CN109057282A - 一种建筑装修用瓷砖顶高器 - Google Patents
一种建筑装修用瓷砖顶高器 Download PDFInfo
- Publication number
- CN109057282A CN109057282A CN201810993275.8A CN201810993275A CN109057282A CN 109057282 A CN109057282 A CN 109057282A CN 201810993275 A CN201810993275 A CN 201810993275A CN 109057282 A CN109057282 A CN 109057282A
- Authority
- CN
- China
- Prior art keywords
- threaded rod
- hole
- ceramic tile
- plate
- outside
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F21/00—Implements for finishing work on buildings
- E04F21/18—Implements for finishing work on buildings for setting wall or ceiling slabs or plates
- E04F21/1805—Ceiling panel lifting devices
- E04F21/1822—Ceiling panel lifting devices with pivotally mounted arms
Abstract
本发明公开了一种建筑装修用瓷砖顶高器,包括底座、第一螺纹杆、第一通孔、按板、套杆、支撑板、固定板、调节螺母、标杆、刻度尺、滑槽、移动板、滑块、第二螺纹杆、第二通孔、连接杆、阶梯孔、限位板、滚珠和安装槽,所述阶梯孔内部设置有第一螺纹杆,所述阶梯孔内部位于第一螺纹杆底端安装有限位板,本发明结构科学合理,使用安全方便,转动按板使第一螺纹杆转动,限位板转动时使滚珠转动,滚珠减少限位板与阶梯孔内部的摩擦力,便于工作人员进行操作,通过调节调节螺母使移动板移动,移动板与固定板对瓷砖两侧进行夹紧防止瓷砖滑动,使瓷砖顶高器对瓷砖进行固定,通过刻度尺可准确调节瓷砖顶高器高度。
Description
技术领域
本发明涉及建筑装修技术领域,具体为一种建筑装修用瓷砖顶高器。
背景技术
建筑装修是为保护建筑物的主体结构、完善建筑物的使用功能和美化建筑物,采用装饰装修材料或饰物,对建筑物的内外表面及空间进行的各种处理过程。
但是目前市场上的瓷砖顶高器不仅结构复杂,而且功能单一,现有的瓷砖顶高器技术中,瓷砖顶高器在进行升高过程中操作较为复杂,需要工具辅助升高,不便于操作,瓷砖顶高器对瓷砖进行顶高过程中瓷砖容易发生偏移,同时瓷砖顶高器升高位置不准确。
发明内容
本发明的目的在于提供一种建筑装修用瓷砖顶高器,以解决上述背景技术中提出的问题。
为了解决上述技术问题,本发明提供如下技术方案:一种建筑装修用瓷砖顶高器,包括底座、第一螺纹杆、第一通孔、按板、套杆、支撑板、固定板、调节螺母、标杆、刻度尺、滑槽、移动板、滑块、第二螺纹杆、第二通孔、连接杆、阶梯孔、限位板、滚珠和安装槽,所述底座顶端开设有阶梯孔,所述阶梯孔内部设置有第一螺纹杆,所述阶梯孔内部位于第一螺纹杆底端安装有限位板,所述阶梯孔内部两侧均开设有安装槽,所述安装槽内部设置有滚珠,所述第一螺纹杆外侧开设有第一通孔,所述第一通孔内部设置有连接杆,所述连接杆两端均安装有按板,所述第一螺纹杆外侧套接有套杆,所述套杆外侧套接有支撑板,所述支撑板一端安装有固定板,所述支撑板顶端开设有滑槽,所述支撑板顶端设置有移动板,所述移动板底部安装有滑块,且滑块与滑槽配合连接,所述固定板两侧均安装有第二螺纹杆,所述移动板外侧开设有第二通孔,且第二螺纹杆另一端套接于第二通孔内部,所述第二螺纹杆外侧套接有调节螺母,所述底座一侧安装有标杆,所述标杆外侧安装有刻度尺。
进一步的,所述标杆外侧设置有固定螺栓,所述底座一侧开设有螺纹孔,所述标杆与底座通过固定螺栓与螺纹孔配合连接。
进一步的,所述按板外侧套接有橡胶套,所述橡胶套与按板通过强力胶粘接。
进一步的,所述底座底部设置有橡胶垫,所述橡胶垫底部设置有防滑纹。
进一步的,所述标杆一侧设置有加强筋。
进一步的,所述滚珠与安装槽为间隙配合,且滚珠与安装槽内部涂抹有润滑油脂。
与现有技术相比,本发明所达到的有益效果是:本发明结构科学合理,使用安全方便,转动按板使第一螺纹杆转动,限位板转动时使滚珠转动,滚珠减少限位板与阶梯孔内部的摩擦力,便于工作人员进行操作,通过调节调节螺母使移动板移动,移动板与固定板对瓷砖两侧进行夹紧防止瓷砖滑动,使瓷砖顶高器对瓷砖进行固定,通过刻度尺可准确调节瓷砖顶高器高度。
附图说明
附图用来提供对本发明的进一步理解,并且构成说明书的一部分,与本发明的实施例一起用于解释本发明,并不构成对本发明的限制。在附图中:
图1是本发明的整体结构示意图。
图2是本发明的移动板安装结构示意图。
图3是本发明的滚珠安装结构示意图。
图中:1、底座;2、第一螺纹杆;3、第一通孔;4、按板;5、套杆;6、支撑板;7、固定板;8、调节螺母;9、标杆;10、刻度尺;11、滑槽;12、移动板;13、滑块;14、第二螺纹杆;15、第二通孔;16、连接杆;17、阶梯孔;18、限位板;19、滚珠;20、安装槽。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
请参阅图1-3,本发明提供一种技术方案:一种建筑装修用瓷砖顶高器,包括底座1、第一螺纹杆2、第一通孔3、按板4、套杆5、支撑板6、固定板7、调节螺母8、标杆9、刻度尺10、滑槽11、移动板12、滑块13、第二螺纹杆14、第二通孔15、连接杆16、阶梯孔17、限位板18、滚珠19和安装槽20,底座1顶端开设有阶梯孔17,底座1底部设置有橡胶垫,橡胶垫底部设置有防滑纹,更好的增大底座1底部摩擦力,防止底座1滑动,阶梯孔17内部设置有第一螺纹杆2,阶梯孔17内部位于第一螺纹杆2底端安装有限位板18,阶梯孔17内部两侧均开设有安装槽20,安装槽20内部设置有滚珠19,滚珠19与安装槽20为间隙配合,且滚珠19与安装槽20内部涂抹有润滑油脂,更好的使滚珠19在安装槽20内部进行滚动,第一螺纹杆2外侧开设有第一通孔3,第一通孔3内部设置有连接杆16,连接杆16两端均安装有按板4,按板4外侧套接有橡胶套,橡胶套与按板4通过强力胶粘接,更好的增大按板4外侧摩擦力,便于工作人员操作,第一螺纹杆2外侧套接有套杆5,套杆5外侧套接有支撑板6,支撑板6一端安装有固定板7,支撑板6顶端开设有滑槽11,支撑板6顶端设置有移动板12,移动板12底部安装有滑块13,且滑块13与滑槽11配合连接,固定板7两侧均安装有第二螺纹杆14,移动板12外侧开设有第二通孔15,且第二螺纹杆14另一端套接于第二通孔15内部,第二螺纹杆14外侧套接有调节螺母8,底座1一侧安装有标杆9,标杆9外侧设置有固定螺栓,底座1一侧开设有螺纹孔,标杆9与底座1通过固定螺栓与螺纹孔配合连接,更好的使底座1与标杆9进行紧密连接,以及便于拆卸和安装,标杆9一侧设置有加强筋,更好的增强标杆9强度,延长其使用寿命,标杆9外侧安装有刻度尺10;底座1顶端开设有阶梯孔17,阶梯孔17内部设置有第一螺纹杆2,阶梯孔17内部位于第一螺纹杆2底端安装有限位板18,阶梯孔17内部两侧均开设有安装槽20,安装槽20内部设置有滚珠19,第一螺纹杆2外侧开设有第一通孔3,第一通孔3内部设置有连接杆16,连接杆16两端均安装有按板4,第一螺纹杆2外侧套接有套杆5,套杆5外侧套接有支撑板6,通过转动按板4使第一螺纹杆2转动,限位板18转动时使滚珠19转动,滚珠19减少限位板18与阶梯孔17内部的摩擦力,提高第一螺纹杆2转动速度,支撑板6对瓷砖底部进行支撑,第一螺纹杆2转动使支撑板6进行升降,支撑板6一端安装有固定板7,支撑板6顶端开设有滑槽11,支撑板6顶端设置有移动板12,移动板12底部安装有滑块13,且滑块13与滑槽11配合连接,固定板7两侧均安装有第二螺纹杆14,移动板12外侧开设有第二通孔15,且第二螺纹杆14另一端套接于第二通孔15内部,第二螺纹杆14外侧套接有调节螺母8,通过调节调节螺母8使移动板12移动,移动板12与固定板7对瓷砖两侧进行夹紧防止瓷砖滑动,底座1一侧安装有标杆9,标杆9外侧安装有刻度尺10,通过刻度尺10可准确调节。
需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。
最后应说明的是:以上所述仅为本发明的优选实施例而已,并不用于限制本发明,尽管参照前述实施例对本发明进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。
Claims (6)
1.一种建筑装修用瓷砖顶高器,包括底座(1)、第一螺纹杆(2)、第一通孔(3)、按板(4)、套杆(5)、支撑板(6)、固定板(7)、调节螺母(8)、标杆(9)、刻度尺(10)、滑槽(11)、移动板(12)、滑块(13)、第二螺纹杆(14)、第二通孔(15)、连接杆(16)、阶梯孔(17)、限位板(18)、滚珠(19)和安装槽(20),其特征在于:所述底座(1)顶端开设有阶梯孔(17),所述阶梯孔(17)内部设置有第一螺纹杆(2),所述阶梯孔(17)内部位于第一螺纹杆(2)底端安装有限位板(18),所述阶梯孔(17)内部两侧均开设有安装槽(20),所述安装槽(20)内部设置有滚珠(19),所述第一螺纹杆(2)外侧开设有第一通孔(3),所述第一通孔(3)内部设置有连接杆(16),所述连接杆(16)两端均安装有按板(4),所述第一螺纹杆(2)外侧套接有套杆(5),所述套杆(5)外侧套接有支撑板(6),所述支撑板(6)一端安装有固定板(7),所述支撑板(6)顶端开设有滑槽(11),所述支撑板(6)顶端设置有移动板(12),所述移动板(12)底部安装有滑块(13),且滑块(13)与滑槽(11)配合连接,所述固定板(7)两侧均安装有第二螺纹杆(14),所述移动板(12)外侧开设有第二通孔(15),且第二螺纹杆(14)另一端套接于第二通孔(15)内部,所述第二螺纹杆(14)外侧套接有调节螺母(8),所述底座(1)一侧安装有标杆(9),所述标杆(9)外侧安装有刻度尺(10)。
2.根据权利要求1所述的一种建筑装修用瓷砖顶高器,其特征在于:所述标杆(9)外侧设置有固定螺栓,所述底座(1)一侧开设有螺纹孔,所述标杆(9)与底座(1)通过固定螺栓与螺纹孔配合连接。
3.根据权利要求1所述的一种建筑装修用瓷砖顶高器,其特征在于:所述按板(4)外侧套接有橡胶套,所述橡胶套与按板(4)通过强力胶粘接。
4.根据权利要求1所述的一种建筑装修用瓷砖顶高器,其特征在于:所述底座(1)底部设置有橡胶垫,所述橡胶垫底部设置有防滑纹。
5.根据权利要求1所述的一种建筑装修用瓷砖顶高器,其特征在于:所述标杆(9)一侧设置有加强筋。
6.根据权利要求1所述的一种建筑装修用瓷砖顶高器,其特征在于:所述滚珠(19)与安装槽(20)为间隙配合,且滚珠(19)与安装槽(20)内部涂抹有润滑油脂。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810993275.8A CN109057282A (zh) | 2018-08-29 | 2018-08-29 | 一种建筑装修用瓷砖顶高器 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810993275.8A CN109057282A (zh) | 2018-08-29 | 2018-08-29 | 一种建筑装修用瓷砖顶高器 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109057282A true CN109057282A (zh) | 2018-12-21 |
Family
ID=64756378
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810993275.8A Pending CN109057282A (zh) | 2018-08-29 | 2018-08-29 | 一种建筑装修用瓷砖顶高器 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109057282A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112796493A (zh) * | 2020-12-22 | 2021-05-14 | 赵俊兰 | 一种贴墙瓷砖上泥用瓷砖定位装置 |
CN115126198A (zh) * | 2021-03-26 | 2022-09-30 | 广东博智林机器人有限公司 | 可调节支撑架以及板材铺贴方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2308760A1 (fr) * | 1975-04-25 | 1976-11-19 | Mecavis | Appareil de levage notamment pour la mise en place de plaques de plafond |
CN101146972A (zh) * | 2005-02-22 | 2008-03-19 | 达芬奇意大利/美国集团有限责任公司 | 瓷砖对正和找平装置以及使用该装置的方法 |
CN204728665U (zh) * | 2015-07-09 | 2015-10-28 | 李艳会 | 瓷砖架高调整器 |
CN207092498U (zh) * | 2017-07-07 | 2018-03-13 | 张文丰 | 一种瓷砖高度调节器 |
CN207211668U (zh) * | 2017-08-21 | 2018-04-10 | 青岛华联装饰工程有限公司 | 一种装修用墙面瓷砖可调节承托装置 |
CN108166735A (zh) * | 2018-01-31 | 2018-06-15 | 王广志 | 一种用于控制墙面砖镶贴和嵌缝精度的设备及方法 |
CN108301608A (zh) * | 2018-02-05 | 2018-07-20 | 何洋洋 | 一种用于室内贴瓷砖的辅助贴砖架 |
-
2018
- 2018-08-29 CN CN201810993275.8A patent/CN109057282A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2308760A1 (fr) * | 1975-04-25 | 1976-11-19 | Mecavis | Appareil de levage notamment pour la mise en place de plaques de plafond |
CN101146972A (zh) * | 2005-02-22 | 2008-03-19 | 达芬奇意大利/美国集团有限责任公司 | 瓷砖对正和找平装置以及使用该装置的方法 |
CN204728665U (zh) * | 2015-07-09 | 2015-10-28 | 李艳会 | 瓷砖架高调整器 |
CN207092498U (zh) * | 2017-07-07 | 2018-03-13 | 张文丰 | 一种瓷砖高度调节器 |
CN207211668U (zh) * | 2017-08-21 | 2018-04-10 | 青岛华联装饰工程有限公司 | 一种装修用墙面瓷砖可调节承托装置 |
CN108166735A (zh) * | 2018-01-31 | 2018-06-15 | 王广志 | 一种用于控制墙面砖镶贴和嵌缝精度的设备及方法 |
CN108301608A (zh) * | 2018-02-05 | 2018-07-20 | 何洋洋 | 一种用于室内贴瓷砖的辅助贴砖架 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112796493A (zh) * | 2020-12-22 | 2021-05-14 | 赵俊兰 | 一种贴墙瓷砖上泥用瓷砖定位装置 |
CN115126198A (zh) * | 2021-03-26 | 2022-09-30 | 广东博智林机器人有限公司 | 可调节支撑架以及板材铺贴方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109057282A (zh) | 一种建筑装修用瓷砖顶高器 | |
CN209425149U (zh) | 一种建筑板材新材料磨边装置 | |
CA2143141A1 (en) | Spring Compressor | |
BRPI1006242A2 (pt) | composição para a fixação de um revestimento, kit para a fixação de um revestimento dental, processos, restauração dentaria e uso de uma composição | |
EP1089326A3 (en) | Wafer support with a dustproof covering film and method for producing the same | |
CA2452992A1 (en) | Stabilizer pad configurations | |
CN111608355A (zh) | 一种墙面大规格玻化砖可调节干挂结构及安装方法 | |
CN208744870U (zh) | 机器人夹具 | |
EP1153333A4 (en) | LEVELING HEAD FOR CAMERA | |
CN205956224U (zh) | 一种轴承安装扣和一种轴承组件 | |
CN212405993U (zh) | 一种装配式装饰墙面的安装调节结构 | |
CN208502140U (zh) | 一种室内设计用装饰墙板 | |
CN210725191U (zh) | 一种可调节的音响安装支架 | |
CN208480981U (zh) | 一种画框安装架 | |
TW200703401A (en) | A device for securing a lightning conductor to a surface and its method thereof | |
CN208860376U (zh) | 一种便于安装就位且结构稳定的花岗岩平台 | |
CN101731975A (zh) | 升降式盆架 | |
CN213777105U (zh) | 一种室内设计用测绘装置 | |
CN111502178A (zh) | 一种装配式架空地板的支撑结构 | |
CN209295004U (zh) | 一种便于调节角度的舞台灯具 | |
CN215174876U (zh) | 一种建筑工程用的室外照明支架 | |
CN212453448U (zh) | 一种墙面大规格玻化砖可调节干挂结构 | |
CN109000106B (zh) | 调节型承载装置 | |
CN213236842U (zh) | 一种电动支撑架 | |
CN216428899U (zh) | 一种装配式架空地面支托装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181221 |
|
RJ01 | Rejection of invention patent application after publication |