CN109058599A - Wall-penetrating type pipeline connecting device - Google Patents
Wall-penetrating type pipeline connecting device Download PDFInfo
- Publication number
- CN109058599A CN109058599A CN201810955562.XA CN201810955562A CN109058599A CN 109058599 A CN109058599 A CN 109058599A CN 201810955562 A CN201810955562 A CN 201810955562A CN 109058599 A CN109058599 A CN 109058599A
- Authority
- CN
- China
- Prior art keywords
- hole
- peripheral frame
- sealing strip
- block
- stud
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L5/00—Devices for use where pipes, cables or protective tubing pass through walls or partitions
- F16L5/02—Sealing
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Installation Of Indoor Wiring (AREA)
Abstract
The present invention provides a kind of wall-penetrating type pipeline connecting device, belongs to technical field of pipeline connection comprising bottom plate, peripheral frame, stud, seal assembly and holds down assembly;Bottom plate is mounted on threshold outline border, and peripheral frame is fixed on bottom plate, and the bottom plate in peripheral frame is provided with the first through hole passed through for blast pipe;Seal assembly includes the multiple sealing strips being successively set in peripheral frame, and the second through-hole passed through for blast pipe is provided between two neighboring sealing strip;It holds down assembly and is arranged in peripheral frame, for making multiple sealing strip sealing first through hole and sealing the gap between the second through-hole and blast pipe.Wall-penetrating type pipeline connecting device provided by the invention improves the quantity of blast pipe in limited threshold space, meets electric panel room to blast pipe quantity and seal request.
Description
Technical field
The present invention relates to technical field of pipeline connection more particularly to a kind of wall-penetrating type pipeline connecting devices.
Background technique
Intra-locomotive, which is spatially laid out, can be divided into drivers' cab, electric panel room, power house, cooling chamber and arrester etc..Electrically
Interior does not allow access into dust, generally continues air feed to electric panel room by the blower being located at outside electric panel room, to maintain in electric panel room
Normal pressure guarantees that dust not can enter electric panel room.Therefore the partition under electric panel room threshold is inserted with a certain number of blast pipes, uses
It needs to be sealed processing in the air feed into electric panel room, and between blast pipe and partition, be lost with reducing normal pressure in electric panel room.
In existing locomotive, the blast pipe 10 positioned at partition two sides is often connected and sealed using pipe fitting 20 through walls, such as Fig. 1
It is shown;Pipe fitting 20 through walls is mainly made of 22, two fitting body 23, locking nut pipe nuts 21.Partition 30 is with certain
The steel plate of thickness, partition 30 are provided with circular hole, and one end of fitting body 23 passes through circular hole, and is arranged with locking nut 22.Due to wearing
Wall coil connector 20 need to screw the pipe nut 21 at locking nut 22 and both ends with spanner when connecting with partition 30, therefore must guarantee to pull
The smallest revolution space of hand.Therefore the distance between the center line of two neighboring pipe fitting 20 through walls should meet minimum installation dimension
M, and the center line of outermost pipe fitting 20 through walls and separator edge 31 be apart from also needing to guarantee minimum installation dimension N, such as Fig. 2 institute
Show.
Since there are the requirements of both minimum installation dimensions M, N, the blast pipe 10 positioned at 30 two sides of partition is using through walls
When pipe fitting 20 passes through partition 30, it will cause 10 quantity of blast pipe arranged in limited threshold space and be not able to satisfy electric panel room
To the quantity demand of blast pipe.
Summary of the invention
The present invention provides a kind of wall-penetrating type pipeline connecting device, the air inlet installed in limited threshold space is improved
Pipe quantity meets requirement of the electric panel room to blast pipe quantity.
To achieve the goals above, the present invention adopts the following technical scheme:
The present invention provides a kind of wall-penetrating type pipeline connecting devices, including bottom plate, peripheral frame, stud, seal assembly and compression
Component;The bottom plate is mounted on threshold outline border, and the peripheral frame is fixed on the bottom plate, the bottom in the peripheral frame
Plate is provided with the first through hole passed through for blast pipe;The seal assembly includes the multiple sealings being successively set in the peripheral frame
Item is provided with the second through-hole passed through for blast pipe between two neighboring sealing strip;Described hold down assembly is arranged in the peripheral frame
It is interior, for making multiple sealing strips seal the first through hole and sealing the gap between the second through-hole and the blast pipe.
Compared with prior art, wall-penetrating type pipeline connecting device provided by the invention has the following advantages that;
Wall-penetrating type pipeline connecting device provided by the invention, blast pipe are plugged in the second through-hole in seal assembly, and
Using holding down assembly by blast pipe sealed holding in the second through-hole, and seal assembly can also to the first through hole on bottom plate into
Row sealing;The blast pipe of partition two sides is attached using pipe fitting through walls compared to the prior art and is compared, the present invention can be
In limited threshold space, the quantity of blast pipe is improved, meets electric panel room to blast pipe quantity and seal request.
Further, the quantity of the first through hole is one, and the first through hole passes through for multiple blast pipes;It is described
The area of first through hole is less than the area of the peripheral frame, and is formed between the surrounding of the first through hole and the inner wall of the peripheral frame
Sealing strip faying surface.
Further, the peripheral frame is rectangle frame, and the first through hole is rectangular opening;The sealing strip is rectangular strip, and
The length direction of the sealing strip is parallel to the length direction of peripheral frame, and the length of the rectangular strip is greater than the length of the rectangular opening
Degree, and it is equal to the length of the peripheral frame, multiple sealing strips are cumulative along the width direction of the peripheral frame.
Further, the seal assembly includes three sealing strips successively arranged;It is located in the middle the two sides of sealing strip
It is respectively arranged at least one first semi-circular recesses, the side of the sealing strip of intermediate sealing strip two sides is provided at least one
A second semi-circular recesses;First semi-circular recesses and second semi-circular recesses are oppositely arranged that form described second logical
Hole.
Further, the both ends of the sealing strip are respectively provided with multiple rubber mats being successively bonded.
Further, described to hold down assembly including pressing plate, right angle trigonometry block and right-angled trapezium block;The right angle trigonometry block
Including the first inclined-plane and the first bottom surface, the right-angled trapezium block includes the second inclined-plane, first side and bottom surface;The right angle three
Hornblock and right-angled trapezium block are socketed on the stud, and the bottom surface of the right-angled trapezium block is abutted with the sealing strip, described
The first side of right-angled trapezium block is connected on the bottom plate, the second inclined-plane of the right-angled trapezium block and the right angle trigonometry block
The first inclined-plane abut against;The pressing plate is pressed on the first bottom surface of the right angle trigonometry block, and is fixed on the stud.
Further, the stud includes thread segment, and the thread segment is provided with fastening nut;The pressing plate is set in institute
It states on stud, and is fixed on the stud by fastening nut.
Further, the right angle trigonometry block is provided with the circular through hole through the first inclined-plane and the first bottom surface, described straight
Angle corner block is set on the stud by the circular through hole.
Further, the right-angled trapezium block is provided with the limiting slot through second inclined-plane and first side, described
Right-angled trapezium block is set on the stud by the limiting slot.
Further, the right-angled trapezium block is provided with the waist-shaped hole through second inclined-plane and first side, described
Right-angled trapezium block is set on the stud by the waist-shaped hole.
In addition to it is described above present invention solves the technical problem that, constitute technical solution technical characteristic and by these
Outside beneficial effect brought by the technical characteristic of technical solution, what wall-penetrating type pipeline connecting device provided by the invention can solve
The other technical characteristics and these technical characteristic bring beneficial effects for including in other technologies problem, technical solution, will be
Further details of explanation is made in specific embodiment.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, the present invention will be implemented below
Example or attached drawing needed to be used in the description of the prior art are briefly described, it should be apparent that, the accompanying drawings in the following description is only
It is only a part of the embodiments of the present invention, for those of ordinary skill in the art, in the premise not made the creative labor
Under, it can also be obtained according to these attached drawings other attached drawings.
Fig. 1 is the connection schematic diagram of pipe fitting and partition through walls in the prior art;
Fig. 2 is pipe fitting through walls distribution schematic diagram on partition in the prior art;
Fig. 3 is the top view of wall-penetrating type pipeline connecting device provided in an embodiment of the present invention;
Fig. 4 is the sectional view along A-A in Fig. 3;
Fig. 5 is scheme of installation of the seal assembly in peripheral frame in Fig. 3;
Fig. 6 is the scheme of installation in peripheral frame that holds down assembly in Fig. 3;
Fig. 7 is the structural schematic diagram of the first sealing strip in Fig. 5;
Fig. 8 is the structural schematic diagram of the second sealing strip in Fig. 5;
Fig. 9 is the front view of right angle trigonometry block in Fig. 6;
Figure 10 is the cross-sectional view of right angle trigonometry block in Fig. 6;
Figure 11 is the front view of Fig. 6 right-angled trapezium block;
Figure 12 is the cross-sectional view of Fig. 6 right-angled trapezium block.
Description of symbols:
10- blast pipe, 20- pipe fitting through walls,
21- pipe nut, 22- locking nut,
23- fitting body, 30- partition,
31- separator edge, 40- bottom plate,
41- first through hole, 50- peripheral frame,
60- seal assembly, the first sealing strip of 61-,
The second sealing strip of 62-, the second through-hole of 63-,
64- body of rubber, 65- rubber mat,
The first semi-circular recesses of 66-, the second semi-circular recesses of 67-,
70- holds down assembly, 71- pressing plate,
72- right angle trigonometry block, 73- right-angled trapezium block,
80- stud, 90- fastening nut,
721- circular through hole, the first bottom surface 722-,
The second bottom surface 723-, the first inclined-plane 724-,
731- limiting slot, the second inclined-plane 732-,
733- bottom surface, 734- first side
735- upper bottom surface.
Specific embodiment
In order to keep the above objects, features and advantages of the present invention more obvious and easy to understand, below in conjunction with of the invention real
The attached drawing in example is applied, technical scheme in the embodiment of the invention is clearly and completely described.Obviously, described implementation
Example is only a part of the embodiments of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, this field is general
Logical technical staff all other embodiment obtained without creative labor, belongs to protection of the present invention
Range.
The embodiment of the present invention is described below in detail, examples of the embodiments are shown in the accompanying drawings, wherein from beginning to end
Same or similar label indicates same or similar element or element with the same or similar functions.Below with reference to attached
The embodiment of figure description is exemplary, it is intended to is used to explain the present invention, and is not considered as limiting the invention.
In the description of the present invention, it is to be understood that, term " center ", " longitudinal direction ", " transverse direction ", " length ", " width ",
" thickness ", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom" "inner", "outside", " up time
The orientation or positional relationship of the instructions such as needle ", " counterclockwise ", " axial direction ", " radial direction ", " circumferential direction " be orientation based on the figure or
Positional relationship is merely for convenience of description of the present invention and simplification of the description, rather than the device or element of indication or suggestion meaning must
There must be specific orientation, be constructed and operated in a specific orientation, therefore be not considered as limiting the invention.
In addition, term " first ", " second " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance
Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or
Implicitly include at least one this feature.In the description of the present invention, the meaning of " plurality " is at least two, such as two, three
It is a etc., unless otherwise specifically defined.
As shown in Figures 3 to 6, wall-penetrating type pipeline connecting device provided in an embodiment of the present invention, including bottom plate 40, peripheral frame
50,70 are held down assembly stud 80, seal assembly 60 and;Bottom plate 40 is mounted on threshold outline border, and peripheral frame 50 is fixed on bottom plate 40,
Bottom plate 40 in peripheral frame 50 is provided with the first through hole 41 passed through for blast pipe 10;Seal assembly 60 includes being successively set on
Multiple sealing strips in peripheral frame 50 are provided with the second through-hole 63 passed through for blast pipe 10 between two neighboring sealing strip;It compresses
Component 70 is arranged in peripheral frame 50, for making multiple sealing strip sealing first through hole 41 and the second through-hole 63 of sealing and blast pipe
Gap between 10.
Specifically, bottom plate 40 is using with the production of certain thickness steel plate, chamfered shape and the threshold outline border of bottom plate 40
Shape is similar, and the profile of bottom plate 40 can be square or rectangle etc..Bottom plate 40 can be using welding and bolted side
Formula is mounted on threshold outline border, in the present embodiment not to the type of attachment of the chamfered shape of bottom plate 40 and bottom plate 40 and threshold outline border
It is limited, as long as bottom plate 40 is fixed on threshold outline border.First passed through for blast pipe 10 is provided on bottom plate 40
Through-hole 41, the quantity of first through hole 10 are at least one.
Peripheral frame 50 may include multiple vertical plate splicing compositions, for example, peripheral frame 50 can be joined end to end by four vertical plates forms frame shape
Structure, peripheral frame 50 is fixed on the side of bottom plate 40, and peripheral frame 50 surrounds the region of 41 place bottom plate 40 of first through hole;Peripheral frame 50
Inside and bottom plate 40 are embedded with seal assembly 60 and compression group towards the side of peripheral frame 50 the first space of formation in the first space
Part 70, wherein seal assembly 60 may be mounted at the lower section in the first space, and can arrange along the length direction of peripheral frame 50, close
It the lower section of sealing assembly 60 and is abutted with the lower edge of peripheral frame 50;Stud 80 is vertically mounted on bottom plate 40, and is located at seal assembly
It between 60 top and the top edge of peripheral frame 50,70 is mounted in the first space, holds down assembly 70 parallel for that will hold down assembly
It installs and holds down assembly in seal assembly 60 and 70 abutted with seal assembly 60.
Seal assembly 60 includes multiple sealing strips, and the length direction of sealing strip is parallel with the length direction of peripheral frame 50, multiple
Width direction of the sealing strip successively along peripheral frame 50 adds up, and the passed through for blast pipe 10 is formed between two neighboring sealing strip
Two through-holes 63, the interior multiple sealing strips being arranged of peripheral frame 50 can form effective sealing to first through hole 41, while can also be to second
Gap between through-hole 63 and blast pipe 10 is sealed.
When multiple sealing strips are successively clamped between blast pipe 10, by being located at 70 productions that hold down assembly above sealing strip
Raw is pressed down against power, makes 10 grip seal of blast pipe in the second through-hole 63, realizes blast pipe 10 across threshold and enters electricity
Gas chamber, and can into electric panel room air feed.It is passed through by connector 20 through walls compared with threshold enters electric panel room with blast pipe 10, this hair
The wall-penetrating type pipeline connecting device of bright offer screws required space without making the spacing between adjacent blast pipe 10 meet spanner,
The installation number that the blast pipe in limited threshold space can be improved meets electric panel room to the quantitative requirement of blast pipe.
In the present embodiment, the quantity of first through hole 41 is one, and first through hole 41 passes through for multiple blast pipes 10;First
The area of through-hole 41 is less than the area of peripheral frame 50, and forms sealing strip between the surrounding of first through hole 41 and the inner wall of peripheral frame 50 and take
Junction.Specifically, in actual blast pipe 10 arrangement, since actual installation position and the theoretical installation site of blast pipe 10 are deposited
In deviation, therefore to pass through threshold convenient for blast pipe 10, bottom plate 40 can be provided with a first through hole 41, first through hole 41 can
To accommodate multiple blast pipes 10 also cross the area of this first through hole 10 is greater than area surface of all blast pipes on bottom plate 40
Product, and it is less than the area of peripheral frame 50, sealing strip faying surface, multiple sealing strips are formed between first through hole 41 and the inner wall of peripheral frame 50
Both ends be separately mounted on sealing strip faying surface, first through hole can effectively be sealed.
In the present embodiment, peripheral frame 50 is rectangle frame, and first through hole 41 is rectangular opening;Sealing strip is rectangular strip, and sealing strip
Length direction be parallel to the length direction of peripheral frame 50, the length of rectangular strip is greater than the length of rectangular opening, and is equal to peripheral frame 50
Length;Multiple sealing strips are cumulative along the width direction of peripheral frame 50.Specifically, peripheral frame 50 can be rectangle frame, corresponding bottom plate 40
The first through hole 41 of setting is rectangular opening, and rectangular item can be set in sealing strip, and the length direction of sealing strip is parallel to peripheral frame 50
Length direction, due to rectangular strip length be greater than rectangular opening length and be equal to peripheral frame 50 length, so first through hole with
Sealing strip faying surface is formed between the inner wall of peripheral frame 50, the both ends of sealing strip may be mounted on sealing strip faying surface, and seal
The both ends of item are abutted with the inner wall of peripheral frame 50.Multiple sealing strips successively add up along the width direction of peripheral frame 50, are formed to first
The sealing of through-hole and to multilayer blast pipe carry out grip seal.In the present embodiment, the length phase of the length and peripheral frame 50 of sealing strip
Deng, it is connected to the both ends of sealing strip on the inner wall of peripheral frame 50, the stability for being mounted on sealing strip in peripheral frame 50 can be enhanced, raising
Seal assembly 60 acts on the grip seal of blast pipe 10.
Referring to Fig. 5, the seal assembly 60 in the present embodiment includes three sealing strips successively arranged;It is located in the middle close
The two sides of strip of paper used for sealing are respectively arranged at least one first semi-circular recesses 66, and the sealing strip side positioned at intermediate sealing strip two sides is set
It is equipped at least one second semi-circular recesses 67;First semi-circular recesses 66 and the second semi-circular recesses 67 are oppositely arranged to form
Two through-holes 63.
Specifically, seal assembly 60 may include the sealing strip in three peripheral frames successively arranged 50, and three sealing strips
Width direction along peripheral frame 50 is cumulative, is located in the middle sealing strip and is known as the first sealing strip 61, is located at the first about 61 sealing strip
Two sides are the second sealing strip 62.The both ends for being located in the middle the first sealing strip 61 are abutted with the inner wall of peripheral frame 50, two sides
At least one is provided with for clamping the first semi-circular recesses 66 of blast pipe 10;The both ends of same second sealing strip 62 with
The inner wall of peripheral frame 50 abuts, and is provided with and the first semi-circular recesses 66 compatible second towards the side of the first sealing strip 61
Semi-circular recesses 67, the first semi-circular recesses 66 and the second semi-circular recesses 67 form the second through-hole 63, the second through-hole 63 for into
The insertion installation of air hose 10.It is understood that the aperture of the second through-hole 63 is slightly less than the outer diameter of blast pipe 10, make the second through-hole 63
Clearance fit is installed between blast pipe 10, can guarantee that blast pipe 10 is clamped in seal assembly 60 and seal assembly 60 can be with
Blast pipe 10 is sealed.
As shown in Figures 7 and 8, the both ends of sealing strip are respectively provided with multiple rubber mats 65 being successively bonded.Specifically, sealing strip is
Rectangular strip, the length of sealing strip are equal to the length of peripheral frame 50, are connected to the both ends of sealing strip respectively on the inner wall of peripheral frame 50.By
In in actual installation process, blast pipe 10 there may be offset, it is therefore desirable to deviate to sealing strip, make blast pipe
In 10 the first semi-circular recesses 66 of insertion or the second semi-circular recesses 67.Sealing strip is adjusted for convenience, the present embodiment
Middle that sealing strip is designed to two parts, including main part and adjustable part, main part includes body of rubber 64, adjustable
Part is made of the rubber mat 65 for being located at 64 both ends of body of rubber bonding;The section of rubber mat 65 is identical as the section of body of rubber 64,
It is bonded with the equal thickness rubber mat 65 of identical the piece number respectively at the both ends of body of rubber 64.
For the installation convenient for sealing strip in peripheral frame 50, can will be bonded with the Design of length of the body of rubber 64 of rubber mat 65 at
Greater than the length of peripheral frame 50, when sealing strip to be installed in peripheral frame 50, according to offset needed for each sealing strip, Ke Yixuan
It selects and removes the rubber mat 65 at 64 both ends of body of rubber, and make the length of sealing strip entirety equal to the length of peripheral frame 50.It can manage
65 quantity of rubber mat of solution, 64 both ends of body of rubber bonding can carry out selection adjustment as the case may be.
As shown in Fig. 9 to Figure 12 and combine Fig. 6, hold down assembly 70 include pressing plate 71, right angle trigonometry block 72 and right angle ladder
Shape block 73;Right angle trigonometry block 72 include the first inclined-plane 724 and the first bottom surface 722, right-angled trapezium block 73 include the second inclined-plane 732,
First side 734 and bottom surface 733;Right angle trigonometry block 72 and right-angled trapezium block 73 are socketed on stud 80, right-angled trapezium block 73
Bottom surface 733 abutted with sealing strip, the first side 734 of right-angled trapezium block 73 is connected on bottom plate 40, right-angled trapezium block 73
First inclined-plane 724 on the second inclined-plane 732 and right angle trigonometry block 72 abut against;Pressing plate 71 is pressed in the first bottom of right angle trigonometry block 72
On face 722, and it is fixed on stud 80.
It 70 is mounted between 50 top edge of top and peripheral frame of seal assembly 60 by stud 80 specifically, holding down assembly,
It wherein holds down assembly and 70 is abutted with seal assembly 60.Hold down assembly 70 include pressing plate 71, right angle trigonometry block 72 and right-angled trapezium block
73。
Wherein, right angle trigonometry block 72 and right-angled trapezium block 73 are rubber block, and right angle trigonometry block 72 includes the first inclined-plane
724, the first bottom surface 722, the second bottom surface 723 and two first end faces, the shape of two first end faces are right angled triangle, the
One bottom surface 722 and the second bottom surface 723 and the first inclined-plane 724 are opposite, and the first inclined-plane 724 is by two first end faces respectively with first
Bottom surface 722 and the connection of the second bottom surface 723.Right-angled trapezium block 73 includes the second inclined-plane 732, upper bottom surface 735, bottom surface 733, first
Side 734 and two second end faces, wherein the second inclined-plane 732 is opposite with first side 734, and the second inclined-plane 732 and the first side
Face 734 is made of the stringcourse of right-angled trapezium.
Right-angled trapezium block 73 is set on stud 80 and right-angled trapezium block 73 is installed close to bottom plate 40, right-angled trapezium block 73
Bottom surface 733 abutted with sealing strip, first side 734 is abutted with bottom plate 40, two second end face is connected to peripheral frame respectively
On 50 inner walls, and right-angled trapezium block 73 is abutted by the second inclined-plane 732 with right angle trigonometry block 72.
Likewise, right angle trigonometry block 72 is arranged on stud 80 and is located at side of the right-angled trapezium block 73 far from bottom plate 40, directly
Angle corner block 72 is abutted against by second inclined-plane 732 on the first inclined-plane 724 and right-angled trapezium block 73, and pressing plate 71 is mounted on right angle three
On first bottom surface 722 of hornblock 72, and the equal length of the length of pressing plate 71 and the first bottom surface 722, pressing plate 71 can be made to apply
Under the action of pressure is uniform on first bottom surface 722, the extruding force that pressing plate 71 generates is transferred to right angle trigonometry block through the first bottom surface 722
72, so that right angle trigonometry block 72 is generated the extruding force towards bottom plate 40, and by the first inclined-plane 724 and the second inclined-plane 732, make right angle
Trapezoid block 73 generates the active force for being pressed down against sealing strip, and then adjusts the gap between the second through-hole 63 and blast pipe, makes close
Sealing assembly 60 realizes sealed clamping to blast pipe.
On the basis of the above embodiments, stud 80 includes thread segment, and thread segment is provided with fastening nut 90;71 sets of pressing plate
It is located on stud 80, and is fixed on stud 80 by fastening nut 90.Specifically, bottom plate 40 is provided with two in the present embodiment
A stud 80, two studs 80 are distributed along the length direction of peripheral frame 50, and the axial direction of stud 80 is axially parallel with blast pipe.Spiral shell
One end of column 80 is fixed on bottom plate 40, and usual stud 80 is fixed on bottom plate 40 using welding or by the way of being threadedly coupled,
The other end of stud 80 is provided with externally threaded thread segment, the internal screw thread phase of the external screw thread and fastening nut 90 of thread segment
Match, pressing plate 71 is set on stud 80, and is pressed on the first bottom surface 722 of right angle trigonometry block 72, and solid by fastening nut 90
It is scheduled on the first bottom surface 722.
After component 60 to be sealed is mounted in peripheral frame 50, successively pressed on the stud 80 between peripheral frame 50 and seal assembly 60
Enter right-angled trapezium block 73 and right angle trigonometry block 72, right angle trigonometry block 72 is compressed by pressing plate 71.It, can by rotational fastener nut 90
Adjust that pressing plate 71 is mobile towards the direction of bottom plate 40 on stud 80, make pressing plate 71 act on right angle trigonometry block 72 towards bottom plate
40 active forces increase, and active force is transferred to right-angled trapezium block by the first inclined-plane 724 and the second inclined-plane 732 by right angle trigonometry block 72
On 73, and then increase the extruding force between seal assembly 60 and blast pipe, blast pipe grip seal is made to be mounted on the second through-hole 63
In.
On the basis of the above embodiments, right angle trigonometry block 72 is provided with through the first inclined-plane 724 and the first bottom surface 722
Circular through hole 721, right angle trigonometry block 72 are set on stud 80 by circular through hole 721.Specifically, on the first inclined-plane 724
Middle and lower part is provided with circular through hole 721, and circular through hole 721 runs through the first inclined-plane 724 and the first bottom surface 722, right angle trigonometry block 72
It is set on stud 80 by circular through hole 721;In the present embodiment, the aperture of circular through hole 721 is slightly larger than the outer diameter of stud 80,
Slide right angle trigonometry block 72 on stud 80, the extruding force for transmitting pressing plate 71 is transferred to trapezoidal through right angle trigonometry block 72
Right angle block.
On the basis of the above embodiments, right-angled trapezium block 73 is provided with through the second inclined-plane 732 and first side 734
Limiting slot 731, right-angled trapezium block 73 are set on stud 80 by limiting slot 731.Specifically, limiting slot 731 is arranged second
The middle and upper part on inclined-plane 732, and it is through to first side 734, the notch of limiting slot 731 is located at the upper bottom surface of right-angled trapezium block 73
On 735, right-angled trapezium block 73 is mounted on stud 80 by limiting slot 731, and stud 80 limits right-angled trapezium block 73 in peripheral frame 50
It inside swings, for right-angled trapezium block 73 when by extruding force from right angle trigonometry block 72, right-angled trapezium block 73 is along stud 80
It moves up and down, and then compresses each sealing strip.The limiting slot 731 that right-angled trapezium block 73 is arranged, provides right-angled trapezium block 73 along spiral shell
The mobile upper and lower displacement of column 80, increases right-angled trapezium block 73 to the adjustable range of sealing strip.It is understood that limiting slot
731 the second inclined-plane 732 position it is corresponding in the position on the first inclined-plane 724 with circular through hole 721, stud 80 can be made successively to wear
Cross right-angled trapezium block 73 and right angle trigonometry block 72.
On the basis of the above embodiments, right-angled trapezium block 73 is provided with through the second inclined-plane 732 and first side 734
Waist-shaped hole, right-angled trapezium block 73 are set on stud 80 by waist-shaped hole.Specifically, the middle and upper part for being located at the second inclined-plane 732 is set
It is equipped with waist-shaped hole, the axis direction of waist-shaped hole is consistent with the inclined direction on the second inclined-plane 732, and waist-shaped hole runs through the second inclined-plane 732
With first side 734, the wide outer diameter slightly larger than stud 80 in the hole of waist-shaped hole prevents right-angled trapezium block 73 from swinging on stud 80.
The waist-shaped hole that right-angled trapezium block 73 is arranged, provides the upper and lower displacement that right-angled trapezium block 73 is moved along stud 80, increases right angle
Adjustable range of the trapezoid block 73 to sealing strip.It is understood that position and circular through hole of the waist-shaped hole on the second inclined-plane 732
721 the first inclined-plane 724 position it is corresponding, stud 80 can be made to sequentially pass through right-angled trapezium block 73 and right angle trigonometry block 72.
Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent
Pipe present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: its according to
So be possible to modify the technical solutions described in the foregoing embodiments, or to some or all of the technical features into
Row equivalent replacement;And these are modified or replaceed, various embodiments of the present invention technology that it does not separate the essence of the corresponding technical solution
The range of scheme.
Claims (10)
1. a kind of wall-penetrating type pipeline connecting device, which is characterized in that including bottom plate, peripheral frame, stud, seal assembly and compression group
Part;
The bottom plate is mounted on threshold outline border, and the peripheral frame is fixed on the bottom plate, the bottom in the peripheral frame
Plate is provided with the first through hole passed through for blast pipe;
The seal assembly includes the multiple sealing strips being successively set in the peripheral frame, is provided between two neighboring sealing strip
The second through-hole passed through for blast pipe;
Described hold down assembly is arranged in the peripheral frame, for making multiple sealing strips seal the first through hole and sealing second
Gap between through-hole and the blast pipe.
2. wall-penetrating type pipeline connecting device according to claim 1, which is characterized in that the quantity of the first through hole is one
A, the first through hole passes through for multiple blast pipes;
The area of the first through hole is less than the area of the peripheral frame, and the inner wall of the surrounding of the first through hole and the peripheral frame
Between formed sealing strip faying surface.
3. wall-penetrating type pipeline connecting device according to claim 1, which is characterized in that the peripheral frame is rectangle frame, described
First through hole is rectangular opening;The sealing strip is rectangular strip, and the length direction of the sealing strip is parallel to the length side of peripheral frame
To the length of the rectangular strip is greater than the length of the rectangular opening, and is equal to the length of the peripheral frame, multiple sealing strip edges
The width direction of the peripheral frame is cumulative.
4. wall-penetrating type pipeline connecting device according to claim 3, which is characterized in that the seal assembly include three according to
The sealing strip of secondary arrangement;
The two sides for being located in the middle sealing strip are respectively arranged at least one first semi-circular recesses, are located at intermediate sealing strip two sides
The side of sealing strip be provided at least one second semi-circular recesses;
First semi-circular recesses and second semi-circular recesses are oppositely arranged to form second through-hole.
5. wall-penetrating type pipeline connecting device according to claim 3, which is characterized in that the both ends of the sealing strip are respectively provided with
Multiple rubber mats being successively bonded.
6. wall-penetrating type pipeline connecting device according to claim 1, which is characterized in that it is described hold down assembly including pressing plate,
Right angle trigonometry block and right-angled trapezium block;
The right angle trigonometry block includes the first inclined-plane and the first bottom surface, and the right-angled trapezium block includes the second inclined-plane, first side
And bottom surface;
The right angle trigonometry block and right-angled trapezium block are socketed on the stud, the bottom surface of the right-angled trapezium block with it is described close
Strip of paper used for sealing abuts, and the first side of the right-angled trapezium block is connected on the bottom plate, the second inclined-plane of the right-angled trapezium block with
First inclined-plane of the right angle trigonometry block abuts against;
The pressing plate is pressed on the first bottom surface of the right angle trigonometry block, and is fixed on the stud.
7. wall-penetrating type pipeline connecting device according to claim 6, which is characterized in that the stud includes thread segment, institute
It states thread segment and is provided with fastening nut;
The pressing plate is set on the stud, and is fixed on the stud by fastening nut.
8. wall-penetrating type pipeline connecting device according to claim 6, which is characterized in that the right angle trigonometry block, which is provided with, to be passed through
The circular through hole on the first inclined-plane and the first bottom surface is worn, the right angle trigonometry block is set in the stud by the circular through hole
On.
9. wall-penetrating type pipeline connecting device according to claim 6, which is characterized in that the right-angled trapezium block, which is provided with, to be passed through
The limiting slot on second inclined-plane and first side is worn, the right-angled trapezium block is set in the stud by the limiting slot
On.
10. wall-penetrating type pipeline connecting device according to claim 6, which is characterized in that the right-angled trapezium block is provided with
Waist-shaped hole through second inclined-plane and first side, the right-angled trapezium block are set in the stud by the waist-shaped hole
On.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810955562.XA CN109058599A (en) | 2018-08-21 | 2018-08-21 | Wall-penetrating type pipeline connecting device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810955562.XA CN109058599A (en) | 2018-08-21 | 2018-08-21 | Wall-penetrating type pipeline connecting device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109058599A true CN109058599A (en) | 2018-12-21 |
Family
ID=64686704
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810955562.XA Pending CN109058599A (en) | 2018-08-21 | 2018-08-21 | Wall-penetrating type pipeline connecting device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109058599A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112664722A (en) * | 2020-12-24 | 2021-04-16 | 重庆北鑫机电有限公司 | Electromechanical pipeline sleeve pipe support and electromechanical pipeline protection device |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2321850A1 (en) * | 1998-03-06 | 1999-09-10 | Beele Engineering B.V. | A bushing |
CN1555469A (en) * | 2001-09-21 | 2004-12-15 | ���ʹɷ�����˾ | Seal for a cable entry, pipe penetration or the like |
KR20100090583A (en) * | 2009-02-06 | 2010-08-16 | 주식회사 엘스콤 | Device for preventing a fire from spreading along the cable passing through the ceiling and the wall |
CN201827525U (en) * | 2010-10-20 | 2011-05-11 | 上海怡博船务有限公司 | Sealing device |
CN201844123U (en) * | 2009-02-04 | 2011-05-25 | 烙克赛克有限公司 | Compressible sealing part or threading part and sealing system used for wire cables, wire rods or pipelines |
CN102345767A (en) * | 2010-07-30 | 2012-02-08 | 刘新月 | Cable sealing frame with four closed sides |
CN203273036U (en) * | 2013-04-22 | 2013-11-06 | 天津赛百林科技有限公司 | Cable hole gap sealing-partition device |
CN105071321A (en) * | 2015-08-19 | 2015-11-18 | 江苏五信新材料科技有限公司 | Method for improving electromagnetic shielding performance of multi-path cable sealing device |
CN106764094A (en) * | 2016-11-18 | 2017-05-31 | 伊斯特密封科技(江苏)有限公司 | A kind of modular cable, pipeline run through sealing device |
-
2018
- 2018-08-21 CN CN201810955562.XA patent/CN109058599A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2321850A1 (en) * | 1998-03-06 | 1999-09-10 | Beele Engineering B.V. | A bushing |
CN1555469A (en) * | 2001-09-21 | 2004-12-15 | ���ʹɷ�����˾ | Seal for a cable entry, pipe penetration or the like |
CN201844123U (en) * | 2009-02-04 | 2011-05-25 | 烙克赛克有限公司 | Compressible sealing part or threading part and sealing system used for wire cables, wire rods or pipelines |
KR20100090583A (en) * | 2009-02-06 | 2010-08-16 | 주식회사 엘스콤 | Device for preventing a fire from spreading along the cable passing through the ceiling and the wall |
CN102345767A (en) * | 2010-07-30 | 2012-02-08 | 刘新月 | Cable sealing frame with four closed sides |
CN201827525U (en) * | 2010-10-20 | 2011-05-11 | 上海怡博船务有限公司 | Sealing device |
CN203273036U (en) * | 2013-04-22 | 2013-11-06 | 天津赛百林科技有限公司 | Cable hole gap sealing-partition device |
CN105071321A (en) * | 2015-08-19 | 2015-11-18 | 江苏五信新材料科技有限公司 | Method for improving electromagnetic shielding performance of multi-path cable sealing device |
CN106764094A (en) * | 2016-11-18 | 2017-05-31 | 伊斯特密封科技(江苏)有限公司 | A kind of modular cable, pipeline run through sealing device |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112664722A (en) * | 2020-12-24 | 2021-04-16 | 重庆北鑫机电有限公司 | Electromechanical pipeline sleeve pipe support and electromechanical pipeline protection device |
CN112664722B (en) * | 2020-12-24 | 2022-07-29 | 重庆北鑫机电有限公司 | Electromechanical pipeline sleeve pipe support and electromechanical pipeline protection device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103672224B (en) | Pipeline connection part and there is its air conditioner | |
CN203926321U (en) | A kind of securing means of the anti-Anti-theft-dismounting that relaxes | |
CN202812532U (en) | Pipeline connecting assembly and air conditioner provided with the same | |
CN109058599A (en) | Wall-penetrating type pipeline connecting device | |
CN102900185A (en) | Connecting assembly used for mounting curtain wallboard | |
CN106322012A (en) | Clamp type pipe joint | |
CN104712637A (en) | T-shaped bolt convenient to mount and mounting channel | |
CN202899370U (en) | Connection component used for installing of curtain wall plate | |
CN106760087B (en) | Rectangular steel pipe curtain wall cross beam column linked system | |
CN116006793A (en) | Novel anti-disassembly sleeve and tightening and installing method of anti-disassembly sleeve | |
EP4354005A1 (en) | Removal-prevention connector | |
CN206346326U (en) | From unit-built type thermal insulation plate | |
EP3690360A1 (en) | Integrated cooling assembly and battery assembly | |
CN205481974U (en) | Expansion valve connects manages assembly with expansion valve business turn over | |
TWM410111U (en) | Air filter device for compressor | |
CN204141105U (en) | A kind of New type water pump flange | |
US11309771B2 (en) | Cooling jacket and cooling unit | |
CN204666004U (en) | Assembled aluminum flat tube configuration | |
CN112268152A (en) | Shunt joint device of quick connecting pipe | |
CN203641522U (en) | Stop valve | |
CN107124050B (en) | Stator punching sheet, motor and compressor | |
CN108151587A (en) | Vehicle armor component and with its vehicle | |
CN106091551B (en) | A kind of door body assembly and refrigeration equipment of refrigeration equipment | |
CN201401903Y (en) | Coplanar connecting structure of box panel of air handling unit of central air conditioner | |
CN205261892U (en) | Novel air conditioner installing bracket |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20181221 |
|
WD01 | Invention patent application deemed withdrawn after publication |