置过多而造成浪费,或是过少,当强降雨出现时,由于管道容量的限制,管道平均每小时的排水量小于降雨量,城市内涝仍旧存在。故急需对所建设的城市湿地的蓄水能力,即污水容纳量进行研究与预估,从而为管网的建设提供理论依据,建设好符合预期的城市湿地。
发明内容
针对上述现有技术存在的不足,本发明的目的是提供一种城市湿地的污水容纳量研究方法。
为实现上述目的,本发明采用的技术方案是:城市湿地的污水容纳量研究方法,包括如下步骤:
(1)研究对象的选取:选取具有包括但不限于河流湿地、景观湿地中一种或多种在内的湿地恢复的某个城市湿地区域作为研究对象,且控制流入该研究对象内的污水,包括降雨水和城市污水,先流入湿地再通过排水管道排出研究对象外,记录该研究对象的面积,并统计和记录排水管道布施量;
(2)统计某一时间段内研究对象中排水管道流出量和进入研究对象内的流入量:根据当地气象中心的天气预报信息,选取某强降雨天,将从某一次下雨开始至该次下雨结束这段时间作为统计时间段,通过预设在排水管道上的监测模块监测排水管道在统计时间段内每小时排水量,然后计算出统计时间段内总排水量A;根据气象台当天发布的降雨量,计算出统计时间段内的总降雨量B;根据研究对象内常规生活污水每天排出量计算出统计时间段内向湿地排放的生活污水量C;
(3)计算出研究对象地表面积存的水量:计算出统计时间段内研究对象未被湿地消纳、未被排水管道排掉而滞留在地表面的污水量D;
(4)计算出每小时研究对象绿色海绵体污水容纳量:先计算出研究对象在统计时间段内被对应的湿地消纳的污水量为E=B+C-A-D,然后计算出每小时各个研究对象被对应的绿色海绵体吸收的污水量D’;
(5)计算出单位面积湿地平均污水容纳量:计算出研究对象单位面积绿色海绵体吸收的污水量D1’ = D’/研究对象的湿地面积;
(6)根据D1’获得某个城市在不改变已有排水管网设施基础上的湿地的恢复面积或是某个城市在不改变已有湿地构建面积基础上的排水管网设施量。
本发明具备的有益效果:采用本发明的研究方法,获得城市湿地每小时平均污水容量,可根据该值作为城市湿地恢复面积和排水管网设施的建设理论基础,有效提高城市湿地的建设效率,真正解决城市内涝问题。
具体实施方式
现结合具体实施例,来对本发明作进一步的阐述。本领域技术人员应当理解,下面所具体描述的内容是说明性的而非限制性的,不应以此限制本发明的保护范围。
实施例一
城市湿地的污水容纳量研究方法,包括如下步骤:
(1)研究对象的选取:选取具有包括但不限于河流湿地、景观湿地中一种或多种在内的湿地恢复的某个城市湿地区域作为研究对象,且控制流入该研究对象内的污水,包括降雨水和城市污水,先流入湿地再通过排水管道排出研究对象外,记录该研究对象的面积,并统计和记录排水管道布施量;
(2)统计某一时间段内研究对象中排水管道流出量和进入研究对象内的流入量:根据当地气象中心的天气预报信息,选取某强降雨天,将从某一次下雨开始至该次下雨结束这段时间作为统计时间段,通过预设在排水管道上的监测模块监测排水管道在统计时间段内每小时排水量,然后计算出统计时间段内总排水量A;根据气象台当天发布的降雨量,计算出统计时间段内的总降雨量B;根据研究对象内常规生活污水每天排出量计算出统计时间段内向湿地排放的生活污水量C;
(3)计算出研究对象地表面积存的水量:计算出统计时间段内研究对象未被湿地消纳、未被排水管道排掉而滞留在地表面的污水量D;
(4)计算出每小时研究对象绿色海绵体污水容纳量:先计算出研究对象在统计时间段内被对应的湿地消纳的污水量为E=B+C-A-D,然后计算出每小时研究对象被对应的绿色海绵体吸收的污水量D’;
(5)计算出单位面积湿地平均污水容纳量:计算出研究对象单位面积绿色海绵体吸收的污水量D1’ = D’/研究对象的湿地面积;
(6)根据D1’获得某个城市在不改变已有排水管网设施基础上的湿地的恢复面积或是某个城市在不改变已有湿地构建面积基础上的排水管网设施量。如要恢复某个城市的湿地:先根据该城市每小时的平均生活污水排放量以及该城市平均每小时的降雨量,从而获得湿地恢复面积,因为城市的生活污水排放量和城市的降雨量在现有技术中已经有相关数据建立,可以直接拿来用。
Claims (1)
1.一种城市湿地的污水容纳量研究方法,包括如下步骤:
(1)研究对象的选取:选取具有包括但不限于河流湿地、景观湿地中一种或多种在内的湿地恢复的某个城市湿地区域作为研究对象,且控制流入该研究对象内的污水,包括降雨水和城市污水,先流入湿地再通过排水管道排出研究对象外,记录该研究对象的面积,并统计和记录排水管道布施量;
(2)统计某一时间段内研究对象中排水管道流出量和进入研究对象内的流入量:根据当地气象中心的天气预报信息,选取某强降雨天,将从某一次下雨开始至该次下雨结束这段时间作为统计时间段,通过预设在排水管道上的监测模块监测排水管道在统计时间段内每小时排水量,然后计算出统计时间段内总排水量A;根据气象台当天发布的降雨量,计算出统计时间段内的总降雨量B;根据研究对象内常规生活污水每天排出量计算出统计时间段内向湿地排放的生活污水量C;
(3)计算出研究对象地表面积存的水量:计算出统计时间段内研究对象未被湿地消纳、未被排水管道排掉而滞留在地表面的污水量D;
(4)计算出每小时研究对象绿色海绵体污水容纳量:先计算出研究对象在统计时间段内被对应的湿地消纳的污水量为E=B+C-A-D,然后计算出每小时各个研究对象被对应的绿色海绵体吸收的污水量D’;
(5)计算出单位面积湿地平均污水容纳量:计算出研究对象单位面积绿色海绵体吸收的污水量D1’ = D’/研究对象的湿地面积;
(6)根据D1’获得某个城市在不改变已有排水管网设施基础上的湿地的恢复面积或是某个城市在不改变已有湿地构建面积基础上的排水管网设施量。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810694322.9A CN109060065A (zh) | 2018-06-29 | 2018-06-29 | 一种城市湿地的污水容纳量研究方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810694322.9A CN109060065A (zh) | 2018-06-29 | 2018-06-29 | 一种城市湿地的污水容纳量研究方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109060065A true CN109060065A (zh) | 2018-12-21 |
Family
ID=64817953
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810694322.9A Pending CN109060065A (zh) | 2018-06-29 | 2018-06-29 | 一种城市湿地的污水容纳量研究方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109060065A (zh) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3663406A (en) * | 1971-03-11 | 1972-05-16 | Ppg Industries Inc | Combined electrodialysis and ultrafiltration of an electrodeposition bath |
JPH0570520B2 (zh) * | 1989-01-30 | 1993-10-05 | Ebara Infilco | |
CN1923721A (zh) * | 2005-09-02 | 2007-03-07 | 中国科学院沈阳应用生态研究所 | 一种城市地表径流生态处理方法 |
CN202046934U (zh) * | 2011-03-08 | 2011-11-23 | 北京仁创科技集团有限公司 | 一种人工湿地水体处理系统 |
CN103374972A (zh) * | 2012-04-26 | 2013-10-30 | 交通运输部科学研究院 | 集路面径流收集、净化、蓄水并为植物利用的系统及方法 |
CN103603320A (zh) * | 2013-11-11 | 2014-02-26 | 厦门理工学院 | 一种lid型雨水沟渠及其设计计算方法 |
KR101671917B1 (ko) * | 2016-02-24 | 2016-11-04 | 한국환경공단 | 저수지 유입 농업비점오염 처리를 위한 농업 비점오염 처리용 인공습지 설계 및 운영방법 |
CN107916646A (zh) * | 2016-10-08 | 2018-04-17 | 山东省水利勘测设计院 | 一种雨洪资源挖潜量估算方法 |
-
2018
- 2018-06-29 CN CN201810694322.9A patent/CN109060065A/zh active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3663406A (en) * | 1971-03-11 | 1972-05-16 | Ppg Industries Inc | Combined electrodialysis and ultrafiltration of an electrodeposition bath |
JPH0570520B2 (zh) * | 1989-01-30 | 1993-10-05 | Ebara Infilco | |
CN1923721A (zh) * | 2005-09-02 | 2007-03-07 | 中国科学院沈阳应用生态研究所 | 一种城市地表径流生态处理方法 |
CN202046934U (zh) * | 2011-03-08 | 2011-11-23 | 北京仁创科技集团有限公司 | 一种人工湿地水体处理系统 |
CN103374972A (zh) * | 2012-04-26 | 2013-10-30 | 交通运输部科学研究院 | 集路面径流收集、净化、蓄水并为植物利用的系统及方法 |
CN103603320A (zh) * | 2013-11-11 | 2014-02-26 | 厦门理工学院 | 一种lid型雨水沟渠及其设计计算方法 |
KR101671917B1 (ko) * | 2016-02-24 | 2016-11-04 | 한국환경공단 | 저수지 유입 농업비점오염 처리를 위한 농업 비점오염 처리용 인공습지 설계 및 운영방법 |
CN107916646A (zh) * | 2016-10-08 | 2018-04-17 | 山东省水利勘测设计院 | 一种雨洪资源挖潜量估算方法 |
Non-Patent Citations (3)
Title |
---|
刘振乾 等: "湿地蓄水量动态 SD 仿真研究-以三江平原沼泽湿地为例", 《地理与地理信息科学》 * |
尼庆伟: "基于遗传程序设计方法的内陆湿地年蓄水量变化预测研究-以卧龙湖湿地为例", 《安全与环境学报》 * |
赵伶俐 等: "利用人工湿地减少排入水体的污水量", 《科技信息》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205444302U (zh) | 一种城市道路雨水控制管网系统 | |
CN103015517A (zh) | 智能控制型抗冲击城市下凹式雨水公园 | |
Hernández et al. | The use of rainwater in Alicante (Southeast Spain). A new urban approach to urban water management | |
CN109033517A (zh) | 一种提高雨水管网设计方案适用性的工程优化方法 | |
CN103967105A (zh) | 居住组团雨水生态排放系统 | |
Coombes et al. | Integrated urban water cycle management: Moving towards systems understanding | |
CN208844656U (zh) | 雨水收集与恒压自渗植被补水网 | |
CN112443023A (zh) | 一种城市多功能防涝储水设施 | |
O'Connor et al. | Total water management: The new paradigm for urban water resources planning | |
CN109060065A (zh) | 一种城市湿地的污水容纳量研究方法 | |
KR101181304B1 (ko) | 유비쿼터스 도시의 물순환 건전성 시뮬레이션 방법 | |
CN115619126A (zh) | 一种海绵电厂规划设计方法及系统 | |
CN113449983B (zh) | 一种新型城市湿地规划设计方法 | |
CN206667418U (zh) | 一种建筑小区的海绵城市雨水收集回用系统 | |
CN108985589A (zh) | 一种海绵城市的污水容纳量研究方法 | |
Li | Research on rational utilization of urban water resources Based on sponge city theory-making comparison between China and Singapore | |
Yang et al. | Water supply risks and urban responses under a changing climate: A case study of Hong Kong | |
Zhang | Exploring the utility of sponge cities and rhs for rainwater utilization and urban flood prevention | |
Xu et al. | Integrated river restoration in a mountainous city and case study | |
Li et al. | Analysis and Evaluation of the Urban Rainwater Harvesting System in Green Buildings | |
Csóka et al. | Alternatives how to mitigate urban flooding and CSO in urbanized areas used in European cities and towns | |
Gnecco et al. | The role of domestic rainwater harvesting systems in storm water runoff mitigation | |
Reinstädtler et al. | Water Harvesting Case Studies in G ermany: Urban and Regional Investigations | |
Fu et al. | Study on the Potential Development of Rainwater Utilization in the Hilly City of Southern China | |
Che et al. | Outline of some stormwater management and LID projects in Chinese urban area |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181221 |