CN109056504A - A kind of bridge precast beam low hydration heat is prefabricated to use internal lining pipe and its method for prefabricating - Google Patents
A kind of bridge precast beam low hydration heat is prefabricated to use internal lining pipe and its method for prefabricating Download PDFInfo
- Publication number
- CN109056504A CN109056504A CN201811074836.0A CN201811074836A CN109056504A CN 109056504 A CN109056504 A CN 109056504A CN 201811074836 A CN201811074836 A CN 201811074836A CN 109056504 A CN109056504 A CN 109056504A
- Authority
- CN
- China
- Prior art keywords
- prefabricated
- internal lining
- lining pipe
- inner sleeve
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B11/00—Apparatus or processes for treating or working the shaped or preshaped articles
- B28B11/24—Apparatus or processes for treating or working the shaped or preshaped articles for curing, setting or hardening
- B28B11/245—Curing concrete articles
- B28B11/246—Underwater curing
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B23/00—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- Manufacturing & Machinery (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
A kind of bridge precast beam low hydration heat of the present invention is prefabricated to disclose one kind by that will pour scope control in a certain range with internal lining pipe and its method for prefabricating, the heat of hydration is balanced, and by repeatedly pouring, weakens the prefabricated of the thermogenetic stress of whole aquation and use internal lining pipe and its method for prefabricating.It will not leave behind hole, integral strength is unaffected.It is characterized in that being provided with multiple spiral laminations on the outside of the outer tube, and the spiral lamination of same row is one group, inner sleeve is placed in outer tube, the inner sleeve and outer tube are homocentric, the inner sleeve pipe diameter is the half of housing pipe diameter, prefabricated chamber is equipped between the inner sleeve pipe outer wall and outer sleeve inner wall, four demarcation plates are angularly placed in prefabricated intracavitary, and prefabricated chamber is divided into equal-sized four parts, the demarcation plate side is connected with inner sleeve pipe outer wall, the other side is connected with outer sleeve inner wall, and the separation plate surface is equipped with link slot.
Description
Technical field
A kind of bridge precast beam low hydration heat of the present invention is prefabricated to use internal lining pipe and its method for prefabricating, is related to a kind of bridge bearing
Internal lining pipe and its method for prefabricating when framework is prefabricated, belong to road and bridge construction field.In particular to a kind of by the way that range will be poured
Control in a certain range, enables the heat of hydration to be balanced, and by repeatedly pouring, and weakens that whole aquation is thermogenetic to answer
The prefabricated of power uses internal lining pipe and its method for prefabricating.
Background technique
Currently, in order to shorten the period, a large amount of load-bearing framework is all that synchronous progress is prefabricated, so during bridge construction
After transport to scene and be combined, shorten the construction period, especially in short Super Engineering of some span large-engineering periods, by
It is huge in structure size, it needs to combine by exterior sheathing and reinforcing bar when carrying out prefabricated, then once be poured using concrete
Completion is built, but since concrete generates big calorimetric when carrying out hydrated, position biggish for dimensional thickness, inside and outside temperature difference
Increase, is easy cracking, it is therefore desirable to constantly cool down, so that the heat of hydration is quickly spread, but since medium position is difficult to
It reaches, therefore there are risks, it is existing to be implanted into steel pipe in concrete, fluid is injected into steel pipe, and hot friendship is carried out by fluid
Change so that middle portion temperature declines, but the hole that steel pipe is reserved at middle part so that integral strength declines, and steel pipe and concrete it
Between combination, heat transfer it is poor, and section is smaller, the thermal Finite that can take away poor to the support of concrete, cannot be gradually
Break up heat of hydration bring stress.
Publication number CN204983667U discloses a kind of built-in type circulating cooling for reducing the mass concrete heat of hydration
Pipe, it is characterised in that: the built-in type circulating cooling pipe includes the cooling water pipe being placed in concrete and is placed in outside concrete
First connection water pipe, the second connection water pipe, the cooling water pipe are by a plurality of lateral cooling water pipe and a plurality of longitudinal cooling water pipe
Composition, a plurality of transverse direction cooling water pipe is distributed parallelly in concrete, and the section of every lateral cooling water pipe is matrix pattern, a plurality of
Longitudinal cooling water pipe is distributed between adjacent two lateral cooling water pipelines, and two adjacent transverse cooling water pipes are connected;
The water outlet that the water inlet port of cooling water pipe connect water pipe with first connects, and cooling water pipeline water outlet port connect water pipe with second
Metal end connection, second connection water pipe water outlet with first connect water pipe water inlet pipe pass through water circulating pump connection, the party
Method is taken away the heat of hydration by water body flow, but since size is big, the thermal Finite that tube body can be taken away, the alleviation to the heat of hydration
Effect is general, and at the construction field (site), and the installation sealing and flow control of tube body are more complex.
Summary of the invention
In order to improve above situation, a kind of bridge precast beam low hydration heat of the present invention is prefabricated to use internal lining pipe and its method for prefabricating
Scope control will be poured in a certain range by providing a kind of pass through, and the heat of hydration is balanced, and by repeatedly pouring,
It weakens the prefabricated of the whole thermogenetic stress of aquation and uses internal lining pipe and its method for prefabricating.It will not leave behind hole, integral strength is not
It is impacted.
A kind of bridge precast beam low hydration heat of the present invention is prefabricated to be achieved in that a kind of bridge of the present invention is pre- with internal lining pipe
Beam low hydration heat processed is prefabricated to be made of with internal lining pipe outer tube, engaging lug, reinforcing bar, inner sleeve, demarcation plate and spiral lamination, described outer
Outside of sleeve is provided with multiple spiral laminations, and the spiral lamination of same row is one group, and inner sleeve is placed in outer tube, the inner sleeve and
Outer tube is homocentric, and the inner sleeve pipe diameter is the half of housing pipe diameter, sets between the inner sleeve pipe outer wall and outer sleeve inner wall
There is a prefabricated chamber, four demarcation plates are angularly placed in prefabricated intracavitary, and prefabricated chamber are divided into equal-sized four parts, the separation
Plate side is connected with inner sleeve pipe outer wall, and the other side is connected with outer sleeve inner wall, and the separation plate surface is equipped with link slot, institute
Stating link slot is arc groove, and multiple engaging lugs are angularly placed on outer tube lateral wall, the engaging lug and outer tube one at
Type.
The invention further relates to a kind of prefabricated method for prefabricating with internal lining pipe of bridge precast beam low hydration heat, including following step
It is rapid:
(1) it is fixed one by one by multiple engaging lugs on the external sleeve outer wall of reinforcing bar first, and then internal lining pipe is fixed, so
Prefab-form is erected on the outside of internal lining pipe afterwards;
(2) secondly filled the water into internal lining pipe, when prefabricated chamber and inner sleeve in fill water;
(3) then to injecting concrete between template and internal lining pipe;
(4) two opposite in one's duty water of prefabricated chamber are extracted out, then inwardly injects concrete;
(5) water in inner sleeve is extracted out, inwardly injects concrete;
(6) finally the in one's duty water of prefabricated chamber remaining two is gradually extracted out, and is implanted sequentially concrete.
Beneficial effect.
One, the heat of hydration can be made to keep balance, improve cooling effect.
Two, the thermogenetic stress of whole aquation can be weakened.
Three, it will not leave behind hole, integral strength is unaffected.
Detailed description of the invention
Fig. 1 is a kind of prefabricated structural schematic diagram with internal lining pipe of bridge precast beam low hydration heat of the present invention.
Fig. 2 is a kind of prefabricated three-dimensional structure diagram with internal lining pipe of bridge precast beam low hydration heat of the present invention.
In attached drawing
Wherein part are as follows: prefab-form (1), outer tube (2), concrete (3), engaging lug (4), reinforcing bar (5), inner sleeve (6), point
Partition (7), spiral lamination (8).
Specific embodiment:
A kind of bridge precast beam low hydration heat of the present invention is prefabricated to be achieved in that a kind of bridge precast beam of the present invention with internal lining pipe
Low hydration heat is prefabricated to use internal lining pipe by outer tube (2), engaging lug (4), reinforcing bar (5), inner sleeve (6), demarcation plate (7) and spiral lamination
(8) it forms, is provided with multiple spiral laminations (8) on the outside of the outer tube (2), and the spiral lamination (8) of same row is one group, inner sleeve
(6) it is placed in outer tube (2), the inner sleeve (6) and outer tube (2) are homocentric, and inner sleeve (6) diameter is outer tube (2)
The half of diameter is equipped with prefabricated chamber between inner sleeve (6) outer wall and outer tube (2) inner wall, four demarcation plates (7) are angularly
It is placed in prefabricated intracavitary, and prefabricated chamber is divided into equal-sized four parts, demarcation plate (7) side and inner sleeve (6) outer wall
It is connected, the other side is connected with outer tube (2) inner wall, and demarcation plate (7) surface is equipped with link slot, and the link slot is arc
Shape slot, multiple engaging lugs (4) are angularly placed on outer tube (2) lateral wall, the engaging lug (4) and outer tube (2) one at
Type.
The invention further relates to a kind of prefabricated method for prefabricating with internal lining pipe of bridge precast beam low hydration heat, including following step
It is rapid:
(1) multiple engaging lugs (4) on outer tube (2) outer wall are fixed one by one by reinforcing bar (5) first, so to internal lining pipe into
Row is fixed, and then prefab-form (1) is erected on the outside of internal lining pipe;
(2) secondly filled the water into internal lining pipe, when prefabricated chamber and inner sleeve (6) in fill water;
(3) concrete (3) then are injected between template and internal lining pipe;
(4) two opposite in one's duty water of prefabricated chamber are extracted out, then inwardly injection concrete (3);
(5) water in inner sleeve (6) is extracted out, inwardly injects concrete (3);
(6) finally the in one's duty water of prefabricated chamber remaining two is gradually extracted out, and is implanted sequentially concrete (3).
It is provided with multiple spiral laminations (8) on the outside of the outer tube (2), and the design that the spiral lamination (8) of same row is one group, energy
It is enough to enter concrete (3) in spiral lamination (8) when concrete (3) pours, and then increase outer tube (2) and concrete (3)
Bonding strength;
Four demarcation plates (7) are angularly placed in prefabricated intracavitary, and prefabricated chamber are divided into equal-sized four parts of design, can
To it is prefabricated it is intracavitary repeatedly poured, and then weaken the whole thermogenetic stress of aquation;
Demarcation plate (7) surface is equipped with link slot, and the link slot is the design of arc groove, can increase demarcation plate (7) and
The bonded area of concrete (3) improves bonding strength
The engaging lug (4) and outer tube (2) integrally formed design can be improved the prefabricated preceding fixing-stable to internal lining pipe
Property;
When pouring, the design to being poured between prefab-form (1) and internal lining pipe in advance can be in advance to internal lining pipe and prefabricated molds
Plate (1) carries out pouring connection, pour by several times to internal lining pipe inside convenient for postorder;
When to being poured in internal lining pipe, prefabricated chamber is poured in two times, and inner sleeve (6) among prefabricated chamber two-step pouring into
The design that pours of row can cool down to intermediate heat, so that after middle portion temperature decline, then complete whole to pour work
Make;
The present invention will not leave hole after the completion of pouring, and then integral strength is unaffected, and by repeatedly pouring, weaken
The whole thermogenetic stress of aquation;
Scope control will be poured in a certain range by reaching, and the heat of hydration is balanced, and by repeatedly pouring, be weakened whole
The purpose of the thermogenetic stress of the aquation of body.
Claims (7)
1. a kind of bridge precast beam low hydration heat is prefabricated to use internal lining pipe, it is characterized in that: by outer tube, engaging lug, reinforcing bar, inner sleeve
Pipe, demarcation plate and spiral lamination composition, the outer tube outside is provided with multiple spiral laminations, and the spiral lamination of same row is one group, interior
Casing is placed in outer tube, and prefabricated chamber is equipped between the inner sleeve pipe outer wall and outer sleeve inner wall, and four demarcation plates are angularly set
In prefabricated intracavitary, and prefabricated chamber is divided into equal-sized four parts, the demarcation plate side is connected with inner sleeve pipe outer wall, separately
Side is connected with outer sleeve inner wall, and multiple engaging lugs are angularly placed on outer tube lateral wall, the engaging lug and outer tube
It is integrally formed.
2. a kind of bridge precast beam low hydration heat according to claim 1 is prefabricated to use internal lining pipe, it is characterised in that in described
Casing and outer tube are homocentric, and the inner sleeve pipe diameter is the half of housing pipe diameter.
3. a kind of bridge precast beam low hydration heat according to claim 1 is prefabricated to use internal lining pipe, it is characterised in that described point
Baffle surface is equipped with link slot.
4. a kind of bridge precast beam low hydration heat according to claim 1 is prefabricated to use internal lining pipe, it is characterised in that the company
Access slot is arc groove.
5. a kind of prefabricated method for prefabricating with internal lining pipe of bridge precast beam low hydration heat, it is characterised in that the following steps are included:
(1) it is fixed one by one by multiple engaging lugs on the external sleeve outer wall of reinforcing bar first, and then internal lining pipe is fixed, so
Prefab-form is erected on the outside of internal lining pipe afterwards;
(2) secondly filled the water into internal lining pipe, when prefabricated chamber and inner sleeve in fill water;
(3) then to injecting concrete between template and internal lining pipe;
(4) two opposite in one's duty water of prefabricated chamber are extracted out, then inwardly injects concrete;
(5) water in inner sleeve is extracted out, inwardly injects concrete;
(6) finally the in one's duty water of prefabricated chamber remaining two is gradually extracted out, and is implanted sequentially concrete.
6. the prefabricated method for prefabricating with internal lining pipe of a kind of bridge precast beam low hydration heat according to claim 5, feature
It when being to pour, pours, internal lining pipe and prefab-form can be poured in advance between prefab-form and internal lining pipe in advance
Connection is built, internal lining pipe inside pour by several times convenient for postorder.
7. the prefabricated method for prefabricating with internal lining pipe of a kind of bridge precast beam low hydration heat according to claim 5, feature
When being to be poured in the internal lining pipe, prefabricated chamber is poured in two times, and inner sleeve among prefabricated chamber two-step pouring into
The design that pours of row can cool down to intermediate heat, so that after middle portion temperature decline, then complete whole to pour work
Make.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811074836.0A CN109056504B (en) | 2018-09-14 | 2018-09-14 | Lining pipe for low-hydration-heat prefabrication of bridge precast beam and prefabricating method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811074836.0A CN109056504B (en) | 2018-09-14 | 2018-09-14 | Lining pipe for low-hydration-heat prefabrication of bridge precast beam and prefabricating method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109056504A true CN109056504A (en) | 2018-12-21 |
CN109056504B CN109056504B (en) | 2020-12-25 |
Family
ID=64762612
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811074836.0A Active CN109056504B (en) | 2018-09-14 | 2018-09-14 | Lining pipe for low-hydration-heat prefabrication of bridge precast beam and prefabricating method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109056504B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111535157A (en) * | 2020-05-11 | 2020-08-14 | 中国建筑第七工程局有限公司 | High pier capable of reducing hydration heat of mass concrete and construction method thereof |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102010031285A1 (en) * | 2010-07-13 | 2012-01-19 | H.S.W. Ingenieurbüro GmbH | Thermo-active earth-contacted concrete component for heating- and cooling extraction or heat- and cooling storage, has concrete body, heat transducer pipes and drain mass provided between concrete body and heat transducer pipes |
CN102758534A (en) * | 2012-07-30 | 2012-10-31 | 中建商品混凝土有限公司 | Method for cooling mass concrete |
CN205296162U (en) * | 2015-12-29 | 2016-06-08 | 中国电建集团中南勘测设计研究院有限公司 | Condenser tube and applied this condenser tube's layering roller compacted concrete structure |
CN206279530U (en) * | 2016-12-20 | 2017-06-27 | 中国电建集团贵阳勘测设计研究院有限公司 | A kind of cooling water pipe optimization device of concrete cooling |
CN206801032U (en) * | 2017-02-23 | 2017-12-26 | 华西能源工程有限公司 | A kind of mass concrete cracking-proof system |
CN107558504A (en) * | 2017-08-16 | 2018-01-09 | 中交四航工程研究院有限公司 | A kind of construction method for controlling concrete component cracking |
-
2018
- 2018-09-14 CN CN201811074836.0A patent/CN109056504B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102010031285A1 (en) * | 2010-07-13 | 2012-01-19 | H.S.W. Ingenieurbüro GmbH | Thermo-active earth-contacted concrete component for heating- and cooling extraction or heat- and cooling storage, has concrete body, heat transducer pipes and drain mass provided between concrete body and heat transducer pipes |
CN102758534A (en) * | 2012-07-30 | 2012-10-31 | 中建商品混凝土有限公司 | Method for cooling mass concrete |
CN205296162U (en) * | 2015-12-29 | 2016-06-08 | 中国电建集团中南勘测设计研究院有限公司 | Condenser tube and applied this condenser tube's layering roller compacted concrete structure |
CN206279530U (en) * | 2016-12-20 | 2017-06-27 | 中国电建集团贵阳勘测设计研究院有限公司 | A kind of cooling water pipe optimization device of concrete cooling |
CN206801032U (en) * | 2017-02-23 | 2017-12-26 | 华西能源工程有限公司 | A kind of mass concrete cracking-proof system |
CN107558504A (en) * | 2017-08-16 | 2018-01-09 | 中交四航工程研究院有限公司 | A kind of construction method for controlling concrete component cracking |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111535157A (en) * | 2020-05-11 | 2020-08-14 | 中国建筑第七工程局有限公司 | High pier capable of reducing hydration heat of mass concrete and construction method thereof |
CN111535157B (en) * | 2020-05-11 | 2021-06-01 | 中国建筑第七工程局有限公司 | High pier capable of reducing hydration heat of mass concrete and construction method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN109056504B (en) | 2020-12-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203256730U (en) | Prefabricated energy pile device for embedding heat transmission pipe | |
US10655892B2 (en) | Heat transfer pipe embedded in a prefabricated pipe pile and embedding method | |
CN105544608A (en) | Pipe-joint steel shell and concrete combined structure for immersed tunnel and manufacturing method thereof | |
CN103649666A (en) | Thermal energy storage and plant, method and use thereof | |
CN103485332B (en) | A kind of construction method of precast energy pile | |
CN107626891A (en) | A kind of preparation method of diesel engine water oil-piping casting mold and water oil-piping | |
CN111042112A (en) | Novel pipe distribution type drilling and pouring energy pile and construction method thereof | |
CN109056504A (en) | A kind of bridge precast beam low hydration heat is prefabricated to use internal lining pipe and its method for prefabricating | |
CN104295004A (en) | UHPC-CFST combination column structure and construction method thereof | |
CN103498470B (en) | A kind of hexagon precast energy pile and preparation method thereof | |
CN112878507A (en) | Reinforced full grouting sleeve and casting molding method thereof | |
CN203347203U (en) | Multi-functional super-thick bulked concrete steel tube support system | |
CN109853775B (en) | Modularized wall enclosure structure | |
CN109724277B (en) | Geothermal well heat exchange device | |
CN103438738A (en) | Communicating pipe pressure-bearing water-storage type heat exchanger and manufacture process thereof | |
CN104453236B (en) | Circulating water natural cooling system for controlling large-volume concrete cracks and construction method | |
CN208518216U (en) | A kind of grout sleeve | |
CN106351235A (en) | Assembled type four-combined-round-steel-pipe concrete inner support structure and manufacturing method | |
CN113191043B (en) | Hydraulic tunnel lining concrete temperature crack control strong constraint method and temperature control system | |
CN206052758U (en) | The attachment structure of a small-sized clump of piles and cushion cap | |
CN205224781U (en) | Cooling tower pond structure of in cold areas prestressing without bondn structure | |
CN107740543A (en) | A kind of connection of double and muscle full grout sleeve and double and muscle connection method | |
CN110080466A (en) | Grouting sleeve and preparation method and application thereof | |
CN103557726A (en) | Heating multi-pipe heat-conducting shell-tube-type water storage heat exchanger and manufacturing process thereof | |
CN204849831U (en) | Novel well bore preformed block |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 221000 1-501, loftc building, West Greenland Business City, Hanyuan Avenue, Yunlong District, Xuzhou City, Jiangsu Province Applicant after: XUZHOU XINNANHU TECHNOLOGY Co.,Ltd. Address before: Block F, Tongchuang new block, science and Technology Park, China University of mining and technology, 221000 Jiefang South Road, Quanshan District, Xuzhou City, Jiangsu Province Applicant before: XUZHOU XINNANHU TECHNOLOGY Co.,Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant |