CN109056840A CN201810830512.9A CN201810830512A CN109056840A CN 109056840 A CN109056840 A CN 109056840A CN 201810830512 A CN201810830512 A CN 201810830512A CN 109056840 A CN109056840 A CN 109056840A
Authority
CN
China
Prior art keywords
slip casting
permeable membrane
earthwork
film
joint body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810830512.9A
Other languages
Chinese (zh)
Inventor
刘忠池
梁艳文
潘意宽
张中亮
刘天懋
吴海波
李盈
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI YUANFANG GROUNDWORK ENGINEERING Co Ltd
Original Assignee
SHANGHAI YUANFANG GROUNDWORK ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI YUANFANG GROUNDWORK ENGINEERING Co Ltd filed Critical SHANGHAI YUANFANG GROUNDWORK ENGINEERING Co Ltd
Priority to CN201810830512.9A priority Critical patent/CN109056840A/en
Publication of CN109056840A publication Critical patent/CN109056840A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention provides a kind of underground polyethylene film for earthwork connector and its construction methods, wherein, underground polyethylene film for earthwork connector includes joint body, the two sides of the joint body offer slip casting slot respectively, it is equipped in each slip casting slot and is fixedly connected with portion, the slip casting slot with it is described be fixedly connected portion from the side of the joint body to the middle part of the joint body extend, the two side ends of the joint body, which are equipped with, to be open and leads to the slip casting slot, in turn, antiseepage film or permeable membrane are protruded by the opening, the antiseepage film or the permeable membrane are fixed around the home by the portion of being fixedly connected, the inner wall of the slip casting slot is equipped with water-swellable body with described be fixedly connected between portion, the antiseepage film or the permeable membrane are pressed by the water-swellable body.The present invention solves the problems, such as how polyethylene film for earthwork to be applied in underground anti-seepage processing construction, further increases construction quality and efficiency, reduces be may cause pollution of constructing.

Description

Underground polyethylene film for earthwork connector and its construction method
Technical field
The invention belongs to build underground anti-seepage leakage technical field, it is related to a kind of underground polyethylene film for earthwork connector and its construction Method.
Background technique
Underground anti-seepage processing is mainly used for separating the connection of underground water, and Main is to close pollution source of groundwater It in a region, and then prevents pollution sources from spreading, avoids continuing the clean underground water of pollution.
Currently, in construction of diaphragm wall, the existing construction method for generalling use concreting cut-pff wall.However, On the one hand this way can generate crack, poor reliability in the long-term use;On the other hand it will also result in secondary pollution, It is unfavorable for environmental protection.
Summary of the invention
An object of the present invention is in order to overcome the shortcomings in the prior art, to provide a kind of underground polyethylene film for earthwork and connect Head and its construction method, to solve the problems, such as that how polyethylene film for earthwork is applied to underground anti-seepage is handled in construction, further Enhance the fixing intensity of polyethylene film for earthwork, to improve construction quality and efficiency, reduces be may cause pollution of constructing.
In order to achieve the above object, being achieved through the following technical solutions:
A kind of underground polyethylene film for earthwork connector, including joint body, the two sides difference of the joint body are provided first Slip casting slot is offered, is equipped in each slip casting slot and is fixedly connected with portion, the slip casting slot is with the portion that is fixedly connected by institute The side for stating joint body extends to the middle part of the joint body, and the two side ends of the joint body, which are equipped with, to be open and lead to institute Slip casting slot is stated, in turn, antiseepage film or permeable membrane is protruded by the opening, is fixed around the home by the portion of being fixedly connected described anti- Film or the permeable membrane are seeped, the inner wall of the slip casting slot is equipped with water-swellable body with described be fixedly connected between portion, by described Water-swellable body presses the antiseepage film or the permeable membrane.
Preferably, it is disconnected in the middle part of the side of the joint body and then forms the opening, the portion of being fixedly connected includes Fixed connecting end and solderless wrapped connection end, the fixed connecting end are fixed in the side gap of the joint body, and the solderless wrapped connection end connects to described The middle part of head ontology extends.
Preferably, the solderless wrapped connection end includes the enlarged footing connected around the home for the antiseepage film or the permeable membrane.
Preferably, the enlarged footing is rounded or rectangular or triangle, protrude into the antiseepage film in the slip casting slot or The permeable membrane is close to and is fused to each surface of the enlarged footing.
It preferably, include a straight extended segment, the width of the straight extended segment between the fixed connecting end and the solderless wrapped connection end Degree is less than the expansion width of the enlarged footing, and the antiseepage film or the permeable membrane include initial segment, around covering section and external section, The upper and lower surface of the straight extended segment be respectively used to the initial segment and it is described external section it is straight be bonded, the enlarged footing Surface be used to fit closely with described around covering section.
Preferably, built-in slip casting pipe, the built-in slip casting pipe are equipped between the enlarged footing and the inner wall of the slip casting slot Tube wall injected hole is distributed with.
Preferably, the water-swellable body is the rubber bar or rubber strip meeting water and gradually expanding.
For above-mentioned purpose is better achieved, the present invention also provides a kind of underground polyethylene film for earthwork connection construction method, packets Include following steps:
Multiple above-mentioned underground polyethylene film for earthwork connectors are provided;
The antiseepage film or the permeable membrane are protruded into the slip casting slot from the two side ends of the single joint body respectively It is interior;
The antiseepage film or the permeable membrane are bypassed into the solderless wrapped connection end that the slip casting slot is goed deep into the portion of being fixedly connected;
The antiseepage film or the permeable membrane are close to be fixed on each surface for being fixedly connected with portion;
In slip casting in the slip casting slot until the slip casting slot is filled;
It is sufficiently expanded to the water-swellable body so that pressing in the antiseepage film or the permeable membrane;
It repeats the above steps, until by multiple underground polyethylene film for earthwork connectors by multiple antiseepage films or institute It states permeable membrane and encloses connection.
Preferably, around the home the antiseepage film or the process of the permeable membrane the following steps are included:
The portion of being fixedly connected includes fixed connecting end, straight extended segment and solderless wrapped connection end, and the fixed connecting end is fixed in described connect The side gap of head ontology, the solderless wrapped connection end extends to the middle part of the joint body and including an enlarged footing, described straight Extended segment is integrally connected between the fixed connecting end and the solderless wrapped connection end;
The antiseepage film or the permeable membrane are protruded into the slip casting slot by the side gap of the joint body, and Gradually extend along the straight extended segment, until completely around and be coated on the enlarged footing.
Preferably, the fixed antiseepage film or the process of the permeable membrane the following steps are included:
The antiseepage film or the permeable membrane include initial segment, around section and external section is covered, by the initial segment and institute The external section of straight upper and lower surface for fitting in the straight extended segment and mutual welding are stated, is fitted closely described in institute around covering section State the surface of enlarged footing and mutual welding.
Beneficial effect provided by the invention includes:
1) multiple antiseepage films are securely connected using multiple underground polyethylene film for earthwork connectors, and then be enclosed big The underground anti-seepage drain region of area, good seepage-proof property are also more convenient more efficient, will not generate secondary pollution for construction, complete Meet the requirement of Modern Green environmental protection construction entirely;
2) around the home, by way of welding and expansion press, antiseepage film is fixed in the slip casting slot of antiseepage membrane body, So that fixation is stronger, and it is not easily to fall off, dramatically increase service life.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of polyethylene film for earthwork connector first embodiment in underground of the present invention;
Fig. 2 is corresponding to status diagram after the slip casting of Fig. 1;
Fig. 3 is the final Construction State schematic diagram of polyethylene film for earthwork connection construction method in underground of the present invention.
Figure label:
Joint body 1;Slip casting slot 2;It is fixedly connected with portion 3;Opening 4;Antiseepage film or permeable membrane 9.
Specific embodiment
The present invention is described in detail with reference to the accompanying drawing:
Embodiment one:
Referring to figs. 1 and 2, present invention firstly provides a kind of underground polyethylene film for earthwork connectors, including rectangle Joint body 1, the two sides of the joint body 1 offer slip casting slot 2 respectively, are equipped with and are fixedly connected in each slip casting slot 2 Portion 3, the slip casting slot 2 is with the portion 3 that is fixedly connected from the side of the joint body 1 to the middle part of the joint body 1 Extend, the two side ends of the joint body 1 are equipped with opening 4 and lead to the slip casting slot 2, in turn, are protruded by the opening 4 anti- Film or permeable membrane 9 are seeped, the antiseepage film or the permeable membrane 9, the slip casting slot 2 are fixed by the portion 3 that is fixedly connected around the home Inner wall with it is described be fixedly connected between portion 3 be equipped with water-swellable body 5, the antiseepage film is pressed by the water-swellable body 5 Or the permeable membrane 9.
Specifically, the opening 4 is disconnected and then formed in the middle part of the side of the joint body 1, it is described to be fixedly connected with the packet of portion 3 Fixed connecting end 30 and solderless wrapped connection end 32 are included, the fixed connecting end 30 is fixed in the side gap of the joint body 1, the solderless wrapped connection end 32 extend to the middle part of the joint body 1.
The solderless wrapped connection end 32 includes the enlarged footing 36 connected around the home for the antiseepage film or the permeable membrane 9.More preferably Ground, the enlarged footing 36 is rounded or rectangular or triangle, protrudes into the antiseepage film in the slip casting slot 2 or the permeable membrane 9 are close to and are fused to each surface of the enlarged footing 36.It is equipped between the enlarged footing 36 and the inner wall of the slip casting slot 2 pre- Grouting Pipe 6 is buried, injected hole is distributed in the tube wall of the built-in slip casting pipe 6.
State includes a straight extended segment 34, the width of the straight extended segment 34 between fixed connecting end 30 and the solderless wrapped connection end 32 Less than the expansion width of the enlarged footing 36, the antiseepage film or the permeable membrane 9 include initial segment 90, around covering section 92 and outer Section 94 is connect, the upper and lower surface of the straight extended segment 34 is respectively used to and the initial segment 90 and the external section of 94 straight patches It closes, the surface of the enlarged footing 36 is used to fit closely with described around covering section 92.
More preferably, the joint body 1 of rectangle is integrally formed, and the middle part of joint body 1 has certain thickness interval The slip casting slot 2 of the left and right sides is spaced sufficiently apart by layer in turn, also, also guarantees the structural strength of joint body 1.The antiseepage film Or the permeable membrane 9 is all made of high performance PE material, heat seal bond is strong.The water-swellable body 5 is that chance water is gradually swollen The rubber bar or rubber strip of swollen polyurethane material block the water seepage road in interior outside after rubber bar or rubber strip expand completely Diameter achievees the purpose that antiseepage water blockoff.
After with above structure feature, the present invention also provides a kind of underground polyethylene film for earthwork connection construction methods, originally Inventing above-mentioned underground polyethylene film for earthwork connector can also be implemented by the construction method, which includes following step It is rapid:
A. as shown in Figure 1, providing multiple above-mentioned underground polyethylene film for earthwork connectors;
B. the antiseepage film or the permeable membrane 9 are protruded into the note from the two side ends of the single joint body 1 respectively In stock tank 2, then the antiseepage film or the permeable membrane 9 be fixedly connected with the solderless wrapped connection for going deep into the slip casting slot 2 in portion 3 around described End 32;Step b specific practice in construction can be, by the antiseepage film or the permeable membrane 9 by the joint body 1 Side, which disconnects/is open, to be protruded at 4 in the slip casting slot 2, and is gradually extended along the straight extended segment 34, until completely around simultaneously It is coated on the enlarged footing 36;
C. the antiseepage film or the permeable membrane 9 are close to be fixed on each surface for being fixedly connected with portion 3;The step C specific practice in construction can be, the preferably described antiseepage film or the permeable membrane 9 include initial segment 90, around cover section 92 and External section 94, simultaneously by the initial segment 90 and the external section of 94 straight upper and lower surfaces for fitting in the straight extended segment 34 Mutual welding fits closely surface and mutual welding in the enlarged footing 36 around covering section 92 for described;
D. as shown in Fig. 2, by built-in slip casting pipe 6 to slip casting in the slip casting slot 2 up to filling the slip casting slot 2, To form a connector unit being fixedly connected with antiseepage film 9, without taking out built-in slip casting pipe 6 after slip casting;
E. to the water-swellable body 5 sufficiently expansion so that press is in the antiseepage film or the permeable membrane 9;
F. as shown in figure 3, repeating the above steps, until will be multiple by multiple underground polyethylene film for earthwork connectors 1 The antiseepage film or the permeable membrane 9 enclose the underground anti-seepage drain region Z for connecting and then forming large area.
After completing above-mentioned implementation process, following characteristics of the invention should be able to be embodied:
1) structure is simple, convenient for construction.
2) by way of around the home and using water-swellable body to connect stronger, service life between film and connector It is long.
3) good seepage-proof property avoids secondary pollution.
Embodiment in the present invention is only used for that the present invention will be described, and is not construed as limiting the scope of claims limitation, Other substantially equivalent substitutions that those skilled in that art are contemplated that, are within the scope of the invention.

Claims (10)

1. a kind of underground polyethylene film for earthwork connector, which is characterized in that including joint body, the two sides of the joint body are distinguished Slip casting slot is offered, is equipped in each slip casting slot and is fixedly connected with portion, the slip casting slot is with the portion that is fixedly connected by institute The side for stating joint body extends to the middle part of the joint body, and the two side ends of the joint body, which are equipped with, to be open and lead to institute Slip casting slot is stated, in turn, antiseepage film or permeable membrane is protruded by the opening, is fixed around the home by the portion of being fixedly connected described anti- Film or the permeable membrane are seeped, the inner wall of the slip casting slot is equipped with water-swellable body with described be fixedly connected between portion, by described Water-swellable body presses the antiseepage film or the permeable membrane.
2. polyethylene film for earthwork connector in underground according to claim 1, which is characterized in that in the side of the joint body Portion disconnects and then forms the opening, and the portion of being fixedly connected includes fixed connecting end and solderless wrapped connection end, and the fixed connecting end is fixed in institute The side gap of joint body is stated, the solderless wrapped connection end extends to the middle part of the joint body.
3. polyethylene film for earthwork connector in underground according to claim 2, which is characterized in that the solderless wrapped connection end includes described in confession The enlarged footing that antiseepage film or the permeable membrane connect around the home.
4. polyethylene film for earthwork connector in underground according to claim 3, which is characterized in that the enlarged footing is rounded or square Shape or triangle, the antiseepage film or the permeable membrane protruded into the slip casting slot are close to and are fused to the table of the enlarged footing Face.
5. polyethylene film for earthwork connector in underground according to claim 4, which is characterized in that the fixed connecting end and the solderless wrapped connection It include a straight extended segment between end, the width of the straight extended segment is less than the expansion width of the enlarged footing, the antiseepage Film or the permeable membrane include initial segment, around covering section and external section, the upper and lower surface of the straight extended segment be respectively used to The initial segment and the external section of straight fitting, the surface of the enlarged footing are used to fit closely with described around covering section.
6. polyethylene film for earthwork connector in underground according to claim 3, which is characterized in that the enlarged footing and the slip casting Built-in slip casting pipe is equipped between the inner wall of slot, injected hole is distributed in the tube wall of the built-in slip casting pipe.
7. polyethylene film for earthwork connector in underground according to any one of claims 1 to 6, which is characterized in that the water-swellable Body is the rubber bar or rubber strip meeting water and gradually expanding.
8. a kind of underground polyethylene film for earthwork connection construction method, which comprises the following steps:
Multiple polyethylene film for earthwork connectors in underground as described in claim 1 are provided;
Antiseepage film or permeable membrane are protruded into the slip casting slot from the two side ends of the single joint body respectively;
The antiseepage film or the permeable membrane are bypassed into the solderless wrapped connection end that the slip casting slot is goed deep into the portion of being fixedly connected;
The antiseepage film or the permeable membrane are close to be fixed on the surface for being fixedly connected with portion;
In slip casting in the slip casting slot until the slip casting slot is filled;
It is sufficiently expanded to the water-swellable body so that pressing in the antiseepage film or the permeable membrane;
It repeats the above steps, until by multiple underground polyethylene film for earthwork connectors by multiple antiseepage films or the infiltration Permeable membrane encloses connection.
9. polyethylene film for earthwork connection construction method in underground according to claim 8, which is characterized in that the antiseepage around the home The process of film or the permeable membrane the following steps are included:
The portion of being fixedly connected includes fixed connecting end, straight extended segment and solderless wrapped connection end, and the fixed connecting end is fixed in the connector sheet The side gap of body, the solderless wrapped connection end extend to the middle part of the joint body and including an enlarged footing, the straight extensions Section is integrally connected between the fixed connecting end and the solderless wrapped connection end;
The antiseepage film or the permeable membrane are protruded into the slip casting slot by the side gap of the joint body, and along institute Straight extended segment is stated gradually to extend, until completely around and be coated on the enlarged footing.
10. polyethylene film for earthwork connection construction method in underground according to claim 9, which is characterized in that fixed described anti- Seep the process of film or the permeable membrane the following steps are included:
The antiseepage film or the permeable membrane include initial segment, around covering section and external section, by the initial segment and described outer The straight upper and lower surface for fitting in the straight extended segment of section and mutual welding are connect, is fitted closely described in the expansion around covering section The surface of major part and mutual welding.
CN201810830512.9A 2018-07-26 2018-07-26 Underground polyethylene film for earthwork connector and its construction method Pending CN109056840A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810830512.9A CN109056840A (en) 2018-07-26 2018-07-26 Underground polyethylene film for earthwork connector and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810830512.9A CN109056840A (en) 2018-07-26 2018-07-26 Underground polyethylene film for earthwork connector and its construction method

Publications (1)

Publication Number Publication Date
CN109056840A true CN109056840A (en) 2018-12-21

Family

ID=64836461

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810830512.9A Pending CN109056840A (en) 2018-07-26 2018-07-26 Underground polyethylene film for earthwork connector and its construction method

Country Status (1)

Country Link
CN (1) CN109056840A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110284526A (en) * 2019-07-01 2019-09-27 上海远方基础工程有限公司 Underground anti-seepage jointing and underground anti-seepage attachment device
CN110284528A (en) * 2019-07-01 2019-09-27 上海远方基础工程有限公司 Underground anti-seepage film connector and underground anti-seepage film attachment device
CN110284527A (en) * 2019-07-01 2019-09-27 上海远方基础工程有限公司 Underground anti-seepage connector and underground anti-seepage device
CN114753394A (en) * 2022-05-07 2022-07-15 中国水电基础局有限公司 Double-layer HDEP (high-density polyethylene) membrane locking joint connecting device and using method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5584601A (en) * 1994-05-27 1996-12-17 Sud-Chemi Ag Process for production of cut-off walls
JP2008002071A (en) * 2006-06-20 2008-01-10 Shimizu Corp Impervious sheet construction method and impervious sheet construction apparatus
CN102367670A (en) * 2011-09-13 2012-03-07 北京高能时代环境技术股份有限公司 Triangular sealing device for connecting vertical soft barrier system
CN102444145A (en) * 2011-09-13 2012-05-09 北京高能时代环境技术股份有限公司 Porous sealing device for connecting vertical flexible barrier system
CN204570751U (en) * 2014-12-31 2015-08-19 上海远方基础工程有限公司 Underground anti-seepage jointing and underground anti-seepage device
CN204570715U (en) * 2014-12-31 2015-08-19 上海远方基础工程有限公司 Underground anti-seepage jointing
CN208870095U (en) * 2018-07-26 2019-05-17 上海远方基础工程有限公司 Underground polyethylene film for earthwork connector

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5584601A (en) * 1994-05-27 1996-12-17 Sud-Chemi Ag Process for production of cut-off walls
JP2008002071A (en) * 2006-06-20 2008-01-10 Shimizu Corp Impervious sheet construction method and impervious sheet construction apparatus
CN102367670A (en) * 2011-09-13 2012-03-07 北京高能时代环境技术股份有限公司 Triangular sealing device for connecting vertical soft barrier system
CN102444145A (en) * 2011-09-13 2012-05-09 北京高能时代环境技术股份有限公司 Porous sealing device for connecting vertical flexible barrier system
CN204570751U (en) * 2014-12-31 2015-08-19 上海远方基础工程有限公司 Underground anti-seepage jointing and underground anti-seepage device
CN204570715U (en) * 2014-12-31 2015-08-19 上海远方基础工程有限公司 Underground anti-seepage jointing
CN208870095U (en) * 2018-07-26 2019-05-17 上海远方基础工程有限公司 Underground polyethylene film for earthwork connector

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110284526A (en) * 2019-07-01 2019-09-27 上海远方基础工程有限公司 Underground anti-seepage jointing and underground anti-seepage attachment device
CN110284528A (en) * 2019-07-01 2019-09-27 上海远方基础工程有限公司 Underground anti-seepage film connector and underground anti-seepage film attachment device
CN110284527A (en) * 2019-07-01 2019-09-27 上海远方基础工程有限公司 Underground anti-seepage connector and underground anti-seepage device
CN114753394A (en) * 2022-05-07 2022-07-15 中国水电基础局有限公司 Double-layer HDEP (high-density polyethylene) membrane locking joint connecting device and using method

Similar Documents

Publication Publication Date Title
CN109056840A (en) Underground polyethylene film for earthwork connector and its construction method
CN108867710A (en) Underground anti-seepage film grafting connector and its construction method
CN109056838A (en) Underground anti-seepage film plugs connector and its construction method
CN204570751U (en) Underground anti-seepage jointing and underground anti-seepage device
CN208870093U (en) Underground anti-seepage film connector
CN209924489U (en) Screw hole plugging structure
CN208870095U (en) Underground polyethylene film for earthwork connector
CN208870094U (en) Underground anti-seepage film grafting connector
CN204662696U (en) Body of wall
CN109024703A (en) Underground anti-seepage film connector and its construction method
CN208870092U (en) Underground anti-seepage film plugs connector
CN204785110U (en) Integral type wall pipe is said and is used waterproof prefab
CN107514207A (en) The window frame and its construction technology used on a kind of fair-faced concrete wall
CN203948812U (en) A kind of tubing connection pipe fitting
CN204570715U (en) Underground anti-seepage jointing
CN101463926A (en) Water-proof method for pipeline crossing full-packaging waterproof layer
CN208805325U (en) A kind of watertight test system at piping lane straight cut
CN205136922U (en) Sealing joint who connects hasp locking of bamboo -shaped prestressing force plastics pipe racks and blast pipe
CN105899029B (en) A kind of encapsulating structure and packaging method of injectable nerve stimulator
CN216713405U (en) Waterstop structure for prevention of seepage of construction joint
KR102081436B1 (en) Waterproof sheet and constructing method thereof
CN205206065U (en) Concrete wall reserves hole structure
CN105042257A (en) Sealing joint used for connecting bamboo-like prestress plastic pipes and provided with clamping groove locking function
CN212358944U (en) Keel splicing type heat-insulation wall surface structure
CN211037919U (en) Reinforced concrete structure reserves bolt hole block structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication