CN109057391A - 一种用于预防钢框架结构连续倒塌的局部加固结构 - Google Patents

一种用于预防钢框架结构连续倒塌的局部加固结构 Download PDF

Info

Publication number
CN109057391A
CN109057391A CN201810975177.1A CN201810975177A CN109057391A CN 109057391 A CN109057391 A CN 109057391A CN 201810975177 A CN201810975177 A CN 201810975177A CN 109057391 A CN109057391 A CN 109057391A
Authority
CN
China
Prior art keywords
steel
frame
column
preventing
prestress wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810975177.1A
Other languages
English (en)
Inventor
孟宝
钟炜辉
郝际平
谭政
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian University of Architecture and Technology
Original Assignee
Xian University of Architecture and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian University of Architecture and Technology filed Critical Xian University of Architecture and Technology
Priority to CN201810975177.1A priority Critical patent/CN109057391A/zh
Publication of CN109057391A publication Critical patent/CN109057391A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

本发明公开了一种用于预防钢框架结构连续倒塌的局部加固结构,包括钢框架失效柱、两根钢框架柱及若干预应力钢绞线;钢框架失效柱位于两根钢框架柱之间,且钢框架失效柱与两根钢框架柱之间平行分布,钢框架失效柱与钢框架柱之间设置有两根钢框架梁,其中,各预应力钢绞线的一端固定于一根钢框架梁上,各预应力钢绞线的另一端固定于另一根钢框架梁上,该结构能够使得钢框架失效柱和其上层结构共同工作。

Description

一种用于预防钢框架结构连续倒塌的局部加固结构
技术领域
本发明属于建筑工程技术领域,涉及一种用于预防钢框架结构连续倒塌的局部加固结构。
背景技术
近年来,高层建筑结构在非预期荷载(地震、火灾、撞击、爆炸等)作用下往往会发生连续倒塌,导致严重的生命财产损失。因此,如何防止建筑结构因非预期荷载而引发整体坍塌,保证建筑结构的整体稳定性和可靠性是当前迫切解决的热点问题。当钢框架结构中的竖向关键构件(承重柱)失效后,使得剩余结构发生多次内力重分布,而与失效柱相连的两跨梁在剩余结构首次内力重分布时起着重要作用。与失效柱相连的结构层首先发生严重的破坏,进而失效柱的上层结构出现轻微的破坏,使得剩余结构在首次内力重分布时失效柱上层结构的性能并未得到充分发挥,即失效柱层与其上层结构并未出现共同工作。
发明内容
本发明的目的在于克服上述现有技术的缺点,提供了一种用于预防钢框架结构连续倒塌的局部加固结构,该结构能够使得钢框架失效柱和其上层结构共同工作。
为达到上述目的,本发明所述的用于预防钢框架结构连续倒塌的局部加固结构包括钢框架失效柱、两根钢框架柱及若干预应力钢绞线;
钢框架失效柱位于两根钢框架柱之间,且钢框架失效柱与两根钢框架柱之间平行分布,钢框架失效柱与钢框架柱之间设置有两根钢框架梁,其中,各预应力钢绞线的一端固定于一根钢框架梁上,各预应力钢绞线的另一端固定于另一根钢框架梁上。
预应力钢绞线通过端部锚具固定于钢框架梁上。
钢框架梁的上翼缘及下翼缘上均开设有螺栓孔,预应力钢绞线穿过钢框架梁上翼缘上的螺栓孔及下翼缘上的螺栓孔后通过端部锚具固定。
各预应力钢绞线均垂直于钢框架梁。
各预应力钢绞线均倾斜分布。
各预应力钢绞线与钢框架失效柱之间的夹角小于90°。
钢框架失效柱两侧的各预应力钢绞线对称分布。
本发明具有以下有益效果:
本发明所述的用于预防钢框架结构连续倒塌的局部加固结构在具体操作时,钢框架失效柱与钢框架柱之间设置有两根钢框架梁,两根钢框架梁之间通过若干预应力钢绞线相连接,从而连接失效区域的上下层,使得钢框架结构在某竖向柱失效后,钢框架失效柱与其上的钢框架梁能够共同工作,以提高钢框架结构的竖向抗倒塌承载能力及稳定性,防止钢框架失效柱层梁柱节点过早破坏,为人员疏散和消防员工作提供一定的时间,结构简单,操作方便,实用性极强。
附图说明
图1为实施例一的结构示意图;
图2为图1中A-A方向的截面图;
图3为实施例二的结构示意图;
图4为图3中B-B方向的截面图;
图5为图3中C-C方向的截面图。
其中,1为钢框架柱、2为钢框架失效柱、3为钢框架梁、4为预应力钢绞线、5为端部锚具。
具体实施方式
下面结合附图对本发明做进一步详细描述:
参考图1及图3,本发明所述的用于预防钢框架结构连续倒塌的局部加固结构包括钢框架失效柱2、两根钢框架柱1及若干预应力钢绞线4;钢框架失效柱2位于两根钢框架柱1之间,且钢框架失效柱2与两根钢框架柱1之间平行分布,钢框架失效柱2与钢框架柱1之间设置有两根钢框架梁3,其中,各预应力钢绞线4的一端固定于一根钢框架梁3上,各预应力钢绞线4的另一端固定于另一根钢框架梁3上。
预应力钢绞线4通过端部锚具5固定于钢框架梁3上,其中,钢框架梁3的上翼缘及下翼缘上均开设有螺栓孔,预应力钢绞线4穿过钢框架梁3上翼缘上的螺栓孔及下翼缘上的螺栓孔后通过端部锚具5固定;钢框架失效柱2两侧的各预应力钢绞线4对称分布。
实施例一
参考图1及图2,当钢框架结构在非预期荷载作用下,竖向承重构件(如图2所示的钢框架失效柱2)发生失效,剩余结构在竖向荷载作用下发生内力重分布,则在钢框架梁3的上翼缘及下翼缘上开孔,然后安装预应力钢绞线4,其中,各预应力钢绞线4垂直于钢框架梁3,进而对预应力钢绞线4进行施加预拉力,最后通过端部锚具5进行锚固。
实施例二
参考图3、图4及图5,当钢框架结构在非预期荷载作用下,竖向承重构件(如图3所示的钢框架失效柱2)发生失效,剩余结构在竖向荷载作用下发生内力重分布,则在钢框架梁3的上翼缘及下翼缘上开孔,然后安装预应力钢绞线4,其中,各预应力钢绞线4倾斜分布,且各预应力钢绞线4与钢框架失效柱2之间的夹角小于90°,钢框架失效柱2左右两侧的各预应力钢绞线4对称分布,然后对预应力钢绞线4进行施加预拉力,最后再通过端部锚具5进行锚固。
以上表述仅为本发明的较佳实施例,并不是对发明的限定,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。

Claims (7)

1.一种用于预防钢框架结构连续倒塌的局部加固结构,其特征在于,包括钢框架失效柱(2)、两根钢框架柱(1)及若干预应力钢绞线(4);
钢框架失效柱(2)位于两根钢框架柱(1)之间,且钢框架失效柱(2)与两根钢框架柱(1)之间平行分布,钢框架失效柱(2)与钢框架柱(1)之间设置有两根钢框架梁(3),其中,各预应力钢绞线(4)的一端固定于一根钢框架梁(3)上,各预应力钢绞线(4)的另一端固定于另一根钢框架梁(3)上。
2.根据权利要求1所述的用于预防钢框架结构连续倒塌的局部加固结构,其特征在于,预应力钢绞线(4)通过端部锚具(5)固定于钢框架梁(3)上。
3.根据权利要求1所述的用于预防钢框架结构连续倒塌的局部加固结构,其特征在于,钢框架梁(3)的上翼缘及下翼缘上均开设有螺栓孔,预应力钢绞线(4)穿过钢框架梁(3)上翼缘上的螺栓孔及下翼缘上的螺栓孔后通过端部锚具(5)固定。
4.根据权利要求1所述的用于预防钢框架结构连续倒塌的局部加固结构,其特征在于,各预应力钢绞线(4)均垂直于钢框架梁(3)。
5.根据权利要求1所述的用于预防钢框架结构连续倒塌的局部加固结构,其特征在于,各预应力钢绞线(4)均倾斜分布。
6.根据权利要求5所述的用于预防钢框架结构连续倒塌的局部加固结构,其特征在于,各预应力钢绞线(4)与钢框架失效柱(2)之间的夹角小于90°。
7.根据权利要求1所述的用于预防钢框架结构连续倒塌的局部加固结构,其特征在于,钢框架失效柱(2)两侧的各预应力钢绞线(4)对称分布。
CN201810975177.1A 2018-08-24 2018-08-24 一种用于预防钢框架结构连续倒塌的局部加固结构 Pending CN109057391A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810975177.1A CN109057391A (zh) 2018-08-24 2018-08-24 一种用于预防钢框架结构连续倒塌的局部加固结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810975177.1A CN109057391A (zh) 2018-08-24 2018-08-24 一种用于预防钢框架结构连续倒塌的局部加固结构

Publications (1)

Publication Number Publication Date
CN109057391A true CN109057391A (zh) 2018-12-21

Family

ID=64756058

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810975177.1A Pending CN109057391A (zh) 2018-08-24 2018-08-24 一种用于预防钢框架结构连续倒塌的局部加固结构

Country Status (1)

Country Link
CN (1) CN109057391A (zh)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100656285B1 (ko) * 2005-02-21 2006-12-11 주식회사 한기엔지니어링건축사사무소 인장 및 전단 보강을 위한 외부강선의 정착구조
CN201460262U (zh) * 2009-03-18 2010-05-12 曾朝杰 钢筋混凝土异型柱、钢框架结构体系低、多层建筑
CN102587296A (zh) * 2012-02-21 2012-07-18 朔黄铁路发展有限责任公司 一种桥梁结构自平衡体外预应力加固法
CN103669567A (zh) * 2013-12-19 2014-03-26 北京工业大学 一种新型震后易修复钢异形柱-预应力偏心支撑架
CN204001197U (zh) * 2014-06-16 2014-12-10 同济大学 一种体外预应力自复位框架结构
CN104213635A (zh) * 2014-08-27 2014-12-17 广东省建筑设计研究院 建筑体系张弦结构中预应力索失效下的防连续倒塌设计方法
CN104806032A (zh) * 2015-02-28 2015-07-29 同济大学 一种防结构连续倒塌的体外抗力可调钢绞线网装置
CN105937307A (zh) * 2016-06-07 2016-09-14 江西赣粤高速公路股份有限公司 一种预应力钢丝绳弯剪加固混凝土t梁及其加固方法
CN206144181U (zh) * 2016-07-11 2017-05-03 国质(北京)建设工程检测鉴定中心 一种加固钢结构
CN106639037A (zh) * 2017-01-23 2017-05-10 青岛理工大学 一种适用预制装配的耗能减震斜向预应力剪力墙结构体系

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100656285B1 (ko) * 2005-02-21 2006-12-11 주식회사 한기엔지니어링건축사사무소 인장 및 전단 보강을 위한 외부강선의 정착구조
CN201460262U (zh) * 2009-03-18 2010-05-12 曾朝杰 钢筋混凝土异型柱、钢框架结构体系低、多层建筑
CN102587296A (zh) * 2012-02-21 2012-07-18 朔黄铁路发展有限责任公司 一种桥梁结构自平衡体外预应力加固法
CN103669567A (zh) * 2013-12-19 2014-03-26 北京工业大学 一种新型震后易修复钢异形柱-预应力偏心支撑架
CN204001197U (zh) * 2014-06-16 2014-12-10 同济大学 一种体外预应力自复位框架结构
CN104213635A (zh) * 2014-08-27 2014-12-17 广东省建筑设计研究院 建筑体系张弦结构中预应力索失效下的防连续倒塌设计方法
CN104806032A (zh) * 2015-02-28 2015-07-29 同济大学 一种防结构连续倒塌的体外抗力可调钢绞线网装置
CN105937307A (zh) * 2016-06-07 2016-09-14 江西赣粤高速公路股份有限公司 一种预应力钢丝绳弯剪加固混凝土t梁及其加固方法
CN206144181U (zh) * 2016-07-11 2017-05-03 国质(北京)建设工程检测鉴定中心 一种加固钢结构
CN106639037A (zh) * 2017-01-23 2017-05-10 青岛理工大学 一种适用预制装配的耗能减震斜向预应力剪力墙结构体系

Similar Documents

Publication Publication Date Title
US7188452B2 (en) Sleeved bracing useful in the construction of earthquake resistant structures
JP2020514572A (ja) 組立式コンクリート充填円形鋼管複合節点
CN109837988B (zh) 一种延性连梁摇摆钢框架体系
JP2016514224A (ja) 構造躯体システムにおいて不連続弾性挙動を提供する構造接合機構
US9683365B2 (en) Piston based self-centering brace apparatus
Jagadish et al. A study on bracing systems on high rise steel structures
US20160340897A1 (en) Yield Link for Providing Increased Ductility, Redundancy, and Hysteretic Damping in Structural Bracing Systems
CN106368317A (zh) 全预制装配式框架、开缝式剪力墙以及框架‑剪力墙结构
CN109057391A (zh) 一种用于预防钢框架结构连续倒塌的局部加固结构
Lopes et al. Design of the linked column frame structural system
CN101974940A (zh) 约束屈曲支撑与混凝土梁节点
CN114837300A (zh) 一种具有减震自复位功能的装配式钢框架及其预制方法
CN109653359B (zh) 一种大净空且带法兰盘的自复位钢框架中心支撑体系
CN214994849U (zh) 一种限位式复刚度装配型屈曲约束支撑
CN109653358B (zh) 一种大净空的自复位钢框架中心支撑体系
CN214364054U (zh) 装配腋撑式顶底角钢梁柱连接钢框架
Liu et al. Structural performance assessment and control of super tall buildings during construction
Harshitha et al. ″Analysis Of RC Framed Structure With Structural Steel Braced Using Etabs ″
CN110306425B (zh) 可大幅度减小承受弯矩的矮墩刚构桥的墩底构造
CN209741650U (zh) 一种装配式钢框架桥墩
CN208329654U (zh) 一种吊、安一体可拆卸钢框架建筑墙体的连接结构
CN208023855U (zh) 一种钢筋混凝土楼梯抗震加固结构
CN112302170A (zh) 装配腋撑式顶底角钢梁柱连接钢框架
Kulkarni¹ et al. Study of P-Delta effect on tall steel structure
Gururaja et al. Progressive Collapse Potential of Irregular Concrete Building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181221