CN109059690A - A kind of open cut tunnel for effectively preventing slungshot, reducing vibration is perpendicular to dig standing method - Google Patents

A kind of open cut tunnel for effectively preventing slungshot, reducing vibration is perpendicular to dig standing method Download PDF

Info

Publication number
CN109059690A
CN109059690A CN201811047863.9A CN201811047863A CN109059690A CN 109059690 A CN109059690 A CN 109059690A CN 201811047863 A CN201811047863 A CN 201811047863A CN 109059690 A CN109059690 A CN 109059690A
Authority
CN
China
Prior art keywords
slungshot
blasting
open cut
cut tunnel
effectively preventing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811047863.9A
Other languages
Chinese (zh)
Inventor
张馨
宋宏坤
陈历珊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 18th Bureau Group Co Ltd
Original Assignee
China Railway 18th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 18th Bureau Group Co Ltd filed Critical China Railway 18th Bureau Group Co Ltd
Priority to CN201811047863.9A priority Critical patent/CN109059690A/en
Publication of CN109059690A publication Critical patent/CN109059690A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • F42D1/08Tamping methods; Methods for loading boreholes with explosives; Apparatus therefor
    • F42D1/10Feeding explosives in granular or slurry form; Feeding explosives by pneumatic or hydraulic pressure

Abstract

A kind of open cut tunnel for effectively preventing slungshot, reducing vibration is perpendicular to dig standing method, comprising the following steps: 1., behind the area presplit blasting III, carries out the area I, II charging blast-hole and empty eye to apply brill;2., charging blast-hole using positive continuous structure powder charge, snubber can be spaced blashole charge;3., detonator wire is even close to jail, guarantee to be powered good, upper cover 0.5m thickness sand;4., using with a thickness of 30mm steel plate cover blasting body, discharge water on top and flood 0.5~1.0m high of steel plate;5., equipment, personnel, animal etc. evacuate to outside safe distance, warn, confirm and go to check again after detonation after safety, big gun are rung 15 minutes, get rid of the danger, confirmation is without releasing warning after danger.The beneficial effects of the present invention are: dense mud and wet clay can effectively absorb blasting energy, concussion of blasting is reduced, reduces noise;Blasting body is covered using steel plate, pushes down boundary, effectively prevents slungshot, guarantees construction area, residential block and workshop safety.

Description

A kind of open cut tunnel for effectively preventing slungshot, reducing vibration is perpendicular to dig standing method
Technical field
The present invention relates to blasting technique fields, and in particular to a kind of open cut tunnel for effectively preventing slungshot, reducing vibration is perpendicular to dig pine Dynamic blasting method.
Background technique
Explosion is destroyed structure with explosive, very common in constructing tunnel, in many constructing tunnels, need into Row open cut tunnel explosion, open cut tunnel explosion can accelerate construction speed, improve construction effect.
In the railway terminal engineering tunnel of Dalian, open cut tunnel is up to more than 800 rice, and explosion place is especially close far from residential block, individually Red line is constructed next to building in place, is also easy to produce a large amount of slungshots using open cut tunnel Blasting Excavation, slungshot splashes give anti-nurse Great inconvenience is brought, and slungshot can not also be controlled well, causes security risk big, neighbouring resident and workshop worker Often resistance work, construction progress pole is not smooth, causes very huge economic loss to unit in charge of construction.
Summary of the invention
It is erected the purpose of the present invention is to provide a kind of open cut tunnel for effectively preventing slungshot, reducing vibration and digs standing method, To solve the problems mentioned in the above background technology.
To achieve the above object, the invention provides the following technical scheme:
A kind of open cut tunnel for effectively preventing slungshot, reducing vibration is perpendicular to dig standing method, comprising the following steps:
1., behind the area presplit blasting III, carry out the area I, II charging blast-hole and empty eye to apply brill;
2., charging blast-hole using positive continuous structure powder charge, snubber can be spaced blashole charge;
3., detonator wire is even close to jail, guarantee to be powered good, upper cover 0.5m thickness sand;
4., using with a thickness of 30mm steel plate cover blasting body, discharge water on top and flood 0.5~1.0m high of steel plate;
5., equipment, personnel, animal etc. evacuate to outside safe distance, warn, confirm that detonation after safety, big gun are rung 15 minutes It goes to check again afterwards, get rid of the danger, confirmation is without releasing warning after danger;
6., by same method to the area II carry out blast working.
Be as a further solution of the present invention: step 1. in apply the drill bit of brill and select φ 75mm, borehole spacing is 1000mm, burden 1200mm, snubber depth are 4m, and reliever depth is 3.5m, make a call to 4 skies between adjacent two rows charging blast-hole Eye.
As the present invention, further scheme is: selection φ 70mm emulsification water-proof explosive and second-delay detonator, adjacent two Section delays to be 1.2~1.4s, and stemming fills out 1.0m high with wet clay, remaining all to be blocked with dense mud, empty eye not powder charge, all Fill dense mud.
As the present invention, further scheme is: steel plate must push down boundary, 300~500mm be overlapped, with M36 or more spiral shell Bolt is connected firmly.
As the present invention further scheme be: step 5. in, hide big gun safe distance cannot be less than 200m, every crossing It is intended to set blasting guarding, equipment, personnel, animal etc. evacuate to outside safe distance, operator's band safety cap.
The beneficial effects of the present invention are:
1, dense mud and wet clay can effectively absorb blasting energy, reduce concussion of blasting, reduce noise;
2, blasting body is covered using steel plate, pushes down boundary, effectively prevent slungshot, guarantee construction area, residential block and workshop peace Entirely.
Detailed description of the invention
Fig. 1 is the perpendicular layout drawing for digging blasting boreholes of open cut tunnel of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Referring to Fig. 1, a kind of open cut tunnel for effectively preventing slungshot, reducing vibration is perpendicular to dig standing method, including following step It is rapid:
1., behind the area presplit blasting III, carry out the area I, II charging blast-hole and empty eye to apply brill;
2., charging blast-hole using positive continuous structure powder charge, snubber can be spaced blashole charge;
3., detonator wire is even close to jail, guarantee to be powered good, upper cover 0.5m thickness sand prevents subsequent security implementations work It destroys, break in work;
4., using with a thickness of 30mm steel plate cover blasting body, discharge water on top and flood 0.5~1.0m high of steel plate, be used for Energy is absorbed, blast-shaking speed is reduced, prevents slungshot occur;
5., equipment, personnel, animal etc. evacuate to outside safe distance, warn, confirm that detonation after safety, big gun are rung 15 minutes It goes to check again afterwards, get rid of the danger, confirmation is without releasing warning after danger;The implementation person of blowing out, squad leader and security official's linkage blasting system.By pacifying Crew is responsible for putting warning, and squad leader takes charge, the person of blowing out squad leader make an inspection tour safety issue blow out instruction after, using loudspeaker, It blows a whistle warning, just starts detonation after confirming surrounding safety;
6., by same method to the area II carry out blast working.
Step 1. in apply the drill bit of brill and select φ 75mm, borehole spacing is 1000mm, burden 1200mm, snubber are deep For 4m, reliever depth is 3.5m, and 4 empty eyes are made a call between adjacent two rows charging blast-hole.
φ 70mm emulsification water-proof explosive and second-delay detonator are selected, delays for adjacent two sections to be 1.2~1.4s, stemming is used wet Clay fills out 1.0m high, remaining all to be blocked with dense mud, and dense mud is all filled in empty eye not powder charge, for absorbing energy, reduces Concussion of blasting.
Steel plate must push down boundary, overlap 300~500mm, be bolted securely with M36 or more.
Step 5. in, big gun safe distance of hiding cannot be less than 200m, and every crossing be intended to set blasting guarding, equipment, personnel, dynamic Object etc. evacuates to outside safe distance, operator's band safety cap.
1 area open cut tunnel Shu Wa I blasting parameter design table of table
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims Variation is included within the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiments being understood that.

Claims (5)

1. a kind of open cut tunnel for effectively preventing slungshot, reducing vibration is perpendicular to dig standing method, which is characterized in that including following step It is rapid:
1., behind the area presplit blasting III, carry out the area I, II charging blast-hole and empty eye to apply brill;
2., charging blast-hole using positive continuous structure powder charge, snubber can be spaced blashole charge;
3., detonator wire is even close to jail, guarantee to be powered good, upper cover 0.5m thickness sand;
4., using with a thickness of 30mm steel plate cover blasting body, discharge water on top and flood 0.5~1.0m high of steel plate;
5., equipment, personnel, animal etc. evacuate to outside safe distance, warn, confirm after detonation after safety, big gun are rung 15 minutes again It goes to check, get rid of the danger, confirmation is without releasing warning after danger;
6., by same method to the area II carry out blast working.
2. a kind of open cut tunnel for effectively preventing slungshot, reducing vibration according to claim 1 erects standing method of digging, special Sign is, step 1. in apply the drill bit of brill and select φ 75mm, borehole spacing is 1000mm, burden 1200mm, snubber are deep For 4m, reliever depth is 3.5m, and 4 empty eyes are made a call between adjacent two rows charging blast-hole.
3. a kind of open cut tunnel for effectively preventing slungshot, reducing vibration according to claim 1 erects standing method of digging, special Sign is, selects φ 70mm emulsification water-proof explosive and second-delay detonator, delays for adjacent two sections to be 1.2~1.4s, stemming is used wet Clay fills out 1.0m high, remaining all to be blocked with dense mud, and dense mud is all filled in empty eye not powder charge.
4. a kind of open cut tunnel for effectively preventing slungshot, reducing vibration according to claim 1 to 3 is perpendicular to dig standing side Method, which is characterized in that steel plate must push down boundary, overlap 300~500mm, be bolted securely with M36 or more.
5. a kind of open cut tunnel for effectively preventing slungshot, reducing vibration according to claim 4 erects standing method of digging, special Sign is, step 5. in, big gun safe distance of hiding cannot be less than 200m, and every crossing be intended to set blasting guarding, equipment, personnel, dynamic Object etc. evacuates to outside safe distance, operator's band safety cap.
CN201811047863.9A 2018-09-10 2018-09-10 A kind of open cut tunnel for effectively preventing slungshot, reducing vibration is perpendicular to dig standing method Pending CN109059690A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811047863.9A CN109059690A (en) 2018-09-10 2018-09-10 A kind of open cut tunnel for effectively preventing slungshot, reducing vibration is perpendicular to dig standing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811047863.9A CN109059690A (en) 2018-09-10 2018-09-10 A kind of open cut tunnel for effectively preventing slungshot, reducing vibration is perpendicular to dig standing method

Publications (1)

Publication Number Publication Date
CN109059690A true CN109059690A (en) 2018-12-21

Family

ID=64759968

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811047863.9A Pending CN109059690A (en) 2018-09-10 2018-09-10 A kind of open cut tunnel for effectively preventing slungshot, reducing vibration is perpendicular to dig standing method

Country Status (1)

Country Link
CN (1) CN109059690A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109059691A (en) * 2018-09-10 2018-12-21 中铁十八局集团有限公司 A kind of open cut tunnel for effectively preventing slungshot, reducing vibration is perpendicular to dig standing method
CN111121573A (en) * 2019-12-30 2020-05-08 临沂会宝岭铁矿有限公司 Ground loosening blasting method for dense plant area

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101419041A (en) * 2008-11-19 2009-04-29 中煤第一建设公司第四十九工程处 Deep hole blasting process in frost weathering bedrock segment
US20130247789A1 (en) * 2012-03-20 2013-09-26 Brent Dee Alexander Hot hole charge system
CN106595410A (en) * 2016-12-24 2017-04-26 中铁十八局集团有限公司 Deep foundation pit earth pressure controlled blasting method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101419041A (en) * 2008-11-19 2009-04-29 中煤第一建设公司第四十九工程处 Deep hole blasting process in frost weathering bedrock segment
US20130247789A1 (en) * 2012-03-20 2013-09-26 Brent Dee Alexander Hot hole charge system
CN106595410A (en) * 2016-12-24 2017-04-26 中铁十八局集团有限公司 Deep foundation pit earth pressure controlled blasting method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
中铁二局股份有限公司编著: "《土木工程施工工艺-隧道及地铁工程》", 31 March 2009 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109059691A (en) * 2018-09-10 2018-12-21 中铁十八局集团有限公司 A kind of open cut tunnel for effectively preventing slungshot, reducing vibration is perpendicular to dig standing method
CN111121573A (en) * 2019-12-30 2020-05-08 临沂会宝岭铁矿有限公司 Ground loosening blasting method for dense plant area

Similar Documents

Publication Publication Date Title
CN103175451B (en) A kind of construction method of tunnel shock-absorbing hole controlled blasting
CN103629980A (en) Adjacent existing railway steep mountain loosen control blast construction method
CN102032844B (en) Method for blasting closed rock of shield tunnel in complex strata
KR100780916B1 (en) Digging a method of construction base rock environmental pollution using many free face
CN108036684A (en) A kind of Pile Diameter is the bridge cylinder pile foundation blasting method of 1.7-1.9m
CN106595410A (en) Deep foundation pit earth pressure controlled blasting method
CN105823387A (en) Rapid construction method for deep hole blasting of vertical shaft frozen bedrock
CN107178366A (en) A kind of stoping method of post ore body
CN106638693A (en) Dismantling construction method of immersed tunnel steel-pipe pile concrete wall by drilling and blasting
CN102937399A (en) Stress relief blasting method based on ground stress transient release
CN109059690A (en) A kind of open cut tunnel for effectively preventing slungshot, reducing vibration is perpendicular to dig standing method
CN109000525A (en) A kind of shield driving upper-soft lower-hard ground presplit blasting construction method
CN104819670A (en) Pre-drilling mesopore shaft excavation blasting method
CN108915694A (en) It the step tunneling boring unprotect layer tight-face blasting of tunnel lower layer and repairs the roads and protects logical construction method
CN109059691A (en) A kind of open cut tunnel for effectively preventing slungshot, reducing vibration is perpendicular to dig standing method
CN112880501B (en) Flight-limited hole drilling and blasting method for controlling tunnel blasting flyrock
CN104457466A (en) Explosion method of open-cut tunnel segment
CN108088338A (en) A kind of Pile Diameter is the bridge cylinder pile foundation blasting method of 1.1-1.3m
CN108061492A (en) A kind of Pile Diameter is the bridge cylinder pile foundation blasting method of 0.8-1m
CN110631439A (en) Small-clear-distance blasting control method for subway station
CN105588479A (en) Three-times elementary error vibration reduction major blasting method using rock flour spaced loading in blasting holes
CN114183138A (en) Coal seam end mining drilling hole presplitting blasting method
CN109405688A (en) Close on the blasting construction method in existing operation tunnel
CN109812277B (en) Active protection double-layer pipe shed safety hole-exiting method for high-fall vertical suspended rock tunnel
KR100438028B1 (en) A tunnel blasting method favorable to the environment,which utilizes pre-splitting and an upper center cut

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20181221

WD01 Invention patent application deemed withdrawn after publication